ÇALIK ENERJİ SAN.TİC.


POWER SYSTEMS E.P.C. GROUP

GARDABANI TPP
GEORGIA

GARDABANI C.C.P.P
230 MW

Revision History

1 30.01.201 FOR COMMISSIONING LDI SKN SSV


0 08.01.201 FOR COMMISSIONING LDI SKN SSV
B 23.12.201 FOR APPROVAL LDI SKN SSV
A 03.12.201 FOR APPROVAL VBA SKN SSV
4
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

DOCUMENT TITLE/SUBJECT:

TESTING AND COMMISSIONING PROCEDURE:- IPBD &GCB

PROJECT DOCUMENT NO:


Size A-4
Detailed Information

Proje Syste Serial


Type
Doc.
Disc

Unit Orig. Lang. Eng.


ct m No

No. of
GAC 12 VX RMH LAH 008 04
Sheet

Rev.
1
No:
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 2 OF 3
FOR IPBD & GCB Revision :1

TABLE OF CONTENTS

1.0 Objective : 03

2.0 Methodology : 03

3.0 Acceptance Criteria : 03

4.0 Attachments : 03

This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 3 OF 3
FOR IPBD & GCB Revision :1

1.0 Objective:

Objective of this document is to have a written down procedure for the commissioning
related activities of Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker.

2.0 Methodology

Broadly the methodology of the commissioning is as below:


 Checking the completeness of the erection of the equipment and accessories.
 Conducting the pre-commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
 Conducting the commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
 Ensuring upstream & downstream equipments are already commissioned or ready
for commissioning

3.0 Acceptance Criteria

 IPBD & GCB have been commissioned in compliance with checks and tests
mentioned in the attachments

4.0 Attachments:

Following attachments, attached with this document, may be referred for conducting the
pre-commissioning and commissioning activities for IPBD &GCB:

Attachment 1: Pre-commissioning Checks: IPBD & GCB

Attachment 2: Pre Commissioning Test: Insulation Resistance Measurement

Attachment 3: Pre Commissioning Test: High Voltage Test

Attachment 4: Pre Commissioning Test: Contact Resistance Test

Attachment 5: Pre-commissioning Test: Voltage Transformer Test

Attachment 6: Pre-commissioning Test: Current Transformer Test

Attachment 7: Commissioning Checks: IPBD & GCB


---XXX---