RENCANA ANGGARAN BIAYA ( OE )

DAFTAR KUANTITAS DAN HARGA

NAMA PAKET / PEKERJAAN : WATERPROOFING COATING TALANG DAN ATAP BETON


LOKASI : JL. PAHLAWAN NO. 102-108 SURABAYA
TAHUN ANGGARAN : 2019
A
N
n
o
l
Harga Jumlah
s
No. Uraian Pekerjaan Volume Sat. Satuan Harga Referens
( Rp. ) ( Rp. )
c
a b T d e f g = (dxf) h
.
0
1 Pembersihan Lokasi V
2 1.00 ls 3,500,000.00 3,500,000.00
I.
2 Pengelupasan/pengerokan Plesteran Eksisting 2,985.94 m2 17,600.00 52,552,544.00
.a
3 Bongkar Pasang Atap Solar Plate 1 1.00 ls 7,500,000.00 7,500,000.00
4 Buangan Sisa Bongkaran 1.00 ls 4,000,000.00 4,000,000.00
5 Penambalan dak bagian bawah 92.88 m2 54,000.00 5,015,520.00
6 Penambalan dak bagian atas 92.88 m2 54,000.00 5,015,520.00
7 Waterproofing Plat Dak 2,985.94 m2 300,000.00 895,782,000.00
8 Waterproofing Talang 345.72 m2 300,000.00 103,716,000.00
9 Pengecatan Dinding Parapet 535.50 m2 16,282.20 8,719,118.10
10 Pipa PVC AW 3 (talang) 28.00 m 28,000.00 784,000.00
11 Pasang Roof drain 56.00 bh 75,000.00 4,200,000.00
12 Screeding t.5 cm 166.58 m3 62,700.00 10,444,566.00
T
13 Injection Retak beton . 1,948.00 titik 75,000.00 146,100,000.00
14 Sepatu Safety 0 17.00 bh 475,000.00 8,075,000.00
6
15 Helm 17.00 bh 76,500.00 1,300,500.00
.
16 Masker a 17.00 bh 16,000.00 272,000.00
. 17.00 bh 45,000.00 765,000.00
17
### Sarung Tangan 1
JUMLAH BIAYA KONSTRUKSI 1,257,741,768.10
PAJAK PPN 10% 125,774,177
JUMLAH BIAYA SELURUHNYA 1,383,515,945
JUMLAH BIAYA DIBULATKAN Rp 1,383,515,000.00
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF! Lembar ke : 2

VOLUME
No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu Bongkaran Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Siaran Plesteran
Tanah Galian Luar Belah/Kali Pasangan Bongkaran Hole K. 175
M3 M3 M3 M3 M2 M2 M3 M3 M M3 M2 M3 Bh
P2
GALIAN P 2

1 0.50 X 0.20 X 0.40 = 0.04

2 0.50 X 0.19 X 0.37 = 0.04

3 0.37 X 1.40 = 0.52

0.59 M2
GALIAN P1 - P2
0.86 + 0.59 X 50.00 = 36.42 36.42
2

GALIAN P 3
1 0.50 X 0.26 X 0.18 = 0.02

2 0.50 X 0.27 X 0.27 = 0.04

3 0.20 X 1.40 = 0.28

0.34 M2

GALIAN P2 - P3
0.59 + 0.34 X 50.00 = 23.33 23.33
2

P3
TIMBUNAN P 1
A - + - X 0.30 = -
2

- M2

TIMBUNAN P2
0.50 X 0.11 X 0.24 = 0.01

0.50 X 0.12 X 0.24 = 0.01

0.03 M2

0.50 X 0.35 X 0.55 = 0.10

0.50 X 0.53 X 0.40 = 0.11

0.20 M2

TIMBUNAN P2 - P3
0.03 + 0.20 X 50.00 = 5.75 5.75
2

SUB TOTAL 59.75 - 5.75 - - - - - - - -


TIME SCHEDULE
NAMA PAKET / PEKERJAAN : WATERPROOFING COATING TALANG DAN ATAP BETON
LOKASI : JL. PAHLAWAN NO. 102-108 SURABAYA
TAHUN ANGGARAN : 2019

Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Referensi
( Rp. ) ( Rp. )
a b d e f g = (dxf) h 1

1 Pembersihan Lokasi 1.00 ls 3,500,000.00 3,500,000.00 0.28% 0.3%


2 Pengelupasan/pengerokan Plesteran Eksisting 2,985.94 m2 17,600.00 52,552,544.00 4.18%
3 Bongkar Pasang Atap Solar Plate 1.00 ls 7,500,000.00 7,500,000.00 0.60%
4 Buangan Sisa Bongkaran 1.00 ls 4,000,000.00 4,000,000.00 0.32%
5 Penambalan dak bagian bawah 92.88 m2 54,000.00 5,015,520.00 0.40%
6 Penambalan dak bagian atas 92.88 m2 54,000.00 5,015,520.00 0.40%
7 Waterproofing Plat Dak 2,985.94 m2 300,000.00 895,782,000.00 71.22%
8 Waterproofing Talang 345.72 m2 300,000.00 103,716,000.00 8.25%
9 Pengecatan Dinding Parapet 535.50 m2 16,282.20 8,719,118.10 0.69%
10 Pipa PVC AW 3 (talang) 28.00 m 28,000.00 784,000.00 0.06%
11 Pasang Roof drain 56.00 bh 75,000.00 4,200,000.00 0.33%
12 Screeding t.5 cm 166.58 m3 62,700.00 10,444,566.00 0.83%
13 Injection Retak beton 1,948.00 titik 75,000.00 146,100,000.00 11.62%
14 Sepatu Safety 17.00 bh 475,000.00 8,075,000.00 0.64% 0.1%
15 Helm 17.00 bh 76,500.00 1,300,500.00 0.10% 0.0%
16 Masker 17.00 bh 16,000.00 272,000.00 0.02% 0.0%
17 Sarung Tangan 17.00 bh 45,000.00 765,000.00 0.06% 0.0%
100.00%

1,257,741,768.10

Jumlah Harga Pekerjaan


0.3%
0.3%
ULE

1 2 3

2 3 4 1 2 3 4 1 2 3 4

2.1% 2.1%

0.6%

0.3%

0.4%

0.4%

23.7% 23.7% 23.7%

4.1% 4.1%

0.7%

0.1%

0.3%

0.8%

3.9% 3.9% 3.9%

0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% `

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

2.8% 2.5% 0.9% 27.9% 27.9% 23.9% 1.1% 0.9% 3.9% 3.9% 3.9%
3.1% 5.6% 6.4% 34.4% 62.3% 86.2% 87.3% 88.2% 92.1% 96.1% 100%

Trenggalek, ……… 2019


PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah


Tanah Galian Luar
M3 M3 M3

P0 - P3
bongkaran pas batu

0.17 x 0.92 x 2.00 = 0.31

0.12 x 1.12 = 0.13

0.45

0.45 x 150.00 = 67.08 m3

Galian Tanah
0.15 x 0.92 x 2.00 = 0.28

0.18 x 1.39 = 0.25


0.53

0.53 x 150.00 = 78.93 m3 78.93


-

SUB TOTAL 78.93 - -

-
Lembar ke : 1

VOLUME
Pas. Batu Bongkaran Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Siaran Plesteran
Belah/Kali Pasangan Bongkaran Hole K. 175
M3 M2 M2 M3 M3 M M3 M2 M3 Bh

67.08
- - - 67.08 - - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu
Tanah Galian Luar Belah/Kali
M3 M3 M3 M3

P0 - P3
Pas. Bekas bongkaran

0.10 x 0.92 x 2.00 = 0.18

0.12 x 0.99 = 0.12

0.30

0.30 x 150.00 x 0.50 = 22.71 m3

Pas. Baru
0.20 x 0.92 x 2.00 = 0.37

0.18 x 1.39 = 0.25


0.62

0.62 x 150.00 = 92.73 m3 92.73


-

SUB TOTAL - - - 92.73

-
Lembar ke : 2

VOLUME
Bongkaran Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Siaran Plesteran
Pasangan Bongkaran Hole K. 175
M2 M2 M3 M3 M M3 M2 M3 Bh

22.71
- - - 22.71 - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu
Tanah Galian Luar Belah/Kali
M3 M3 M3 M3
P 3'
GALIAN P 3'
1 0.50 x 0.20 x 0.49 = 0.05

2 0.50 x 0.30 x 0.81 = 0.12


3 1.47 + 1.49 x 0.30 = 0.44
2

=
0.61 M2

GALIAN P 4
1 0.50 x 0.20 x 0.49 = 0.05

2 0.50 x 0.30 x 0.81 = 0.12


3 1.47 + 1.18 x 0.30 = 0.40
2

0.57 M2

GALIAN P3' - P4
0.61 + 0.57 X 50.00 = 29.56 29.56
2
P4

SUB TOTAL 29.56 - - -


Lembar ke : 3

VOLUME
Bongkaran Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Siaran Plesteran
Pasangan Bongkaran Hole K. 175
M2 M2 M3 M3 M M3 M2 M3 Bh
- - - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu
Siaran
Tanah Galian Luar Belah/Kali
M3 M3 M3 M3 M2

GALIAN P 5
1 1.46 + 1.18 X 0.30 = 0.40
2
2 0.50 X 0.30 X 0.49 = 0.07

3 0.50 X 0.51 X 0.79 = 0.20

0.67 M2
GALIAN P4 - P5
0.57 + 0.67 X 50.00 = 30.97 30.97
2

GALIAN P 6
1 1.44 + 1.18 X 0.30 = 0.39
2
2 0.50 X 0.30 X 0.45 = 0.07

3 0.50 X 0.40 X 0.75 = 0.15


0.61 M2

GALIAN P5 - P6
0.67 + 0.61 X 50.00 = 32.04 32.04
2

SUB TOTAL 63.01 - - - -


Lembar ke : 4

VOLUME
Bongkaran Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Plesteran
Pasangan Bongkaran Hole K. 175
M2 M3 M3 M M3 M2 M3 Bh
- - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF! Lembar ke : 5

VOLUME
No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu Bongkaran
Pas. Bekas Drain Geotextil Bronjong Dolken
Siaran Plesteran
Tanah Galian Luar Belah/Kali Pasangan
Bongkaran Hole
M3 M3 M3 M3 M2 M2 M3 M3 M M2 M3 Bh

GALIAN P 7
1 1.48 + 1.18 X 0.30 = 0.40
2
0.50 X 0.24 X 0.54 = 0.06

0.50 X 0.44 X 0.62 = 0.14

0.60 M2
GALIAN P6 - P7
0.61 + 0.60 X 50.00 = 30.27 30.27
2

GALIAN P8
1 1.28 + 1.18 X 0.08 = 0.10
2
2 0.50 X 0.23 X 0.97 = 0.11

3 0.18 + 0.04 X 1.01 = 0.11


2

0.32 M2

GALIAN P7 - P8
0.60 + 0.32 X 50.00 = 23.10 23.10
2

#REF!

SUB TOTAL 53.37 - - - - - - - - -


PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF! Lembar ke : 6

VOLUME
No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu Beton Geotextil Bronjong Dolken
Siaran Plesteran
Tanah Galian Luar Belah/Kali K. 175
M3 M3 M3 M3 M2 M2 M3 M2 M3 Bh

GALIAN P 9
1 1.45 + 1.18 X 0.35 = 0.46
2
2 0.50 X 0.24 X 0.30 = 0.04

3 0.45 + 0.09 X 0.81 = 0.22


2
0.71 M2
GALIAN P8-P9
0.32 + 0.71 X 50.00 = 25.97 25.97
2

GALIAN P10
1 1.18 + 1.74 X 0.39 = 0.56
2
2 0.50 X 0.27 X 0.50 = 0.07

3 0.30 + 0.60 X 0.50 = 0.23


2
0
,
3 0.86 M2
9
GALIAN P9 -P10
0.71 + 0.86 X 50.00 = 39.27 39.27
2

#REF!

SUB TOTAL 65.24 - - - - - - - - -


PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah


Tanah Galian Luar
M3 M3 M3

GALIAN P 11
1 0.12 + 0.50 X 0.70 = 0.22
2
2 0.19 + 0.45 X 0.73 = 0.23
2
3 1.55 + 1.18 X 0.51 = 0.70
2
1.15 M2
GALIAN P10- P11
0.32 + 1.15 X 50.00 = 36.92 36.92
2

GALIAN P12
1 1.18 + 1.45 X 0.35 = 0.46
2
2 0.50 X 0.51 X 0.60 = 0.15
0.6
0.6
3 0.50 X 0.14 X 0.60 = 0.04
0.35
0.66 M2

GALIAN P11- P12


1.15 + 0.66 X 3.50 = 3.16 3.16
#REF! 2

SUB TOTAL 40.08 - -


Lembar ke : 7

VOLUME
Pas. Batu Beton Geotextil Bronjong Dolken
Siaran Plesteran
Belah/Kali K. 175
M3 M2 M2 M3 M2 M3 Bh
- - - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

V
No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu
Siaran
Tanah Galian Luar Belah/Kali
M3 M3 M3 M3 M2

1 PEKERJAAN PASANGAN
POTONGAN P.0 A

0.30 x 0.80 x 2.00 = 0.48

1.40 X 0.30 = 0.42


0.90

F = 0.90
0
, X 150.00 = - -
3
0

Plesteran 0.38 x 2.00 x 150.00 = 114.00

#REF! Siaran 0.72 x 2.00 x 150.00 = 216.00 216.00


0.80 x 1.00 x 150.00 = 120.00 120.00
SUB TOTAL - - - - 336.00
Lembar ke : 8

VOLUME
Bongkaran
Pas. Bekas
Drain Beton Geotextil Bronjong Dolken
Plesteran
Pasangan
Bongkaran
Hole K. 175
M2 M3 M3 M M3 M2 M3 Bh

114.00
114.00 - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

VOL
No. SKET GAMBAR POTONGAN PERHITUNGAN Galian Timbunan Tanah Pas. Batu
Tanah Galian Luar Belah/Kali
M3 M3 M3 M3

1 PEKERJAAN PASANGAN
POTONGAN P.0 A 0.90 + 1.16 X 0.30 = 0.31
2

0.31 X 2 = 0.62

0.80 + 1.36 X 0.30 = 0.32


2 0.94

F = 0.94

0.94 X 403.50 = 380.10 380.10

#REF! Plesteran 0.38 x 2.00 x 403.50 = 306.66


#REF!
Siaran 0.85 x 2.00 x 403.50 = 685.95
0.80 x 1.00 x 403.50 = 322.80
SUB TOTAL - - - 380.10
Lembar ke : 9

VOLUME
Bongkaran
Pas. Bekas
Drain
BetonGeotextil Bronjong Dolken
Siaran Plesteran
Pasangan
Bongkaran
HoleK. 175
M2 M2 M3 M3 M M3 M2 M3 Bh

306.66

685.95
322.80
1,008.75 306.66 - - - - -
PERHITUNGAN VOLUME
PROGRAM : #REF!
#REF!
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!

VOLUME
No. REKAPITULASI Galian Timbunan Tanah Pas. Batu Bongkaran
Siaran Plesteran
Tanah Galian Luar Belah/Kali Pasangan
M3 M3 M3 M3 M2 M2 M3

Lembar ke 1 78.93 - - - - - 67.08

Lembar ke 2 - - - 92.73 - - -

Lembar ke 3 29.56

Lembar ke 4 63.01 - - - - - -

Lembar ke 5 53.37 - - - - - -

Lembar ke 6 65.24 - -

Lembar ke 7 40.08 - - - -

Lembar ke 8 - - - - 336.00 114.00 -

Lembar ke 9 - - - 380.10 1,008.75 306.66 -


-

SUB TOTAL 300.63 - - 472.83 1,344.75 420.66 67.08


Lembar ke : 11

VOLUME
Pas. Bekas Drain Beton Geotextil Bronjong Dolken
Bongkaran Hole K. 175
M3 M M3 M2 M3 Bh

- - - - -

22.71 - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
22.71 - - - -
UPAH TENAGA KERJA DAN HARGA BAHA K.9 HAL. 1.1
RUAL ROAD DEVELOPMENT
PROPINSI: JAWA TIMUR KODE : 35
PROGRAMME TH. 2019
KABUPATEN: TRENGGALEK KODE : 03
UPAH (Rp./hari) TH.2019
NO. TENAGA KERJA KODE
(Dataran Rendah NON PPN)
Setelah Revisi
1 Buruh semi terlatih L.103 75,000
2 Buruh tak terlatih L.101 70,000
3 Buruh terlatih L.106 80,000
4 Juru Ukur - 120,000
5 Kepala Tukang L.073 87,500
6 Mandor L.061 90,000
7 Mekanik semi terlatih L.072 85,000
8 Mekanik terlatih L.071 95,000
9 Operator Loader / Excavator - 200,000
10 Operator semi terlatih L.082 100,000
11 Operator terlatih L.081 150,000
12 Pekerja - 70,000
13 Pembantu operator L.083 75,000
14 Pembantu sopir L.099 75,000
15 Penjaga Mesin Gilas - 70,000
16 Sopir terlatih L.091 100,000
17 Sopir pribadi L.092 100,000
18 Tukang Batu / Besi / Aspal / Cat L.079 85,000
19 Juru Ukur memakai pesawat L.080 400,000
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan be
Misal : Buldozer, Motor Grader, Wheel Loader, Asphalt finisher dan lain-lain
**) Operator yang mengoperasikan peralatan untuk melayani pekerjaan berat yang agak ringan.
Misal : Steel Wheeled Roller, Stamper, Mechanical Ranmer, Concrete Mixer / mesin pengaduk beton dan lain-lai
HARGA / SATUAN (Rp.) TH. 2019
NO BAHAN / MATERIAL KODE SATUAN
(Dataran Rendah NON PPN)
Setelah Revisi
1 A i r ( Diangkut sejauh 3 km ) M- m3 82.90
2 Agregat halus 0,2 - 0,5 cm M027 m3 288,300
3 Alat-alat bantu *) M170 set 142,000
4 Angker Bolt (20 kg) - set 68,250
5 As-Buton M062 tone 2,500,000
6 Aspal Drum (sewaktu-waktu ada M061 kg 9,100
7 perubahan harga mengikuti
Aspal Curah (sewaktu-waktu M061-A kg 7,350
harga
ada yang berlaku
perubahan / mengikuti
harga harga
8 Baja konstruksi / Profil M165 kg 11,250
perubahan
harga yang tersebut)
berlaku / harga
9 Baja Sling D.14 mm M- m' 36,250
perubahan tersebut)
10 Baja Sling D.32 mm M- m' 191,600
11 Baja tulangan beton / Besi beton ( M167 A kg 9,100
12 Baja tulangan beton / Besi beton ( M167 kg 9,000
13 Bambu Bronjong M- bt 18,900
14 Bambu Bongkotan M- bt 17,800
15 Bambu Ori M- bt 21,400
16 Bambu Apus / Tali M- bt 10,450
17 Batang Kelapa M- bt 664,100
18 Batu Belah 7 - 10 cm M021 m3 199,100
19 Batu Belah 10 - 15 cm / 10 - 20 cm M020 m3 199,100
20 Batu Belah 15 - 25 cm M- m3 198,550
21 Batu Belah / Batu Gebal M17 m3 115,000
22 Batu Belah / Batu Kali M- m3 115,000
23 Batu Brobos MD. Palimanan M- m3 122,250
24 Batu Brobos MD. Suruh M- m3 141,100
25 Batu Gunung (quarry) M010 m3 210,000
26 Batu Kali quari M- m3 210,000
27 Batu merah M- bj 750
28 Batu muka M- m2 45,000
29 Batu pecah 0,2 - 1 cm (Pecah mesin M026 m3 261,250
30 Batu pecah 1 - 2 cm M025-A m3 353,800
31 Batu pecah 1 - 2 cm (Pecah mesin) M025 m3 235,100
32 Batu pecah 2 - 3 cm M024 m3 304,500
33 Batu pecah 2 - 3 cm (Pecah mesin) M024-A m3 224,650
34 Batu pecah 3 - 5 cm M023 m3 284,500
35 Batu pecah 3 - 5 cm (Pecah mesin) M023-A m3 209,000
36 Batu pecah 5 - 7 cm M022 m3 198,550
37 Batu quarry pecah tersaring M018 m3 250,200
38 Batu quarry-royalti MR10 m3 218,200
39 Baut baja/Begel M163 kg 9,950
40 PERTALITE (sewaktu-waktu ada M184 ltr 7,650
41 perubahan harga mengikuti
Besi galvanis d. 2" SNI SPINDO M164 m' 74,400
harga yang berlaku / harga
42 Besi galvanis d. 3" SNI SPINDO M- m' 107,500
perubahan tersebut)
43 Bodem M- bh 70,550
44 Besi Kanal C 10/UNP M- kg 14,350
45 Besi Siku M- kg 10,850
46 Besi Plat M- kg 10,850
47 Besi Plat Strip M- kg 11,000
48 Besi Bulat ST 60 M- kg 18,200
49 Besi Cor M- kg 25,200
50 Begisting Plat Baja M- kg 32,500
51 Bronze (Murhes) C2 M- bh 2,205,000
52 Bronze (Murhes) C3 M- bh 1,680,000
53 Bronze (Murhes) B* M- bh 2,992,500
54 Bronjong pabrikasi (2x1x0,5; Æ 2,7 mm)M- bh 255,000
55 Bronjong pabrikasi (2x1x0,5; Æ 3,0 mm)M- bh 313,450
56 Buis beton d. 100 (50 cm) M035 m' 105,000
57 Buis beton d. 40 - 100 cm M030 m' 80,000
58 Buis beton d. 50 (50 cm) M032 m' 50,000
59 Buis beton d. 60 (50 cm) M031 m' 70,000
60 Buis beton d. 80 (50 cm) M033 m' 90,000
61 Cat Tembok M- kg 23,600
62 Cat Jembatan/Emco M090 kg 57,500
63 Cat Marka Jalan (Thermo plastic) - m2 41,800
64 Cat Marka M- kg 20,300
65 Cat Meny Besi M- kg 35,300
66 Cat Putih Seng Bron M- kg 27,250
67 Cetok M- bh 20,000
68 Dolken kayu & sejenis d. 15 -20 cm M- bt 69,300
69 Dolken kayu jati d. 15 - 20 cm P. 2 M- bt 110,200
70 Druklager Besar M- bh 446,250
71 Druklager Kecil M- bh 357,000
72 Elektrode Baja RB M- kg 40,600
73 Ember M- bh 10,300
74 Filler M- kg 1,600
75 Gedek M- lbr 62,700
76 Gemuk / Stemvet M- kg 35,000
77 Geotextile Non Woven tbl:1,4 M- m2 15,750
78 dan berat : 250 gr/m2
Gergaji M- bh 40,500
79 Gergaji Besi M- bh 13,600
80 Glass bit M- kg 36,600
81 Grosok brantas M- m3 250,000
82 Gunting pemotong baja M- bh 261,250
83 Gembok - bh 31,350
84 Ijuk M- kg 20,900
85 Kapur Sirih M- m3 530,400
86 Kasut Kayu M- bh 9,750
87 Kawat baja (bindrat) M168 kg 18,500
88 Kawat bronjong M162 kg 20,900
89 Kawat galvanis 4 mm (BWG 8) M- kg 19,500
90 Kawat duri M- kg 15,700
91 Kawat Harmonika M- m2 30,000
92 Kawat Burung M- m2 13,750
93 Kawel B 32 mm M- bj 75,000
94 Kawel K 14 mm M- bj 50,000
95 Kayu acuan M180 m3 5,140,800
96 kayu bakar M070 m3 241,750
97 Kayu Balau M- m3 11,493,150
98 Kayu Balau Papan M- m3 12,538,000
99 Kayu Jati Lokal M- m3 18,500,000
100 Kayu Kamper M- m3 9,403,500
101 Kayu Kruing M- m3 7,313,850
102 Kayu Meranti M- m3 6,269,000
103 Kayu Tahun M- m3 2,612,100
104 Kayu untuk konstruksi jembatan M181 m3 10,448,300
105 Papan kayu bowplank / begisting - m3 2,415,000
106 Karung plastik (56-58 x 98-100) D - bh 5,250
107 Kantong plastik (56-58 x 98-100) t - bh 5,250
108 Keranjang M- bh 17,300
109 Kereta dorong M- bh 506,750
110 Kerikil sungai tak tersaring M.013 m3 235,100
111 Kerikil galian-royalti M.011 m3 218,200
112 Kerikil sungai - dipungut royalti MR.012 m3 261,400
113 Kerikil galian pecah tersaring M.014 m3 235,100
114 Kertas Gosok M- lbr 3,750
115 Kotak adukan M- bh 20,900
116 Kuas Eterna 2" - 5" M- bh 11,100
117 Kunci pembengkok tulangan M- bh 23,900
118 Meteran M- bh 33,300
119 Minyak aspal M064 ltr 14,700
120 Minyak bakar (sewaktu-waktu M065-A ltr 11,300
121 ada perubahan harga
Minyak Cat tiner A mengikuti M- ltr 26,150
harga yang berlaku / harga
122 Minyak Cat tiner B M- ltr 15,500
perubahan tersebut)
123 Minyak Diesel / Solar Subsidi M183 ltr 5,450
124 (sewaktu-waktu
DEXLITE/Minyak ada perubahan
Diesel/ Solar M- ltr 9,550
harga mengikuti
Industri harga
(sewaktu-waktu yang
dapat
125 Mini Pile 200 mm x 200 mm x 4 M- m' 261,700
berlaku
berubah)/ harga perubahan
126 Minyak flux
tersebut) M063 ltr 11,700
127 Minyak Pelumas M185 ltr 26,000
128 Minyak Begisting ltr 8,900
128 Minyak Tanah (sewaktu-waktu M065 ltr 15,100
129 ada perubahan harga mengikuti
Mur Baut 1/2", 5/8", 7/8" - kg 20,900
harga yang berlaku / harga
130 Nipple - bh 7,800
perubahan tersebut)
131 Na F + Ring - bh 262,500
132 Ongkos Kerja Konstruksi - kg 12,000
133 Ongkos Kerja Mesin - kg 20,000
134 Ongkos Kerja Kayu - m3 1,040,400
135 Paku Jembatan M166 kg 22,000
136 Paku payung M- kg 26,150
137 Paku usuk / reng M- kg 16,750
138 Pal KM M- bh 263,000
139 Palu M- bh 28,750
140 Paku keling 3/4', 5/8', 7/8' - kg 18,850
141 Pasir ayak beton (Brantas) M041 m3 100,000
142 Pasir Brantas M041-A m3 100,000
143 Pasir pasang lokal M041-B m3 105,000
144 Pasir urug M040 m3 100,000
145 Patok Pengarah M- bh 125,600
146 Patok kayu uk. 4 x 6 x 50 cm M- m3 5,231,000
147 Paving stone warna Non Konstruk M082 bh 1,400
148 Paving stone polos Non Konstruks M- bh 1,300
149 Paving stone warna K.175 M- bh 1,300
150 Paving stone polos K.175 M- bh 1,250
151 Paving stone warna K.225 M- bh 1,400
152 Paving stone polos K.225 M- bh 1,350
153 Pipa PVC 1,5" (sejenis naga sakti) M- m' 11,250
154 Pipa PVC 2" (sejenis naga sakti) M- m' 12,500
155 Pipa - kg 16,100
156 Pengecatan tanpa sand - m2 125,000
157 Plat Bronze - kg 108,300
158 Pisau Besar M- bh 36,700
159 Plamur kayu M- kg 27,700
160 Plamur tembok M- kg 6,600
161 Rambu jalan M- bh 735,000
162 Rumput tempel M- m2 3,700
163 Rubber joint Filer - m' 23,400
164 Roda Gigi M. 10 (285 ) kg - ps 3,225,000
165 Semen PC M080 40kg/zak 47,050
166 Semen PC M- 50kg/zak 60,000
167 Semen PC M- kg 1,200
168 Sirtu Lokal / Urug M- m3 144,200
169 Spie - bh 26,250
170 Split Pen / Pengunci - bh 47,250
171 Seal Karet - m' 446,250
172 Sandblasting & Cat Besi - m2 181,800
173 Tang pemotong kawat M- bh 25,100
174 Timbris - unit 31,700
175 Tanah urug - m3 75,000
176 Multiplek 6 mm - lbr 85,000
177 Timbunan biasa M050-A m3 65,000
178 Timbunan pilihan M050 m3 75,000
179 Jarum penengeras 32 mm - bj 100,000
180 Jarum penengeras 14 mm - bj 47,300
181 Pelindung seling 32 mm - bj 72,100
182 Pelindung seling 14 mm - bj 22,300
183 Tusuk Bambu - bh 250
184 Tali Rafia - m 260
185 Banner - m2 20,500
186 Pahat Beton (Betel) - jam 25,000
187 Linggis - Bh 36,600
188 Rool meter - Bh 80,000
189 Tambang ijuk/plastik - m 2,000
190 Kawat Las Kg 25,000
191 Karung plastik (56-58 x 98-100) Bh 6,300
192 Diner 1000 dg
Sewa Mesin Printing 3 Warna
Las - Hr 275,000
193 Sewa Chain Saw (42.600 x 5 jam) - jam 213,000
194 Sewa Kereta Dorong - hr 100,400
195 Sewa Pesawat Ukur - Hr 131,200
196 Sewa Alat Strouss Pile set 6,500
197 Sewa Tripot dan Timbris. - jam 187,400
198 Sewa Vibrator Beton. - jam 144,600
199 Sewa Jack Hammer (47.500 x 5 jam) - Hr 126,000
200 Sewa Stamper (44.800 x 5 jam) - Hr 120,700
201 Sewa Pompa Air - Hr 132,900
202 Sewa Molen (85.500 x 5 jam) - unit/hr 100,000
203 Sewa Excavator jam 765,900
204 Sewa Buldozer jam 1,098,000
205 Sewa Pile Driver + Hammer jam 276,300
206 Rantai kg 23,000
207 Pillow block bh 450,750

Catatan PENTING : jarak dari pelabuhan terdekat


*) Alat-alat yang diperlukan untuk menyelesaikan pekerjaan- tempat pengiriman aspal dan besi (kelipatan 5
pekerjaan tanah, pembersihan lain-lain dengan menggunakan km) km
tenaga manusia (labour intensive)

Misal :
1 cangkul atau skop ……...Rp. 61,000 Trenggalek, tgl - - 2019

1 parang…………………………Rp. 45,000 + PEJABAT PEMBUAT KOMITMEN


Dinas Pekerjaan Umum dan Penataan Ruang
1 pikulan dan 2 bakul …..Rp. 36,000 + Kabupaten Trenggalek
=
JUMLAH untuk 3 alat-alat.Rp. 142,000

JOKO WIDODO, SST.MT


NIP. 19740313 199901 1 001
HAL. 1.1

TH. 2019

KETERANGAN

alatan untuk melayani pekerjaan berat

an berat yang agak ringan.


mesin pengaduk beton dan lain-lain.

KETERANGAN
abuhan terdekat
dan besi (kelipatan 5

- - 2019

AT KOMITMEN
dan Penataan Ruang
Trenggalek

DO, SST.MT
199901 1 001
ANALISA HARGA SATUAN

Kabupaten : Trenggalek
No. Jenis Pekerjaan : T.02.a1
Jenis Pekerjaan : Uitset Trase Saluran

Harga Satuan
No Uraian Koefisien Satuan
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja. 0.012 OH 70,000
2 Pembantu Juru Ukur 0.004 OH 75,000
3 Juru Ukur. 0.004 OH 400,000
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Waterpass 0.004 Sewa/hari 131,200.00
2 Theodolith 0.004 Sewa/hari 131,200.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m' (D+E)

ANALISA HARGA SATUAN

Kabupaten : Trenggalek
No. Jenis Pekerjaan : T.06.a.1
Jenis Pekerjaan : Galian tanah biasa sedalam ≤ 1 m

Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja 0.5630 OH 70,000.00
2 Mandor 0.0563 OH 90,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m3 (D+E)

ANALISA HARGA SATUAN

Kabupaten : Trenggalek
No. Jenis Pekerjaan : P.01.e.1
Bongkar 1 m3 pasangan Batu Belah / Kali dan p
Jenis Pekerjaan :
Batu Belah / Kali (manual)
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Mandor 0.140 OH 90,000.00
2 Pekerja 1.400 OH 70,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Bodem 0.008 Bh 70,550.00
2 Pahat Beton 0.012 Bh 25,000.00
3 Linggis 0.020 Bh 36,600.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m3 (D+E)

P.01.c.2 Menggunakan Molen

Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja OH 1.800 70,000.00
2 Tukang Batu OH 0.900 85,000.00
3 Mandor OH 0.180 90,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu Belah / Kali m3 1.200 115,000.00
2 Pasir Brantas m3 0.520 100,000.00
3 Portland Cement kg 163.000 1,200.00
Jumlah Harga Bahan
C Peralatan
1 Molen Sewa/Hari 0.076 100,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m3 (D+E)

Mortar tipe N (untuk mutu PP tertentu setara dengan campuran 1 PC:4 PP, pasangan Batu B
P.01.c.2.a
bekas bongkaran)

Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja OH 1.800 70,000.00
2 Tukang Batu OH 0.900 85,000.00
3 Mandor OH 0.180 90,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu Belah / Kali m3 0.000 115,000.00
2 Pasir Brantas m3 0.520 100,000.00
3 Portland Cement kg 163.000 1,200.00
Jumlah Harga Bahan
C Peralatan
1 Molen Sewa/Hari 0.076 100,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m3 (D+E)

ANALISA HARGA SATUAN

Kabupaten : Trenggalek
No. Jenis Pekerjaan : P.03
Jenis Pekerjaan : Pekerjaan siaran dengan mortar jenis PC-PP (1 m

P.03.a Siaran dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan campuran 1

Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja OH 0.300 70,000.00
2 Tukang Batu OH 0.150 85,000.00
3 Kepala Tukang OH 0.015 87,500.00
4 Mandor OH 0.030 90,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Brantas m3 0.012 100,000.00
2 Portland Cement kg 6.340 1,200.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m2 (D+E)

ANALISA HARGA SATUAN

Kabupaten : Trenggalek
No. Jenis Pekerjaan : P.04
Jenis Pekerjaan : Pekerjaan plesteran dengan mortar jenis PC-PP

P.04.a Trasraam tebal 1 cm, dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara deng
PC:2 PP)

Harga Satuan
No Uraian Satuan Koefisien
(Rp)
1 2 3 4 5

A Tenaga Kerja
1 Pekerja OH 0.300 70,000.00
2 Tukang Batu OH 0.150 85,000.00
3 Kepala Tukang OH 0.015 87,500.00
4 Mandor OH 0.030 90,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Brantas m3 0.014 100,000.00
2 Portland Cement kg 7.240 1,200.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan per - m2
Permen PU 28/2016
Jumlah
(Rp)
6

840.00
300.00
1,600.00
2,740.00

524.80
524.80
1,049.60
3,789.60
568.44
4,358.04

Permen PU 28/2016
Jumlah
(Rp)
6

39,410.00
5,067.00
44,477.00

-
44,477.00
6,671.55
51,148.55

Belah / Kali dan pembersihan


Permen PU 28/2016
Jumlah
(Rp)
6

12,600.00
98,000.00
110,600.00

564.40
300.00
732.00
1,596.40
112,196.40
16,829.46
129,025.86

Permen PU 28/2016
Jumlah
(Rp)
6

126,000.00
76,500.00
16,200.00
218,700.00

138,000.00
52,000.00
195,600.00
385,600.00

7,600.00
7,600.00
611,900.00
91,785.00
703,685.00

, pasangan Batu Belah / Kali

Permen PU 28/2016
Jumlah
(Rp)
6

126,000.00
76,500.00
16,200.00
218,700.00

-
52,000.00
195,600.00
247,600.00

7,600.00
7,600.00
473,900.00
71,085.00
544,985.00

ar jenis PC-PP (1 m2)

ngan campuran 1 PC:2 PP)


Permen PU 28/2016
Jumlah
(Rp)
6

21,000.00
12,750.00
1,312.50
2,700.00
37,762.50

1,200.00
7,608.00
8,808.00

-
46,570.50
6,985.58
53,556.08
ortar jenis PC-PP (1 m2)

tentu setara dengan campuran 1

Permen PU 28/2016
Jumlah
(Rp)
6

21,000.00
12,750.00
1,312.50
2,700.00
37,762.50

1,400.00
8,688.00
10,088.00

-
47,850.50
7,177.58
55,028.08