Waste To Energy Checklist
Waste To Energy Checklist
Waste To Energy Checklist
Initial Checklist
Phone +49 30 364 1120-00
Fax +49 30 364 1120-99
Mail info@intec-micro-powder.com
Feed-in tariff or selling price EUR/kWh Dual mode – combination of power supply and feed-in
Other applications Please specify:
e.g., thermal usage, synthesis gas utilisation, combination, application mix
Salary unskilled staff EUR/month (gross) Salary Management EUR/month (gross)
Salary skilled staff EUR/month (gross) Salary General Manager EUR/month (gross)
Operational
Process Water Supply Electricity parameters
minimum of 10 m³/h sediment free process water required
natural source Distance: High kV
e.g., a well, sea*), lake or river km Feed voltage to Medium kV
Pressure at site: network Low V
public water supply
bar Frequency Hz
Drinking Water supply Distance:
Local electricity handling and safety regulations, emission
Approx. 2,5 m³/h required km
standards, other legal obligations: Yes No
Overall costs for water supply: EUR/m³
INTEC MICRO POWDER AG Phone: +49 30 364 1120-0 ∙ Fax: +49 30 364 1120-99 HRB: 82111 B
Kaiserin-Augusta-Allee 14 info@intec-micro-powder.com ∙ www.intec-micro-powder.com Reg. Court/Registergericht:
10553 Berlin (Sitz d. Gesellschaft) Board Members/Vorstand: Dipl.-Ing. Andreas Krüger (CEO/Vorstandsvorsitzender), Prof. Dr. Franz Josef Schmitt, Amtsgericht
GERMANY Eng Keat Cheah ∙ Chairman of the Supervisory Board/Vorsitzender des Aufsichtsrats: Hans A. Detampel Berlin Charlottenburg
1/1 VAT-ID: DE 218236745