Part Ii - Project Report Format For All Engieering Disciplines..
Part Ii - Project Report Format For All Engieering Disciplines..
Part Ii - Project Report Format For All Engieering Disciplines..
ENINEERING DIDCIPLINE:
SUBMITTED TO
THE ENGINEERS BOARD OF KENYA
BY
NAME
EBK No:
Date: ………………….………………….…….……………………………………………......
Email Address:…….………………….…….……………………………………………..........
CERTIFICATION
I certify that this training and experience report was prepared by……… and it is a true and accurate
record of the training and experience that he/she has gained in the course of his/her duties under my
supervision.
Signature: …………….………………………...……………………….…………….... Supervisor’s
Name: ……………………………….……………………….……………………
Date: …………………….……………………….……………………………………………....
pg. ii
TABLE OF CONTENT
DECLARATION...............................................................................................................ii
CERTIFICATION.............................................................................................................ii
LIST OF ABBREVIATIONS AND ACRONYMS.........................................................iv
LIST OF TABLES.............................................................................................................v
LIST OF FIGURES..........................................................................................................vi
1.0 NTRODUCTION.........................................................................................................1
2.0 PROBLEM STATEMENT/ PROJECT DESCRIPTION...........................................1
3.0 OBJECTIVES.............................................................................................................1
4.0 CURRENT SITUATION ANALYSIS.......................................................................1
4.1 POSSIBLE SOLUTIONS...........................................................................................1
4.2 ANALYSIS OF PROPOSED SOLUTIONS..............................................................1
5.0 PREFERRED OPTION...............................................................................................1
6.0 DESIGN OF THE PREFERRED SOLUTION......................................................2
7.0 . COST BENEFIT ANALYSIS..............................................................................2
8.0 CONCLUSION.......................................................................................................3
REFERENCES.......................................................................................................................3
9.0 APPENDICES........................................................................................................4
pg. iii
LIST OF ABBREVIATIONS AND ACRONYMS
pg. iv
LIST OF TABLES
pg. v
LIST OF FIGURES
pg. vi
1.0 NTRODUCTION
You will be required to introduced the project specifically the location of the project, the
client and the purpose. You should also indicate how you came to be involved in the Project.
This should be a brief summary and should not cover areas which will be covered in the
process of carrying out your design.
3.0 OBJECTIVES
Candidates are expected to give the objectives that they intend to achieve after the project is
completed
pg. 1
6.0 DESIGN OF THE PREFERRED SOLUTION
The candidates are expected to follow a sequential step-wise approach to the design.
pg. 2
8.0 CONCLUSION
The candidates should conclude their reports by stating whether or not their objectives were
met
9.0 REFERENCES
If there are any references that the candidates made in the compilation of their reports these
should be listed here.
Include design Manuals, standards and codes referred to in the project report as applicable
pg. 3
10.0APPENDICES
APPENDIX : CALCULATIONS
APPENDIX B: SAMPLE DRAWINGS
Engineers communicate through drawings. Candidates should, therefore submit legible
drawings which can be easily read. They should also be numbered for ease of reference.
They should indicate the names of the designer and the person approving them together with
the other people who either drew or checked. The people listed should append their
signatures against their names and also indicate the date when they performed such
functions
(Drawings must be signed by both the applicant and the supervisor)
APPENDIX C: QUANTITY TAKE OFF SHEETS
APPENDIX D: BILL OF QUANTITIES
Candidates are expected to determine the overall cost of the project by preparing a Bill of
Quantities
If you have any other information which support the main report especially when the
candidate is analysing possible solutions, standards etc which are relevant to your project,
these should be in the Appendices
pg. 4