PROJECTED MANPOWER

PROJECT : D0372 SMP Works for Gravity Circuit Upgrade


Steel Erection For Gravity Circuit Upgrade
LOCATION: OCEANAGOLD PHILS INC, BRGY. DIDIPIO
KASIBU, NUEVA VISCAYA
DATE: JUNE 21, 2019

A. INDIRECT LOADING
ITEM DESIGNATIONS NOS. WEEK 1 WEEK 2
A.1 PROJECT MANAGER 1 44
A.2 PROJECT/FIELD ENGINEER 1 42
A.3 SAFETY OFFICER 1 40
A.4 ADMINISTRATIVE OFFICER 1 38
A.5 DRAFTSMAN 1 36
A.6 FOREMAN 1 34
A.7 SERVICE DRIVER 2 32
A.8 SUPERVISOR 1 30 9 9 9
28
26
T O T A L 9 24
22
20 19 19 19
B. DIRECT LOADING 18
ITEM DESIGNATIONS NOS. 16
B.1 LEADMAN 1 14
B.2 RIGGER 1 12
B.3 ERECTORS 3 10
B.4 FITTERS 3 8
B.5 PAINTERS 2 6
5 5 5
B.6 WELDERS 3 4
B.7 SEMI-SKILLED LABORERS 3 2 3
B.8 SCAFFOLDERS 3
T O T A L 19 0
TOTAL MANPOWER 28 3 5 5 28 28 28
LEGEND: INDIRECT LOADING

DIRECT LOADING

C. EQUIPMENT LOADING
ITEM DESIGNATIONS NOS. WEEK 1 WEEK 2
80T CRANE 1
WELDING TRANSFORMER 2 2 2 2
CUTTING OUTFIT 2 2 2 2
SERVICE VEHICLES 4X4 2 1 1 1 2 2 2
T O T A L 7 1 1 1 6 6 6

1568
NUMBER OF WEEKS
WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9

9 9 9 9 9 9 9 9 9 9 9 9 9 9 9

7 7 7
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
6 6
16 16 16

12 12

28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 23 23 23 18 18

NUMBER OF WEEKS
WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
6 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
WEEK 9 WEEK 10

12

6 6
5 5 5

18 11 11 5

WEEK 9 WEEK 10
1
2
2
2 1 1 1
7 1 1 1