Rate analysics

S.no Description of work unit qty Rate total amount


For New item
1 SS hand rail (Balcony) RMT 3
60 x 40 SS Pipe 304 grade Rf 12 175 2100
40x40 SS Pipe 304 grade Rf 16 135 2160
'D'' Clamp nos 16 55 880
Anchor Grouting Chemical Ls 1 230 230
Labor Charge for making and fixing Rf 10 295 2950
11.5mm Laminated Glass Sqf 33 350 11550
Basecup Nos 5 28 140
charges for welding machine grinting &
buffing machine Ls 1 850 850

Amount 20860
over heads and Margin 15% 4172
Total Amount 25032

2 Toilet epoxy grout 18.03 sqm

Grout kg 2.60 900 2340


Labour charge Nos 2 1000 2000
Spacer pocket 1 160 160
Cleaning with roof chemical LS 1 550 550

Amount 5050
over heads and Margin 15% 757.5
Total Amount 5807.5

3 Floor Tile Cement grout 46.5 sqm


Grout kg 3 70 210
Labour charge Nos 2 1000 2000
Spacer Pck 3 160 480
ordinary cleaning LS 1 200 200

Amount 2890
over heads and Margin 15% 433.5
Total Amount 3323.5

4 Ledge wall Brick and platering 1.1 sqm


Bricks nos 91.00 9.2 837.2
Cement kg 74.00 7 518
M sand unit 0.90 600 540
Labour charge LS 1 1575 1575
Amount 3470.2
over heads and Margin 15% 694.04
Total Amount 4164.24

5 Kitchen raised platform 1.1 sqm


Bricks nos 14.00 9.2 128.8
Cement kg 85.00 7 595
Aggeregate cf 4.00 48.5 194
M sand unit 1.00 600 600
Labour charge LS 1 1400 1400

Amount 2917.8
over heads and Margin 15% 437.67
Total Amount 3355.47

6 Kitchen counter top Granite (material supply)


30 mm thk Granite sqf 27.92 312.70 8730.58
20 mm thk Granite sqf 5.60 212.4 1188.86

Amount 9919.446
over heads and Margin 15% 1487.917
Total Amount 11407.363

7 providing applying I coat primer 1 sf

surface preparation and scrabbing sf 1.00 0.25 0.25


primer sf 1.00 1.00 1.00
labour charge sf 1.00 0.75 0.75

Amount 1.75
over heads and Margin 15% 0.26
Total Amount 2.01

For rate increase item

2 Toilet ledge wall and granite threshold 0.82 Rmt

Granite cutting and laying Sf 1.83 65.00 118.94


Edge polishing Rf 2.79 45.00 125.61
cement mortar /adhesive Sf 1.83 48.00 87.83
cutting tools /blade Sf 1.00 15.00 15.00

Amount 347.39
over heads and Margin 15% 52.11
Total Amount 399.50

providing applying 2 coat putty 1coat primer


3 2 coat OBD paint 10.764 sf

surface preparation and scrabbing sf 10.764 0.25 2.69


Material
2 coat putty sf 10.764 3.25 34.98
1 coat primer sf 10.764 0.79 8.50
2 coat OBD sf 10.764 1.24 13.35
labour charge
2 coat putty sf 10.764 2.00 21.53
1 coat primer sf 10.764 0.50 5.38
2 coat OBD sf 10.764 1.50 16.15
Additional work for Pin holes
Touch up putty material sf 10.764 0.65 7.00
Touch up putty labour sf 10.764 0.50 5.38
scrabbing sf 10.764 0.10 1.08

Amount 116.04
over heads and Margin 15% 17.41
Total Amount 133.44

providing applying 2 coat putty 1coat primer


4 2 coat premium emulsion paint 10.764 Sqf

surface preparation and scrabbing sf 10.764 0.25 2.69


Material
2 coat putty sf 10.764 3.25 34.98
1 coat primer sf 10.764 0.79 8.50
2 coat premium emulsion paint sf 10.764 2.68 28.85
labour charge
2 coat putty sf 10.764 2.00 21.53
1 coat primer sf 10.764 0.50 5.38
2 coat premium emulsion paint sf 10.764 2.75 29.60
Additional work for Pin holes
Touch up putty material sf 10.764 1.25 13.46
Touch up putty labour sf 10.764 1.00 10.76
scrabbing sf 10.764 0.20 2.15

Amount 157.91
over heads and Margin 15% 23.69
Total Amount 181.59

Paint coverage and its cost


material unit rate cov in sf Rate/sf
putty kg 24.73 8 to 14 3.09
primer lt 120.36 160 0.75
OBD kg 100.3 85 1.18
Pre emu paint lt 283.2 120 2.36
Remarks

8344

322.10

71.47
3785.67

3050.43

11407.36

21.66
487.2

133.44

181.59

coat
2coat
1 coat
2coat
2coat