REHAB GEDUNG RSUD DEPOK-2022

NO ITEM BANGUNAN NILAI RAB PAGU ANGGARAN

1 GEDUNG IPSRS #REF! 200,000,000.00

2 GEDUNG FORENSIK #REF! 200,000,000.00

3 GEDUNG A DAN C #REF! 200,000,000.00

4 RUMAH TANGKI SOLAR #REF! 150,000,000.00

5 LABORATORIUM 235,730,000.00 300,000,000.00

6 RUMAH IPAL & KOMPOSTING #REF! 185,000,000.00


REKAPITULASI
KONSULTANSI PERENCANA KONTRUKSI
Sub Kegiatan Pelayanan dan Penunjang Pelayanan BLUD
RSUD KOTA DEPOK
TAHUN ANGGARAN 2022

R. LABORATORIUM

NO URAIAN PEKERJAAN SUB JUMLAH

I PEKERJAAN PERSIAPAN Rp 5,000,000.00

II KESELAMATAN DAN KESEHATAN KERJA (K3) Rp 3,500,000.00

III PEKERJAAN BONGKARAN Rp 15,893,608.97

IV PEKERJAAN GALIAN TANAH Rp 617,292.00

V PEKERJAAN PONDASI DINDING BATA Rp -

VI PEKERJAAN BETON Rp 16,670,473.12

VII PEKERJAAN DINDING BATA Rp 27,278,840.00

VIII PEKERJAAN DINDING PARTISI (GYPSUM) Rp 39,256,521.38

IX PEKERJAAN KUSEN DAN PINTU ALUMINIUM Rp 40,154,820.00

X PEKERJAAN LANTAI Rp 7,651,728.00

XI PEKERJAAN PLAFON (RANGKA EKSISTING) Rp 861,038.24

XII PEKERJAAN SANITASI Rp 30,792,750.00

XIII PEKERJAAN PENGECATAN Rp 21,038,830.56

XIV PEKERJAAN ELEKTRIKAL Rp 3,654,012.50

TOTAL Rp. 212,369,914.77


JUMLAH PPN 11% Rp. 23,360,690.62
JUMLAH TOTAL Rp. 235,730,605.39
DIBULATKAN Rp. 235,730,000.00
A
RENCANA ANGGARAN BIAYA
KONSULTANSI PERENCANA KONTRUKSI
Sub Kegiatan Pelayanan dan Penunjang Pelayanan BLUD
RSUD KOTA DEPOK
TAHUN ANGGARAN 2022

R. LABORATORIUM

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
1 Administrasi, Dokumentasi dan As-Built Drawing ls 1.00 2,500,000.00 2,500,000.00
2 Penutup/pagar proyek bahan terpal ls 1.00 2,500,000.00 2,500,000.00
JUMLAH PEKERJAAN PERSIAPAN 5,000,000.00
II KESELAMATAN DAN KESEHATAN KERJA (K3)
A ALAT PELINDUNG DIRI
1 Topi Pelindung
2 Pelindung Pernafasan dan mulut (masker)
3 Sarung Tangan
ls 1.00 3,500,000.00 3,500,000.00
4 Sepatu keselamatan
B ASURANSI
1 BPJS Ketenagakerjaan dan Kesehatan Kerja
JUMLAH KESELAMATAN DAN KESEHATAN KERJA (K3) 3,500,000.00
III PEKERJAAN BONGKARAN
1 Pek. Bongkaran plafond eksisting (bagian plafon yang rusak) m2 5.95 4,700.00 27,981.92
2 Pek. Bongkaran dinding 1/2 bata sisi utara m2 17.92 10,800.00 193,536.00
3 Pek. Bongkaran beton bertulang kolom praktis m3 0.07 1,961,800.00 141,249.60
4 Pek. Bongkaran keramik untuk jalur pipa air m2 8.70 8,800.00 76,560.00
5 Pek. Bongkaran keramik untuk ruang toilet m2 5.28 8,800.00 46,464.00
6 Pek. Bongkaran keramik galian pondasi m2 19.26 8,800.00 169,488.00
7 Pek. Bobokan dinding utk pemasangan pipa air m2 1.08 10,800.00 11,664.00
8 Pek. Bobokan dinding utk pemasangan kabel m2 0.55 10,800.00 5,940.00
9 Pek. Bongkar lemari filling cabinet besi sistem rel set 12.00 750,000.00 9,000,000.00
10 Pek. Bongkar dan pasang kembali kaca existing uk custom ls 1.00 6,000,000.00 6,000,000.00
11 Pek. Buangan bongkaran m3 4.67 47,300.00 220,725.45
JUMLAH PEKERJAAN BONGKARAN 15,893,608.97
IV PEKERJAAN GALIAN TANAH
1 Pek. Galian untuk pondasi batu kali menerus m3 7.70 - -
2 Pek. Galian pipa m3 3.51 107,900.00 378,729.00
3 Pek. Urugan kembali bekas galian m3 2.34 78,300.00 183,222.00
4 Pek. Buangan bekas galian m3 1.17 47,300.00 55,341.00
JUMLAH PEKERJAAN GALIAN TANAH 617,292.00
V PEKERJAAN PONDASI DINDING BATA
1 Pek. Urugan pasir urug t.5cm m3 0.64 - -
2 Pek. Aanstamping t.10cm m3 0.64 - -
3 Pek. Pas. Batu belah 1pc:5ps m3 7.49 - -
JUMLAH PEKERJAAN PONDASI DINDING BATA -
VI PEKERJAAN BETON
1 Pek. Sloof 15x20 (tul. + bekisting) untuk dinding tembok baru m3 0.64 5,611,200.00 3,602,390.40
2 Pek. Kolom praktis 11x11cm t.3,1m (tul. + bekisting) m' 12.40 98,300.00 1,218,920.00
3 Pek. Kolom praktis 11x11cm t.2,05m (tul. + bekisting) m' 8.20 98,300.00 806,060.00
4 Pek. Ringbalk 15x20 (tul. + bekisting) untuk dinding tembok baru m3 0.64 7,192,000.00 4,617,264.00
5 Pek. Meja beton t.12cm m3 1.02 6,314,700.00 6,425,838.72
JUMLAH PEKERJAAN BETON 16,670,473.12
VII PEKERJAAN DINDING BATA
A DINDING BATA TINGGI 3,1M
1 Pek. Dinding bata merah 1pc:5ps m2 37.12 168,200.00 6,243,584.00
2 Pek. Plesteran 1pc:5ps m2 61.44 115,700.00 7,108,608.00
3 Pek. Acian m2 61.44 51,800.00 3,182,592.00
4 Pek. Keramik dinding toilet 20x25cm t.2m m2 12.80 146,300.00 1,872,640.00
B DINDING BATA TINGGI 2,05M
1 Pek. Dinding bata merah 1pc:5ps m2 17.63 168,200.00 2,965,366.00
2 Pek. Plesteran 1pc:5ps m2 35.26 115,700.00 4,079,582.00
3 Pek. Acian m2 35.26 51,800.00 1,826,468.00
JUMLAH PEKERJAAN DINDING BATA 27,278,840.00
VIII PEKERJAAN DINDING PARTISI (GYPSUM)
1 Pek. Rangka besi hollow 40x40x2mm, modul 60 x 60 cm m2 78.08 372,500.00 29,084,334.38
2 Pek. Dinding Partisi gypsum 2 sisi tinggi 3m m2 57.60 62,600.00 3,605,760.00
3 Pek. Dinding Partisi gypsum2 sisi tinggi 2,10m m2 104.90 62,600.00 6,566,427.00
JUMLAH PEKERJAAN DINDING PARTISI (GYPSUM) 39,256,521.38
IX PEKERJAAN KUSEN DAN PINTU ALUMINIUM
Pek. Kusen Aluminium Pintu Dobel (lebar=120cm) + Full Stiker
1 unit 1.00 4,060,930.00 4,060,930.00
Sanblast (R. tunggu Pasien)

2 Pek. Kusen Aluminium Pintu Single (lebar 100cm) + Full Stiker unit 1.00 2,655,100.00 2,655,100.00
Sanblast (R. Tindakan)

3 Pek. Kusen Aluminium Pintu Single (lebar 80cm) + Full Stiker unit 11.00 2,443,390.00 26,877,290.00
Sanblast
4 Pek. Kusen Aluminium Pintu Toilet (Pabrikasi) unit 2.00 2,127,500.00 4,255,000.00
Pek. Kusen Aluminium Jendela Kaca (lebar 180cm) +Full Stiker
5 unit 1.00 2,306,500.00 2,306,500.00
Sanblast
JUMLAH PEKERJAAN KUSEN DAN PINTU ALUMINIUM 40,154,820.00
X PEKERJAAN LANTAI
1 Pek. Lantai Homogeneous Tile 60x60 m2 27.96 239,600.00 6,699,216.00
2 Pek. Lantai keramik toilet 20x20 anti slip m2 5.28 180,400.00 952,512.00
JUMLAH PEKERJAAN LANTAI 7,651,728.00
XI PEKERJAAN PLAFON (RANGKA EKSISTING)
1 Pek. Plafon calsyboard (R.Toilet) m2 5.95 50,900.00 303,038.24
2 Pek. List Gypsum m' 20.00 27,900.00 558,000.00
JUMLAH PEKERJAAN PLAFON (RANGKA EKSISTING) 861,038.24
XII PEKERJAAN SANITASI
1 Pek. Kran TOTO TX115LESN unit 7.00 258,750.00 1,811,250.00
2 Pek. Kitchen zink unit 5.00 569,250.00 2,846,250.00
3 Pek. Wastafel TOTO Tipe LW 824CJ (R.dokter) unit 1.00 1,932,000.00 1,932,000.00
4 Pek. Closet Duduk TOTO CW635PJ unit 2.00 8,970,000.00 17,940,000.00
5 Pek. Floor drain TOTO TX1DA unit 2.00 479,550.00 959,100.00
6 Pek. Pipa Air Bersih pvc 3/4" m' 10.50 34,300.00 360,150.00
7 Pek. Pipa Air Bersih pvc 3/4" m' 30.00 51,300.00 1,539,000.00
8 Pek. Pipa Air Kotor pvc 4" m' 50.00 68,100.00 3,405,000.00
JUMLAH PEKERJAAN SANITASI 30,792,750.00
XIII PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding tembok t.3,1m dengan cat mowilex m2 57.84 42,100.00 2,435,064.00
2 Pek. Pengecatan dinding tembok t.2,05m dengan cat mowilex m2 29.61 42,100.00 1,246,581.00
3 Pek. Pengecatan dinding partisi t.2,8m dengan cat mowilex m2 115.20 42,100.00 4,849,920.00
4 Pek. Pengecatan dinding partisi t.2,05m dengan cat mowilex m2 209.79 42,100.00 8,832,159.00
5 Pek. Pengecatan plafon calsyboard dengan cat mowilex m2 5.95 42,100.00 250,646.56
6 Pek. Pengecatan List plafon dengan cat mowilex m2 2.00 42,100.00 84,200.00
7 Pek. Cat Epoxy pada meja lab dan dinding tinggi 1m m2 25.31 132,000.00 3,340,260.00
JUMLAH PEKERJAAN PENGECATAN 21,038,830.56
XIV PEKERJAAN ELEKTRIKAL
Catatan: Tidak ada perubahan untuk konfigurasi lampu eksisting

1 Pek. Lampu SL LED 4 watt (toilet) bh 2.00 55,000.00 110,000.00


2 Pek. Saklar tunggal untuk toilet bh 2.00 51,750.00 103,500.00
3 Pek. Stop kontak bh 19.00 51,750.00 983,250.00
4 Pek. Instalasi titik penerangan titik 21.00 117,012.50 2,457,262.50
JUMLAH PEKERJAAN ELEKTRIKAL 3,654,012.50
dinding bata 3,1 m = 12.8 m
dinding bata 2,05 m = 8.6 m
dinding gypsum 3 m = 9.6 m
dinding gypsum 2,10 m = 24.975 m
HARGA SATUAN PEKERJAAN
KOTA DEPOK
TAHUN ANGGARAN 2022

NO URAIAN JUMLAH (Rp)

1 2 3
1 1 M2 Pekerjaan Bongkaran Plafon 4,700.00
2 1 M2 Pekerjaan Bongkaran Keramik 8,800.00
3 1 M2 Pekerjaan Bongkaran Dinding 1/2 bata 10,800.00
4 1 M3 Pekerjaan Bongkaran Beton bertulang 1,961,800.00
5 1 M3 Penggalian tanah biasa sedalam 1 m 107,900.00
6 1 M3 Pembuangan tanah sejauh 30m 47,300.00
7 1 M3 Pengurugan kembali galian 78,300.00
8 1 M3 Pengurugan dengan pasir urug 291,300.00
9 1 M3 Pemasangan pondasi batu belah 1PC:5PP 1,072,100.00
10 1 M3 Pemasangan batu kosong (aanstamping) 599,200.00
11 Pembuatan 1 m3 sloof beton bertulang (200 kg besi+ bekisting) 5,611,200.00
12 Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting) 7,192,000.00
13 Pembuatan 1 m3 kolom beton bertulang (150 kg besi + bekisting) 6,455,200.00
14 Pembuatan 1 m3 dinding/plat beton bertulang (150 kg besi + bekisting) 6,314,700.00
15 Pembuatan 1 m' kolom praktis beton bertulang (11x11) 98,300.00
16 1 M2 Pemasangan rangka besi hollow 40x40x2mm, modul 60 x 60 cm 372,500.00
17 1 M2 Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP 168,200.00
18 1 M2 Pemasangan Dinding Partisi gypsum 12mm 1 sisi 62,600.00
19 1 M2 Pemasangan plesteran 1PC:3PP 118,400.00
20 1 M2 Pemasangan plesteran 1PC:5PP 115,700.00
21 1 M2 Pemasangan acian 51,800.00
22 Pemasangan 1 m2 dinding keramik 20x25 146,300.00
23 Pemasangan 1 m2 lantai keramik 20x20 antislip 180,400.00
24 Pemasangan 1 m2 Homogenous Tile uk. 60x60cm 239,600.00
25 1 M2 Pemasangan langit-langit Calsiboar 50,900.00
26 1 M' Pemasangan list gypsum 27,900.00
27 Pengecatan 1 m2 tembok baru produk Mowilex 42,100.00
28 Pemasangan 1 m’ pipa PVC tipe AW Ø 3/4” 34,300.00
29 Pemasangan 1 m’ pipa PVC tipe AW Ø 1” 51,300.00
30 Pemasangan 1 m’ pipa PVC tipe AW Ø 4” 68,100.00
31 1 M2 Pemasangan Epoxy t.500mc 132,000.00
ANALISA HARGA SATUAN PEKERJAAN
KOTA DEPOK
10% x D
Harga Satuan Jumlah Harga
No Uraian Satuan Koefisien 0
(Rp) (Rp)
F. 007 1 M2 Pekerjaan Bongkaran Plafon
A TENAGA
Pekerja OH 0.0300 125,000.00 3,750.00
Mandor OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 4,275.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 4,275.00


E Overhead & Profit 10% x D 427.50
F Harga Satuan Pekerjaan (D+E) 4,702.50
Dibulatkan 4,700.00
F. 021 1 M2 Pekerjaan Bongkaran Keramik
A TENAGA
Pekerja OH 0.0500 125,000.00 6,250.00
Mandor OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 8,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,000.00


E Overhead & Profit 10% x D 800.00
F Harga Satuan Pekerjaan (D+E) 8,800.00
Dibulatkan 8,800.00

G. 009 1 M2 Pekerjaan Bongkaran Dinding 1/2 bata

A TENAGA
Pekerja OH 0.0730 125,000.00 9,125.00
Mandor OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 9,825.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,825.00


E Overhead & Profit 10% x D 982.50
F Harga Satuan Pekerjaan (D+E) 10,807.50
Dibulatkan 10,800.00

G. 021 1 M3 Pekerjaan Bongkaran Beton bertulang

A TENAGA
Pekerja OH 13.3340 125,000.00 1,666,750.00
Mandor OH 0.6670 175,000.00 116,725.00
JUMLAH TENAGA KERJA 1,783,475.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,783,475.00


E Overhead & Profit 10% x D 178,347.50
F Harga Satuan Pekerjaan (D+E) 1,961,822.50
Dibulatkan 1,961,800.00
5 1 M3 Penggalian tanah biasa sedalam 1 m
A TENAGA
Pekerja OH 0.75 125,000.00 93,750.00
Mandor OH 0.025 175,000.00 4,375.00
JUMLAH TENAGA KERJA 98,125.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,125.00


E Overhead & Profit 10% x D 9,812.50
F Harga Satuan Pekerjaan (D+E) 107,937.50
Dibulatkan 107,900.00
6 1 M3 Pembuangan tanah sejauh 30m
A TENAGA
Pekerja OH 0.33 125,000.00 41,250.00
Mandor OH 0.01 175,000.00 1,750.00
JUMLAH TENAGA KERJA 43,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,000.00


E Overhead & Profit 10% x D 4,300.00
F Harga Satuan Pekerjaan (D+E) 47,300.00
Dibulatkan 47,300.00
7 1 M3 Pengurugan kembali galian
A TENAGA
Pekerja OH 0.5 125,000.00 62,500.00
Mandor OH 0.05 175,000.00 8,750.00
JUMLAH TENAGA KERJA 71,250.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 71,250.00


E Overhead & Profit 10% x D 7,125.00
F Harga Satuan Pekerjaan (D+E) 78,375.00
Dibulatkan 78,300.00
8 1 M3 Pengurugan dengan pasir urug
A TENAGA
Pekerja OH 0.3 125,000.00 37,500.00
Mandor OH 0.01 175,000.00 1,750.00
JUMLAH TENAGA KERJA 39,250.00
B BAHAN
Pasir urug m3 1.2 188,000.00 225,600.00
JUMLAH HARGA BAHAN 225,600.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 264,850.00
E Overhead & Profit 10% x D 26,485.00
F Harga Satuan Pekerjaan (D+E) 291,335.00
Dibulatkan 291,300.00
B PEKERJAAN PONDASI
9 1 M3 Pemasangan pondasi batu belah 1PC:5PP
A TENAGA
Pekerja OH 1.5 125,000.00 187,500.00
Tukang Batu OH 0.75 140,000.00 105,000.00
Kepala Tukang OH 0.075 150,000.00 11,250.00
Mandor OH 0.075 175,000.00 13,125.00
JUMLAH TENAGA KERJA 316,875.00
B BAHAN
Batu belah m3 1.2 249,000.00 298,800.00
Semen Portlan Kg 136 1,500.00 204,000.00
Pasir Pasang m3 0.544 285,000.00 155,040.00
JUMLAH HARGA BAHAN 657,840.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 974,715.00
E Overhead & Profit 10% x D 97,471.50
F Harga Satuan Pekerjaan (D+E) 1,072,186.50
Dibulatkan 1,072,100.00
10 1 M3 Pemasangan batu kosong (aanstamping)
A TENAGA
Pekerja OH 0.78 125,000.00 97,500.00
Tukang Batu OH 0.39 140,000.00 54,600.00
Kepala Tukang OH 0.039 150,000.00 5,850.00
Mandor OH 0.039 175,000.00 6,825.00
JUMLAH TENAGA KERJA 164,775.00
B BAHAN
Batu belah m3 1.2 249,000.00 298,800.00
Pasir urug m3 0.432 188,000.00 81,216.00
JUMLAH HARGA BAHAN 380,016.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 544,791.00


E Overhead & Profit 10% x D 54,479.10
F Harga Satuan Pekerjaan (D+E) 599,270.10
Dibulatkan 599,200.00
6 Pembesian 10 Kg dengan besi polos atau ulir
A TENAGA
Pekerja OH 0.07 125,000.00 8,750.00
Tukang Besi OH 0.07 150,000.00 10,500.00
Kepala Tukang OH 0.007 150,000.00 1,050.00
Mandor OH 0.004 175,000.00 700.00
JUMLAH TENAGA KERJA 21,000.00
B BAHAN
Besi beton (polos/ulir) kg 10.5 11,000.00 115,500.00
Kawat beton kg 0.15 18,000.00 2,700.00
JUMLAH HARGA BAHAN 118,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 139,200.00


E Overhead & Profit 10% x D 13,920.00
F Harga Satuan Pekerjaan (D+E) 153,120.00
Dibulatkan 153,100.00
11 Pembuatan 1 m3 sloof beton bertulang (200 kg besi+ bekisting)
A TENAGA
Pekerja OH 5.65 125,000.00 706,250.00
Tukang batu OH 0.275 140,000.00 38,500.00
Tukang kayu OH 1.56 140,000.00 218,400.00
Tukang besi OH 1.4 140,000.00 196,000.00
Kepala tukang OH 0.323 150,000.00 48,450.00
Mandor OH 0.283 175,000.00 49,525.00
JUMLAH TENAGA KERJA 1,257,125.00
B BAHAN
Kayu kelas III m3 0.27 2,005,476.00 541,478.52
Paku 5 cm – 12 cm kg 2 16,000.00 32,000.00
Minyak bekisting Liter 0.6 35,000.00 21,000.00
Besi beton polos kg 210 11,000.00 2,310,000.00
Kawat beton kg 3 18,000.00 54,000.00
Semen Portland kg 336 1,500.00 504,000.00
Pasir Beton m3 0.54 300,000.00 162,000.00
Kerikil m3 0.81 271,000.00 219,510.00
JUMLAH HARGA BAHAN 3,843,988.52
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,101,113.52
E Overhead & Profit 10% x D 510,111.35
F Harga Satuan Pekerjaan (D+E) 5,611,224.87
Dibulatkan 5,611,200.00
12 Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting)
A TENAGA
Pekerja OH 6.35 125,000.00 793,750.00
Tukang batu OH 0.275 140,000.00 38,500.00
Tukang kayu OH 1.65 140,000.00 231,000.00
Tukang besi OH 1.4 140,000.00 196,000.00
Kepala tukang OH 0.333 150,000.00 49,950.00
Mandor OH 0.318 175,000.00 55,650.00
JUMLAH TENAGA KERJA 1,364,850.00
B BAHAN
Kayu kelas III m3 0.32 2,005,476.00 641,752.32
Paku 5 cm – 12 cm kg 3.2 16,000.00 51,200.00
Minyak bekisting Liter 1.6 35,000.00 56,000.00
Besi beton polos kg 210 11,000.00 2,310,000.00
Kawat beton kg 3 18,000.00 54,000.00
Semen Portland kg 336 1,500.00 504,000.00
Pasir Beton m3 0.54 300,000.00 162,000.00
Kerikil m3 0.81 271,000.00 219,510.00
Kayu kelas II balok m3 0.14 3,936,300.00 551,082.00
Plywood 9 mm Lembar 2.8 134,000.00 375,200.00
Dolken kayu φ (8-10) cm, panj 4 m Batang 16 15,540.00 248,640.00
JUMLAH HARGA BAHAN 5,173,384.32
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,538,234.32
E Overhead & Profit 10% x D 653,823.43
F Harga Satuan Pekerjaan (D+E) 7,192,057.75
Dibulatkan 7,192,000.00
13 Pembuatan 1 m3 kolom beton bertulang (150 kg besi + bekisting)
A TENAGA
Pekerja OH 5.3 125,000.00 662,500.00
Tukang batu OH 0.275 140,000.00 38,500.00
Tukang kayu OH 1.3 140,000.00 182,000.00
Tukang besi OH 1.05 140,000.00 147,000.00
Kepala tukang OH 0.265 150,000.00 39,750.00
Mandor OH 0.265 175,000.00 46,375.00
JUMLAH TENAGA KERJA 1,116,125.00
B BAHAN
Kayu kelas III m3 0.32 2,005,476.00 641,752.32
Paku 5 cm – 12 cm kg 3.2 16,000.00 51,200.00
Minyak bekisting Liter 1.6 35,000.00 56,000.00
Besi beton polos kg 157.5 11,000.00 1,732,500.00
Kawat beton kg 2.25 18,000.00 40,500.00
Semen Portland kg 336 1,500.00 504,000.00
Pasir Beton m3 0.54 300,000.00 162,000.00
Kerikil m3 0.81 271,000.00 219,510.00
Kayu kelas II balok m3 0.12 3,936,300.00 472,356.00
Plywood 9 mm Lembar 2.8 134,000.00 375,200.00
Dolken kayu φ (8-10) cm, panjang 4 m Batang 32 15,540.00 497,280.00
JUMLAH HARGA BAHAN 4,752,298.32
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,868,423.32
E Overhead & Profit 10% x D 586,842.33
F Harga Satuan Pekerjaan (D+E) 6,455,265.65
Dibulatkan 6,455,200.00
14 Pembuatan 1 m3 dinding/plat beton bertulang (150 kg besi + bekisting)
A TENAGA
Pekerja OH 5.3 125,000.00 662,500.00
Tukang batu OH 0.275 140,000.00 38,500.00
Tukang kayu OH 1.3 140,000.00 182,000.00
Tukang besi OH 1.05 140,000.00 147,000.00
Kepala tukang OH 0.262 150,000.00 39,300.00
Mandor OH 0.265 175,000.00 46,375.00
JUMLAH TENAGA KERJA 1,115,675.00
B BAHAN
Kayu kelas III m3 0.24 2,005,476.00 481,314.24
Paku 5 cm – 12 cm kg 3.2 16,000.00 51,200.00
Minyak bekisting Liter 1.6 35,000.00 56,000.00
Besi beton polos kg 157.5 11,000.00 1,732,500.00
Kawat beton kg 2.25 18,000.00 40,500.00
Semen Portland kg 336 1,500.00 504,000.00
Pasir Beton m3 0.54 300,000.00 162,000.00
Kerikil m3 0.81 271,000.00 219,510.00
Kayu kelas II balok m3 0.16 3,936,300.00 629,808.00
Plywood 9 mm Lembar 2.8 134,000.00 375,200.00
Dolken kayu φ (8-10) cm, panjang 4 m Batang 24 15,540.00 372,960.00
JUMLAH HARGA BAHAN 4,624,992.24
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,740,667.24
E Overhead & Profit 10% x D 574,066.72
F Harga Satuan Pekerjaan (D+E) 6,314,733.96
Dibulatkan 6,314,700.00
15 Pembuatan 1 m' kolom praktis beton bertulang (11x11)
A TENAGA
Pekerja OH 0.18 125,000.00 22,500.00
Tukang batu OH 0.02 140,000.00 2,800.00
Tukang kayu OH 0.02 140,000.00 2,800.00
Tukang besi OH 0.02 140,000.00 2,800.00
Kepala tukang OH 0.006 150,000.00 900.00
Mandor OH 0.009 175,000.00 1,575.00
JUMLAH TENAGA KERJA 33,375.00
B BAHAN
Kayu kelas III m3 0.002 2,005,476.00 4,010.95
Paku 5 cm – 12 cm kg 0.01 16,000.00 160.00
Minyak bekisting Liter 0.015 35,000.00 525.00
Besi beton polos kg 3 11,000.00 33,000.00
Kawat beton kg 0.45 18,000.00 8,100.00
Semen Portland kg 4 1,500.00 6,000.00
Pasir Beton m3 0.006 300,000.00 1,800.00
Kerikil m3 0.009 271,000.00 2,439.00
JUMLAH HARGA BAHAN 56,034.95
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,409.95


E Overhead & Profit 10% x D 8,941.00
F Harga Satuan Pekerjaan (D+E) 98,350.95
Dibulatkan 98,300.00
E PEKERJAAN BESI DAN ALUMINIUM
1 1 KG Pemasangan besi profil
A TENAGA
Pekerja OH 0.06 125,000.00 7,500.00
Tukang Las Konstruksi OH 0.06 140,000.00 8,400.00
Kepala tukang OH 0.006 150,000.00 900.00
Mandor OH 0.003 175,000.00 525.00
JUMLAH TENAGA KERJA 17,325.00
B BAHAN
Besi Profil Kg 1.15 15,000.00 17,250.00
JUMLAH HARGA BAHAN 17,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,575.00


E Overhead & Profit 10% x D 3,457.50
F Harga Satuan Pekerjaan (D+E) 38,032.50
Dibulatkan 38,000.00
16 1 M2 Pemasangan rangka besi hollow 40x40x2mm, modul 60 x 60 cm
A TENAGA
Pekerja OH 0.35 125,000.00 43,750.00
Tukang Besi OH 0.35 140,000.00 49,000.00
Kepala Tukang OH 0.035 150,000.00 5,250.00
Mandor OH 0.018 175,000.00 3,150.00
JUMLAH TENAGA KERJA 101,150.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4 47,500.00 190,000.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 47,500.00 47,500.00
JUMLAH HARGA BAHAN 237,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 338,650.00


E Overhead & Profit 10% x D 33,865.00
F Harga Satuan Pekerjaan (D+E) 372,515.00
Dibulatkan 372,500.00
G. 017 Pembesian 100kg jaring kawat wiremesh M6
A TENAGA
Pekerja OH 0.25 125,000.00 31,250.00
Tukang Besi OH 0.25 140,000.00 35,000.00
Kepala Tukang OH 0.025 150,000.00 3,750.00
Mandor OH 0.025 175,000.00 4,375.00
JUMLAH TENAGA KERJA 74,375.00
B BAHAN
Wiremesh M6 kg 102 35,273.37 3,597,883.60
Kawat Ikat kg 0.5 18,000.00 18,000.00
JUMLAH HARGA BAHAN 3,615,883.60
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,690,258.60


E Overhead & Profit 10% x D 369,025.86
F Harga Satuan Pekerjaan (D+E) 4,059,284.46
Dibulatkan 4,059,200.00
Pembesian 1kg jaring kawat wiremesh M6 40,592.00
Pembesian 1m2 jaring kawat Wiremesh M6 (1m2 = 3,065 kg) 124,424.86

F PEKERJAAN DINDING
1 1 M2 Pemasangan dinding bata merah 1/2 batu camp. 1PC:3PP
A TENAGA
Pekerja OH 0.3 125,000.00 37,500.00
Tukang Batu OH 0.1 140,000.00 14,000.00
Kepala Tukang OH 0.01 150,000.00 1,500.00
Mandor OH 0.015 175,000.00 2,625.00
JUMLAH TENAGA KERJA 55,625.00
B BAHAN
Bata merah m3 70 1,000.00 70,000.00
Semen Portlan Kg 14.37 1,500.00 21,555.00
Pasir Pasang m3 0.04 285,000.00 11,400.00
JUMLAH HARGA BAHAN 102,955.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 158,580.00
E Overhead & Profit 10% x D 15,858.00
F Harga Satuan Pekerjaan (D+E) 174,438.00
Dibulatkan 174,400.00
17 1 M2 Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP
A TENAGA
Pekerja OH 0.3 125,000.00 37,500.00
Tukang Batu OH 0.1 140,000.00 14,000.00
Kepala Tukang OH 0.01 150,000.00 1,500.00
Mandor OH 0.015 175,000.00 2,625.00
JUMLAH TENAGA KERJA 55,625.00
B BAHAN
Bata merah m3 70 1,000.00 70,000.00
Semen Portlan Kg 9.68 1,500.00 14,520.00
Pasir Pasang m3 0.045 285,000.00 12,825.00
JUMLAH HARGA BAHAN 97,345.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 152,970.00


E Overhead & Profit 10% x D 15,297.00
F Harga Satuan Pekerjaan (D+E) 168,267.00
Dibulatkan 168,200.00
19 1 M2 Pemasangan plesteran 1PC:3PP
A TENAGA
Pekerja OH 0.4 125,000.00 50,000.00
Tukang Batu OH 0.2 140,000.00 28,000.00
Kepala Tukang OH 0.02 150,000.00 3,000.00
Mandor OH 0.013 175,000.00 2,275.00
JUMLAH TENAGA KERJA 83,275.00
B BAHAN
1. PC Kg 10.368 1,500.00 15,552.00
2. PP m3 0.031 285,000.00 8,835.00
JUMLAH HARGA BAHAN 24,387.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,662.00


E Overhead & Profit 10% x D 10,766.20
F Harga Satuan Pekerjaan (D+E) 118,428.20
Dibulatkan 118,400.00
20 1 M2 Pemasangan plesteran 1PC:5PP
A TENAGA
Pekerja OH 0.4 125,000.00 50,000.00
Tukang Batu OH 0.2 140,000.00 28,000.00
Kepala Tukang OH 0.02 150,000.00 3,000.00
Mandor OH 0.022 175,000.00 3,850.00
JUMLAH TENAGA KERJA 84,850.00
B BAHAN
1. PC Kg 6.912 1,500.00 10,368.00
2. PP m3 0.035 285,000.00 9,975.00
JUMLAH HARGA BAHAN 20,343.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 105,193.00


E Overhead & Profit 10% x D 10,519.30
F Harga Satuan Pekerjaan (D+E) 115,712.30
Dibulatkan 115,700.00
21 1 M2 Pemasangan acian
A TENAGA
Pekerja OH 0.2 125,000.00 25,000.00
Tukang Batu OH 0.1 140,000.00 14,000.00
Kepala Tukang OH 0.01 150,000.00 1,500.00
Mandor OH 0.01 175,000.00 1,750.00
JUMLAH TENAGA KERJA 42,250.00
B BAHAN
Semen PC Kg 3.25 1,500.00 4,875.00
JUMLAH HARGA BAHAN 4,875.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,125.00


E Overhead & Profit 10% x D 4,712.50
F Harga Satuan Pekerjaan (D+E) 51,837.50
Dibulatkan 51,800.00
22 Pemasangan 1 m2 dinding keramik 20x25
A TENAGA
Pekerja OH 0.26 125,000.00 32,500.00
Tukang Batu OH 0.13 140,000.00 18,200.00
Kepala tukang OH 0.013 150,000.00 1,950.00
Mandor OH 0.013 175,000.00 2,275.00
JUMLAH TENAGA KERJA 54,925.00
B BAHAN
Keramik 20x25 m2 1.05 33,333.33 35,000.00
###
Semen Portlan Kg 9.3 1,500.00 13,950.00
Pasir Pasang M3 0.018 285,000.00 5,130.00
Semen warna Kg 1.5 16,000.00 24,000.00
JUMLAH HARGA BAHAN 78,080.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 133,005.00


E Overhead & Profit 10% x D 13,300.50
F Harga Satuan Pekerjaan (D+E) 146,305.50
Dibulatkan 146,300.00
L. 017 Pemasangan 1 m2 lantai keramik 20x20 antislip
A TENAGA
Pekerja OH 0.26 125,000.00 32,500.00
Tukang Batu OH 0.13 140,000.00 18,200.00
Kepala tukang OH 0.013 150,000.00 1,950.00
Mandor OH 0.013 175,000.00 2,275.00
JUMLAH TENAGA KERJA 54,925.00
B BAHAN
Keramik 20x20 roman m2 1.05 56,200.00 59,010.00
###
Semen Portlan Kg 9.3 1,500.00 13,950.00
Pasir Pasang M3 0.018 285,000.00 5,130.00
Semen warna Kg 1.94 16,000.00 31,040.00
JUMLAH HARGA BAHAN 109,130.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 164,055.00


E Overhead & Profit 10% x D 16,405.50
F Harga Satuan Pekerjaan (D+E) 180,460.50
Dibulatkan 180,400.00
Pemasangan 1 m2 Homogenous Tile uk. 60x60cm
A TENAGA
Pekerja OH 0.26 125,000.00 32,500.00
Tukang Batu OH 0.13 140,000.00 18,200.00
Kepala tukang OH 0.013 150,000.00 1,950.00
Mandor OH 0.013 175,000.00 2,275.00
JUMLAH TENAGA KERJA 54,925.00
B BAHAN
Granite Tile M2 1.05 129,000.00 135,450.00
Semen Portlan Kg 9.8 1,500.00 14,700.00
Pasir Pasang M3 0.045 285,000.00 12,825.00
JUMLAH HARGA BAHAN 162,975.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 217,900.00


E Overhead & Profit 10% x D 21,790.00
F Harga Satuan Pekerjaan (D+E) 239,690.00
Dibulatkan 239,600.00
I. 043 PEKERJAAN DINDING PARTISI
E. 024 1 M2 Pemasangan Dinding Partisi gypsum 12mm 1 sisi
A TENAGA
Pekerja OH 0.1 125,000.00 12,500.00
Tukang kayu OH 0.05 140,000.00 7,000.00
Kepala tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 175,000.00 875.00
JUMLAH TENAGA KERJA 21,125.00
B BAHAN
Gypsum board 12mm Lembar 0.364 93,500.00 34,034.00
Paku skrup kg 0.11 16,000.00 1,760.00
JUMLAH HARGA BAHAN 35,794.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,919.00


E Overhead & Profit 10% x D 5,691.90
F Harga Satuan Pekerjaan (D+E) 62,610.90
Dibulatkan 62,600.00
I PEKERJAAN PLAFOND
K. 015 1 M2 Pemasangan langit-langit Calsiboar
A TENAGA
Pekerja OH 0.1 125,000.00 12,500.00
Tukang kayu OH 0.05 140,000.00 7,000.00
Kepala tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 175,000.00 875.00
JUMLAH TENAGA KERJA 21,125.00
B BAHAN
calsyboard Lembar 0.364 64,300.00 23,405.20
Paku skrup kg 0.11 16,000.00 1,760.00
JUMLAH HARGA BAHAN 25,165.20
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,290.20


E Overhead & Profit 10% x D 4,629.02
F Harga Satuan Pekerjaan (D+E) 50,919.22
Dibulatkan 50,900.00
26 1 M' Pemasangan list gypsum
A TENAGA
Pekerja OH 0.05 125,000.00 6,250.00
Tukang Kayu OH 0.05 140,000.00 7,000.00
Kepala tukang OH 0.005 150,000.00 750.00
Mandor OH 0.003 175,000.00 525.00
JUMLAH TENAGA KERJA 14,525.00
B BAHAN
List kayu profil m 1.05 10,237.00 10,748.85
Paku kg 0.01 16,000.00 160.00
JUMLAH HARGA BAHAN 10,908.85
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,433.85


E Overhead & Profit 10% x D 2,543.39
F Harga Satuan Pekerjaan (D+E) 27,977.24
Dibulatkan 27,900.00
27 Pengecatan 1 m2 tembok baru produk Mowilex
A TENAGA
Pekerja OH 0.02 125,000.00 2,500.00
Tukang cat OH 0.063 140,000.00 8,820.00
Kepala tukang OH 0.0063 150,000.00 945.00
Mandor OH 0.003 175,000.00 525.00
JUMLAH TENAGA KERJA 12,790.00
B BAHAN
Plamuur Kg 0.1 28,500.00 2,850.00
Cat dasar Kg 0.1 124,700.00 12,470.00
Cat penutup Mowilex Kg 0.26 39,230.77 10,200.00
JUMLAH HARGA BAHAN 25,520.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,310.00


E Overhead & Profit 10% x D 3,831.00
F Harga Satuan Pekerjaan (D+E) 42,141.00
Dibulatkan 42,100.00
L PEKERJAAN SANITASI
28 Pemasangan 1 m’ pipa PVC tipe AW Ø 3/4”
A TENAGA
Pekerja OH 0.036 125,000.00 4,500.00
Tukang batu OH 0.06 140,000.00 8,400.00
Kepala tukang OH 0.006 150,000.00 900.00
Mandor OH 0.002 175,000.00 350.00
JUMLAH TENAGA KERJA 14,150.00
B BAHAN
Pipa PVC 3/4” M 1.2 11,000.00 13,200.00
Perlengkapan % 35 3,850.00 3,850.00
JUMLAH HARGA BAHAN 17,050.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 31,200.00


E Overhead & Profit 10% x D 3,120.00
F Harga Satuan Pekerjaan (D+E) 34,320.00
Dibulatkan 34,300.00
29 Pemasangan 1 m’ pipa PVC tipe AW Ø 1”
A TENAGA
Pekerja OH 0.036 125,000.00 4,500.00
Tukang batu OH 0.06 140,000.00 8,400.00
Kepala tukang OH 0.006 150,000.00 900.00
Mandor OH 0.002 175,000.00 350.00
JUMLAH TENAGA KERJA 14,150.00
B BAHAN
Pipa PVC 1” M 1.2 21,000.00 25,200.00
Perlengkapan % 35,00 7,350.00 7,350.00
JUMLAH HARGA BAHAN 32,550.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 46,700.00


E Overhead & Profit 10% x D 4,670.00
F Harga Satuan Pekerjaan (D+E) 51,370.00
Dibulatkan 51,300.00
30 Pemasangan 1 m’ pipa PVC tipe AW Ø 4”
A TENAGA
Pekerja OH 0.081 125,000.00 10,125.00
Tukang batu OH 0.135 140,000.00 18,900.00
Kepala tukang OH 0.0135 150,000.00 2,025.00
Mandor OH 0.004 175,000.00 700.00
JUMLAH TENAGA KERJA 31,750.00
B BAHAN
Pipa PVC 4” M 1.2 19,500.00 23,400.00
Perlengkapan % 35 6,825.00 6,825.00
JUMLAH HARGA BAHAN 30,225.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 61,975.00


E Overhead & Profit 10% x D 6,197.50
F Harga Satuan Pekerjaan (D+E) 68,172.50
Dibulatkan 68,100.00
Overhead & Profit
10% x D

TKDN

3,750.00
525.00
4,275.00

6,250.00
1,750.00

9,125.00
700.00

13.334
0.667

1,666,750.00
116,725.00

13.334
0.667
93,750.00
4,375.00

41,250.00
1,750.00

62,500.00
8,750.00

37,500.00
1,750.00

187,500.00
105,000.00
11,250.00
13,125.00

97,500.00
54,600.00
5,850.00
6,825.00

8,750.00
10,500.00
1,050.00
700.00

706,250.00
38,500.00
218,400.00
196,000.00
48,450.00
49,525.00
793,750.00
38,500.00
231,000.00
196,000.00
49,950.00
55,650.00

662,500.00
38,500.00
182,000.00
147,000.00
39,750.00
46,375.00
662,500.00
38,500.00
182,000.00
147,000.00
39,300.00
46,375.00

10000 22,500.00
121 2,800.00
82.6446281 2,800.00
0.01452 2,800.00
900.00
1,575.00

7,500.00
8,400.00
900.00
525.00
17,325.00
-
43,750.00
49,000.00
5,250.00
3,150.00
101,150.00
-

31,250.00
35,000.00
3,750.00
4,375.00
74,375.00
-

M6 =
1 lbr= 11.34 m2 34,76 kg
1 m2 = 3.0652557

37,500.00
14,000.00
1,500.00
2,625.00
55,625.00
-
37,500.00
14,000.00
1,500.00
2,625.00
55,625.00
-

7 KG /M2
50,000.00
pc 6.912 28,000.00
brt jns pp 3,000.00
3,850.00
84,850.00
-
6.912 90 622.08
2.34
624.42

6.938
249.768

3.5681143

5.1428571

25,000.00
14,000.00
1,500.00
1,750.00
42,250.00
-

32,500.00
18,200.00
1,950.00
2,275.00
54,925.00
-
1333.33333

32,500.00
18,200.00
1,950.00
2,275.00
54,925.00
-
1333.33333

32,500.00
18,200.00
1,950.00
2,275.00
54,925.00
-
12,500.00
7,000.00
750.00
875.00
21,125.00
-

12,500.00
7,000.00
750.00
875.00
21,125.00
-

6,250.00
7,000.00
750.00
525.00
14,525.00
-
2,500.00
8,820.00
945.00
525.00
12,790.00
-

4,500.00
8,400.00
900.00
350.00
14,150.00
-

4,500.00
8,400.00
900.00
350.00
14,150.00
-

10,125.00
18,900.00
2,025.00
700.00
31,750.00
-

10% x D 8902455
9792700.5
4%
ANALISA PEKERJAAN KUSEN ALUMINIUM
KOTA DEPOK

1 UNIT PINTU DOBEL P1 (L=120CM)


Kusen Aluminium m' 5.40 148,057.50 799,510.50
Profil Daun Pintu Aluminium m' 10.40 148,050.00 1,539,720.00
Kaca Polos t.5mm m2 2.10 182,056.25 382,318.13
Stiker Sandblast m2 4.20 45,000.00 189,000.00
Engsel pintu 5" bh 6.00 49,256.25 295,537.50
Kunci Pintu + Gagang bh 2.00 154,937.50 309,875.00
Upah Setel 5% lot 1.00 175,798.06 - 175,798.06
Jumlah 3,515,961.13 175,798.06 3,691,759.18
Keuntungan maksimal 10% 369,175.92
Jumlah 4,060,935.10
Dibulatkan 4,060,930.00
1 UNIT PINTU P2 (L=100CM)
Kusen Aluminium m' 5.20 148,057.50 769,899.00
Profil Daun Pintu Aluminium m' 6.00 148,050.00 888,300.00
Kaca Polos t.5mm m2 1.50 182,056.25 273,084.38
Stiker Sandblast m2 1.44 45,000.00 64,800.00
Engsel pintu 5" bh 3.00 49,256.25 147,768.75
Kunci Pintu + Gagang bh 1.00 154,937.50 154,937.50
Upah Setel 5% lot 1.00 114,939.48 - 114,939.48
Jumlah 2,298,789.63 114,939.48 2,413,729.11
Keuntungan maksimal 10% 241,372.91
Jumlah 2,655,102.02
Dibulatkan 2,655,100.00
1 UNIT PINTU P3 (L=80CM)
Kusen Aluminium m' 5.00 148,057.50 740,287.50
Profil Daun Pintu Aluminium m' 5.60 148,050.00 829,080.00
Kaca Polos t.5mm m2 1.08 182,056.25 196,620.75
Stiker Sandblast m2 1.04 45,000.00 46,800.00
Engsel pintu 5" bh 3.00 49,256.25 147,768.75
Kunci Pintu + Gagang bh 1.00 154,937.50 154,937.50
Upah Setel 5% lot 1.00 105,774.73 - 105,774.73
Jumlah 2,115,494.50 105,774.73 2,221,269.23
Keuntungan maksimal 10% 222,126.92
Jumlah 2,443,396.15
Dibulatkan 2,443,390.00

1 UNIT JENDELA (L=180CM)


Kusen Aluminium m' 6.10 148,050.00 903,105.00
Kaca Polos t.5mm m2 2.07 182,056.25 375,946.16
pelubangan kaca bh 1.00 75,000.00 75,000.00
Stiker Sandblast m2 2.07 45,000.00 92,925.00
Ambalan dari blockteak lapis HPL tbl 20mm bh 1.00 550,000.00 550,000.00
Upah Setel 5% lot 1.00 99,848.81 - 99,848.81
Jumlah 1,996,976.16 99,848.81 2,096,824.96
Keuntungan maksimal 10% 209,682.50
Jumlah 2,306,507.46
Dibulatkan 2,306,500.00

1 M PASANG KUSEN ALUMINIUM


Bahan :
Aluminium profil warna 4" m' 1.10 120,000.00 132,000.00 -
Skrup fixer bh 2.00 325.00 650.00 -
Sealant karet kusen tube 0.06 37,500.00 2,250.00 -
Tenaga Kerja :
Pekerja Oh 0.04 125,000.00 - 5,375.00
Tukang Oh 0.04 140,000.00 - 6,020.00
Kepala Tukang Oh 0.00 150,000.00 - 645.00
Mandor Oh 0.00 175,000.00 - 367.50
Jumlah 134,900.00 12,407.50 147,307.50
Keuntungan maksimal 0% -
Jumlah 147,307.50
Dibulatkan 147,300.00
1 M PASANG PROFIL DAUN PINTU
Bahan :
Profil Aluminium Daun Pintu m' 1.10 120,000.00 132,000.00 -
Skrup fixer bh 2.00 700.00 1,400.00 -
Sealant karet kusen tube 0.06 37,500.00 2,250.00 -
Tenaga Kerja :
Pekerja Oh 0.04 125,000.00 - 5,375.00
Tukang Oh 0.04 140,000.00 - 6,020.00
Kepala Tukang Oh 0.00 150,000.00 - 645.00
Mandor Oh 0.00 175,000.00 - 367.50
Jumlah 135,650.00 12,407.50 148,057.50
Keuntungan maksimal 0% -
Jumlah 148,057.50
Dibulatkan 148,050.00
1 BUAH PASANG KUNCI PINTU SILINDER
Bahan :
Kunci Pintu Silinder Bh 1.00 54,000.00 54,000.00 -
Tenaga Kerja :
Pekerja Oh 0.06 125,000.00 - 7,500.00
Tukang Kayu Oh 0.60 140,000.00 - 84,000.00
Kepala Tukang Kayu Oh 0.06 150,000.00 - 9,000.00
Mandor Oh 0.00 175,000.00 - 437.50
Jumlah 54,000.00 100,937.50 154,937.50
Keuntungan maksimal 0% -
Jumlah 154,937.50
Dibulatkan 154,930.00
1 PASANG PEK. HANDLE PINTU
Bahan :
Handle Pintu psg 1.00 75,000.00 75,000.00 -
Tenaga Kerja :
Pekerja Oh 0.06 125,000.00 - 7,500.00
Tukang Kayu Oh 0.60 140,000.00 - 84,000.00
Kepala Tukang Kayu Oh 0.06 150,000.00 - 9,000.00
Mandor Oh 0.00 175,000.00 - 437.50
Jumlah 75,000.00 100,937.50 175,937.50
Keuntungan maksimal 0% -
Jumlah 175,937.50
Dibulatkan 175,930.00
1 BUAH PEK. ENGSEL PINTU 4"
Bahan :
Engsel Pintu 4" Bh 1.00 24,000.00 24,000.00 -
Tenaga Kerja :
Pekerja Oh 0.02 125,000.00 - 1,875.00
Tukang Kayu Oh 0.15 140,000.00 - 21,000.00
Kepala Tukang Kayu Oh 0.02 150,000.00 - 2,250.00
Mandor Oh 0.00 175,000.00 - 131.25
Jumlah 24,000.00 25,256.25 49,256.25
Keuntungan maksimal 0% -
Jumlah 49,256.25
Dibulatkan 49,250.00
1 M2 PASANGAN KACA POLOS, T = 5 MM
Bahan :
Kaca polos 5" M2 1.10 118,000.00 129,800.00 -
Sealent Tube 0.27 37,500.00 10,125.00
Tenaga Kerja :
Pekerja Oh 0.15 125,000.00 - 18,750.00
Tukang Kayu Oh 0.15 140,000.00 - 21,000.00
Kepala Tukang Kayu Oh 0.02 150,000.00 - 2,250.00
Mandor Oh 0.00 175,000.00 - 131.25
Jumlah 139,925.00 42,131.25 182,056.25
Keuntungan maksimal 0% -
Jumlah 182,056.25
Dibulatkan 182,050.00
lab
DAFTAR HARGA BAHAN BANGUNAN
KOTA DEPOK
TAHUN 2022

KONO JENIS BAHAN BANGUNAN SATUAN HARGA BARU


Rp.

Bata Merah Bakar Kelas I bh 1,000


Batu Belah Pondasi m³ 249,000
Batu Pecah Mesin 1/2 m³ 271,000
Pasir Beton m3 300,000
Pasir Pasang Kali m³ 285,000
Pasir Urug m³ 188,000
Semen PC/50kg kg 1,500
Semen Warna kg 16,000
Air liter 3.5
Mowilex lt (1,3kg) 51,000
Mowilex kg 39,231
Kwas 3" bh 10,200
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt 124,700
Plamir tembok kg 28,500
Dolken 7 s/d 10 bt 15,540
Kayu Albasia m³ 2,005,476
Kayu Papan Albasia m³ 2,005,476
Kayu Balok Kelas II m³ 3,936,300
Formite/penjaga jarak bekisting/spacer bh 150
Gypsum 120 x 240 t = 9 mm ex DN lbr 90,000
Gypsum 120 x 240 t = 12 mm ex DN lbr 93,500
Calsyboard t=4mm lbr 64,300
List profil gypsum m' 10,237
Multiplek 9 mm 120 x 240 lbr 134,000
Keramik uk. 20x25 KW I DN m² 33,333
Keramik uk. 20x25 KW I DN antislip m² 56,200
Homogenous Tile uk. 60x60cm m² 129,000
Besi Beton U-24 Rata - Rata kg 11,000
Besi Profil DN SII kg 15,000
Besi Hollow 40x40 btg 190,000
Kawat Beton kg 18,000
Paku 1 cm s/d 3 cm kg 16,000
Paku 4 cm s/d 7 cm kg 16,000
Paku 8 cm s/d 12 cm kg 16,000
Piser bh 700
Pipa PVC Ø 1" (AW) bt 21,000
Pipa PVC Ø 3/4" (AW) bt 11,000
Pipa PVC Ø 4" (AW) bt 78,000
Solatip Leideng gl 4,200
Kusen Aluminium Alexindo m' 120,000
Engsel Pintu 4" bh 24,000
Handle Pintu Roset Stainless 02 m' 75,000
Kunci silinder m' 54,000
Propil Daun Pintu Aluminium Alexindo m' 120,000
Kaca polos 5mm m2 118,000
Sealent tube 37,500
Stiker Sandblast m2 45,000
Pintu Aluminium Pabrikasi unit 1,850,000
Kran TOTO TX115LESN bh 225,000
Jet Washer Toto THX20MCRB bh 474,000
Wastafel TOTO Tipe LW 824CJ unit 1,680,000
Closet Duduk TOTO CW635PJ unit 7,800,000
Floor drain TOTO TX1DA unit 417,000
Pemasangan Epoxy 500mc m2 120,000
DAFTAR UPAH PEKERJA BANGUNAN
KOTA DEPOK
TAHUN 2022

NO JENIS PEKERJA BANGUNAN SATUAN WAKTU HARGA (Rp)


KODE
KP 1 Kepala Tukang 1 ORANG/ HR 150,000.00
T 2 Tukang 1 ORANG/ HR 140,000.00
KTB 3 Kepala Tukang Batu 1 ORANG/ HR 150,000.00
TBT 4 Tukang Batu Terampil 1 ORANG/ HR 140,000.00
KTBB 5 Kepala Tukang Besi Beton 1 ORANG/ HR 150,000.00
TBBT 6 Tukang Besi Beton Terampil 1 ORANG/ HR 140,000.00
KTBP 7 Kepala Tukang Besi Profil 1 ORANG/ HR 150,000.00
TBPRT 8 Tukang Besi Profil Terampil 1 ORANG/ HR 140,000.00
KTCP 9 Kepala Tukang Cat/ Pelitur 1 ORANG/ HR 150,000.00
TCPT 10 Tukang Cat/ Pelitur Terampil 1 ORANG/ HR 140,000.00
KTK 11 Kepala Tukang Kayu 1 ORANG/ HR 150,000.00
TKT 12 Tukang Kayu Terampil 1 ORANG/ HR 140,000.00
KTA 13 Kepala Tukang Aspal 1 ORANG/ HR 150,000.00
TA 14 Tukang aspal 1 ORANG/ HR 140,000.00
ML 15 Mandor lapangan 1 ORANG/ HR 175,000.00
OAB 16 Operator alat besar 1 ORANG/ HR 150,000.00
P 17 Pekerja 1 ORANG/ HR 125,000.00