8. MATERIAL CONTROL
8.1 Scope
8.2 Policy
8.3 Responsibility
8.3 Purchasing
8.3.1 Only material permitted by the Code shall be used in the construction of boilers,
pressure vessels & parts to be stamped with ASME Code symbol stamp.
The materials are ordered by Supply Chain manager attaching the Technical
Delivery Condition (TDC) (Exhibit No. 8.01) to the Purchase Order (Exhibit No
8.03).
8.3.3 For welding consumables WE shall prepare the WTDC (Exhibit No-10.11) &
Material Request for welding consumable (Exhibit No-8.02) & QCM shall
approve.
8.3.4 TDC, WTDC & MR is forwarded to the Supply Chain Manager. The Supply
Chain Manager forwards a copy of MR along with TDC and WTDC to SK for
checking whether the material is in stock or not.
8.3.5 For the material not available in stock the Supply Chain Manager prepares
the Purchase Order (Exhibit No. 8.03) according to the MR, WTDC& TDC.
8.3.6 The Supply Chain Manager Send one set of Unpriced P.O., MR, WTDC & TDC
and all necessary attachments to SK & QCM / WE for use during receiving
inspection.
8.4.3 The QCE upon notification from SK shall verify that material is correctly
marked in accordance with the material purchase specification and
material grade as per the Code. QCE verify the markings as per the Code
requirements and shall record his observation on the IMIR (Exhibit No.
8.05). He shall also record the actual marking in the IMIR. Recertification
where necessary shall be done in accordance with Section 8.4.8.
8.4.4 For Welding consumable WE shall verify batch test certificate and clear for
further processing. Batch test may be performed where necessary in
consultation with AI.
SECTION :8
QUALITY CONTROL MANUAL
PAGE : 3 OF 8
ISSUE NO. : A
REVISION : 05
LTEW TITLE : MATERIAL CONTROL
DATE : 10.04.2017
8.4.5 Available stock materials required to use for ASME shall be inspected by
QCE. He will review available marking to verify compliance with applicable
Code requirements. Where necessary MTR / MTC and any additional
material or inspection requirement shall be validated to ensure
conformance to the requirements of Code. If current Edition of the
Specification Call for additional tests, QCE shall raise NCR and undertake
necessary test and resolve also QCE shall certify in accordance with
Section 8.4.8.
Case I
Material received with ASTM materials with year of edition on MTR listed in
Mandatory Appendix II of ASME Sec II Part A/B as applicable and acceptable to
current edition.
The QCE shall verify the material against all the requirements of the required
year/addenda of material specification. After satisfactory verification,
QCE shall re-certify the material on the MTR.
Case II
The QC Engineer shall raise NCR and verify the material against all the
requirements of the required year/addenda of material specification. After
satisfactory verification, he shall re-certify the material on the MTR and submitted
to the AI for his acceptance. He shall prepare a Material Comparison List (Sample
Form- Exhibit 8.09) and attach along with material records as an evidence of
satisfactory verification.
CASE III
8.4.9 The SK is responsible for proper handling, marking and storage of the material
in the ASME stock yard until release. Also SK to take necessary validation for
compliance.
SECTION :8
QUALITY CONTROL MANUAL
PAGE : 5 OF 8
ISSUE NO. : A
REVISION : 05
LTEW TITLE : MATERIAL CONTROL
DATE : 10.04.2017
8.4.10 All accepted material shall be Hard punched the LTEW metal stamp by
QCE. While hard stamping the accepted material necessary care to be
taken as per clause 8.5.Such cases code marking shall be applied in
accordance with Clause 8.7.4.
The loose parts like pipe fittings etc., are attached with a material status
sticker as “ACCEPTED” (Exhibit No. 8.08) and shall be kept in stores.
8.4.11 If the material does not confirm to the requirements of the ASME Code,
specification & PO. QCE will put the remarks on the IMIR & it shall be considered
as Non Conformities and to be handled as per Chapter 14 of the Manual.
8.4.12 All materials which are not conforming to the requirement shall be attached
with a tag/sticker “HOLD“(Exhibit No. 8.08) sticker until NCR is resolved.
8.5 Stamping
Hard stamping shall not be applied to ferrous material less than ¼” (6 mm) and
non ferrous material less than ½” (12 mm) thickness or where the service
conditions prohibit die-stamping for material identification, and so specified by
the user. In this case marking shall be done preferably by etching or engraving or
by permanent paint marker. For ASME Sec VIII Div 2 items, hard stamping shall
be done by commercially available low stress die stamps as per para 3.2.7.2 of
part-3 of ASME Section VIII-Div-2.
8.6.1 Stores keeper shall issue the accepted material for production, against Indent
(Exhibit No 8.07) requested by Planning Engineer.
8.6.2 After receipt of accepted material Production Engineer shall ensure the
correctness of the material being issued and mark the required further markings
and offer the same to QCE.
8.7.1 Before material is cut into two or more pieces, or the original marking is cut out,
the following details shall be marked / stamped on materials for proper
Traceability of materials on each piece and Balance Material.
SECTION :8
QUALITY CONTROL MANUAL
PAGE : 6 OF 8
ISSUE NO. : A
REVISION : 05
LTEW TITLE : MATERIAL CONTROL
DATE : 10.04.2017
Plates: Job No, Part No, MSN, Material Specification and Grade/Type/class
and additional Marking such as MTLTV, UT, Heat No & Plate No.
Pipes: Job No, Part No, MSN, Material Specification and Grade, Heat No/Lot no,
Size and Schedule no.
The QCE shall confirm the proper transfer of marking as per above and record
including IMIR in the Material Heat Chart (Exhibit No 8.06).
8.7.2 If hard stamping of the material is not permitted, the marking shall be done by
engraving or other suitable methods.
8.7.3 For small parts (on which full transfer of identification is not feasible), shall be
Identified with the relevant Part No. and Material grade, other details of such
Material i.e. Heat No, Plate No etc. shall be documented on Material Heat Chart
(Exhibit No. 08.06).
8.7.4 Code marking if used QCM shall establish a procedure and accepted by AI.
8.8.1 Substitution of Material is authorized by the Design Engineer & approved by DEM
shall be subject to the acceptance of the QCM. All material Substitutions require
AI’s acceptance
8.8.2 The Design Engineer shall document material substitution in the design
calculations, if applicable, and shall record the material substitution on the
drawings and TDC which shall be revised as described in this QC Manual
Section 7.9
When supplementary material testing is required (e.g. impact testing) the QCM
shall be responsible for subcontracting to laboratory complying with the Code
requirements for calibration and certification.
All IMIR mentioned in this chapter are made available by the QCM with all
SECTION :8
QUALITY CONTROL MANUAL
PAGE : 7 OF 8
ISSUE NO. : A
REVISION : 05
LTEW TITLE : MATERIAL CONTROL
DATE : 10.04.2017
Accepted test results for review to the AI and are filed in the job file.
8.12.1 Any item received with a Partial Data Report shall be inspected by the QCE for
possible damage and identification with the Partial Data Report.
8.12.2 The QCM shall review the Partial Data Report for completeness and then submit
it to the AI prior to it being used in fabrication.
8.13.1 All Code material supplied by the customer or his designee is received and
inspected as described in section 8.2, 8.3, 8.4 & 8.5.
8.15.1 Materials which do not confirm to Code requirements shall be rejected by QCE in
concurrence with the QCM with the appropriate comments on the corresponding
NCR.
8.15.2 Rejected materials shall be identified with “REJECTED” (Exhibit No. 8.08) tag
and will be stored at separate identified location.
Ordering of Material
In addition to the DIV-1, PO/TDC of DIV.2 material shall include all the supplemental
requirements of the part 3 including but not limited to the following:
Requirements for the material manufacturer to certify that all requirements including
special requirements if any of the material specified have been complied with.
Material received and not satisfy the TDC and PO requirement. The missed
requirement shall be tested by LTEW and it complies the material shall be
certified by LTEW QCE.
The Material test reports shall be made available to AI for his review.