01 Main Load Dispatch Center HVAC Layout Plan Drawing For KOTEBE

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

A A

NOTES:
B
1. THIS DRAWING IS A FINAL WORKING DRAWING . IT CAN BE USED FOR B
INSTALLATION PURPOSES.

2. DIMENSIONS SHOWN ARE ACTUAL. THEY CAN BE USED FOR EXECUTION OF WORK.
3. DISCREPANCIES IN THE DRAWINGS SHALL BE BROUGHT TO THE NOTICE OF THE
C ENGINEER PRIOR TO EXECUTION OF ANY WORKS. C

4. THE CONTRACTOR SHALL INCLUDE IN THE PRICE FOR ALL WORKS ASSOCIATED WITH
COMPLYING WITH THE REGULATIONS AND REQUIREMENTS PREVAILING AT THE TIME OF
THE TENDER.
5. THE CONTRACTOR SHALL OBTAIN FROM THE UTILITY COMPANIES THE LOCATION OF
D
EXISTING SERVICES AND SHALL TAKE PRECAUTIONS NOT TO DAMAGE SAME DURING D

CONSTRUCTION.
6. ALL SERVICES SHALL BE INSTALLED CONCEALED WITH SUITABLE ACCESS FOR
MAINTENANCE. SERVICES IN EQUIPMENT ROOMS COULD BE EXPOSED, SUBJECT TO
THE APPROVAL OF THE ENGINEER.
E 7. PROVIDE ACCESS PANELS IN DUCTS FOR FIRE DAMPER ACCESS AS PER E

SPECIFICATIONS.
8. FOR THERMOSTATS & TEMPERATURE SENSOR REQUIREMENTS FOR FCU,FAHU.REFER
TO HVAC CONTROL SPECIFICATIONS.
9. FIRE DAMPERS TO BE PROVIDED IN ALL SUPPLY AIR, RETURN AIR, FRESH AIR AND
F EXTRACT AIR DUCTS WHEREVER THE DUCTS CROSS A FIREZONE/FIRE SHUTTER. F

RATING TO MATCH FIRE ZONE BOUNDARY RATING.


10. VOLUME CONTROL DAMPERS TO BE INSTALLED IN ALL BRANCHES TO ENSURE AIR
BALANCING TO ACHIEVE REQUIRED AIR FLOWS.
11. PROVIDE ANCHOR SUPPORTS AT THE ENDS OF PIPE RUNS HAVING FLEXIBLE
G
CONNECTIONS. G

12. DOOR UNDER CUT TO BE PROVIDED FOR ALL TOILET AND JANITOR ROOM ON ALL
FLOORS WITH EXHAUST AIR @ 25mm.
13. PROVIDE FLEXIBLE CONNECTION FOR ALL SERVICES CROSSING AN EXPANSION JOINTS.
14. ALL ROOM PROTECTED BY FM-200 SYSTEM WILL HAVE MOTORIZED FIRE DAMPERS IN SA
/ RA EA DUCTS TERMINATIONS IN TO THESE ROOMS. SEQUENCE OF OPERATION OF
H H
THESE MOTORIZED DAMPERS TO BE AS PER SPECIFICATIONS. RATING SAME AS FIRE
ZONE BOUNDARY RATING.
15. MINIMUM DISTANCES BETWEEN AIR INTAKE AIR DISCHARGE TO BE MAINTAINED AS PER
ASHRAE 62.1 2013
16. ALL GENERAL EXHAUST DUCT SHALL BE TERMINATED WITH ST. ST. WIREMESH AND A
I I
BELL MOUTH OPENING.
17. PROVIDE FIRE DAMPERS FOR ALL DUCT BRANCHES AT ENTRY TO SHAFT OR A FIRE
RATED WALL, WITH ACCESS PANEL AS PER SPECIFICATIONS AND SHOWN ON STANDARD
DETAILS. INSULATED DUCTS TO HAVE DOUBLE SKIN INSULATED ACCESS.
18. PIPE ALL FCU CONDENSATE DRAIN TO NEAREST FLOOR DRAIN. ALL CONDENSATE
J DRAIN LINES ARE TO BE INSULATED AS PER SPECIFIED, WHERE SUBJECT TO J

MECHANICAL ABUSE SHALL BE ALUMINUM CLAD.

K K

EMPLOYER : CONTRACTOR: CONSULTANT :


Consortium of GE's Grid
ETHIOPIAN ELECTRIC POWER Solutions(France) and
ADDIS ABABA, ETHIOPIA Sinohydro Corporation Ltd(China)
HIFAB Oy
PROJECT: Plant, Design, Supply, Installation and CONTRACT NO. EEP/33.20/238/14
Testing&Commissioning of EEP
National Load Dispatch Center Project PROJECT NO.
BY NAME DATE SCALE 1:75 TITLE:

DESIGNED MUHAMMED YAHI 08/21/2023 UNIT m Main Load Dispatch Center HVAC Layout Plan Drawing for KOTEBE
L L
08/21/2023 submission for approval 08/21/2023 HVAC COVER PAGE
V00 CHECKED Wu SD PLOT A1

REV. DATE DESCRIPTION APPROVED DEMEKE ASHENAFI 08/21/2023 SHEET 01/09 DOC. NO. NLDC-BUI-DWG-SH-EEP-CIV-DES-KOTEBE-0059-V00 REV. V00