Ref: IRCON/30 I 8/DFCCIL-CTP-12/MH/00 13 Date:- July 16, 2021

IRCON International Limited,


(DFCC Vaitarana-Sachin of Western Corridor Phase-2)
Civil, Building and Track Works, Package-CTP-12
Project Office: 1/7/2 Vaishnav Nagri, Nr. Ayappa Temple,
Atul-Pamera Road, Dist. Valsad- 396 001
Email: ircon.30l 8@ircon.org

Sub.:- Regarding resolving the issue of running source of water at Vangaon Site towards the LOA no.
IRCON/3018/DFCCIL-CTP-12/Misc. Building/08-330/6169 dated 22.09.2020 for 'Construction of depot
Building, Service building, Residential Building, Electrical substation and balance work at station building at
Ancheli, Pardi & Gholvad DFC Crossing Stations in Gujarat state and at saphale & palghar Crossing station in
Maharashtra State along with residential quarters at Kelve Road,Boisar & palghar nearby Indian Railway
stations of Vaitarana-sachin section in connection with construction of Western Dedicated Freight Corridor
Phase -II (CTP-12)'

Ref.:-
1. LOA no. IRCON/30 l 8/DFCCIL-CTP-12/Misc. Building/08-330/6169 dated 22.09.2020
2. Progress review meeting at IRCON Mumbai officie (dated 07.07.2021),
3. Progress review meeting at IRCON Ancheli Office (dated 09.07.2021),
4. Vangaon Site visit in the presence of Mr. Yash Goyal (IRCON), Mr. Arun V (IRCON), Mr. Rakesh
(IRCON), Mr. Ajay Mehra (ACPL), Mr. Manish Sorout (ACPL), Mr. Rakesh Razak (ACPL) & Mr.
Kuldeep Yadav (ACPL) dated 10.07.2021

Dear Sir,
As we raised the issue/concern of diverting the running sources of water at Vangaon site during the
PRM's held at IRCON Mumbai Office (dated 07.07.2021) and IRCON Ancheli Office (dated 09.07.2021), a
visit of Mr. Yash Goyal (AGM-IRCON) was planned to visit the Vangaon site next day, but, after visiting the
Vangaon site, it was concluded that the situation of Vangaon site is not in the condition to resume the
construction activities there due to the running source of water. Many times we have used our best efforts to
drain out the water from the pits but without diverting the running source of water, the building area can't be
drained out. Since the water is coming from the nearby 2-3 drains/Naala, and the ROB side, hence we are
requesting you to please take an appropriate step towards the diversion of running source of water from building
area, so that the construction activities can be resumed there. Presently we are facing a lot of financial loss there
due to stopping of our all the construction activities. Our all the machineries, assets as well as the manpower is
idle due to it.
You are requested to please resolve the aforementioned issue at the earliest, so that, the unexpected
wastage/idleness of resources as well as time, can be avoideatnere.

CC-to - - - - --
. - - -ORCON) bharat.i"athore@ircon.org; rm.kam~a~ircon.org;..l!BIDY@ircon.org; -kconvangaon@gmail.com

(ACPL) ajaymehra@akankshagroup.co.in; alokgupta@graphisads.com: pm.maharashtra@akankshagroup.co.in;


mkspc2@gmail.com;

Reg. Office: C-6/23, Safdarjung Development Area, New Delhi-110016


Uo~,-1 ("\ffi,-. 0 . (' '1 "l ')nd C'lnr"'· cntt. ri.ll~rl,o+ l\lou, nolhi '1 '1 nn-1 a:

You might also like