Final Inspection Release Note: Rawae Al Amal Industrial Services

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Report No.

: 1066/DR-001
FINAL INSPECTION RELEASE NOTE
Date: 01-06-2020
Rawae Al Amal Industrial Services

Job No.: 1066/20 Client : SAUDI PAPER MANUFACTURING CO., UNIT-2, DAMMAM
Project: REPAIR OF BOILER 6 CASTING & INSULATION Description : REPAIR OF BOILER 6 CASTING & INSULATION
Drawing No.: NIL Item ID No.: BOILER 6
ITP No.: NIL ITP Stage : NIL
Code of Manufacture : As per Client Instruction
Inspection Activity
Surviellance Witness Hold Final Inspection Release

Sl.No. Stages RAISCO Cleint Remarks

1 Door opened at chimney side and cleaning done

Removal of damaged plate at refractory area and rectification


2 done with new plate 6mm x 800 x 200

Refractories replaced with new one after completion of plate


3 welding and cleaning

4 Door closed with new gasket and all bolts are tightened properly

5 Removal of cladding sheet and insulation in damaged portion


(Chimney side Shell plate bottom)

6
After removing rectified shell plate
7 Insulation and cladding sheet fixing done after completion of
wleding and cleaning
Comments :
Repair of Bolier 6 casting and Insulation done as per client instruction and found satisfactorty.

Attachment (if any): NIL RFI No.: Not Applicable


Result:
Accepted Accepted with Comments

Rejected NCR's (If any)

Certified by Witnessed by
RAISCO CLIENT END USER (If Required)

Name RAHAMATHULLAH

Signature

Date 01-06-2020

RAISCO-QSP-008-Format-06 Rev.0 Date:29-03-2020 Page 1 of 1