1 Scope............................................................ 2
2 Purpose......................................................... 2
3 Applicable Documents.................................. 2
4 Definitions..................................................... 3
5 Responsibilities............................................. 3
1 Scope
1.1 This Saudi Aramco Inspection Procedure (SAIP) shall be used to identify,
investigate and, document substandard equipment/material procured directly by
Saudi Aramco Purchasing Department or by Contractors for Saudi Aramco
projects. Equipment Deficiency Reports (EDR) through SAP (quality
notification type Q4) will be used to report deficiencies.
1.2 EDR's are issued when a newly purchased inspectable material arrives at a Saudi
Aramco plant or project site with a major deficiency (manufacturing problem or
deviation from purchase order requirements), or when it fails prematurely after
being put in service due to manufacturing problems.
1.3 Excluded from this procedure are materials considered non-inspectable by the
Inspection Department.
2 Purpose
The purpose of this SAIP is to ensure that the reporting, investigation, and
documentation of equipment deficiencies are handled consistently; this includes proper
feedback to the EDR Coordinator, EDR Originator, and other appropriate organizations
and that necessary corrective action is taken to prevent recurrence of deficiencies.
The purpose of the EDR process is to determine the root cause of the problem, record
the actions taken to correct the problem, and to avoid reoccurrence in the future. EDR
is to measure the effectiveness of the manufacturer's quality system and the
effectiveness of the inspection process.
3 Applicable Documents
Page 2 of 7
Document Responsibility: Inspection Dept. 00-SAIP-12
Issue Date: 1 October 2007
Next Planned Update: 30 September 2012 Equipment Deficiency Reports
4 Definitions
EDR Originator: An individual who creates and submits the EDR through SAP
notification (type Q4) to report the equipment deficiency.
Substandard Material: Any material delivered to Saudi Aramco that does not meet
material specifications, either as stated in the purchase order or fails in use when
installed in Saudi Aramco facilities.
5 Responsibilities
5.1.1 The EDR originator shall gather all required information to report
equipment deficiency, and then create EDR quality notification (type
Q4) in SAP. Whenever possible, he should attach to the EDR
notification copy of related documents (e.g., purchase order, change
orders and project specifications, etc.).
5.1.2 Project Engineer, project quality manager, and assigned Saudi Aramco
Inspection Representative shall be included in the interested party
section for all project material EDRs.
Page 3 of 7
Document Responsibility: Inspection Dept. 00-SAIP-12
Issue Date: 1 October 2007
Next Planned Update: 30 September 2012 Equipment Deficiency Reports
5.1.3 Once the EDR originator changes the quality notification status to
"Submitted", the system will automatically forward the EDR via SAP
workflow to the VID EDR Coordinator for further processing.
The EDR Coordinator shall perform the following functions when he receives
the EDR by workflow:
a) Review the EDR and ensure that it clearly specifies the purchase order,
vendor/manufacturer, manufacturing plant location, material/equipment,
and description of the deficiency with reference to the specific violated
requirement. EDRs that lack this information should not be approved.
EDR coordinator should contact EDR originator requesting the missing
information. When EDR originator fails to provide required information
within one week, EDR coordinator should refuse the notification with an
explanation for refusal.
e) Once all tasks are completed, he reviews the EDR corrective actions and
decides if additional tasks are necessary to ensure that these defects will
not recur in the future.
f) After the new tasks have all been completed, he once again reviews the
notification and if satisfied that the EDR has solved the problems related to
Page 4 of 7
Document Responsibility: Inspection Dept. 00-SAIP-12
Issue Date: 1 October 2007
Next Planned Update: 30 September 2012 Equipment Deficiency Reports
g) Prepare a monthly EDR status report and submit it to the RIO supervisors
and to the Superintendent of the Vendor Inspection Division. Individual
EDR can be accessed in SAP at any time.
All interested parties including the originator of the EDR notification are
notified that the EDR is completed.
a) Review the task forwarded to him by the EDR Coordinator via SAP
workflow.
b) Assign the EDR task to the appropriate inspectors within the Inspection
Office.
c) Track all on-going EDR tasks assigned to his Inspection Office and ensure
that actions are taken and followed-up.
5.4 Responsible Inspection Office Inspector: The assigned inspector shall do the
following:
e) Update the information in SAP concerning what has been done to correct
the deficiency and prevent recurrence in the future. He shall attach related
documents to the task in SAP.
Page 5 of 7
Document Responsibility: Inspection Dept. 00-SAIP-12
Issue Date: 1 October 2007
Next Planned Update: 30 September 2012 Equipment Deficiency Reports
f) Once all actions are taken and data are entered in the SAP system, he will
then complete the task of the EDR notification and report investigation
results along with initiated corrective action. The SAP system will then
automatically inform the EDR Coordinator.
Revision Summary
1 October 2007 Revised the "Next Planned Update. Reaffirmed the contents of the document and reissued
with minor changes.
Page 6 of 7
Document Responsibility: Inspection Dept. 00-SAIP-12
Issue Date: 1 October 2007
Next Planned Update: 30 September 2012 Equipment Deficiency Reports
~!
E D R C r e a te d / S u b m itte d b y
O r ig in a to r
E D R R e v ie w e d b y V ID E D R
C o o r d in a to r
No
O r ig in a to r & In te r e s te d
A c c e p te d
P a r tie s n o tifie d
Yes
A s s ig n T a s k to R IO
R IO C o n ta c t M a n u fa c tu r e r /
In s p e c tio n A g e n c y
R IO S e n d F e e d b a c k to E D R
C o o r d in a to r
E D R C o o r d in a to r C o m p le te
EDR
In te r e s te d P a r tie s N o tifie d
Page 7 of 7