PEC + IR April 2022
PEC + IR April 2022
PEC + IR April 2022
CERTIFICATION
I hereby certify that the following items of works consisting of 1 month (covering
(March 24 – April 23, 2022) has been accomplished in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
CERTIFICATION
this is to certify that the water used on all concreting works in the 18B00053:
Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Bridge Program: Replacement of Permanent Weak Bridges –
Abusag Bridge (B04258lZ) along Baybayog – Baggao – Dalin – Sta.
Margarita Road Baggao, Cagayan, was found to be clean and free from
deleterious substances.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 2,842.11 sq. m
(Covering (March 24 – April 23, 2022) for the Item 411() Paint been checked and
inspected in accordance with the Department of Public Works and Highways
Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 82.71 cu. m
(Covering (March 24 – April 23, 2022) for the Item 505(2)a Grouted Riprap,
Class “A” been checked and inspected in accordance with the Department of Public
Works and Highways Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 10.77 cu. m
(Covering (March 24 – April 23, 2022) for the Item 506(1) Stone Masonry been
checked and inspected in accordance with the Department of Public Works and
Highways Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 94.50 cu. m
(Covering (March 24 – April 23, 2022) for the Item 511(1) Gabion been checked
and inspected in accordance with the Department of Public Works and Highways
Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 84.67 sq. m
(Covering (March 24 – April 23, 2022) for the Item 511(2) Filter Cloth been
checked and inspected in accordance with the Department of Public Works and
Highways Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 1,062.50 ln. m
(Covering (March 24 – April 23, 2022) for the Item 603(3) a1 Metal Guardrail
(Metal Beam) including Post, W-Beam been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 10.00 each
(Covering (March 24 – April 23, 2022) for the Item 603(4) b Metal Beam End
Piece, Bull Nose been checked and inspected in accordance with the Department
of Public Works and Highways Standard Specifications and Special Provisions of
contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 502.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 612(1) Reflectorized
Thermoplastic Pavement Markings (White) been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 262.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 612(2) Reflectorized
Thermoplastic Pavement Markings (Yellow) been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 54.00 sq. m
(Covering (March 24 – April 23, 2022) for the Item 618(1) Reflectorized
Thermoplastic Rumble Strips been checked and inspected in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer