Natural Resources Assessment: City of Chattanooga
Natural Resources Assessment: City of Chattanooga
Natural Resources Assessment: City of Chattanooga
Chattanooga-Hamilton County
Regional Planning Agency
10.15.19
CITY OF CHATTANOOGA
NATURAL RESOURCES
ASSESSMENT
Chattanooga City Council Staff Team
Chip Henderson Bryan Shults, Director Development Services
Jerry Mitchell Emily Wood, Principal Planner, AICP
Ken Smith John Bridger, Executive Director
Darrin Ledford Joseph Beeler, Senior Planner
Russell Gilbert Lisa Thompson, Subdivision Coordinator
Carol B. Berz Melony Collins, Graphics & Technology Specialist
Erskine Oglesby Jr. Randolph Pullen, Planning Analyst II
Anthony Byrd Winsetta Ford, Communication Design Supervisor
Demetrus Coonrod Yuen Lee, Director Research and Analysis
6. R-1 Open Space Option 3. Limitations on the Amount of Land Disturbance of Grading
The R-1 Open Space Option was adopted by City Council in 1995 and Permitted at One Time
has rarely been utilized. This tool should be evaluated to determine Explore options of limiting the amount of clearing, grading, or
why it is not being used and if possible amendments are required. disturbance permitted at any one time on a site. For example, a
maximum of 10 acres of clearing, grading, and disturbance should be
This option may need to be removed from the Chattanooga Zoning
permitted only with the 10 acres being stabilized and revegetated prior
Regulations as this is not a zoning classification; it is a subdivision
to applying for additional clearing, grading, or disturbance for other
design option that provides alternative design standards for areas on the same development site.
development of a single-family residential subdivision.
4. Security Bond for Revegetation/Stabilization
7. Promote more opportunities for infill development in less
sensitive areas Explore options of requiring a security bond or letter of credit for sites
RPA is in the process of creating areas plans for the City of of a certain size to provide the city required revegetation and
Chattanooga. One goal or policy of the area plans is to encourage stabilization.
infill development in established neighborhoods and supports various
housing forms and types to meet the housing demand and 5. Slope Stability Certifications
opportunities to provide affordable housing for the residents of Explore option of requiring a geo-technical engineering report or
Chattanooga. Opportunities to promote more housing infill options certificate for slopes sites that the site or slope is free of failures, and
should be identified and established with each area plan. that temporary or permanent ground cover is provided.
Improvements to Permitting Process/Code 6. Site Plan Review or Geo-Technical Report for Critical Lots
Based on the peer view, Gaps Analysis, and best management practices Explore option of requiring detailed site plans for lots identified as
from city staff and stakeholders, there may be additional opportunities for critical lots. A critical lot would be a lot with slopes, floodplains, and
the Land Development Office to explore options for possible amendments high soil erodibility. Additional measures should be required by
to Municipal Code Section 31, Stormwater Management to address applicants such as a geotechnical engineer/report as to the feasibility
of construction and methods of construction that will address the SUMMARY
stabilization and stormwater run-off associated with a critical lot. RPA’s recommendations are not intended to limit or prohibit growth and
development on steep slopes or floodplains. The recommended Natural
7. Timing of Land Disturbing Permit and Start of Construction Resource Ordinance is meant to provide standards that allow for the
Explore options of requiring that the start or beginning of building appropriate and wise development of sites containing slopes and
construction be noted on the application for a land disturbing permit, floodplains.
and the beginning of building construction to begin within so many
days after permanent clearing, grading, and disturbance has ended. As noted earlier in this summary, 54% of the remaining vacant land is on
steep slopes, and permit trends have indicated that development activities
8. Soil Erosion Modeling will continue to increase in these sensitive areas as the City grows.
Require applicants to submit RUSLE soil erosion loss calculations for Currently Chattanooga only regulates two of twenty-two common zoning
construction sites prior to receiving a land disturbing permit. The standards found among the six peer cities. The increase in citizen
Revised Universal Soil Loss Equation (RUSLE) is the most widely concerns and complaints about loss of tree cover, mass grading,
applied model in the U.S. The RUSLE model measures variables stormwater run-off and impacts to the City’s scenic character has served
such as annual soil loss due, rainfall impact, soil erodibility, and as an indicator that the current standards for sensitive site development
topography derived from slope length and slope gradient in order to are inadequate. It is also important to note that many of the current
understand soil loss rates and erosion. Understanding soil types and standards actually make the problem worse by offering limited flexibility in
erodibility can help the City staff to estimate annual soil loss to water setbacks, right-of-way widths, and density incentives to promote
erosion and understand how the construction phase of land protection of sensitive areas.
development impacts water quality. At the time of writing this
Assessment, the Land Development Office is considering amending As stated earlier in this Executive Summary, during the creation of this
their 2017 enforcement policy to require applicants to submit RUSLE assessment RPA would adhere to five key values or principles during this
calculations with permit applications. assessment as well as suggesting recommendations.
1. Protecting the Health, Safety and Welfare of the City of Chattanooga
9. Stormwater Requirements Resident
Consider including additional peak flow stormwater requirements and 2. Protecting the Environment
3. Protecting Scenic Beauty
stormwater detention for steep sites during post-construction 2, 5,
4. Balancing Protection with Meeting Housing Needs
10, and 25-year storm events. Peak flow rates for disturbed,
5. Balancing Protection with Protection of Private Property Rights
unvegetated conditions must also be considered by the design
engineer, with the greater flowrate of the two conditions (disturbed or
To address the identified issues, and to balance the key values listed
post-developed) governing.
above, RPA has provided a list of recommended changes that
accomplishes the following:
• Better definitions of the sensitive resources to be protected
• Clear standards for how these sites are developed through
grading, clearing and filling limits
• Density bonuses for leaving sensitive areas undisturbed
• New zoning/subdivision tools that provide added flexibility for
setbacks, and right-of-way widths
• Improved land disturbing permit standards to provide more “due
diligence” safeguards when developing in sensitive areas