HARGA PERHITUNGAN SENDIRI

(HPS)

KEGIATAN : PEKERJAAN REHAB RUMAH TIPE 50


LOKASI : TAMANSARI METROPOLITAN
TAHUN ANGGARAN : 2019

S KONTRAK
A
NO. URAIAN JENIS PEKERJAAN T HARGA SATUAN JUMLAH
U
VOLUME
A (Rp.) (Rp.)
N

I. PEKERJAAN PERSIAPAN 300,000.00


1 Pembersihan Bh 1.000 300,000.00 300,000.00

II PEKERJAAN TANAH 10,950,964.93


1 Galian Tanah Biasa M³ 10.880 106,975.00 1,163,888.00
2 Timbunan Tanah Bekas Galian M³ 3.808 35,658.33 135,786.93
3 Urugan Tanah bawah Lantai M³ 63.000 135,190.00 8,516,970.00
4 Urugan Pasir di bawah Pondasi M³ 1.700 141,790.00 241,043.00
5 Urugan Pasir di bawah lantai M³ 6.300 141,790.00 893,277.00

III. PEKERJAAN PONDASI 5,555,140.80


1 Pasangan Batu Kosong M³ 1.632 534,930.00 873,005.76
2 Pasangan Batu Kali 1:4 M³ 4.864 962,610.00 4,682,135.04

IV. PEKERJAAN BETON 8,302,254.17


1 Lantai Beton Tumbuk 1:3:5 Tbl. 7 cm M³ 9.730 168,549.00 1,639,981.77
2 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 18.000 168,549.00 3,033,882.00
3 Balok Latai K-175 11/15 + Besi + Bekisting M' 12.800 283,468.00 3,628,390.40

V. PEKERJAAN DINDING 6,108,537.60


1 Pasangan Batu Bata ½ Bata 1:4 M² 39.680 153,945.00 6,108,537.60

VI. PEKERJAAN LANTAI 10,229,162.25


1 Pasang Lantai Homogenus 60 x 60cm M² 16.000 349,245.00 5,587,920.00
2 Pasang Lantai Tegel Keramik 30 x 30cm (anti slip) Kamar Mandi M² 4.200 280,577.00 1,178,423.40
3 Pasang Dinding Tegel Keramik 30 x 60 cm Kamar Mandi M² 11.850 292,221.00 3,462,818.85

VII. PEKERJAAN PLESTERAN & ACIAN 9,165,048.32


1 Plesteran Dinding M² 79.360 79,847.00 6,336,657.92
2 Acian M² 79.360 35,640.00 2,828,390.40

IX. PEKERJAAN ATAP 9,490,739.00


1 Pas.Rangka Baja Ringan M² 21.800 268,587.00 5,855,196.60
2 Atap Spandek Unit 21.800 166,768.00 3,635,542.40

X PEKERJAAN PINTU 1,300,000.00


1 Pek. Pintu KM Unit 1.000 1,300,000.00 1,300,000.00

XI. PEKERJAAN PENGECATAN DAN FINISHING 5,641,693.20


1 Cat Tembok M² 101.160 55,770.00 5,641,693.20

XII. PEKERJAAN PLAFOND 8,563,424.60


1 Rangka Plafond Metal Panel 40 x 40 cm M² 21.800 224,538.00 4,894,928.40
2 Plafond Gypsum M² 21.800 127,597.00 2,781,614.60
3 List Profil Gypsum M 19.800 44,792.00 886,881.60
XIII. PEKERJAAN SANITAIR 8,571,790.00
1 Pek. Instalasi Air Bersih Ttk 1.000 150,000.00 150,000.00
2 Pas. Mata Kran Bh 1.000 52,415.00 52,415.00
3 Pas. Kloset Duduk Bh 1.000 1,780,570.00 1,780,570.00
3 Pas. Pipa PVC Ø ½" M 5.000 35,323.00 176,615.00
4 Pas. Pipa PVC Ø 4" M 5.000 232,438.00 1,162,190.00
5 Septiktank Lengkap Instalasi Unit 1.000 3,500,000.00 3,500,000.00
6 Sumur Resapan Safety Tank Unit 1.000 1,750,000.00 1,750,000.00

XIV. PEKERJAAN LISTRIK 1,455,000.00


1 Instalasi Titik Nyala Ttk 5.000 125,000.00 625,000.00
2 Pas. Downlight LED Bh 5.000 130,000.00 650,000.00
3 Saklar Tunggal Broco Bh 1.000 60,000.00 60,000.00
4 Stop Kontak Bh 2.000 60,000.00 120,000.00

XV. PEKERJAAN LAIN-LAIN 300,000.00


1 Pembersihan Akhir Ls 1.000 300,000.00 300,000.00

JUMLAH TOTAL 85,933,754.87


JUMLAH TOTAL 85,933,754.87
PEMBULATAN 85,933,000.00
TERBILANG : DELAPAN PULUH LIMA JUTA SEMBILAN RATUS TIGA PULUH TIGA RIBU RUPIAH

Dibuat Oleh

DESKREIYEAR TIWA
Pelaksana