(RFI)
[IKAN] RDMP - Refinery Unit V
Project : Unit / Area : 068
Balikpapan Project
Enviromate Technology
Subcontractor : Request Date : 2024-04-05
International
Inspection Detail
ISO DWG NO .
- 26071-675-V1Z-MBHH-00099
4. Description - 26071-V1Z-013001H01-00087
- 26071-V1Z-013001H01-00088
- 26071-675-V1Z-MBHH-00204
Remark
Steam reformer part .
- Air Duct from APH II to SMR Baterry limit
- Combustion Air Duct Header
- Combustion Air Duct Manifolds
- Combustion Air Finger Ducts
- Air Duct from SMR battery limit Air duct header
Contractor
Subcontractor IPMT
Construction QA/QC
Name
Signature
Date
INSPECTION REPORT FOR
HOT SERVICE INSULATION
RDMP RU-V Balikpapan
Project : Report No :
(ISBL/OSBL) Project
Result
No Check List Remark
Accept Reject N/A
1 Material Verification
2 Surface Preparation
2.1 Surface Cleanliness : Free from Oil, Dust, Rust and Dry
Name
Signature
Date
Result
No Check List Remark
Accept Reject N/A
1 Material Verification
2 Surface Preparation
2.1 Surface Cleanliness : Free from Oil, Dust, Rust and Dry
Note :
Name
Signature
Date