CWP NO. A11-WP8.1-020-FI-MC-205; A01-WP2.

7-
{QRCODE}
020-FI-MC-204; A01-WP2.5-020-FI-MC-203; A05-
WP4.8-000-FI-MC-203

MANUFACTURING DATA BOOK - INDEX


FOR PRESSURE VESSELS LOT 2.2 (CS LP)
UNIT 0000
GENERAL
FACILITIES
SD-UJV
DOCUMENT STATUS SIGNED DATE
1 - Accepted as Submitted (Submit Certified Final)
2 - Revise and Resubmit - Incorporate Comments,
Up-rev and Resubmit
3 - Rejected - Document Unacceptable, Revise and
Re-submit (work can proceed where not
impacted by this rejection)
Next Revision 4 - Review not required
SCF – SUPPLIER Certified Final
AA ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVE SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT / PURCHASE ORDER

A 11/11/22 OA JA CO CERTIFIED FINAL


OD 29/08/22 OA JA CO RE-ISSUED FOR
REVIEW OC 21/06/22 OA JA CO RE-ISSUED FOR
REVIEW OB 12/05/22 OA JA CO RE-ISSUED FOR
REVIEW OA 13/04/22 OA JA CO RE-ISSUED FOR
REVIEW O 21/03/22 OA JA CO ISSUED FOR REVIEW
ISSUE DATE BY CHKD APPD DESCRIPTION
WHEN REVISION HAS BEEN MADE TO THIS DOCUMENT THE INDEX OF ISSUE SHALL BE INDICATED IN A
TRIANGLE NEAR THE PART(S) CONCERNED
CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED

This document is confidential. The copyright therein is vested in


Nigeria LNG Ltd.
Recipients must obtain the written authority of the said company before
wholly or partly duplicating these contents or disclosing the same to others.
“NLNG TRAIN7”
All rights reserved.
DISCIPLINE: MEC

LOCATION: BONNY ISLAND, NIGERIA PROJECT: NLNG TRAIN


7 Company Project No: B190170NTP
Contractor Project No: N88480
NIGERIA LNG LTD
Page 1 of 4
UNIT: 0000 MANUFACTURING DATA BOOK -
INDEX Company Doc NoT-14.428.706
FOR PRESSURE VESSELS LOT 2.2 (CS Contractor Doc No: LG00-RC-E-28706
PO NUMBER
1383847
LP) UNIT 0000 - GENERAL Vendor Doc No: MGV-SDUJV-T7-QAC-REC-
FACILITIES 00027
MG VOWGAS LIMITED
Include Document number & Title for all GAD
MANUFACTURING DATA BOOK - INDEX

SECT. DESCRIPTION BOOK PAGE


1 CONTRACTOR UNPRICED PURCHASE ORDER
2 CONTRACTOR MATERIAL REQUISITION
3 SUB-VENDOR LIST
4 UNPRICED SUB-ORDERS
5 APPROVED INSPECTION & TEST PLAN
T-14.428.698-INSPECTION AND TEST PLAN (ITP) FOR OFF
5.1 GAS KO DRUM (6-V-2073)
T-14.428.699-INSPECTION AND TEST PLAN (ITP) FOR
5.2 PENTANE RECEIVER (6-V-2081)
T-14.428.700-INSPECTION AND TEST PLAN (ITP) FOR
5.3
3PHASE SEPARATOR (7-V-1202)
T-14.428.701-INSPECTION AND TEST PLAN (ITP) FOR
5.4 DEBUTANISER REFLUX DRUM (7-V-1570)
T-14.428.701-INSPECTION AND TEST PLAN (ITP) FOR
5.5 INSTRUMENT AIR BUFFER VESSEL (V- Include Document number & Title
4701G)
for ITP for Head forming
SSURE
T-14.428.804-INSPECTION AND TEST PLAN (ITP) FOR
5.6 SURFACE PREPARATION AND PAINTING FOR 5.8
PRE VESSELS LOT 2.2 (CS LP)
T-14.428.807-INSPECTION AND TEST PLAN FOR
5.7 GIRTH FLANGE FOR OFF GAS KO DRUM (6-V-2073)
6 APPROVED WAIVER REQUIREMENTS
7 CLOSED-OUT NON-CONFORMITIES (NCR)
8 APPROVED GENERAL ARRANGEMENT DRAWING
9 APPROVED DATA SHEETS N/A
10 APPROVED PROCEDURES
T-14.428.685--PROJECT QUALITY PLAN FOR PRESSURE
10.1 VESSELS LOT 2.2 (CS LP)
T-14.428.686--PAINTING SPECIFICATION AND
10.2 PROCEDURE FOR PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.693--NON-DESTRUCTIVE TEST(NDT)
10.3 PROCEDURE FOR PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.695--WELD REPAIR PROCEDURE FOR PRESSURE
10.4 VESSELS LOT 2.2 (CS LP)
T-14.428.696--HEAT TREATMENT PROCEDURE ( PWHT)
10.5 FOR PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.697--HYDROSTATIC/FLUSHING/PNEUMATIC
10.6 TEST PROCEDURE FOR PRESSURE VESSELS LOT 2.2(CS
LP) B190170NTP

NLNG TRAIN 7
PROJECT
Company Project No: B19017NTP
LOCATION: BONNY ISLAND, PROJECT: NLNG TRAIN 7 Contractor Project No: N88480
NIGERIA NIGERIA LNG LTD Page 2 of 5
UNIT 0000 MANUFACTURING DATA BOOK - INDEX FOR Company Doc No: T-14.428.706
PRESSURE Contractor Doc No: LG00-RC-E-28706
VESSELS LOT 2.2 (CS LP) UNIT 0000 GENERAL Vendor Doc No: MGV-SDUJV-T7-QAC-REC-00027
T-14.428.703--WELDING CONSUMABLE CONTROL
10.7
PROCEDURE FOR PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.705--PACKING, MATERIAL HANDLING AND
10.8 TRACEABILITY PROCEDURE FOR PRESSURE VESSELS
LOT
T-14.428.803--HEAD COLD FORMING PROCEDURE FOR
10.9
PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.805--DIMENSIONAL CONTROL PROCEDURE
10.10
FOR PRESSURE VESSELS LOT 2.2 (CS LP)
T-14.428.806-GIRTH FLANGE FORMING PROCEDURE
10.11
FOR OFF GAS KO DRUM (6-V-2073)
T-14.428.808- NDT PROCEDURE FOR GIRTH FLANGE FOR
10.12
GAS KO DRUM (6-V-2073)
T-14.428.809-HARDNESS TEST PROCEDURE FOR
10.13
PRESSURE VESSELS LOT 2.2 (CS LP)

APPROVED WELDING DOSSIER (WPS / PQR /


11
WPQR / WELDER'S CERTIFICATES)
12 U-STAMP CERTIFICATES N/A
13 TEST CERTIFICATES
13.1 PO ITEM #1 - TAG No 6-V-2073 (OFF GAS KO DRUM)
MATERIAL USED FOR FABRICATION (TRACEABILITY
13.1.1
LIST + MATERIAL CERTIFICATES 3.1 / 2.2)
13.1.2 WELD MAP & WELD LOG
13.1.3 NDE REPORTS
13. 1.4 HARDNESS TEST REPORT
13.1.5 HYDROSTATIC TEST REPORTS
13.1.6 PNEUMATIC/LEAK TEST REPORT
13.1.7 VISUAL / DIMENSIONAL REPORTS
13.1.8 DISH ENDS NORMALIZING HEAT TREATMENT REPORT
13.1.9 PAINTING REPORTS
13.1.10 OTHER TEST REPORTS
13.2 PO ITEM #2 – TAG No 6-V-2081 (PENTANE RECEIVER)
MATERIAL USED FOR FABRICATION (TRACEABILITY
13.2.1
LIST + MATERIAL CERTIFICATES 3.1 / 2.2)
13.2.2 WELD MAP & WELD LOG
13.2.3 NDE REPORTS
13.2.4 HARDNESS TEST REPORT
13.2.5 HYDROSTATIC TEST REPORTS
13.2.6 PNEUMATIC/LEAK TEST REPORT
13.2.7 VISUAL / DIMENSIONAL REPORTS
B190170NTP

NLNG TRAIN 7
PROJECT
Company Project No: B19017NTP
LOCATION: BONNY ISLAND, PROJECT: NLNG TRAIN 7 Contractor Project No: N88480
NIGERIA NIGERIA LNG LTD Page 3 of 5
UNIT 0000 MANUFACTURING DATA BOOK - INDEX FOR Company Doc No: T-14.428.706
PRESSURE Contractor Doc No: LG00-RC-E-28706
VESSELS LOT 2.2 (CS LP) UNIT 0000 GENERAL Vendor Doc No: MGV-SDUJV-T7-QAC-REC-00027
13.2.8 PAINTING REPORTS
13.2.9 OTHER TEST REPORTS
13.3 PO ITEM #3- TAG No 7-V-1202 (3PHASE SEPARATOR)
MATERIAL USED FOR FABRICATION (TRACEABILITY
13.3.1
LIST + MATERIAL CERTIFICATES 3.1 / 2.2)
13.3.2 WELD MAP & WELD LOG
13.3.3 NDE REPORTS
13.3.4 HARDNEST TEST REPORT
13.3.5 HYDROSTATIC TEST REPORTS
13,3.6 PNEUMATIC/LEAK TEST REPORT
13.3.7 VISUAL / DIMENSIONAL REPORTS
13.3.8 DISH END NORMALIZING HEAT TREATMENT REPORT
13.3.9 POST WELD HEAT TREATMENT (PWHT) REPORT
13.3.10 PAINTING REPORTS
13.3.11 OTHER TEST REPORTS
PO ITEM #4- TAG No 7-V-1570 (DE-BUTANISER
13.4
REFLUX DRUM)
MATERIAL USED FOR FABRICATION (TRACEABILITY
13.4.1
LIST + MATERIAL CERTIFICATES 3.1 / 2.2)
13.4.2 WELD MAP & WELD LOG
13.4.3 NDE REPORTS
13.4.4 HARDNESS TEST REPORT
13.4.5 HYDROSTATIC TEST REPORTS
13,4.6 PNEUMATIC/LEAK TEST REPORT
13.4.7 VISUAL / DIMENSIONAL REPORTS
13.4.8 PAINTING REPORTS
13.4.9 OTHER TEST REPORTS
PO ITEM #5- TAG No V-4701G (INSTRUMENT AIR
13.5
BUFFER VESSEL)
MATERIAL USED FOR FABRICATION (TRACEABILITY
13.5.1
LIST + MATERIAL CERTIFICATES 3.1 / 2.2)
13.5.2 WELD MAP & WELD LOG
13.5.3 NDE REPORTS
13.5.4 HARDNESS TEST REPORT
13.5.5 HYDROSTATIC TEST REPORTS
13.5.6 PNEUMATIC/LEAK TEST REPORT
13.5.7 VISUAL / DIMENSIONAL REPORTS
13.5.8 PAINTING REPORTS
13.5.9 OTHER TEST REPORTS B190170NTP

NLNG TRAIN 7
PROJECT
Company Project No: B19017NTP
LOCATION: BONNY ISLAND, PROJECT: NLNG TRAIN 7 Contractor Project No: N88480
NIGERIA NIGERIA LNG LTD Page 4 of 5
UNIT 0000 MANUFACTURING DATA BOOK - INDEX FOR Company Doc No: T-14.428.706
PRESSURE Contractor Doc No: LG00-RC-E-28706
VESSELS LOT 2.2 (CS LP) UNIT 0000 GENERAL Vendor Doc No: MGV-SDUJV-T7-QAC-REC-00027
14 COPY OF NAMEPLATE
15 HAZARDOUS AREA CERTIFICATES N/A
15.1 RESUMING TABLE
15.2 CERTIFICATES

APPENDIX 01 – SHIPPING DOSSIER (SD)

SECT. DESCRIPTION BOOK PAGE


A01.1 CERTIFICATE / DECLARATION OF CONFORMITY
A01.2 CONTRACTOR RELEASE NOTES (NTM)
A01.3 LIFTING EQUIPMENT CERTIFICATION
A01.4 HAZARDOUS MATERIAL SHIPMENT N/A
A01.5 CERTIFICATION
COSHH DATA SHEETS N/A
A01.6 PACKING LIST

APPENDIX 02 - PRESERVATION DOSSIER (PD)

SECT. DESCRIPTION BOOK PAGE


A02.1 APPROVED PRESERVATION PROCEDURE/JOB
A02.2 CARD
PRESERVATION ACTIVITIES REPORT

B190170NTP

NLNG TRAIN 7
PROJECT
Company Project No: B19017NTP
LOCATION: BONNY ISLAND, PROJECT: NLNG TRAIN 7 Contractor Project No: N88480
NIGERIA NIGERIA LNG LTD Page 5 of 5
UNIT 0000 MANUFACTURING DATA BOOK - INDEX FOR Company Doc No: T-14.428.706
PRESSURE Contractor Doc No: LG00-RC-E-28706
VESSELS LOT 2.2 (CS LP) UNIT 0000 GENERAL Vendor Doc No: MGV-SDUJV-T7-QAC-REC-00027