QUOTATION

Date : 19-10-2020
Quote No : 20-21/Q/111
POC : Jagan
Mobile : +919884009711

SERVICE PROVIDER CUSTOMER


VR CLOUD Tamilnadu Coke and Power Pvt Ltd
GNT Road(Opposite of Royal Enfield) GummidiPonndi – 601201.
Munuswamy Nagar
Gummidipoondi - 601201
: +91 97920923464 POC : Mr. Shyam Prasad
: sales@jpvrcloud.in Contact : +91 9384010016
Email : purchase1tcppl@gmail.com
PAN No: AARFV6572B
GST No: 33AARFV6572B1ZY

Dear Sir,
We are in pleasure to provide the following quotation as per the given scope of work.

S. NO DESCRIPTION HSN QTY PRICE AMOUNT

1 NVR 8521 1 No’s 10,200 10,200


 16 Camera Supportable NVR Dahua
 2 SATA
2 HDD 84717020 1 No’s 13,900 13,900
 6 TB Surveillance HDD
3 PoE Swtich 85176290 3 No’s 8,200 24,600
 8 Port PoE Switch with 2 SFP Module
4 Cat6 Network cable 8544 550 Mtr 23 12,650
 Cat6 Cable Digsoul
5 OFC Cable 9001 450 Mtr 18 8,100
 6 core single mode
 Birla
6 Network Connector 8536 40 No’s 8 320
 RJ45 Network Connector
7 Patch Card 8544 4 No’s 800 3,200
 Fiber Patch Card
8 Media Convertor 8517 1 No’s 3,300 3,300
 100/1000 Single Mode Media
Convertor
9 Fiber Tiffin Box 8536 3 No’s 150 450

10 HDPE Hose 3917 450 Mtr 48 21,600

11 Outdoor PVC Rack For Media Convertor, PoE 8517 1 No’s 1,600 1,600
Switch
12 Back Box 8517 16 No’s 80 1,280

13 Camera 85258020 16 No’s 5,800 92,800


 4MP IP Camera Day and Night Vision
14 PVC Pipe 3917 550 Mtr 17 9,350
 ‘1’ and ‘3/4’ Inch Pipe, Bend
15 Other Materials 3,000
 Screw, Clamp, Cable Tie, ETC….
Total 2,06,350

GST (18%) 37,143

Grand Total 2,43,493

ERECTION CHARGES

S. NO DESCRIPTION HSN QTY PRICE AMOUNT

1 Installation, Testing & Commissioning of Camera 998713 16 No’s 300 4,800


2 Installation, Testing & Commissioning of NVR 998713 1 No’s 1,000 1,000
3 CAT-6, OFC Cable Laying Charges 998713 1000 Mtr 20 20,000
4 2U Rack Fixing Charges 998713 1 No’s 300 300
5 Splicing Charges 998713 8 Core 300 2,400
* GST 18% Is applicable for all items. TOTAL 28,500
GST 18% 5,130
GRAND TOTAL 33,630

GENERAL TERMS & CONDITONS


18% GST will be applicable additional.
80% of the supply payment along with the purchase order and 20% on product delivery.
80% of the Erection payment along with the purchase order and 20% on completion.
WORKSTATION PCs for view point are not included.
Transport and the accommodation will be charged additionally at the actual.
Warranty 12 months from the date of supply. Breakdown calls would be attend within 48 hours from the time of
escalation.
The Extension of the Warranty for the next year will be entertained as AMC. Comprehensive AMC will be 15%
from the basic Sale Value.
For outstation break down calls, the above estimation will include planning for engineer deputation and travelling
duration In case, the calls logged during Sundays or holidays, then response date will be based on next working day as
actual date.
WARRANTY will not applicable for the Power Supply, Cable & its Accessories.
Delivery Within 30 Days from the Issue of PO along with the advance payment. This Proposal Is Valid For 15 Days.
Mounting accessories will be charged additionally according to site requirement.
Erection Charges should not include the CIVIL WORKS if any.
Scaffolding, Ladder and Raw Power Should be provided by the client at the time of erection and warranty period.
Actual consumed cable quantity will be billed.
Monitor/ Display Unit will not Included in This proposal.