QM - Inspection After GR in Production
QM - Inspection After GR in Production
QM - Inspection After GR in Production
This functionality is used when you need to do a quality inspection in a product after production process. It is an integration between PP (Production Planning) and QM
(Quality Management).
For this procedure you will have to follow six steps:
The inspection type must be assigned in the inspection setup from the material master.
- Go to transaction MM01
- Click on Insp. Setup
- Assign Inspection Type 04 - Final Inspection at GR from Production
Flag 'Post to insp. stock' has to be set because you want that the material does to quality stock after GR.
* Inspection characteristic that can be used in several inspection plans and can be evaluated independently of an inspection plan. Master inspection characteristics facilitate and
standardize inspection planning (SAPterm).
- Go to transaction QS21
- Choose quantitative characteristic (in this example)
- Set status to Released
- Complete 'Short text' and 'Search field'
- Set up Control Indicators (very important!)
- Click on Quant. Data to define Decimal places and Lower and Upper specif. limit.
- Click OK
- Click OK
The inspection plan contains which material to inspect, in which plant, during which process, with what kind of operation.
- Go to transaction QP01
- Create New Entries
- Assign an Operation
- Assign an Inspection Characteristic
5. Release a Production Order
A production order defines which material is to be processed, at which location, at what time and how much work is required. It also defines which resources are to be used and how
the order costs are to be settled. (SAP Help)
- Go to transaction CO01
- Release the Production Order in the green flag
6. GR for Production Order
- Go to MB31
- Use movement type 101
- Select the quantity
- Fill the field "Order" with the production order number
- Enter
Now check MMBE to check the stock: