: 1066/DR-001
FINAL INSPECTION RELEASE NOTE
Date: 01-06-2020
Rawae Al Amal Industrial Services
Job No.: 1066/20 Client : SAUDI PAPER MANUFACTURING CO., UNIT-2, DAMMAM
Project: REPAIR OF BOILER 6 CASTING & INSULATION Description : REPAIR OF BOILER 6 CASTING & INSULATION
Drawing No.: NIL Item ID No.: BOILER 6
ITP No.: NIL ITP Stage : NIL
Code of Manufacture : As per Client Instruction
Inspection Activity
Surviellance Witness Hold Final Inspection Release
4 Door closed with new gasket and all bolts are tightened properly
6
After removing rectified shell plate
7 Insulation and cladding sheet fixing done after completion of
wleding and cleaning
Comments :
Repair of Bolier 6 casting and Insulation done as per client instruction and found satisfactorty.
Certified by Witnessed by
RAISCO CLIENT END USER (If Required)
Name RAHAMATHULLAH
Signature
Date 01-06-2020