Specification For SP Primary & Secondary Supports: 0 16.06.2020 First Issue NV US SVK
Specification For SP Primary & Secondary Supports: 0 16.06.2020 First Issue NV US SVK
Specification For SP Primary & Secondary Supports: 0 16.06.2020 First Issue NV US SVK
TABLE OF CONTENTS
2.0 UNIT RESPONSIBILITY...............................................................................................................................2
Page 2 of 3
Title: Specification for Spring Hanger and Support
2.1 SPRING HANGER SUPPLIER.......................................................................................................................2
4 2
6 ASSEMBLIES................................................................................................................................................3
6.1 DATA SHEETS AND DRAWINGS................................................................................................................3
6.2 INSPECTION AND TESTING.......................................................................................................................3
8 PROTECTIVE COATING................................................................................................................................3
MSS SP 58 Pipe Hangers & Supports: Materials, Design, Manufacture, Selection Application &
Installation
4
4.2 The cold setting and hot setting shall be identified by permanently attached white and red markers
respectively.
6 ASSEMBLIES
Page 3 of 3
Title: Specification for Spring Hanger and Support
The required hanger assemblies shall be detailed on data sheets included in commodity
specification.
6.2 The vendor is to provide the missing information on the hardware design such as hanger size, model
number, figure number etc. and return the data sheets with his quotations.
6.3 Weld sizes are to be shown on the assembly drawing by the vendor.
6.4 The vendor shall also provide outline drawings showing dimensioned mounting requirements for spring
hanger assemblies.
8 PROTECTIVE COATING
All hardware and assembly shall be painted with min. 2 coats of synthetic enamel unless otherwise specified.
Spring coil shall
10.1.1 Travel stops are to be removed and placed into their storage position after completion of the hydrostatic
testing, realignment of the piping connected to rotating machinery, and the installation of insulation.