PROJECT: AFJAT MUAITHER RPS &

BILL OF QUANTITIES BILL NO:


ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

BILL NO. 1

PRELIMINARIES AND GENERAL


REQUIREMENTS

GTC/899/2017 1/1 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.

Notes
- Each item in the Preliminaries shall be priced
individually and the Contractor shall not enter any
lump sum covering more than one item or group
of items. It is mandatory that all items of Bill no. 1
to be priced.

Contract Administration
A Allow for all costs related to superintendence,
administration, coordination, attaining all required
permits and RO's, building permits, etc..., all
costs involved in the preparation and submission
of all procedures, method statements, reports,
documentation by fixed photos and video through
the construction period...etc., required for the
implementation of the works. All in accordance
with Specifications.
IM
B Site Mobilization
Allow for all costs involved in the mobilization of all
labor, supervision personnel, construction
materials, equipments & plants, transport,
consumables etc. which are required to set up all
project sites including the cleaning of the site, the
removal of the dirt and debris to approved dump
sites, etc. and necessary fire and safety
equipments all in accordance with Specifications. IM

Carried Forward to Collection

GTC/899/2017 1/2 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.

A Storage of Materials & Facilities for Contractor


Allow for Providing, erecting adequate temporary
sheds for the storage of materials, tools, and
equipments and temporary Contractor Office,
Sanitary facilities for the use of all persons
employed on the Sites.
Those used for the storage of cement and other
perishable materials and the like are to be
weatherproofed at all times.

IM

B Allow for maintaining the stores and other


Contractor facilities during the entire period of the
contract. IM

C Project Sign Boards


Allow for providing and erecting of Signboards in
Arabic & English, Trench Notice Boards, Barriers
for trenches to the specifications and as directed
by the Engineer etc. for the sites. IM

D Allow for maintaining of Signboards and Barriers


above during the Contract period and afterwards
cleaning away to the specifications and as
directed and approved by the Engineer.
IM

Carried Forward to Collection

GTC/899/2017 1/3 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.

A Project Site Offices


Allow for providing and erecting on site in a
location approved by Kahramaa a site office for
the exclusive use of Kahramaa Engineers to the
specifications and complete with furniture as
described in the scope of works, clause 74.
IM

B Allow for operating and maintaining of above site


offices for Kahramaa Engineers for the full
duration of construction complete as specified.
The Contractor shall be expected to take care of
all site meetings by providing soft drink (tea,
coffee, cold drink) and daily maintain, clean all
rooms, furniture, fittings and WC’s, throughout the
period of the Contract.
IM

C Security of Works and Insurance


Allow for security and insurance for the proposed
works for the entire contract period.
The Contractor shall be entirely responsible for
the security of all the works stores, materials,
plant, personnel, etc. both his own and sub-
contractors and must provide all necessary
watching, lighting and other precaution as
necessary to ensure security against theft, loss or
damage and the protection of the public.
LS

Carried Forward to Collection

GTC/899/2017 1/4 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.

A Existing Services
Prior to the commencement of any work, the
Contractor is to ascertain from the relevant
authority the exact position, depth and level of all
existing services in the area and make what ever
provisions may be required by the authorities
concerned for the support maintenance and
protection of such services
LS

B Demobilization & Site Clearance


Allow for all costs for demobilization of personnel
and removal from site of all constructional plant,
site offices, all temporary works and any other
kind of works not being part of the permanent
works, rubbish, debris and surplus materials,
equipment rubbish, unused materials and leave in
clean and tidy state to the satisfaction of the
Kahramaa Engineer.
IM

Specific Requirements

C Traffic regulation to Specifications IM


D Access Roads to Specifications IM

E Tests of Materials to Specifications IM


F Allow for any other items necessary for the proper
execution of the works and not listed in the items
above. (Provide a detailed List related to all sites)
LS

GTC/899/2017 1/5 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.
Carried Forward to Collection

GTC/899/2017 1/6 PRELIMINARIES


PROJECT: AFJAT MUAITHER RPS &
BILL OF QUANTITIES BILL NO:
ASSOCIATED PIPELINES

PRELIMINARIES AND GENERAL REQUIREMENTS 1

ITEM
ITEM DESCRIPTION UNIT QTY. RATE QR AMOUNT QR
REF.

BILL NO. 1 - PRELIMINARIES - COLLECTION

Total from page 1/2

Total from page 1/3

Total from page 1/4

Total from page 1/5

Carried Forward to General Summary

GTC/899/2017 1/7 PRELIMINARIES