CONSULTING SERVICES FOR “DETAILED PROJECT REPORT FOR CONSTRUCTION OF BRIDGE ACROSS
SHARAVATHI BACKWATERS NEAR SIGANDHUR IN SAGARA TALUK, SHIVAMOGGA DISTRICT DPR
2
CONSULTING SERVICES FOR “DETAILED PROJECT REPORT FOR CONSTRUCTION OF BRIDGE ACROSS
SHARAVATHI BACKWATERS NEAR SIGANDHUR IN SAGARA TALUK, SHIVAMOGGA DISTRICT DPR
post further travel towards west to reach Sullahalli village and further to Kargal to join SH-50
and further NH-206 at Jog. The economy of the region and the agricultural activity has
suffered for quite long due to the absence of a direct connectivity.
It is a missing link for a length of 2.425 Kms i.e., from Km 31.700 to 34.125 of NH-369E
With a view to inviting bids for the Project, the Executive Engineer, National Highways
Division, Chitradurga (hereinafter called Employer) has decided to conduct a feasibility
study for determining the technical feasibility of the Project. If the Project found technically
feasible and financially/economically viable, the Project may be awarded on EPC basis to a
private entity (the “Contractor”) selected through a competitive bidding process. The Project
would be implemented in accordance with the terms and conditions stated in the EPC
agreement to be entered into between the Authority PW,P&IWTD [NH] and the Contractor
(the EPC Agreement)
In pursuance of the above, the Employer has decided to carry out the process for selection of
a Technical Consultant, for preparing the Detailed Project Report and bid documents through
Executive Engineer, National Highways Division, Chitradurga (hereinafter called Employer)
The Technical Consultant shall prepare the Detailed Project Report in accordance with the
Terms of Reference (the “TOR”).