TECHNICS OFFSHORE ENGINEERING PTE LTD

72, LOYANG WAY, SINGAPORE - 508762, TEL: (65)-6545 9968, FAX: (65)-6545 0668

VISUAL INSPECTION REPORT

Client Name: PETRONAS Job No.: TOE- 13068E

Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
ASME "U"STAMP NO : TOE-U-1037-14 Date: 13-Feb-14

TAG NO:- V-7511C


DESCRIPTION: PRIMARY OIL SEPARATOR

DRAWING NO:- 91013010-M-DW-101-16 REV-A

PRIMARY OIL SEPARATOR: V-7511C


All the nozzles,Internal and External attachments weld size and finishing are checked and found satisfactory

TOEPL AUTHORISED INSPECTOR(ABSG) B.V.INSPECTOR CLIENT


WITNESSED BY WITNESSED BY WITNESSED BY
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:


TECHNICS OFFSHORE ENGINEERING PTE LTD
72, LOYANG WAY, SINGAPORE - 508762, TEL: (65)-6545 9968, FAX: (65)-6545 0668

VISUAL INSPECTION REPORT

Client Name: PETRONAS Job No.: TOE- 13068E

Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
ASME "U"STAMP NO : TOE-U-1036-14 Date: 13-Feb-14

TAG NO:- V-7511B


DESCRIPTION: PRIMARY OIL SEPARATOR

DRAWING NO:- 91013010-M-DW-101-16 REV-A

PRIMARY OIL SEPARATOR: V-7511B


All the nozzles,Internal and External attachments weld size and finishing are checked and found satisfactory

TOEPL AUTHORISED INSPECTOR(ABSG) B.V.INSPECTOR CLIENT


WITNESSED BY WITNESSED BY WITNESSED BY
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:


TECHNICS OFFSHORE ENGINEERING PTE LTD
72, LOYANG WAY, SINGAPORE - 508762, TEL: (65)-6545 9968, FAX: (65)-6545 0668

VISUAL INSPECTION REPORT

Client Name: PETRONAS Job No.: TOE- 13068E

Project Name: SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND
ASSOCIATED EQUIPMENT FOR 15 MW POWER PLANT FOR GARRAF
DEVELOPMENT FACILITY OPERATION
ASME "U"STAMP NO : TOE-U-1035-14 Date: 13-Feb-14

TAG NO:- V-7511A


DESCRIPTION: PRIMARY OIL SEPARATOR

DRAWING NO:- 91013010-M-DW-101-16 REV-A

PRIMARY OIL SEPARATOR: V-7511A


All the nozzles,Internal and External attachments weld size and finishing are checked and found satisfactory

TOEPL AUTHORISED INSPECTOR(ABSG) B.V.INSPECTOR CLIENT


WITNESSED BY WITNESSED BY WITNESSED BY
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE: