Nothing Special   »   [go: up one dir, main page]

PEC + IR April 2022

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

CERTIFICATION

I hereby certify that the following items of works consisting of 1 month (covering
(March 24 – April 23, 2022) has been accomplished in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.

1) A.1.1(15) Operation & Maintenance of Temporary Field Office, Laboratory and


Living Quarters Building for the Engineer
2) A.1.1(6) Provision of Combined Field Office, Laboratory and Living Quarters
Building for the Engineer (Rental Basis)
3) B.7 Occupational Safety and Health Program

This certification is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

CERTIFICATION

this is to certify that the water used on all concreting works in the 18B00053:
Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Bridge Program: Replacement of Permanent Weak Bridges –
Abusag Bridge (B04258lZ) along Baybayog – Baggao – Dalin – Sta.
Margarita Road Baggao, Cagayan, was found to be clean and free from
deleterious substances.

This certification is issued in connection with the construction of the above-


mentioned project, under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 2,842.11 sq. m
(Covering (March 24 – April 23, 2022) for the Item 411() Paint been checked and
inspected in accordance with the Department of Public Works and Highways
Standard Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 82.71 cu. m
(Covering (March 24 – April 23, 2022) for the Item 505(2)a Grouted Riprap,
Class “A” been checked and inspected in accordance with the Department of Public
Works and Highways Standard Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 10.77 cu. m
(Covering (March 24 – April 23, 2022) for the Item 506(1) Stone Masonry been
checked and inspected in accordance with the Department of Public Works and
Highways Standard Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 94.50 cu. m
(Covering (March 24 – April 23, 2022) for the Item 511(1) Gabion been checked
and inspected in accordance with the Department of Public Works and Highways
Standard Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 84.67 sq. m
(Covering (March 24 – April 23, 2022) for the Item 511(2) Filter Cloth been
checked and inspected in accordance with the Department of Public Works and
Highways Standard Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 1,062.50 ln. m
(Covering (March 24 – April 23, 2022) for the Item 603(3) a1 Metal Guardrail
(Metal Beam) including Post, W-Beam been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 10.00 each
(Covering (March 24 – April 23, 2022) for the Item 603(4) b Metal Beam End
Piece, Bull Nose been checked and inspected in accordance with the Department
of Public Works and Highways Standard Specifications and Special Provisions of
contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 502.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 612(1) Reflectorized
Thermoplastic Pavement Markings (White) been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 262.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 612(2) Reflectorized
Thermoplastic Pavement Markings (Yellow) been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

April 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 54.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 618(1) Reflectorized
Thermoplastic Rumble Strips been checked and inspected in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer