Mitsubishi Heavy Industries, LTD.: Plan Record
Mitsubishi Heavy Industries, LTD.: Plan Record
Mitsubishi Heavy Industries, LTD.: Plan Record
AP- CHECK-
ISOMETRIC SCREW NO. D E S C R I P T I O N (DATE) PROVED ED
Notes:
1. This document is the property of and contains confidential proprietary information of MITSUBISHI
HEAVY INDUSTRIES, LTD. (MHI) and shall not be reproduced, used, disclosed or transmitted in
2. This document has been prepared based on MHI’s standard philosophy and experiences.
Sec. Code
Therefore, contents shall be reviewed after finalizing P&ID such as Boiler Water/Steam, Air and Gas,
RL4
Fuel Coal/Oil, and so on for Guodian Taizhou Power Plant.
出図先 部数
HBC 2 3. This document shows design requirement for wind box damper control method from MHI to the
三電殿
プ技一
Owner, DI and DCS manufacturer.
小林 PM A
プ 計機 A 4. Since the division concept of plant control function and DCS system configuration which are
配
一 prepared and supplied by others are not fixed yet, this document describes on MHI’s design basis.
設
プ 装
二 海淡
計 計二 S+1
電 電
火 ソ
制 機
ソ 調
計画 S+1
陸 新技
ボ 保技
設 DESIGN REQUIREMENT
エ 技サ
ネ 燃シ S+1
環
機
計
陸 技
タ 本
ガ
風 力
舶 タ
原 設
(伝)
火 計
(企)
火 計 A4×4
(輸)
計 電 工 A3×1 5 SHEET(S) WITH COVER
建 設
土 建 CONTROL & ELECTRICAL SYSTEM
生 管 ENGINEERING SECTION GUODIAN TAIZHOU POWER PLANT 2 x 1000MW COAL FIRED BOILERS
品 証
機品一
機品二 APPROVED N.GOTO
本社 1
計制技 H . M AT S U N A G A
WIND BOX DAMPER CONTROL METHOD
CHECKED Y.MURAOKA
AND CONTROL REQUIREMENT
D R AW N
CONFERRED SCALE ~
原輸二
菱制シ技 1 C U S TO M E R ’ S D R AW I N G NO .
エネ環 陸ボ ORDER ITEM REV.
控
計 6
07457/07458 61000 MITSUBISHI’ S DRAW ING NO. 0
61120-1002
MITSUBISHI HEAVY INDUSTRIES,LTD.
NA GASAKI SHIPYARD & MACHINERY WOR KS
DRAWN Jun.28, 2005 ISSUED
Record of Revision
61120-1002
0 NOV. 24, 2005 SH NO.5 ; Deleted AIR CYLINDER of U-AA/L-AA WIND BOX.