SOP For Gas Turbine Startup
SOP For Gas Turbine Startup
SOP For Gas Turbine Startup
: GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
Mallavaram
RB Singh
Vice President
Ramakrishna Maintenance
Asst.Manager -Inst
N. Bose Babu
( Shiftincharge )
0 20.01.2015 Asset in Charge, Kakinada
Vimal Gupta
Asst.Manager- Inst.Maint Nitin Bartakke
1
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
INDEX
INDEX
Index 2
1 Purpose / Scope 3
2 HSE Considerations / Requirements 3
3 Abbreviations & Definition 3
4 Key Responsibility 4
5 Procedure 5
6 References 19
7 Records 19
2
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
1. Purpose / Scope :
A Standard Operating Procedure (SOP) is a written set of guidelines to perform the Operation activity of
Equipment or System in effective manner to ensure safety and reliability of equipment or system.
This document is to gives precise information about the Operating procedure to be followed for Operation
of the Gas Turbines of OGT in an effective and safe manner and to meet the optimum standards of
operational reliability and continuity.
2. HSE Considerations:
3
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
4. Key Responsibility :
4
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
Startup Checks:
The following check sheets are to be duly filled after thorough checks before startup by the shift team
and signed by respective Shift In-charge and maintenance in charge for ensuring the equipment
availability for safe and effective operation of the plant.
c) Startup Sequence
Please tick( √ ) on the status and ensure the selection mode of feeders in “Auto” position.
6
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
7
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
During initial startup with Black start cooling system, Black start cooling
water line up valves in open.
Lube Oil Cooler Cooling water inlet valve is Open
Lube Oil Cooler Cooling water Outlet valve is Open
Diesel Engine Cooling Water inlet valve is open
Diesel Engine Cooling Water outlet valve is open
Generator Cooling Water inlet valve is open
Generator Cooling Water outlet valve is open
Flame Detector Cooling Water inlet valve is open
Flame Detector Cooling Water outlet valve is open
Check for water leaks in accessory compartment (L.O Cooler & Starting DE),
Turbine Compartment ( Flame scanner ), Generator Air Cooling Area.
During Ratcheting :
8
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
9
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
10
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
11
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
Turbine Compartment
Activity Status Remarks
Ensure Flame Detector Isolation Valves are in Open Condition
Ensure Compressor Discharge extraction (17 th Stage) air line isolation valve
for Bleed Valve actuation is in open condition.
Ensure Compressor Air extraction (11th Stage) air line isolation valve for
Bearing Sealing is in open condition.
12
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
b) Startup Permissives. :
“READY TO START” status in GT Mark Vie will be available only when all the following start
checks are satisfied.
Note: Signals in the proper start to permit a start are shown in GREEN.
A GREEN signal is required to start the unit.
Signals which are RED inhibits start request.
13
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
G. Multiple Starts Permissive – L2FZ Timer is set at 15 secs for start command.
I. Lube Oil Tank Temp Normal-L26QN L.O tank temperature should be more than
10 °C.
Start Checks-1
Mode selection in Main Screen should not
a. Control Mode OFF-L43O be in OFF mode (It should be either
CRANK/FIRE/AUTO).
14
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
c) GT Startup Sequence. :
16
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
17
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
1. Once the GT breaker is closed on dead bus and GT power is restored, C losure of
incomers of PMCC should be done after synchronizing with Black start DG.
2. On restoration of normal power supply to GT MCC the remaining drives being fed
from GTMCC will be connected and started.
3. The restoration of cooling water system is envisaged manually.After normalization
of cooling water system by process and after getting required pressure (5 Kg/cm2),
Main cooling water valves to be opened. And after ensuring the normalcy of the
system, Emergency cooling water system ( Black start cooling system ) can be shut
down by locally or through DCS and manually closing the black start line up valves.
iii. Control Room Engineer to note down & monitor all following parameters during startup and
normal operation of gas turbine.
Turbine operating data
Gas fuel system
Exhaust temperatures.
Bearing metal and lube oil drain temperatures.
Wheel space temperatures.
Turbine compartment temperatures.
Vibrations ( Siesmic )
Vibrations ( Shaft )
Flame intensity.
Lube and hydraulic oil pressure
Auxillary and electrical system in service.
Water injection system.
Generator data and winding temperatures.
iv. Field Engineer to check for oil leakages, abnormal sound, flue gas leakages during startup.
v. Field Engineer to check for gas leakages using Portable LEL meter in accessory & Turbine
compartment during startup.
vi. Field Engineer to note down & monitor all following parameters during normal operation of gas
turbine.
Fuel gas conditioning skid pressure and temperature.
Cooling water system parameters.
Diesel tank and Lube oil tank levels.
18
Doc. No. : GSPC-OGT-CPP-SOP-001
Gujarat State Petroleum Corporation Rev. No. : 00
Limited Issued : 20.01.2015
SOP for Gas Turbine Startup
6. References :
7. 7. Records :
19