Terminology A
• Path: a sequence of
connected, dependent
activities.
• Critical path: the longest path
C through the activity network
that allows for the completion
of all project-related activities;
A B D the shortest expected time in
which the entire project can
be completed. Delays on the
critical path will delay
completion of the entire
project.
Terminology
B
• Event: a point in time
when an activity is
started or completed. It
does not consume time.
A C • Burst activity: an activity
that has more than one
activity immediately
following it (more than
D one dependency arrow
flowing from it).
Constructing a Project Network
“Two Approaches”
Uses a Uses an
Activity- node to Activity- arrow to
on-Node on-Arrow
(AON) depict an (AOA) depict an
activity activity
Basic Rules to Follow in Developing
Project Networks
Networks typically flow from left to right.
An activity cannot begin until all preceding connected activities
are complete.
Arrows indicate precedence and flow and can cross over each
other.
Identify each activity with a unique number; this number must be
greater than its predecessors.
Looping is not allowed.
• Function of:
• The number of critical paths
• The amount of slack across near critical
activities
Activity-on-Node Network with
Slack
Practical Considerations
Activity numbering
Calendar dates
Lags
• The minimum amount of time a dependent activity must be
delayed to begin or end
• Lengthy activities are broken down to reduce the delay in the
start of successor activities.
• Lags can be used to constrain finish-to-start, start-to-start,
finish-to-finish, start-to-finish, or combination relationships.
Example of Laddering Using
Finish-to-Start Relationship
Use of Lags
Finish-to-Start Relationship
Start-to-Start Relationship
Use of Lags
Use of Lags to
Reduce Detail
New Product
Development
Process
Use of Lags
Finish-to-Finish
Relationship
Start-to-Finish
Relationship
Network Using Lags
AOA
Activity-on-Arrow Network
Building Blocks
Activity-on-Arrow Network
Fundamentals
Activity-on-Arrow Network
Fundamentals
Koll Center Project: Network
Information
Partial Koll Business Center AOA
Network
Partial AOA Koll Network
Partial AOA Koll Network
Activity-on-Arrow Network
Activity-on-Arrow Network:
Forward Pass
Activity-on-Arrow Network:
Backward Pass
Activity-on-Arrow Network
Backward Pass, Forward Pass, and
Slack
Air Control Inc. Custom Order
Project—AOA Network Diagram
END OF CHAPTER