Inspection & Test Plan (Itp)
Inspection & Test Plan (Itp)
JOB NO. :
CLIENT :
CONTRACTOR :
DISTRIBUTION
QA/QC MANAGER
NOTE :
ALTHOUGH ACTIVITIES IN THIS INSPECTION TEST PLAN ARE ARRANGED SEQUENTIALLY, THE ACTUAL SEQUENCE MAY VARY TO SUIT SITE CIRCUMTANCES
C/qc cilacap/itp cilacap/i-t3104-qaqc-003 rev. 0
INSPECTION & TEST PLAN ( ITP )
Rev. :0
LEGENT CLASSIFICATION
NOTIFICATION : Inspection Request in writing and require a minimum of 24 hours notice of impending inspection / test.
H - HOLD POINT : As notification point, however work may not proceed beyond this point without acceptance or formal waiver from Inspection Authority ( Client / Owner )
A1 - 100% INSPECTION OR TEST : Execution or inspection by TJE
A2 - RANDOM INSPECTION : nspection by TJE at random sample.
W - WITNESS : Witness of inspection by Client/Owner & Sub-Contractor may proceed if Client/Owner not appearance at the pointed time
Witness point shall be given by Notification
SW - SPOT WITNESS : Witness of inspection by Client / Owner and to be done at spot or random ( random sample )
R - REVIEW : Review of certificate / document to ensure compliance with specification.
A - APPROVAL : Approval documentation ( Procedure, Work instruction, Inspection report, etc. )
ABBREVIATIONS
AWS = American Welding Society PWHT = Post Weld Heat Treatment ASME = American Society Mechanical Engineers
CSA = Canadian Standard Association ITP = Inspection Test Plan ASNT = American Societ Non Destructive Testing
WPS = Welding Procedure Specification Tech. Spec. = Technical Specification ASTM = American Societ Testing of Material
PQR = Procedure Qualification Report N/A = Not Applicable API = American Petrolium Institute
NDE = Non Destructive Examination WQTR = Welder Qualification Test Record
NOTES
1) Ref. Inspection activities & Approval Section of Document.
a : Where there is a Subcontractor element, the Subcontractor involved will sign the approval of the activity ( NDE/PWHT )
b : Where there is no Subcontractor element, TJE will sign approval of activity and present to the Client.
c : This Inspection Test Plan at INSPECTION ACTIVITY COLUM should be understood to all concers person will be incharge of tank work.
PIPE WORKS
INSPECTION ACTIVITIES
1.0 REVIEW & CHECK OF THE SPECIFICATIONS, PROCEDURES & CONTRACT DOCUMENTS
1.1 Review all technical specifications, procedures & work instructions Drawing Approved Tech. Spec. & R R/A R/A
1.2 All tech. spec., procedures, work instruction shall be clarified, understood and Tech. Specification Procedure R R/A R/A
implemented accordingly Construction Execution Plan
1.3 Finalise deviation, generate new procedure and work instruction if required R R/A R/A
PIPE WORKS
INSPECTION ACTIVITIES
PIPE WORKS
INSPECTION ACTIVITIES
33.0 DOCUMENTATION
4.0 All documents dossier required as per contract shall Drawing All of Inspection Report A1 R/A R/A
collected and submitted to Client and copy for file Tech. Specification
4.1 All Inspection as per Manual or this ITP already done & the inspection Construction Execution Plan A1 R/A R/A
report already generated and signed
4.2 All NCR or any deviation of contract already closed and documented A1 R/A R/A