Integration Dans Le Systéme de Contrôle
Integration Dans Le Systéme de Contrôle
Integration Dans Le Systéme de Contrôle
ANNEX
DOCUMENT NUMBER
AZ-0014-PRO-AEE-0004
REVISION 00
DOCUMENT ISSUED FOR: REVIEW
DATE 11/03/2021
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND CAN NOT BE DUPLICATED, MODIFIED OR DISCLOSED TO
THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT IS INTENDED FOR, WITHOUT
THE WRITTEN CONSENT OF COBRA.
—
Test Documentation
Site Acceptance Test-Report
ABB Responsible Click here to enter text Client Click here to enter text
X X
Project Manager Site Manager
Azito Energies
Language EN
ABB Switzerland Ltd Doc. No. 1KHF374450
Page 1/16
2) Verify Static Objects Static objects are shown with the correct symbols and colors ☐ ☐
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 3/16
© Hitachi Power Grids. 2020. All rights reserved.
S10-PICS Process related pictures Bay Picture
Step Name Expected Result Passed Failed Comment
1) Verify Display of Bay Picture Display complies with document.
☐ ☐
2) Verify Static Objects Static objects are shown with the correct symbols and colors ☐ ☐
3) Check devices status information 1) Device status is shown with actual value.
☐ ☐
2) Subdialog shows the correct values
2) Dynamic Busbar coloring (de-energized) De-energized section appears in correct color according ☐ ☐
Functional Description
3) Dynamic Busbar coloring (energized) Color changed back according voltage level
☐ ☐
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 4/16
© Hitachi Power Grids. 2020. All rights reserved.
Panel Device Test Final checks (ST)
Step Name Expected Result Passed Failed Comment
3) Labels are complete
2) Terminals check All terminals are in the position they should be
☐ ☐
2) Check signals according signallist All tested signals have to be marked in signallist
☐ ☐
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 5/16
© Hitachi Power Grids. 2020. All rights reserved.
SPLYREDUN RTU Supply Redundancy Redundant Power Supply
Step Name Expected Result Passed Failed Comment
Make sure system is running on primary 1) Supply should not get interrupted
☐ ☐
power supply 2) Error reported in RTU system
Check automated switching to secondary 1) Secondary power supply takes over without interruption
☐ ☐
power supply 2) Error reported in RTU system
Check automated switching to primary 1) Primary power supply takes over without interruption
☐ ☐
power supply 2) Error reported in RTU system
D1 220kV
Loose Devices Loose Devices
Loose Material, Prometer 100 -, SN: WP023515
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 6/16
© Hitachi Power Grids. 2020. All rights reserved.
Energy Energy Measurement Function Test
Step Name Expected Result Passed Failed Comment
2) Reactive Power Reactive Power Measurement and Pulse Outputs are according ☐ ☐
injection (Export / Import)
Q14 Incomer
Panel, Panel -, SN: -
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 7/16
© Hitachi Power Grids. 2020. All rights reserved.
Communication Signaltest and Timesync Function Test
Step Name Expected Result Passed Failed Comment
1) Signal Test Tested Signals are marked in the signal list and stored on ☐ ☐
project drive
2) Check of Time & Time-zone 1) Time is synchronized with GPS time
☐ ☐
2) Timezone is according country local time
4) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram
☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 8/16
© Hitachi Power Grids. 2020. All rights reserved.
BLK Blocking conditions Function Test
Step Name Expected Result Passed Failed Comment
1) Cranke Handle The corresponding switch or the complete feeder is blocked ☐ ☐
(according concept)
2) SF6 Gas 1) The corresponding alarms are generated
☐ ☐
2) The corresponding alarms and blockings are according
blocking concept
3) Double Operation Interlocking 1) Each selection is sending a reservation signal (Hardwired ☐ ☐
Output or GOOSE-Signal)
2) All switching objects are blocked
4) Spring Pressure 1) Circuit breaker can be operated. Corresponding alarm is given ☐ ☐
after x seconds. Autoreclosure is not released
2) CB open command is possible. CB close command is blocked.
Corresponding alarm(s) is/are given
3) CB open and close commands are blocked. Corresponding
alarm(s) is/are given
5) Drive Not Ready 1) Alarm e.g. "drive not ready"
☐ ☐
2) Operation is still possible in cubicle as blocking is done in
drive itself
6) Trip Circuit Supervision CB close command is not possible
☐ ☐
3) Operating Mode OFF: Operation is not possible from Local and Remote
☐ ☐
LOCAL: Operation is possible from control unit only
REMOTE: Operation is possible from SAS only
EMERGENCY: Operation is possible from Mimik only
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 9/16
© Hitachi Power Grids. 2020. All rights reserved.
CMD Command handling Antipumping
Step Name Expected Result Passed Failed Comment
1) Precondition Circuit Breaker opens
☐ ☐
2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 10/16
© Hitachi Power Grids. 2020. All rights reserved.
Power Power Measurement Function Test
Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band
☐ ☐
2) Nominal Values Active and Reactive Power are according injection and single ☐ ☐
line diagram
3) Power Factor CosPhi is according injection
☐ ☐
2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 11/16
© Hitachi Power Grids. 2020. All rights reserved.
50N Instantaneous earth fault protection Function Test
Step Name Expected Result Passed Failed Comment
3) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram
☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
4) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
5) Function as Backup Protection Protection Function is blocked and is not tripping
☐ ☐
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 12/16
© Hitachi Power Grids. 2020. All rights reserved.
TCS Trip circuit suppervision Function Test
Step Name Expected Result Passed Failed Comment
1) Pre-Conditions No Supervision Alarms
☐ ☐
2) Initiation with current The function is only tripping if the current is above the pick-up ☐ ☐
value
3) Initiation without current The function is only tripping if the CB Position is closed ☐ ☐
(independently of the current)
4) ReTrip Time (t1) Tripping times according to setting calculations
☐ ☐
5) Backup Time (t2) Tripping times according to setting calculations
☐ ☐
6) Trip / Close Block The function trips and close block is according to the trip ☐ ☐
matrix concept
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 13/16
© Hitachi Power Grids. 2020. All rights reserved.
50BF Breaker failure protection Function Test
Step Name Expected Result Passed Failed Comment
7) LEDs / Output Relais 1) The LEDs are according to the I/O-List or Schematic Diagram
☐ ☐
2) The Outputs are according to the I/O-List or Schematic
Diagram
8) Blocking The blocking conditions are according to the trip matrix ☐ ☐
concept
9) Inspection and Maintenance Isolator positions are simulated accordingly and an alarm is ☐ ☐
indicated
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 14/16
© Hitachi Power Grids. 2020. All rights reserved.
87B Busbar protection Stability check (ST)
Step Name Expected Result Passed Failed Comment
1) Isolator auxiliary conctacts operation Auxilliary contact opens/closes according isolator sequence in ☐ ☐
sequence schematic attached
2) Breaker auxiliary contacts operation 1) Close command is active till CB is actually closed
☐ ☐
sequence 2) All CB close comands are connected to busbar protection
device (LCC, Mimic, AR, etc.)
3) Stability check The system is stable
☐ ☐
2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 15/16
© Hitachi Power Grids. 2020. All rights reserved.
Power Power Measurement Function Test
Step Name Expected Result Passed Failed Comment
1) Settings measurement transfer mode The setting for the measurement is set to Integral Dead Band
☐ ☐
2) Nominal Values Active and Reactive Power are according injection and single ☐ ☐
line diagram
3) Power Factor CosPhi is according injection
☐ ☐
2) Nominal Values Primary and secondary values are according injection and single ☐ ☐
line diagram
Test Documentation Azito Combined Cycle Power Plant 1KHF374450 [Customer Number] A 16/16