Site Assessment Checklist
Site Assessment Checklist
Site Assessment Checklist
Village/City/Country
(*) Fill in the flow that is available 10% of the time (per year)
(**) Fill in the flow that is available 20% of the time (per year)
… and similar for all other boxes.
Energy generation requirements
Distance to electrical
connection point (electrical m/Ft
cabinet, transformer, pole)
Permitting information
Permits needed/available
Permitting state for water Todo/Done/ Todo/Done/
for land user use? (state,
use? NA NA
community)
Environmental permits
Permitting state for grid Todo/Done/ Todo/Done/
needed/available for the
connection ? NA NA
project?
Varia
Sluice gate automation
required Yes / No Number of sluices
(for flood protection and turbine
safety)
Elevation map or side view of site with distances and heights (specify m or ft)
Be sure to clearly measure the height difference between upstream and downstream water level and to
indicate how much this head difference can change. Clearly indicate the depth of the water (water level to
bottom) for both up- and downstream water levels. Be sure to measure the dimensions of the
downstream area where the turbine will be installed.
River sketch of the planned location of the turbine (add distance to electrical connection point)
Measure how wide and deep the river is in the downstream direction. We need to know this to see if the
whole structure will fit.
Notes
Does the site head change due to changing flows or tidal effects? If so, give a range.
Are there important details to know? Safety system needed for sluice gate?
Does the flow change suddenly (ex. Upstream weir gate that opens suddenly, sluice gate near turbine that
controls flow)