CNT230045-6 C3 HRSG Blow Down Vessel - Report

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Lab Code No.

: Page 1 of 3
Report No. :

Worksheet for Manual Ultrasonic Examination (Thickness Gauging)

Information Supplied by Client


Client : CLP Power Hong Kong Ltd.
Client Address Shown : GED Office, Black Point Power Station, Yung Long Road,
Lung Kwu Tan, Tuen Mun, N.T., Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C2 Plant: HRSG
Sample description : Blow Down Vessel
Test method used : WI-30-04-974 Rev.B
Acceptance standard : Not Applicable
Material Specification : Steel
Stage of material supplied : In-Services
Surface Condition : As Dressed
New Engineering Contract No. :
W.O. No. :

Laboratory Information
Inspection Procedure : WI-30-04-974 Rev.B
Date tested : 16-10-2021
Surface condition : As Dressed
Test Surface Temperature : 25°C
Couplant : UCA2 Test Restriction : None

Equipment - Flaw detector : SIUI / CTS-9005 / Code No. N-001-31


- Probes used : SIUI Probes Welding Gauge : Not Applicable

Probe type GBTC10-5 -- -- -- --


Probe crystal size 10mm -- -- -- --
Probe angle 0° -- -- -- --
Probe frequency 5MHZ -- -- -- --
Time Base Range 0-50mm -- -- -- --
- Calibration block : BS2704:1978 : A2 & A4 Block / Code No.N-003-36 & 48
- Sensitivity block : Not Applicable

Scanning sensitivity level : - Parent metal-compression probe: First back-wall echo 80% full screen height
at sound parent metal.

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.
4. This report is a supplement to our previous test report No.131053CNT160042
NT-R-82 (25/10/2008) P.1
Lab Code No. : 0 Page 2 of 3
Report No. : 0

Worksheet for Manual Ultrasonic Examination (Thickness Gauging)


Test Results

Description of Test Item : C2 HRSG - Blow Down Vessel


Location Tested
Item Tested P1 P2 P3 P4 P5 P6 P7 P8
Blow Down Vessel 20.4 20.5 19.8 20.1 20.0 19.8 19.5 20.2
-End-

Note:All Dimension are measured in millimetre.

Tested by : K.T.Wong Qualification : ASNT-SNT-TC-1A-Level II Date : 16-10-2021

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-UT-Level 3
NT-R-82 (25/10/2008) P.2
Lab. Code No. : 0 Page 3 of 3
Report No. : 0

Worksheet for Manual Ultrasonic Examination (Thickness Gauging)

C2 HRSG - Blow Down Vessel

L.P. Steam Header


H.P. Steam Header

Support Plate
P3(C1 Side) & P7(C4 Side3)

L.P. Water Header


H.P. Water Header

P5
P1
P6
P2

P4(C1 Side) & P8 (C4 Side) Circ. Pump

Test location for Blow Down Vessel - P1 to P8

Remark: This sketch is not in scale.


Tested Area
NT-R-82 (25/10/2008) P.3