Gac 12 VX RMH Lah 008 - Rev 1 - Ipbd & GCB
Gac 12 VX RMH Lah 008 - Rev 1 - Ipbd & GCB
Gac 12 VX RMH Lah 008 - Rev 1 - Ipbd & GCB
AŞ
POWER SYSTEMS E.P.C. GROUP
GARDABANI TPP
GEORGIA
GARDABANI C.C.P.P
230 MW
Revision History
DOCUMENT TITLE/SUBJECT:
No. of
GAC 12 VX RMH LAH 008 04
Sheet
Rev.
1
No:
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 2 OF 3
FOR IPBD & GCB Revision :1
TABLE OF CONTENTS
1.0 Objective : 03
2.0 Methodology : 03
4.0 Attachments : 03
This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 3 OF 3
FOR IPBD & GCB Revision :1
1.0 Objective:
Objective of this document is to have a written down procedure for the commissioning
related activities of Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker.
2.0 Methodology
IPBD & GCB have been commissioned in compliance with checks and tests
mentioned in the attachments
4.0 Attachments:
Following attachments, attached with this document, may be referred for conducting the
pre-commissioning and commissioning activities for IPBD &GCB:
This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others