Visual Inspection Report
Visual Inspection Report
Visual Inspection Report
72, LOYANG WAY, SINGAPORE - 508762, TEL: (65)-6545 9968, FAX: (65)-6545 0668
Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
Date: 28/12/2013
DESCRIPTION: FUEL GAS CONDITIONING UNIT COMPRESSOR SKID-1 (ACCESS PLATFORM)
ACCESS PLATFORM
All the attachments weld size and finishing are checked and found satisfactory
TOEPL CLIENT
WITNESSED BY
NAME: D.SRINIVAS NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
TECHNICS OFFSHORE ENGINEERING PTE LTD
72, LOYANG WAY, SINGAPORE - 508762, TEL: (65)-6545 9968, FAX: (65)-6545 0668
Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
Date: 25/12/2013
DESCRIPTION: FUEL GAS CONDITIONING UNIT COMPRESSOR SKID-1
Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED
EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY
OPERATION
Date: 5-Mar-14
DESCRIPTION: LIFTING ARRANGEMENT DETAILS, FUEL GAS CONDITIONING UNIT COMPRESSOR SKID-1 (SPREADER BAR)
OVERALL DIMENSION
DIMENSION
ITEM REQUIRED ACTUAL DIFF. REMARKS
A 6709 6710 +1 ACCEPTED
B 6389 6390 +1 ACCEPTED
C 160 160 0 ACCEPTED
D 160 160 0 ACCEPTED
SPREADER BAR : ALL THE WELDING JOINTS ARE VERIFIED FOR WELD SIZE, FINISHING & FOUND SATISFACTORY
Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
Date: 5-Mar-14
DESCRIPTION: LIFTING ARRANGEMENT DETAILS, FUEL GAS CONDITIONING UNIT COMPRESSOR SKID-1 (SPREADER BAR)
SPREADER BAR
All the attachments weld size and finishing are checked and found satisfactory