Sample Bar Chart
Sample Bar Chart
Sample Bar Chart
1 General Requirements 1
1.1 Mobilization/Demobilization 1.00 lot 0.01624 4
1.2 Safety Provision 1.00 lot 0.05086 86
1.3 Board-up/Signage's 1.00 lot 0.01055 1
2 Civil Works
Removal and disposal of existing floor tiles including floor
2.1 166.54 sq.m. 0.00654 27
topping
0.9
2.2 Removal and disposal of existing wall tiles 487.94 sq.m. 0.01261 21
Removal and disposal of existing acoustic board ceiling
2.3 100.90 sq.m. 0.00563 9
(600mm x 600mm)
Dismantling of existing toilet fixtures/accessories (including
2.4 53.00 sets 0.00325 12
toilet partitions)
2.5 Dismantling of existing countertop 13.00 sq.m. 0.00131 6
2.6 Dismantling of existing mirror 17.34 sq.m. 0.00056 6
2.7 Dismantling of existing door and door jambs 13.00 sets 0.00113 6 0.8
2.8 Chipping and removal of existing sanitary line and waterline 100.90 lin.m. 0.00461 30
2.9 CHB laying including reinforcements and plastering 18.80 sq.m. 0.00613 3
2.10 Others to complete the works 1.00 lot 0.00666 3
3 Architectural Works
Supply and installation of door and door jamb including
3.1 14.00 sets 0.04876 12
accessories (lockset, hinges, door closer, etc) and painting 0.7
3.2 Supply and installation of phenolic toilet partitions 15.73 sq.m. 0.03355 12
Replacement of mirror including provision of 6mm thk.
3.3 20.79 sq.m. 0.02265 3
marine plywood backing
Supply and installation of granite countertop (including
3.4 19.20 sq.m. 0.03143 15
counter concrete slab)
Supply and installation of 300mm x 300mm ceramic glazed
3.5 166.54 sq.m. 0.05220 30
floor tiles
0.6
Supply and installation of 300mm x 300mm ceramic glazed
3.6 487.94 sq.m. 0.15030 36
wall tiles
Supply and installation of 600mm x 600mm acoustic ceiling
3.7 100.90 sq.m. 0.03475 21
board including frames, hangers and accessories
3.8 Application of Elastomeric waterproofing 221.31 sq.m. 0.01194 15
3.9 Others to complete the works 1.00 lot 0.00246 3
5 Mechanical Works
Replacement of existing exhaust fan including ducting, 0.1
5.1 10.00 sets 0.06381 21
hangers and needed accessories
5.2 Others to complete the works 1.00 lot 0.00238 3
6 Electrical Works
Supply and installation of 2" x 2" ceiling recessed troffer light
6.1 with 2-9W daylight LED tube including wires, conduit, 39.00 sets 0.05272 21
switches, utility boxes and necessary accessories 0
6.2 Others to complete the works 1.00 lot 0.01227 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90
10.341%
11.257%
12.255%
13.172%
14.088%
17.639%
21.191%
25.966%
27.114%
27.846%
29.411%
30.631%
31.912%
33.973%
35.209%
36.383%
37.556%
38.270%
39.116%
39.752%
40.439%
41.126%
41.711%
42.217%
42.456%
42.948%
43.614%
44.265%
44.916%
46.121%
47.327%
48.614%
49.820%
51.025%
52.231%
56.477%
60.075%
63.992%
64.738%
65.136%
65.598%
66.838%
67.253%
67.606%
67.959%
68.328%
68.908%
69.279%
69.700%
70.121%
70.440%
70.680%
70.920%
71.634%
72.522%
73.395%
74.045%
75.102%
76.159%
77.298%
79.190%
80.942%
82.694%
87.835%
91.978%
96.827%
97.958%
98.612%
99.188%
99.594%
0.406%
1.867%
1.986%
2.168%
2.374%
2.580%
2.723%
2.867%
3.025%
3.396%
3.767%
4.188%
4.609%
5.194%
5.700%
6.206%
6.963%
8.099%
9.220%
######