Form - Report Produksi Harian.
Form - Report Produksi Harian.
Form - Report Produksi Harian.
Location: Day/Date:
Report No. Weather:
Description
Time Personnel:
Tools :
07.00-08.00
08.00-09.00
09.00-10.00
10.00-11.00
11.00-12.00
12.00-13.00
13.00-14.00
14.00-15.00
15.00-16.00
16.00-17.00
Progress
Previous: Today: Cumulative:
Note :
Sign
Name
Date
Comment
CLEARING DAILY REPORT
Date : Area :
Report No : Page : of
Weather :
A. ACTIVITY
KP TOTAL
NO. Volume (m2) REMARKS
FROM TO (MTR)
B. EQUIPMENT
WORKING STANDBY
WORK IN TYPE AND SERIES OF
NO. REMARKS
KP EQUIPMENT QTY HOURS QTY HOURS
C. MANPOWER
WORKING STANDBY
NO. MANPOWER REMARKS
QTY HOURS QTY HOURS
B. EQUIPMENT
WORKING STANDBY
WORK IN TYPE AND SERIES OF
NO. REMARKS
KP EQUIPMENT QTY HOURS QTY HOURS
C. MANPOWER
WORKING STANDBY
NO. MANPOWER REMARKS
QTY HOURS QTY HOURS
B. EQUIPMENT
WORK IN TYPE AND SERIES OF WORKING STANDBY
NO. REMARKS
KP EQUIPMENT QTY HOURS QTY HOURS
C. MANPOWER
WORKING STANDBY
NO. MANPOWER REMARKS
QTY HOURS QTY HOURS
EQUIPMENT
WORKING STANDBY
NO. WORK IN KP TYPE AND SERIES OF EQUIPMENT REMARKS
QTY HOURS QTY HOURS
MANPOWER
NO. WORKING STANDBY
MANPOWER REMARKS
QTY HOURS QTY HOURS
TYPE
B. EQUIPMENT AND
WORK IN SERIE
NO. WORKING STANDBY REMARKS
KP S OF
EQUIP
MENT QTY HOURS QTY HOURS
C. MANPOWER
REMA
NO. MANPOWER WORKING STANDBY
RKS
QTY HOURS QTY HOURS
Date : Area :
Report No : Alignment Sheet No. : of
Compressor Type :
Make / Model / Serial No's :
BQT DETAIL
Type of Bend :
Increamnet No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Bend Increment (degree) Under Force
Pull Measurement (mm)
Bend Increment (degree) After Relax
Pipe Thicknees (before bending)
Pipe Thicknees (after bending)
Proyek :
No. Laporan :
Tanggal :
No. Joint :
BENDING/ELBOW :
No. Pipa :
No. Heat :
Panjang (m) :
Panjang
Kumulatif (m) :
No. Joint :
BENDING/ELBOW :
No. Pipa :
No. Heat :
Panjang (m) :
Panjang
Kumulatif (m) :
No. Joint :
BENDING/ELBOW :
No. Pipa :
No. Heat :
Panjang (m) :
Panjang
Kumulatif (m) :
Reviewed by
embuat Komitmen PJIT
………….………….) (...…..………….………….)
Report No.: Date :
Page : of
Welder ID No.
Number of
NO. Joint No. Pipe No. Heat No Length Bend Detail Date Visual Location / KP Number Remarks
ROOT HOT PASS FILLER 1 FILLER 2 FILLER 3 CAPPING NDT Report
L R L R L R L R L R L R
WELDING DATA
Defect Data
0
315 45
270 90
225 135
Type Of Defect :
Size Of Defect :
180
Circumferential Position :
RT Report No. :
Note :
Removal Of Defect
Repair Data
VISUALLY ACCEPTABLE
RT ACCEPTABLE
EQUIPMENT
WORKING STANDBY
WORK
NO. TYPE AND SERIES OF EQUIPMENT REMARKS
IN KP QTY HOURS QTY HOURS
MANPOWER
WORKING STANDBY
NO. MANPOWER REMARKS
QTY HOURS QTY HOURS
Proyek : Lokasi :
No. Laporan : Cuaca Waktu
Tanggal :
Wall Thickness : mm
A. AKTIVITAS
No. Lasan (joint
Section KP Number Inspeksi Visual
number) Panjang Test Lapisan
No
(m) Holiday Pasir
Dari Ke Dari Ke Coating Pipe Body
B. PERALATAN
Bekerja Standby
No. Peralatan Keteran
Jumlah Jam Jumlah Jam
C. TENAGA KERJA
Bekerja Standby
No. Pekerja Keteran
Jumlah Jam Jumlah Jam
D. PROGRESS
Sebelumnya Hari ini Total
(m) (m) (m)
nspeksi Visual
Keterangan
Dasar
Galian
Keterangan
Keterangan
Reviewed by
PJIT
(…….…..…………………….)
BACKFILLING REPORT
Project name : Weather :
Report No : Location :
Date : From KP ……..to KP…….
JOINT NO. BACKFILL DEPTH
LENGTH VISUAL
FROM TO (M) SAND LAYER (M) TOP OF PIPE (M) INSPECTION
EQUIPMENT
WORK IN TYPE AND SERIES OF WORKING STANDBY
NO. REMARKS
KP EQUIPMENT QTY HOURS QTY HOURS
MANPOWER
WORKING STANDBY
NO. MANPOWER REMARKS
QTY HOURS QTY HOURS
BLASTING DATE :
SURFACE PROFILE :
PAINTING MIXING METHOD :
MATERIAL COATING
MERK
COLOR
ENVIRONMENTAL TEST
Dry temperature
Wet temperature
Steel Temperature
Dew Point ©
Rh (%)
PT. KE
Inspector PMC
PGN
NOTE:
Page
:
:
:
1st Repair 2nd Repair 2nd Repair Pre-Hydrostatic
Bend Detail Welder ID No. RADIOGRAPHIC TEST 1st Repair Welding MPI UT Field Joint Coating Peel Test Trenching Lowering In Backfill Thermit Welding
Length Cummulative WPS repair Radiographic Test Welding Radiographic Test Test
NO. Joint No. Pipe No. Heat No Date WPS No. Visual
(mm) (mm) Report ROOT FILLER 1 FILLER 2 FILLER 3 CAPPING No. Report Report Report Report Report Report Report Report Report Report Report Report Report
Angle Type Date Report No. Date Result Date Date Date Date Date Date Date Date Date Date Date Date Date
No. L R L R L R L R L R No. No. No. No. No. No. No. No. No. No. No. No. No.
Date : FinishLoading :