X7Electrical Instrument Telecommmucation Test Plan
X7Electrical Instrument Telecommmucation Test Plan
X7Electrical Instrument Telecommmucation Test Plan
1|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
A ISSUED FOR APPROVAL Noor Q Mohammed SH
Rev. DESCRIPTION DATE PREP’D CH’D REV’D APP’D
Revision Summary
2|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
TABLE OF CONTENT
3|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002
Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
RH/CN C
RH
N
1. APPROVAL OF THE DOCUMENTS/MATERIAL
Verify & ensure
that
construction Approved Drawing, Approved Approved Drawing, Approved Approved Drawing,
drawings and ITP, ITP, Approved ITP,
1.1 RH H R
controlling Approved procedure and Approved procedure and Approved procedure
procedures are deliverable deliverable and deliverable
the correct
revision
Approved Drawing, Approved
Material
ITP, Material Site
1.2 Installation Approved Drawing, Approved ITP RH H R Vendor
Approved procedure and Acceptance Report
inspection
deliverable
2. GENERAL FOR ELECTRICAL, INSTRUMENTATION & TELECOMMUNICATION
Inspection of 1- CILBCFQ-767-ELE-
1- CILBCFQ-767-ELE-15.03-
Cable and 15.03-
10010_0_SPECIFICATION
Cable 10010_0_SPECIFICAT
FOR POWER, CONTROL Inspection Report:
ION FOR POWER,
Accessories : AND EARTHING CABLE
2.1 CONTROL AND RH H R Inspection of Cable
Trench/ /Cable 2- CILBCFQ-767-ELE-15.03-
EARTHING CABLE Trench
laying 10012_0_SPECIFICATION
2- CILBCFQ-767-ELE-
FOR CABLE TRAYS AND
/Termination 15.03-
LADDERS
and Glands 10012_0_SPECIFICAT
4|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002
Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
/Tagging/Backfil RH/CN
ION FOR CABLE
ling /Junction
TRAYS AND
Box/ Cable LADDERS
Treys/Etc
3. ELECTRICAL
CMIT-711-ELE-15.01-00106- CMIT-711-ELE-15.01-00106- Inspection report :
Inspection of
D2_TYPICAL INSTALLATION D2_TYPICAL INSTALLATION inspection of Solar
3.1 Solar System RH H R
DETAILS-CABLING WITH DETAILS-CABLING WITH System installation
Installation
EXTENSION AREA (SOLAR) EXTENSION AREA (SOLAR)
CILBCFQ-767-ELE-15.03- CILBCFQ-767-ELE-15.03-
Inspection of Inspection report :
10009_0_SPECIFICATION for 10009_0_SPECIFICATION for
3.2 Earthing system RH H R inspection of earthing
EARTHING AND LIGHTNING EARTHING AND LIGHTNING
Installation system installation
SYSTEM SYSTEM
4. instrumentation
Inspection of CILBCFQ-765-INS-15.03- CILBCFQ-765-INS-15.03- Inspection report :
4.1 Tubing 10002_0_SPECIFICATION FOR 10002_0_SPECIFICATION FOR RH H R inspection of Tubing
Installation INSTRUMENT INSTALLATION INSTRUMENT INSTALLATION Installation
Inspection of Inspection report :
CILBCFQ-765-INS-15.03- CILBCFQ-765-INS-15.03-
Field inspection of Field
4.2 10002_0_SPECIFICATION FOR 10002_0_SPECIFICATION FOR RH H R
Instrumentation Instruments
INSTRUMENT INSTALLATION INSTRUMENT INSTALLATION
Installation installation
Inspection of CILBCFQ-710-INS-15.03-11001_A CILBCFQ-710-INS-15.03- Inspection report :
4.3 RH H R
WHCP SPECIFICATION FOR 11001_A SPECIFICATION FOR inspection of WHCP
5|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002
Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
Installation WHCP WHCP RH/CN installation
5. Telecommunication
CMIT-720-TEL-DW-10001 WELL CMIT-720-TEL-DW-10001
Inspection of
HEAD DEGASSING STATION WELL HEAD DEGASSING Inspection report :
5.1 CCTV RH H R
COMMUNICATION SYSTEM STATION COMMUNICATION inspection of CCTV
Installation
DRAWINGS(THREE) SYSTEM DRAWINGS(THREE)
Inspection of CMIT-711-TEL-15.03- CMIT-711-TEL-15.03-
Inspection report :
5.2 FOC Testing 10001_D1_SPECIFICATION FOR 10001_D1_SPECIFICATION RH H R
inspection of FOC
(OTDR) FIBER OPTIC CABLE FOR FIBER OPTIC CABLE
6|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
DRAWING/SPECIFICATION NO FORM.
RFI No.
Date
Quantity
Packing Condition
Good Protection
Others :
NOTES:
Attach list of Material
Signature
Date
7|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
Length m
Result
Description of Inspection Remarks
Accepted Rejected N.A
1 Trench Length
2 Trench depth and
3 Trench width
4 Marker installation
5 Cable Pulling
Cable trench/tray/Conduit is complete and
6
ready for cable laying
7 Inspection of final backfilling
8 Cable type and size is correct
9 Cable installation method is proper
10 Cable dressing and tagging is proper
11 Cable is free from damage
12 Cable tray: type and size as per specification
Cable tray: Check installation of cable tray and
13
conduit correct
14 Cable tray: identification is correct
15 Cable tray: verticality and level are correct
16 Cable tray: Sharp edges are smoothed
17 Check Cable glands and Termination installation
18 Check Cable tagging
Check junction box installation as per area of
19
classification
20 Check Junction box alignment, Cleanness, Opening
21 Check Junction Box seal/ Internals
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date
8|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
Result
Description of Inspection Remarks
Accepted Rejected N.A
9 Preservation re-instated
Date
9|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
10 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
Date
DISCIPLINE : PAGE OF
Result Remarks
Description of Inspection Accepte
Rejected N.A
d
A- IMPULSE LINE / OTHER (SPECIFY)
1 Tapping is correct
2 Installation is with correct slope and to Hook up
3 Material is correct to hook up
4 All connection are made
5 Lines are supported correctly
B- AIR SUPPLIS
11 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
INSTRUMENT PAGE OF
TAG NO.:
Result
Description of Inspection Remarks
Accepted Rejected N.A
1 Instrument location is correct
2 Instrument is installed correctly
3 Instrument mounting is robust and vibration free
4 Tray and racking installation sheet is completed
5 Instrument Tubing inspection sheet is completed
12 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
Description of Inspection
Result Remarks
Accepted Rejected N.A
Panel correctly installed, bolted and fastened as per Project
1
Drawings
Base Dimensions, Location, Cable Trenches and Cable Entries as per
2
Project Drawings
3 Exterior, Paint Work and Door Locks undamaged and Interior clean
4 Nameplates and Tagging correct as per Project Drawings
5 Dust Seals undamaged and Unused Gland Entries plugged correctly
Earth Straps, Earth Bars and Connections installed correctly as per
6
Project Drawings
Internal Cards, Modules and Terminals undamaged & installed
7
correctly as per Project Drawings
System Cables installed, supported and tagged correctly as per
8
Project Drawings
9 Coding pin on Plug / Socket correct
10 Data Highway correctly installed and supported
Internal Wiring / Cables installed, clamped, terminated and tagged
11
correctly as per Project Drawings
Multi-Core Cables earth and continuity checks completed and
12
certified (I-007A)
Power Supply and Associated Cables installed as per Project
13
Drawings
Power, I.S. and Non I.S. Cables and Terminations correctly
14
segregated as per Project Specifications
Foundation Fieldbus Terminator (where applicable) fitted and rated
15
correctly as per Project Drawings
Heater / Air Conditioning Unit installed correctly as per Project
16
Drawings
17 Tubing / Piping ‘Hook-up’ correctly installed, tested and certified
Fire, Gas or Smoke Detection Equipment (if applicable) installed as
18
per Project Drawings
19 Enclosure IP/EX ratings correct and suitable for location.
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date
INSPECTION REPORT : INSPECTION OF FIELD CCTV INSTALLATION
DRAWING/SPECIFICATION NO. : Form No.
RFI No.
Date
DISCIPLINE : PAGE OF
13 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
Description of Inspection
Result Remarks
Accepted Rejected N.A
A- CCTV CABLE
Cable procured and installed is in accordance with
1
communications cable schedule
2 Cable is labeled at both ends with cable number
3 Dressing / Cleaning Check of Internal Connection Parts
4 Cable mechanically protected
5 Termination correct at camera
6 Continuity check
Glanding / Locknuts correctly at camera and
7
communications cabinet
8 Bending radius satisfactory
B- CCTV CAMERA
1 All equipment is installed as per project specifications
2 Check CCTV camera locations
3 Cameras are mounted correctly
4 All conductors and coaxial cables terminated correctly
5 All cables and conductors terminated correctly
6 Glanding correct (screen terminated in gland)
Check water bottle is mounted no more than 3m from the
7 camera housing
Camera housing is earthed to structure ,And structure is
8 earthed
9 Check nuts and bolts are tight (secured to mount)
Check all components used as per Hazardous area
10 classification
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date
14 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
15 | P a g e