AHSP Final Re
AHSP Final Re
AHSP Final Re
AT
PEKERJAAN AIRTANAH
(INFORMATIF)
AT.01
ANALISIS BIAYA OPERASI ALAT BERAT PEMBUATAN SUMUR BOR AIRTANAH DALAM
ANALISIS PRODUKTIVITAS DAN BIAYA OPERASI ALAT BERAT PEMBUATAN SUMUR BOR AIRTANAH DALAM
Uraian
Kode
Satuan
Koefisien
5
Tenaga Kerja
Pekerja
L.01
OH
Mandor
L.04
OH
L.08
OH
Harga Satuan
(Rp)
JENIS ALAT
: Mesin Bor, Mud Pump, Air Compressor, Pumping Test unit, Water Jetting
SATUAN PEMBAYARAN : Rupiah/jam
Jumlah
(Rp)
No.
2.50
50,000.00
0.25
75,000.00
0.10
650,000.00
65,000.00
A.
1.
2.
URAIAN PERALATAN
Jenis Peralatan
Merk / Tipe
3.
Tenaga
Pw
4.
Kapasitas
Cp
5.
6.
7.
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
A
W
B
Tahun
Jam
Rp
Rp
Bahan
paket
0.10
25,000.00
2,500.00
Kotak sampel
paket
0.20
250,000.00
50,000.00
paket
0.05
20,000.00
Peralatan
1,000.00
53,500.00
262,250.00
15% x D
39,337.50
HP
Mud Pump
Tone, Koken
RRC/
130
Double
stroke 120
AIR
COMPRESSOR
Truck Cargo
Pick up
PUMPING TEST
UNIT
Welding set
Kubota
225Ah
24
WATER
JETTING
Grunfos dan
Jhon Deer 42
Gardner
Denver 120
10
1,500
645,750,000.00
10
1,500
150,000,000.00
10
1,500
225,000,000.00
5
2,000
175,000,000.00
5
2,000
100,000,000.00
5
1,500
140,000,000.00
10
1,500
160,000,000.00
10
1,500
220,000,000.00
64,575,000
15,000,000
22,500,000
17,500,000
10,000,000
14,000,000
16,000,000
22,000,000
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
0.16275
0.16275
0.16275
0.26380
0.26380
0.26380
0.16275
0.16275
Rp/jam
63,055.70
14,647.09
21,970.63
20,774.05
11,870.89
22,158.99
15,623.56
21,482.39
Rp/jam
861.00
200.00
300.00
175.00
100.00
186.67
213.33
293.33
Jumlah
(Rp)
b. Asuransi, dll.
Pekerja
Tukang Bor
Mandor
Bahan
L.01
OH
L.02
OH
L.04
OH
0.3088
50,000.00
0.0772
60,000.00
0.0309
75,000.00
15,440.00
Peralatan
0.5405
Rp/jam
63,916.70
14,847.09
22,270.63
20,949.05
11,970.89
22,345.66
15,836.89
21,775.73
Rp/jam
156,000.00
144,000.00
360,000.00
26,400.00
24,000.00
28,800.00
50,400.00
144,000.00
Koefisien biaya OP
12.00%
2.Pelumas
G = (E + F)
Rp/jam
97,500.00
90,000.00
225,000.00
8,250.00
7,500.00
18,000.00
31,500.00
90,000.00
2.50%
6.
C.
830,784.62
= (2.5%-3%) x Pw x Mp
449,039.08
Biaya bengkel
= (6,25% - 8,75%)
3.Perawatan dan
perbaikan
= (12,5%-17,5%)
Rp/jam
26,906.25
6,250.00
9,375.00
5,833.33
6,666.67
9,166.67
6.25%
Rp/jam
53,812.50
12,500.00
18,750.00
2,187.50
1,250.00
11,666.67
13,333.33
18,333.33
12.50%
M
L
Rp/jam
Rp/jam
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
1,093.75
14,285.71
7,142.86
625.00
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
Rp/jam
355,647.32
274,178.57
634,553.57
59,359.82
54,803.57
85,728.57
123,328.57
282,928.57
Rp/jam
419,564.02
289,025.66
656,824.20
80,308.87
66,774.46
108,074.23
139,165.46
304,704.30
471,428.58
15% x D
70,714.29
542,142.87
4.Operator
= (m orang/jam) x U1
5.Pembantu operator = (n orang/jam) x U2
1m' Reaming dia. 8 3/4" - 12"
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tenaga Kerja
Pekerja
Harga Satuan
(Rp)
Jumlah
7
50,000.00
D.
14,200.00
L.02
OH
0.071
60,000.00
4,260.00
LAIN - LAIN
1.Bahan Bakar Premium (non subsidi)
Mb
Liter
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
L.04
OH
0.029
75,000.00
2,145.00
Ms
Liter
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
Mp
Liter
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
Bahan
20,605.00
0.5
415,392.31
435,997.31
65,399.60
501,396.90
Tenaga Kerja
Pekerja
Satuan
Koefisien
L.01
OH
Tukang Bor
L.02
OH
Mandor
L.04
OH
Bahan
Harga Satuan
(Rp)
0.072
14,400.00
60,000.00
0.029
2,167.50
419,629.31
440,516.81
15% x D
Uraian
Satuan
Tenaga Kerja
Pekerja
L.01
OH
Tukang Bor
L.02
OH
Mandor
L.04
OH
Koefisien
Harga Satuan
(Rp)
(Rp)
0.3240
50,000.00
0.0810
60,000.00
0.0327
75,000.00
7
16,200.00
2,452.50
Peralatan
0.5714
470,948.72
269,100.10
269,100.10
292,612.60
15% x D
43,891.89
336,504.49
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Tenaga Kerja
Pekerja
L.01
OH
0.3280
50,000.00
Tukang Bor
L.02
OH
0.0820
60,000.00
Mandor
L.04
OH
0.0328
75,000.00
Jumlah
(Rp)
7
16,400.00
Bahan
Peralatan
2,460.00
23,780.00
0.5714
470,948.72
269,100.10
269,100.10
292,880.10
15% x D
43,932.01
336,812.11
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
Tenaga Kerja
Pekerja
L.01
OH
0.072
50,000.00
Tukang Bor
L.02
OH
0.018
60,000.00
Mandor
L.04
OH
0.007
75,000.00
3,600.00
532.50
5,212.50
Bahan
Centralizer
M.104.i
1.050
88,300.00
92,715.00
Ls
0.100
100,000.00
10,000.00
E.09
0.125
Peralatan
102,715.00
847,050.88
105,881.36
105,881.36
213,808.86
15% x D
32,071.33
245,880.19
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tenaga Kerja
Pekerja
Harga Satuan
(Rp)
Jumlah
(Rp)
0.072
50,000.00
Tukang Bor
L.02
OH
0.018
60,000.00
Mandor
L.04
OH
0.007
75,000.00
Bahan
LC Screen 6"
Peralatan
3,600.00
1,080.00
532.50
1.050
1,500,000.00
0.125
5,212.50
1,575,000.00
1,575,000.00
847,050.88
1,580,212.50
15% x D
237,031.88
1,817,244.38
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
Tenaga Kerja
Pekerja
L.01
OH
0.080
Tukang Bor
L.02
OH
0.020
75,000.00
Mandor
L.04
OH
0.008
650,000.00
50,000.00
Bahan
4,000.00
1,500.00
5,330.00
Centralizer
10,830.00
M.104.j
1.050
152,300.00
159,915.00
Ls
0.100
200,000.00
20,000.00
Peralatan
E.09
0.143
179,915.00
847,050.88
121,043.57
AT.10
121,043.57
311,788.57
15% x D
46,768.29
358,556.86
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tenaga Kerja
Pekerja
Harga Satuan
(Rp)
Jumlah
(Rp)
0.080
50,000.00
Tukang Bor
L.02
OH
0.020
60,000.00
Mandor
L.04
OH
0.008
75,000.00
4,000.00
Bahan
LC Screen 8"
M.108.c
1.050
E.09
0.143
3,250,000.00
Peralatan
4.000
1,200.00
615.00
5,815.00
3,412,500.00
3,412,500.00
847,050.88
121,043.57
AT.11
1,080.00
AT.09
4,920.00
AT.08
4.0000
4,860.00
23,512.50
Bahan
Jumlah Harga Bahan
AT.07
6.
Jumlah
121,043.57
3,539,358.57
15% x D
530,903.79
4,070,262.36
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tenaga Kerja
Pekerja
Harga Satuan
(Rp)
Jumlah
(Rp)
*)
0.024
50,000.00
Tukang Bor
L.02
OH
0.006
60,000.00
Mandor
L.04
OH
0.002
75,000.00
Bahan *)
Peralatan
1,200.00
1.250
E.09
0.040
1,732.50
19,455.00
24,318.75
24,318.75
847,050.88
33,882.04
4.000
360.00
172.50
33,882.04
59,933.29
15% x D
8,989.99
68,923.28
AT.12
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
Tenaga Kerja
Pekerja
L.01
OH
1.040
50,000.00
Tukang Bor
L.02
OH
0.260
60,000.00
Mandor
L.04
OH
0.104
75,000.00
52,000.00
15,600.00
7,792.50
75,392.50
Koral
M.12
m3
1.20
140,000.00
168,000.00
PC
M.15
Kg
325
1,240.00
403,000.00
Peralatan
E.09
m3
1.818
847,050.88
AT.13
168,000.00
1,540,107.91
1,540,107.91
1,783,500.41
15% x D
267,525.06
2,051,025.47
Uraian
Kode
Satuan
Koefisien
L.01
OH
Tenaga Kerja
Pekerja
Harga Satuan
(Rp)
Jumlah
(Rp)
0.572
50,000.00
Tukang Bor
L.02
OH
0.143
60,000.00
Mandor
L.04
OH
0.057
75,000.00
28,600.00
8,580.00
4.000
0.572
4,282.50
41,462.50
Bahan
Jumlah Harga Bahan
Peralatan
E.09
m3
1.000
776,687.77
776,687.77
776,687.77
15% x D
122,722.54
818,150.27
940,872.81
*) Pencucian sumur dapat dilakukan dengan metode Air Lifting, Air Jetting dan Blow up
AT.14
Uraian
Kode
Satuan
Tenaga Kerja
Pekerja
L.01
OH
Tukang Bor
L.02
OH
Mandor
L.04
OH
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
0.572
50,000.00
0.143
60,000.00
0.057
75,000.00
7
28,600.00
8,580.00
4.000
0.572
4,282.50
41,462.50
Bahan
Jumlah Harga Bahan
Peralatan
E.09
m3
1.000
248,174.87
248,174.87
248,174.87
289,637.37
15% x D
43,445.61
333,082.97
*) Uji pemompaan sumur dapat dilakukan dengan metode V-Notch atau Orifice
AT.15
Uraian
Kode
Tenaga Kerja
Satuan
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
*)
Pekerja
L.01
OH
8.00
50,000.00
Tukang Bor
L.02
OH
1.00
60,000.00
Mandor
L.04
OH
0.80
75,000.00
400,000.00
60,000.00
60,000.00
60,000.00
Bahan
Resin
tube
250,000.00
500,000.00
Ls
550,000.00
550,000.00
550,000.00
Peralatan
Jumlah Harga Peralatan
610,000.00
15% x D
91,500.00
701,500.00
AT.16
Uraian
Tenaga Kerja
Bahan
Peralatan
Kode
Satuan
L.05
OH
LS
Koefisien
Harga Satuan
(Rp)
6
0.50
(Rp)
7
50,000.00
50,000.00
35,000.00
35,000.00
35,000.00
Jumlah
100,000.00
85,000.00
15% x D
Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam
Drilling Rig
75%
419,564.02
10,000.00
6,500.00
3,500.00
429,564.02
470,948.72
Mud Pump
Air Compressor
30%
0%
289,025.66
656,824.20
289,025.66
656,824.20
Truck Cargo
10%
80,308.87
80,308.87
Produktivitas
(Q)
1.75 m/jam
1.75 m/jam
Koefisien Alat
(1/Q)
0.5714
0.5714
Welding set
5%
108,074.23
108,074.23
Pumping Test
0%
139,165.46
139,165.46
Water Jetting
0%
304,704.30
304,704.30
*) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah, kapasitas ini untuk
konsistensi stiff (sedang), sedangkan untuk tanah lembek kapasitas dikali 2 - 3 dan untuk tanah
keras kapasitas dikali 30 - 50%
Pick up
0%
66,774.46
66,774.46
Welding set
50%
108,074.23
108,074.23
Pumping Test
0%
139,165.46
139,165.46
Water Jetting
0%
304,704.30
304,704.30
Welding set
100%
108,074.23
108,074.23
Pumping Test
0%
139,165.46
139,165.46
Water Jetting
100%
304,704.30
304,704.30
Welding set
Pumping Test
0%
139,165.46
139,165.46
Water Jetting
0%
304,704.30
304,704.30
Pumping Test
100%
139,165.46
9,000.00
9,000.00
148,165.46
Water Jetting
0%
304,704.30
304,704.30
Truck Cargo
10%
80,308.87
80,308.87
Produktivitas
(Q)
8.00 m/jam
7.00 m/jam
25.00 m/jam
0.55 m3/jam
Koefisien Alat
(1/Q)
0.1250
0.1429
0.0400
1.8182
Pick up
10%
66,774.46
66,774.46
Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam
Produktivitas
(Q)
1.00 jam
1.00 jam
1.00 jam
Drilling Rig
20%
419,564.02
419,564.02
776,687.77
Koefisien Alat
(1/Q)
1.0000
1.0000
1.0000
Mud Pump
0%
289,025.66
289,025.66
Air Compressor
100%
656,824.20
12,500.00
12,500.00
669,324.20
Truck Cargo
10%
80,308.87
80,308.87
Pick up
15%
66,774.46
66,774.46
5%
108,074.23
108,074.23
Kode
M
S
K
S+K
M x (S+K)
Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam
Drilling Rig
20%
419,564.02
419,564.02
248,174.87
Mud Pump
0%
289,025.66
289,025.66
Air Compressor
0%
656,824.20
656,824.20
Truck Cargo
5%
80,308.87
80,308.87
66,077.52
506,594.33
Kode
Development Methods
5.
Uji Pemompaan (Pumping Test)
No.
UraIan
1.
Prsentase pemanfaatan
2.
Biaya operasi Alat S = (G + P)
3.
Bahan pakai habis
- Battery, cable lamp, dll.
4.
Biaya operasi Alat+Material
5.
Biaya operasi total
419,629.31
20%
66,774.46
66,774.46
4.0000
20,887.50
830,784.62
Pick up
4,320.00
75,000.00
0.5051
a. Air Lifting
b. Air Jetting
c. Blow Up
6.
(Rp)
50,000.00
(non subsidi)
Jumlah
0.288
3.
Pemasangan Konstruksi Sumur (Pipa Black Steel dan Screen Low Carbon)
No.
UraIan
Kode
Satuan
Drilling Rig
Mud Pump
Air Compressor
1. Prsentase pemanfaatan
M
%
100%
0%
0%
2. Biaya operasi Alat S = (G + P)
S
Rp./jam
419,564.02
289,025.66
656,824.20
3. Bahan pakai habis
K
Rp./jam
12,500.00
- Wire RB & Ciron
Rp./jam
- Acetelyn & CO2
Rp./jam
12,500.00
4. Biaya operasi Alat+Material
S+K
Rp./jam
419,564.02
289,025.66
669,324.20
5. Biaya operasi total
M x (S+K) Rp/jam
847,050.88
6.
Kode
Temporary Cassing
Diameter
a. (ID) 17"
b. (ID) 12"
4.
Pencucian Sumur (Well Development)
No.
UraIan
Kode
1. Prsentase pemanfaatan
M
2. Biaya operasi Alat S = (G + P)
S
3. Bahan pakai habis
K
- Foam/Detergen
4. Biaya operasi Alat+Material
S+K
5. Biaya operasi total
M x (S+K)
415,392.31
15% x D
Uraian
AT.06
3.Minyak Pelumas
Truck Cargo
15%
80,308.87
80,308.87
830,784.62
AT.05
Tukang Bor
Mandor
E.
2
3
Koefisien Alat
(1/Q)
0.5405
0.5000
0.5051
0.5263
Mud Pump
Air Compressor
100%
0%
289,025.66
656,824.20
289,025.66
656,824.20
(Rp)
0.284
Drilling Rig
100%
419,564.02
91,390.00
68,890.00
22,500.00
510,954.02
830,784.62
449,039.08
*) Produktivitas alat sangat tergantung kepada: kondisi peralatan yang digunakan dan konsitensi tanah yang dibor
No
Produktivitas *)
(Q)
1.85 m/jam
2.00 m/jam
1.98 m/jam
1.90 m/jam
2.
Bongkar pasang Temporary Cassing
No.
UraIan
Kode
1.
Prosentase pemanfaatan
M
2.
Biaya operasi Alat S = (G + P)
S
3.
Bahan pakai habis
K
- Wire RB & Ciron
- Acetelyn & CO2
4.
Biaya operasi Alat+Material
S+K
5.
Biaya operasi total
M x (S+K)
2,317.50
*)
m
Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam
4,632.00
22,389.50
AT.04
i = 10%
AT.03
6.
Tenaga Kerja
1.
Pengeboran (Pilot hole dan Reaming)
No.
UraIan
Kode
1. Prsentase pemanfaatan
M
2. Biaya operasi Alat S = (G + P)
S
3. Bahan pakai habis
K
- Drilling Fluid/mud
- Bit
4. Biaya operasi Alat+Material
S+K
5. Biaya operasi total
M x (S+K)
Suku bunga
Uraian
1
A
MESIN BOR
(Drilling Rig)
301,587.50
KETERANGAN
*) Jika tenaga kerja telah dihitung dalam kegiatan pengeboran, maka Harga Satuan (kolom 6) = 0
AT.02
SATUAN
18,750.00
KODE
208,750.00
URAIAN
125,000.00
*)
12,750.00
8.000
4
Pumping Test
Air Lift Methods:
a. Method "V" Notch
b. Method Orifice
Produktivitas
(Q)
1.00 jam
1.00 jam
Koefisien Alat
(1/Q)
1.0000
1.0000
Pick up
10%
66,774.46
66,774.46
Welding set
5%
108,074.23
108,074.23
AHSP.Pus Air.2
97,750.00
sampel
1,500,000.00
1,500,000.00
15% x G
225,000.00
1,822,750.00
AT.17
1 bh Patok Sumur
(diambil dari AHSP Pengukuran dan Pemetaan)
No
Uraian
1
A
Kode
3
Satuan
4
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
Tenaga Kerja
1.
Pekerja
L.01
OH
2.
Mandor
L.04
OH
1.00
50,000.00
0.10
75,000.00
50,000.00
7,500.00
Bahan
1.
3.
Cat tembok
57,500.00
Ls
1.00
175,000.00
M.115.d
kg
0.50
25,200.00
12,600.00
187,600.00
Peralatan
175,000.00
AT.18
245,100.00
15% x D
36,765.00
281,865.00
Uraian
1
A
Kode
3
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
Tenaga Kerja
Pekerja
L.01
OH
1.00
50,000.00
50,000.00
L.08
OH
0.25
650,000.00
162,500.00
Bahan
Cat tembok
Peralatan
Geo listrik
212,500.00
Ls
6.00
30,000.00
M.115.d
kg
0.50
25,200.00
12,600.00
192,600.00
M.121
Sewa-hari
0.333
2,500,000.00
180,000.00
832,500.00
832,500.00
1,237,600.00
15% x D
185,640.00
1,423,240.00
1).
No
Uraian
1
2
A Tenaga Kerja
1 Pekerja
2 Mandor
Kode
Satuan
Koefisien
L.01
L.04
jam
jam
0.1166
7,142.86
0.0117
10,714.29
Jumlah Harga Tenaga Kerja
7
832.55
124.88
957.43
B Bahan
Jumlah Harga Bahan
C Peralatan *
1 Biaya operasi kapal keruk
jam
0.004662 4,213,311.57
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
15% x D
19,643.58
19,643.58
20,601.01
3,090.15
23,691.20
No
Uraian
1
2
A Tenaga Kerja
1 Pekerja
2 Mandor
Kode
Satuan
Koefisien
L.01
L.04
jam
jam
0.0414
7,142.86
0.0041
10,714.29
Jumlah Harga Tenaga Kerja
7
295.77
44.37
340.14
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Excavator
jam
0.04141
600,966.87
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
15% x D
24,884.76
24,884.76
25,224.89
3,783.73
29,008.60
No
Uraian
1
2
A Tenaga Kerja
Kode
Satuan
Koefisien
B Bahan
C Peralatan
1 Dump truck
jam
0.1063
293,273.76
Jumlah Harga Peralatan
15% x D
31,161.10
31,161.10
31,161.10
4,674.16
35,835.30
No.
URAIAN
A.
URAIAN PERALATAN
1.
2.
3.
4.
5.
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi dalam 1 Tahun
6.
Harga Alat
B.
2.
3.
b. Asuransi, dll.
(E+F)
2.
Pelumas
= (2,5%-3%) x Pw x Mp
3.
Perawatan dan =
perbaikan
4.
5.
Sopir
Pembantu Sopir
(12,5 % - 17,5 %)
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
Keterangan :
IAN
KODE
KOEF.
KET.
SATUAN
200 HP K.Keruk
240 HP Pompa
15,000,000,000
Rupiah
1,500,000,000
Rupiah
0.26380
1,780,633.00
Rupiah
15,000.00
Rupiah
(E+F)
1,795,633.00
Rupiah
x Pw x Ms
660,000.00
Rupiah
15.00%
330,000.00
Rupiah
2.50%
468,750
Rupiah
6.25%
Tahun 2012
Suku bunga
i = 10%
Biaya asuransi
p = 0.2%
937,500.00
Rupiah
ang / Jam ) x U1
ang / Jam ) x U2
L
M
14,285.71
7,142.86
Rupiah
Rupiah
(H+I+K+L+M)
2,417,678.57
Rupiah
4,213,311.57
Rupiah
AT / JAM = ( G + P )
Mb
Ms
Mp
10,000.00
10,000.00
30,000.00
Liter
Liter
Liter
12.50%
non-subsidi
non-subsidi
NO
I.
II.
U R A I A N
ASUMSI
1. Jam kerja efektip per hari
2. Faktor pengembangan tanah
3. Faktor pengembangan tanah lepas
4. Tahapan kerja.
a. Penyedia harus meyerahkan rencana kerja untuk
mendapat persetujuan dari direksi.
b. Operator senantiasa mengadakan hubungan konsultasi
dengan direksi dalam mengatasi permasalahan waktu
pelaksanaan pengerukan
c, Lebar pengerukan harus efisien, sesuai dengan spektek
kapal keruk. Kedalaman pengerukan harus 0.5 - 2 kali diameter pipa pemotong (cutter). Kecepatan aliran lumpur
dalam pipa rata-rata 3 m/s.
d. Volume pengerukan yang diakui dihitung berdasarkan
gambar rencana alur. Untuk pelaksanaan pengerukan harus
ditambah dengan pengerukan tambahan setebal 0,5m
e. Pipa-pipa untuk menyalurkan lumpur harus ditata dan dijaga
agar tidak mengganggu aktivitas sekitar lokasi pekerjaan.
ALAT
a. Kapal Keruk
Tenaga
Kapasitas Produksi
Kecepatan
Kandungan air
Kandungan lumpur
KODE
Tk
Fk
Fk1
Pw
V
v
va
vl
Alat Bantu
Pipa apung dan darat dia 14"
Volume Galian ( Q ) : v xx x D2
20% x Q
Koefisien Kapal Keruk = 1/Q
b. Kebutuhan Pompa Dredging
Head Loss Pipa Sepanjang 600 m
Daya Pompa
Pp
Q.1
Q.1'
P
M
I KAPAL KERUK
PAL KERUK
KOEF
SATUAN
7.00
1.20
1.00
jam
200.00
350.00
3.00
80.00
20.00
HP
m3
m/s
%
%
14
0.2979
1072.44
KETERANGAN
"
m/s
m3/jam
Volume Suspensi
214.488
0.004662
m3/jam
24.5253
227.3005
240
m
HP
HP
Volume Lumpur
214.49
1501.42
m3/jam
m3/jam
25.00
2.50
orang
orang
0.1166
0.0117
jam
jam
227.2968
1) Pembuatan Saluran
No
Uraian
1
A
1
2
3
2
Tenaga Kerja
Pekerja
Tukang
Mandor
Bahan
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
Harga Satuan
(Rp)
6
0.0590
50,000.00
0.0295
60,000.00
0.0059
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
2
3
Peralatan
Bulldozer
Excavator
Dump Truck
D
E
E.05
E.11.a
E.08.a
Unit/Jam
Unit/Jam
Unit/Jam
0.0191
506,041.55
0.0295
480,149.15
0.1872
293,273.76
Jumlah Harga Peralatan
15% x D
Uraian
1
A
1
2
3
2
Tenaga Kerja
Pekerja
Tukang
Mandor
Bahan
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
Harga Satuan
(Rp)
6
0.0356
50,000.00
0.0178
60,000.00
0.0036
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
2
3
4
Peralatan
Bulldozer
Excavator
Dump Truck
Water Tanker
E.05
E.11.a
E.08.a
E.49
Unit/Jam
Unit/Jam
Unit/Jam
Unit/Jam
0.0191
0.0295
0.1872
0.0078
506,041.55
480,149.15
293,273.76
238,841.75
Vibro Roller
E.48
Unit/Jam
0.0178
377,451.91
Jumlah Harga Peralatan
D
E
15% x D
Uraian
1
A
1
2
3
2
Tenaga Kerja
Pekerja
Tukang
Mandor
Bahan
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
Harga Satuan
(Rp)
6
0.036
50,000.00
0.018
60,000.00
0.0036
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Excavator
D
E
E.11.a
Unit/Jam
0.0295
480,149.15
Jumlah Harga Peralatan
15% x D
Jumlah
(Rp)
7
No.
2,952.38
1,771.43
442.86
5,166.67
9,659.96
14,175.83
54,912.02
78,747.82
83,914.48
12,587.17
A.
1.
2.
3.
4.
5.
6.
7.
B.
1.
96,501.66
3.
Jumlah
(Rp)
C.
1.
1,777.78
1,066.67
266.67
3,111.11
9,659.96
14,175.83
54,912.02
1,857.66
2.
3.
4.
5.
6,710.26
87,315.73
96,975.70
14,546.35
111,522.05
Jumlah
(Rp)
7
1,777.78
1,066.67
266.67
3,111.11
14,175.83
14,175.83
17,286.94
2,593.04
19,879.98
D.
E.
1.
2.
3.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
Merk / Tipe
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi dalam 1 Tahun
Harga Alat
Perhitungan B
KODE SATUAN
Excavator
Pw
Cp
A
W
B
HP
Tahun
Jam
Rp
(Standard)
80-140 HP
133.0
0.9
5.0
2,000
934,000,000
Rp
93,400,000
Rp/jam
110,874.08
b. Asuransi, dll.
Rp/jam
934.00
Rp/jam
111,808.08
Rp/jam
159,600.00
Pelumas
= (2.5%-3%) x Pw x Mp
Rp/jam
99,750.00
Biaya bengkel
= (6,25% - 8,75%)
Rp/jam
29,187.50
Perawatan dan
perbaikan
= (12,5%-17,5%)
Rp/jam
58,375.00
M
L
Rp/jam
Rp/jam
14,285.71
7,142.86
G = (E + F)
Operator
= (m orang/jam) x U1
Pembantu operator = (n orang/jam) x U2
0.26380
Rp/jam
368,341.07
Rp/jam
480,149.15
Mb
Ms
Mp
Liter
Liter
Liter
10,000.00
10,000.00
30,000.00
n Water Tanker
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Dump Truck
Bulldozer
Roller Vibro
Water Tanker
3-4 M3
100.0
4.0
5.0
2,000
360,000,000
100-150 HP
150.0
5.0
2,000
900,000,000
5-8 Ton
82.0
7.1
5.0
2,000
918,787,500
3000-4500 L
100.0
4,000.0
5.0
2,000
105,000,000
36,000,000
90,000,000
91,878,750
10,500,000
0.26380
0.26380
0.26380
42,735.19
106,837.98
109,068.22
12,464.43
Biaya asuransi
105.00 p= 0.2%
360.00
900.00
918.79
43,095.19
107,737.98
109,987.01
12,569.43
120,000.00
180,000.00
98,400.00
120,000.00
###
75,000.00
112,500.00
61,500.00
75,000.00
2.50%
11,250.00
28,125.00
28,712.11
3,281.25
6.25%
22,500.00
56,250.00
57,424.22
6,562.50
###
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
250,178.57
398,303.57
267,464.90
226,272.32
293,273.76
506,041.55
377,451.91
238,841.75
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
JENIS PEKERJAAN
: MENGGALI TANAH DI BORROW AREA DAN MENGANGK
JARAK ANGKUT
: 4 Km
SATUAN PEMBAYARAN : M3
NO
I.
II.
U R A I A N
ASUMSI
1. Jam kerja efektif per hari
2. Faktor pengembangan tanah
3. Jarak angkut
4. Tahapan kerja.
a. Excavator menggali tanah di borrow area, kemudian
dimuat kedalam dump truck.
b. Dump truck mengangkut material tanah ke lokasi
pekerjaan.
ALAT
a. Excavator Standard
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
KODE
Tk
Fk
L
V
Fb
Fa
Waktu Siklus
Menggali, swing dan memuat ke dump truck
Swing kembali dan lain - lain
Ts1
T. 1
T. 2
Ts.1
Q.1
V
Fa
v.1
v.2
Ts.2
T.1
T.2
Muat
Lain-lain
= ( V : Q.1 ) x 60
T.3
T.4
Ts.2
Q.2
TENAGA
Produksi yang menentukan : Excavator
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Q.1
Q.1'
P
M
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'
JENIS PEKERJAAN
: PEMADATAN
SATUAN PEMBAYARAN : M3
NO
I.
II.
U R A I A N
ASUMSI
1. Jam kerja efektip per hari
2. Faktor pengembangan tanah
3. Faktor tanah lepas
4. Tahapan kerja.
a. Bulldozer menghampar dan meratakan tanah
b. Tanah disiram air menggunakan water tanker truck
c. Kemudian dipadatkan dengan vibro roller.
ALAT
a. Bulldozer 100 - 150 HP ( D 65 E-8 ).
Jarak gusur
Lebar blade
Tinggi blade
Faktor blade
Kecepatan maju ( 0.75 x 3.7 km/jam = 2.8 km/jam)
KODE
Tk
Fk
Fk1
D
Lb
Tb
Fb
F
R
Z
E
Ts.3
Q3
Q3
Koefisien Alat/m3 = 1 / Q3
b. Water Tanker Truck 3000 - 4500 L
Volume tangki air
Kebutuhan air / m3 material padat
Pengisian tangki / jam
Faktor efisiensi alat
V
Wc
n
Fa
Produksi / jam = ( V x n x Fa ) / Wc
Q4
Koefisien Alat/m3 = 1 / Q4
c. Roller Vibro 5 - 8 Ton.
Lebar Drum
Kecepatan maju / mundur
Tebal pemadatan
Jumlah lintasan
Efisiensi kerja
W1
V
H
N
E
Produksi/jam = ( W x V x H x 1,000 x E ) / N
Q5
Koefisien Alat/m3 = 1 / Q5
III.
TENAGA
Produksi yang menentukan : Vibratory Roller
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Q.5
Q.1'
P
M
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'
KOEF
SATUAN
7.00
1.20
4.00
jam
0.80
0.70
0.75
m3
0.37
0.25
0.62
KETERANGAN
km
Pemuatan sedang
Baik
Menit
Menit
Menit
Menit
33.87 m3/jam
0.0295
jam
4.00
m3
0.75
Baik
20.00 Km/jam
30.00 Km/jam
12.00
8.00
Menit
Menit
Menit
7.09
1.00
28.09
Menit
Menit
Menit
5.34 m3/jam
0.1872
jam
33.87 m3/jam
237.10 m3/hari
2.00
0.20
0.0590
0.0059
KOEF
7.00
1.20
1.00
orang
orang
jam
jam
SATUAN
KETERANGAN
jam
50.00
m
3.415
m
D.65 E-8
1.15
m
0.80
Penggusuran sedang
46.67 m/menit
116.17 m/menit
0.05 Menit
0.75
Baik
3.61
m3
1.55
Menit
104.771
m3
52.385
m3
0.0191 jam
4.00 m3
0.07 m3
3.00 kali
0.75 baik
128.57 m3
0.0078 jam
2.20 m
1.50 Km/Jam
0.20 m
8 Kali
0.75 Baik
2.00 m
56.25 m3/jam
0.0178 jam
56.25 m3/jam
393.75 m3/hari
2.00
0.20
orang
orang
0.0356
0.0036
jam
jam
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS ALAT
SATUAN PEMBAYARAN
No.
A.
1.
2.
3.
4.
5.
6.
7.
URAIAN PERALATAN
Peralatan
Merk / Tipe
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
B.
1.
3.
Jenis
HP
Tahun
Jam
Rp
Rp
b. Asuransi, dll.
G = (E + F)
SATUAN
Pw
Cp
A
W
B
KODE
Excavator
(Standard)
80-140 HP
133.0
0.9
5.0
2,000
934,000,000
Dump Truck
Bulldozer
Roller Vibro
KETERANGAN
3-4 M3
100.0
4.0
5.0
2,000
360,000,000
100-150 HP
150.0
5.0
2,000
900,000,000
5-8 Ton
82.0
7.1
5.0
2,000
918,787,500
3000-4500 L
100.0
4,000.0
5.0
2,000
105,000,000
93,400,000
36,000,000
90,000,000
91,878,750
10,500,000
0.26380
0.26380
0.26380
0.26380
0.26380
Rp/jam
110,874.08
42,735.19
106,837.98
109,068.22
12,464.43
Rp/jam
934.00
360.00
900.00
918.79
105.00
Rp/jam
111,808.08
43,095.19
107,737.98
109,987.01
12,569.43
Suku bunga
i = 10%
Asuransi
p = 0.2%
1.
Rp/jam
159,600.00
120,000.00
180,000.00
98,400.00
120,000.00
###
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Rp/jam
99,750.00
75,000.00
112,500.00
61,500.00
75,000.00
###
3.
Biaya bengkel
= (6,25% - 8,75%)
Rp/jam
29,187.50
11,250.00
28,125.00
28,712.11
3,281.25
###
4.
Perawatan dan
perbaikan
= (12,5%-17,5%)
Rp/jam
58,375.00
22,500.00
56,250.00
57,424.22
6,562.50
###
5.
6.
Operator
= (m orang/jam) x U1
Pembantu operator = (n orang/jam) x U2
M
L
Rp/jam
Rp/jam
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
Rp/jam
368,341.07
250,178.57
398,303.57
267,464.90
226,272.32
Rp/jam
480,149.15
293,273.76
506,041.55
377,451.91
238,841.75
Mb
Ms
Mp
Liter
Liter
Liter
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
D.
E.
1.
2.
3.
LAIN - LAIN
Bahan Bakar Premium (non subsidi)
Bahan Bakar Solar
(non subsidi)
Minyak Pelumas
ANALISIS PRODUKTIVITAS ALAT BERAT PENGGALIAN DAN ANGKUTAN MATERIAL/HASIL GALIAN LINTAS PULAU
JENIS PEKERJAAN
: ANGKUTAN MATERIAL LINTAS PULAU
JARAK ANGKUT
: (Asumsi 4); L1= 1 km; L2=10 km dan L3= 2 km
SATUAN PEMBAYARAN : M3
NO
I.
U R A I A N
KODE
KOEF
SATUAN
KETERANGAN
ASUMSI
1. Jam kerja efektif per hari
Tk
7.00
jam
1.20
1.00
1.00
10.00
2.00
km
km
km
ALAT
a. Excavator Standard ( menggali tanah di borrow area )
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
V
Fb
Fa
0.80
0.70
0.75
Waktu Siklus
Menggali, swing dan memuat
Swing kembali dan lain - lain
Ts1
T. 1
T. 2
Ts.1
0.37
0.25
0.62
Menit
Menit
Menit
Menit
Q.1
33.87
m3/jam
0.0295
jam
V
Fa
v.1
v.2
4.00
0.75
20.00
30.00
m3
Km/jam
Km/jam
Waktu Siklus :
Waktu tempuh isi
= ( L1 : v.1 ) x 60
Waktu tempuh kosong = ( L1 : v.2 ) x 60
Muat
= ( V : Q.1 ) x 60
Lain-lain
Ts.2
T.1
T.2
T.3
T.4
Ts.2
3.00
2.00
7.09
1.00
13.09
Menit
Menit
Menit
Menit
Menit
Menit
Q.2
11.46
m3/jam
V
Fb
Fa
Ts3
m3
Pemuatan sedang
Baik
Baik
0.0872
jam
0.80
0.90
0.75
m3
Pemuatan ringan
Baik
Menit
T. 1
T. 2
Ts.3
0.42
0.25
0.67
Menit
Menit
Menit
Q.3
48.36
m3/jam
0.0207
jam
V
Fa
v.1
v.2
2000.00
0.75
5.00
7.00
m3
Km/jam
Km/jam
Waktu Siklus :
Waktu tempuh isi
= ( L2 : v.1 ) x 60
Waktu tempuh kosong = ( L2 : v.2 ) x 60
Muat
= ( V : Q.3 ) x 60
Lain-lain
Ts.4
T.1
T.2
T.3
T.4
Ts.4
120.00
85.71
2481.48
1.00
2688.20
Menit
Menit
Menit
Menit
Menit
Menit
Q.4
27.90
m3/jam
0.0358
jam
V
Fb
Fa
0.80
0.90
0.75
m3
Waktu Siklus
Menggali, swing dan memuat
Swing kembali dan lain - lain
Ts5
T. 1
T. 2
Ts.5
0.42
0.25
0.67
Menit
Menit
Menit
Menit
Q.5
48.36
m3/jam
0.0207
jam
V
Fa
v.1
v.2
3.00
0.75
3.00
5.00
m3
Km/jam
Km/jam
Waktu Siklus :
Waktu tempuh isi
= ( L3 : v.1 ) x 60
Waktu tempuh kosong = ( L3 : v.2 ) x 60
Muat
= ( V : Q.5 ) x 60
Lain-lain
Ts.6
T.1
T.2
T.3
T.4
Ts.6
40.00
24.00
3.72
1.00
68.72
Menit
Menit
Menit
Menit
Menit
Menit
Q.6
1.64
m3/jam
Q.1
Q.1'
P
M
Baik
Pemuatan ringan
Baik
Baik
0.6109
jam
33.87
237.10
m3/jam
m3/jam
3.00
0.30
0.0886
orang
orang
jam
- Mandor
: ( Tk x M ) : Q.1'
Q.3
Q.3'
P
M
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.3'
- Mandor : ( Tk x M ) : Q.3'
c. Di Stock Pile 2 ( C)
Produksi yang menentukan : Excavator
Produksi / hari = Tk x Q.5
Kebutuhan tenaga
- Pekerja
- Mandor
Q.5
Q.5'
P
M
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.5'
- Mandor : ( Tk x M ) : Q.5'
d. Di Stock Pile 3 (Lokasi pekerjaan)
Produksi yang menentukan : Excavator
Produksi / hari = Tk x Q.6
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.6'
- Pekerja : ( Tk x P ) : Q.6'
0.0089
jam
48.36
338.51
m3/jam
m3/jam
3.00
0.30
orang
orang
0.0620
0.0062
jam
jam
48.36
338.51
m3/jam
m3/jam
3.00
0.30
0.0620
0.0062
orang
orang
jam
jam
Q.6
Q.6'
1.64
11.46
m3/jam
m3/jam
P
M
3.00
0.30
orang
orang
1.8326
0.1833
jam
jam
ANALISIS PRODUKTIVITAS ALAT BERAT PENGGALIAN TANAH DI SUNGAI DENGAN EXCAVATOR YANG DIANGKUT DUMPTRUCK
JENIS PEKERJAAN
JARAK ANGKUT
: 1,0 Km
SATUAN PEMBAYARAN : M3
NO
I.
II.
U R A I A N
KODE
SATUAN
KETERANGAN
ASUMSI
1. Jam kerja efektif per hari
Tk
7.00
jam
Fk
Fk1
L
1.20
1.00
1.00
km
V
Fb
Fa
0.60
0.70
0.69
Waktu Siklus
Menggali, swing dan memuat ke dump truck
Swing kembali dan Lain - lain
Ts1
T. 1
T. 2
Ts.1
0.35
0.25
0.60
Menit
Menit
Menit
Menit
Q.1
24.15
m3/jam
0.0414
jam
ALAT
a. Excavator Long Arm
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
D
Lb
Tb
Fb
F
R
Z
E
m3
Kondisi pemuatan sedang
Kondisi operasi alat sedang
Pemeliharaan mesin baik
50.00
m
3.415
m
D.65 E-8
1.15
m
0.80
Penggusuran sedang
46.67 m/menit
116.17 m/menit
0.05
Menit
0.75
Baik
3.61
m3
Ts.2
1.55
Menit
Q2
104.771
m3
Q2
52.385
m3
Koefisien Alat/m3 = 1 / Q2
c. Dump Truck
Kapasits Bak
Faktor Efisiensi Alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
0.0191
V
Fa
v.1
v.2
4.00
0.75
20.00
30.00
Km/jam
Km/jam
Waktu Siklus :
Waktu tempuh isi
= ( L : v.1 ) x 60
Waktu tempuh kosong = ( L : v.2 ) x 60
Muat
= ( V : Q.1 ) x 60
Lain-lain
Ts.3
T.1
T.2
T.3
T.4
Ts.3
3.00
2.00
9.94
1.00
15.94
Menit
Menit
Menit
Menit
Menit
Menit
Q.3
9.41
m3/jam
KOEF
Tenaga
a. Membantu pemuatan tanah oleh Excavator
Produksi yang menentukan : Excavator
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Q.1
Q.1'
P
M
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'
b. Membantu perataan dan perapihan tanah oleh
Buldozer
Produksi yang menentukan : Excavator
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'
Q.2
Q.2'
P
M
m3
Baik
0.1063
jam
24.15
169.05
m3/jam
m3/hari
1.00
0.10
orang
orang
0.0414
0.0041
jam
jam
52.39
366.70
m3/jam
m3/hari
4.00
0.40
0.0764
0.0076
orang
orang
jam
jam
LAMPIRAN A.11
CONTOH PERHITUNGAN CARA MEKANIS
(informatif)
Contoh AHSP Penggalian tanah di Situ/waduk dengan Exacavator di Ponton 1, hasil galian diangkut dengan Ponton 2
JENIS ALAT
: Excavator, Ponton dan Buldozer
SATUAN PEMBAYARAN
: Rupiah/jam
No.
3.
AHSP Galian tanah di Situ/Waduk
Kode
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
C
1
2
3
Peralatan
Biaya Operasi Excavator 1 (long arm) + Ponton 1
Biaya Operasi Excavator 2 (long arm)
Biaya Operasi Buldozer meratakan + perapihan
D
E
Satuan
Koefisien
Harga Satuan
(Rp)
L.01
L.04
OH
OH
0.1626
50,000.00
0.0163
75,000.00
Jumlah Harga Tenaga Kerja
jam
jam
jam
0.0449
648,995.12
0.0327
600,966.87
0.0191
506,041.55
Jumlah Harga Peralatan
Jumlah
(Rp)
15% x D
1
A
Tenaga Kerja
Bahan
Uraian
Kode
Satuan
Peralatan
Biaya Operasi Ponton 2
D
E
KETERANGAN
NO
Rp
b. Asuransi, dll.
Bulldozer
80-140 HP
133.0
0.6
5.0
2,000
1,500,000,000
80-140 HP
133.0
0.8
5.0
2,000
1,725,000,000
120.0
0.0
5.0
2,000
225,000,000
100-150 HP
150.0
0
5.0
2,000
900,000,000
150,000,000
172,500,000
22,500,000
90,000,000
0.26380
0.26380
0.26380
0.26380
Rp/jam
178,063.30
204,772.79
26,709.49
106,837.98
Rp/jam
1,500.00
1,725.00
225.00
900.00
Rp/jam
179,563.30
206,497.79
26,934.49
107,737.98
Suku bunga
i = 10%
II.
G = (E + F)
1.
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Asuransi
p = 0.2%
Rp/jam
159,600.00
159,600.00
144,000.00
180,000.00
Rp/jam
99,750.00
99,750.00
90,000.00
112,500.00
Rp/jam
46,875.00
53,906.25
7,031.25
28,125.00
6.25%
Rp/jam
93,750.00
107,812.50
14,062.50
56,250.00
12.50%
Biaya bengkel
= (6,25% - 8,75%)
Perawatan dan
perbaikan
= (12,5%-17,5%)
jam
Koefisien
12.00%
4.
5.
D.
Operator
= (m orang/jam) x U1
Pembantu operator = (n orang/jam) x U2
M
L
Rp/jam
Rp/jam
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
14,285.71
7,142.86
Rp/jam
421,403.57
442,497.32
276,522.32
398,303.57
15% x D
LAIN - LAIN
Bahan Bakar Premium (non subsidi)
Bahan Bakar Solar
(non subsidi)
Minyak Pelumas
Rp/jam
600,966.87
648,995.12
303,456.82
506,041.55
Mb
Ms
Mp
Liter
Liter
Liter
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
10,000.00
10,000.00
30,000.00
ALAT
a. Excavator 1 (Long Arm) + Ponton 1
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Kode
Satuan
Fk
Fk1
L
1.20
1.00
1.00
km
V
Fb
Fa
0.60
0.70
0.69
0.40
0.25
0.65
Menit
Menit
Menit
Menit
Q.1
V
Fa
v.1
v.2
Waktu Siklus :
Waktu tempuh isi
= ( L : v.1 ) x 60
Waktu tempuh kosong = ( L : v.2 ) x 60
Muat
= ( V : Q.1 ) x 60
Lain-lain
Ts.2
T.1
T.2
T.3
T.4
Ts.2
Q.2
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
KETERANGAN
m3
Pemuatan sedang
Kondisi operasi alat sedang
Pemeliharaan mesin baik
22.29
m3/jam
0.0449
jam
10.00
0.75
5.00
7.00
Km/jam
Km/jam
12.00
8.57
26.92
1.00
48.49
Menit
Menit
Menit
Menit
Menit
Menit
7.73
m3/jam
0.1293
V
Fb
Fa
0.60
0.90
0.69
m3
Baik
jam
m3
Waktu Siklus
Menggali, swing dan membuang ke tanggul
Swing kembali dan Lain - lain
Ts3
T. 1
T. 2
Ts.3
0.36
0.25
0.61
Menit
Menit
Menit
Menit
Q.3
30.54
m3/jam
0.0327
jam
Pemuatan ringan
Kondisi operasi alat sedang
Pemeliharaan mesin baik
Tenaga Kerja
Bahan
C
1
Peralatan
Biaya Operasi Ponton 2
D
E
0.2390
303,456.82
Jumlah Harga Peralatan
15% x D
72,526.18
72,526.18
72,526.18
10,878.93
AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 5 km)
No
1
A
Tenaga Kerja
Bahan
D
Lb
Tb
Fb
F
R
Z
E
50.00
3.415
1.15
0.80
46.67
116.17
0.05
0.75
m
m
m
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Jumlah
(Rp)
7
Penggusuran sedang
Baik
3.61
m3
Ts.4
1.55
Menit
Q4
104.771
m3
Q4
52.385
m3
Koefisien Alat/m3 = 1 / Q4
Jumlah Harga Bahan
Peralatan
Biaya Operasi Ponton 2
D
E
jam
0.3487
303,456.82
Jumlah Harga Peralatan
15% x D
105,815.39
105,815.39
105,815.39
15,872.31
121,687.70
0.0191
III.
C
1
Tenaga.
a. Di Excavator 2 di darat menurunkan hasil galian
dari ponton 2 ke daratan
Produksi yang menentukan: 3 buah Ponton 2
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Q.1
Q.1'
P
M
23.20
162.42
m3/jam
m3/hari
2.00
0.20
OH
OH
0.0862
0.0086
jam
jam
52.39
366.70
m3/jam
m3/hari
AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 10 km)
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'
Jumlah
(Rp)
7
Tenaga Kerja
Jumlah Harga Tenaga Kerja
Bahan
C
1
Peralatan
Biaya Operasi Ponton 2
D
E
0.6230
303,456.82
Jumlah Harga Peralatan
15% x D
189,053.60
189,053.60
189,053.60
28,358.04
217,411.60
Q.1
Q.1'
P
M
4.00
0.40
0.0764
0.0076
D.65 E-8
m/menit
m/menit
Menit
83,405.10
1
A
jam
Ts1
T. 1
T. 2
Ts.1
45,121.60
Uraian
1.5
SATUAN
7.00
Waktu Siklus
Menggali, swing dan memuat ke ponton 2
Swing kembali dan Lain - lain
b. Ponton 2.
Kapasits
Faktor Efisiensi Alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
39,236.19
39,236.19
39,236.19
5,885.43
1.4
KOEF
Tk
2.50%
0.1293
303,456.82
Jumlah Harga Peralatan
1.
2.
3.
Jumlah
(Rp)
KODE
E.
Harga Satuan
(Rp)
U R A IA N
ASUMSI
AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 3 km)
No
1
A
Ponton-2
77,966.80
C
1
1.3
HP
Tahun
Jam
Rp
Excavator 1
+ Ponton-1
AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 1 km)
No
C.
29,112.96
19,677.39
9,659.96
58,450.32
67,797.25
10,169.59
Untuk jarak angkut material atau hasil galian perlu disesuaikan dengan kondisi di lapangannya, dalam contoh ini disajikan
untuk jarak angkut 1 km, 3 km, 5 km dan 10 km seperti berikut ini:
1.2
Pw
Cp
A
W
B
7
8,127.77
1,219.17
9,346.93
Excavator 2
(Long Arm)
URAIAN PERALATAN
Jenis Peralatan
Merk / Tipe
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
B.
1.
(4) Excavator 2
di darat menurunkan hasil galian
dari ponton 2 ke daratan
Uraian
I.
A.
1.
2.
3.
4.
5.
6.
7.
No
KODE SATUAN
(1) Excavator 1
di atas Ponton 1
1.1
U R A IA N
JENIS PEKERJAAN
: GALIAN TANAH / PENGERUKAN SITU
JARAK ANGKUT
: 1,0 Km
SATUAN PEMBAYARAN : M3
orang
orang
jam
jam
HSD.Pus Air.57
LAMPIRAN A.9
CONTOH DAFTAR HARGA SATUAN DASAR TENAGA KERJA,
BAHAN DAN ALAT, KOTA BANDUNG, JAWA BARAT TAHUN 2012
Harga
Satuan Dasar
( Rp. )
5
No
Uraian
Satuan
Kode
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
L.01
L.02
L.03
L.04
L.05
L.06
L.07
L.08
L.09
L.10
L.11
L.12
L.13
L.14
L.15
L.16
50,000.00
60,000.00
70,000.00
75,000.00
100,000.00
50,000.00
450,000.00
650,000.00
1,000,000.00
85,000.00
65,000.00
45,000.00
65,000.00
100,000.00
400,000.00
50,000.00
m3
m3
L
bh
bh
bh
bh
bh
m3
m3
m2
m2
kg
m3
m3
m3
m3
m3
m3
m3
m3
m3
M.01
M.02
M.03
M.04.a
M.04.b
M.04.c
M.04.d
M.04.e
M.05
M.06
M.07a
M.07b
M.08
M.09.a
M.09.b
M.09.c
M.09.d
M.09.e
M.09.f
M.09.g
M.09.h
M.09.i
150,000.00
25,000.00
35,000.00
6,325.00
8,305.00
450.00
650.00
13,750.00
95,000.00
118,250.00
140,500.00
100,000.00
8,500.00
875,000.00
938,000.00
958,000.00
970,500.00
978,000.00
1,015,000.00
1,029,000.00
1,052,500.00
1,076,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Pekerja
Tukang
Kepala Tukang
Mandor
Juru ukur, operator/mekanik alat berat
Pembantu Juru ukur & operator/mekanik alat berat
Akhli muda
Akhli madya
Akhli utama
Supir truck
Supir kendaraan < 2 ton (termasuk sedan)
Kenek
Penjaga malam/Satpam
Drafter CAD/manual
Desain Engineer
Operator komputer/printer/ploter
II
BAHAN / MATERIAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Abu Batu
Air
Bahan Aditif (Caldbon, Strorox, dll)
Batu bata / merah bakar kelas I
Batu bata / merah bakar kelas II
Batu bata / merah bakar kw biasa
Batu bata / merah bakar pres
Batu bata / merah oven (Klingker)
Batu / batu kali/ batu belah
Batu brojol (Untuk bronjong)
Batu candi
Batu muka
Bentonit
Beton Ready Mixed K-175
Beton Ready Mixed K-200
Beton Ready Mixed K-225
Beton Ready Mixed K-250
Beton Ready Mixed K-275
Beton Ready Mixed K-300
Beton Ready Mixed K-325
Beton Ready Mixed K-350
Beton Ready Mixed K-375
Ket.
6
HSD.Pus Air.58
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
KELOMPOK KAYU
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
m3
m3
m3
m3
bh
bh
bh
bh
bh
bh
bh
m3
m3
m3
m3
m3
m3
m3
zak
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
M.09.j
M.09.k
M.09.l
M.09.m
M.10.a
M.10.b
M.10.c
M.10.d
M.10.e
M.10.f
M.10.g
M.11
M.12
M.13
M.14.a
M.14.b
M.14.c
M.14.d
M.15
M.16
M.17.a
M.17.b
M.17.c
M.18.a
M.18.b
M.18.c
M.18.d
M.18.e
M.18.f
M.19.a
M.19.b
M.19.c
M.19.d
M.19.e
1,085,500.00
1,098,200.00
1,148,200.00
1,200,000.00
41,250.00
65,450.00
96,800.00
115,500.00
20,000.00
40,000.00
60,000.00
80,000.00
140,000.00
2,000.00
140,000.00
90,000.00
124,300.00
100,000.00
62,000.00
124,300.00
75,350.00
45,000.00
25,000.00
50,000.00
110,000.00
315,000.00
550,000.00
135,000.00
240,000.00
55,000.00
120,000.00
125,000.00
210,000.00
385,000.00
bt
bt
btg
btg
btg
btg
kg
m3
m3
m3
m3
m'
m3
m3
m3
m3
M.30.a
M.30.b
M.31.a
M.31.b
M.31.c
M.31.d
M.32
M.33.a
M.33.b
M.33.c
M.33.d
M.34
M.35.a
M.35.b
M.35.c
M.35.d
60,000.00
85,000.00
115,000.00
70,250.00
18,000.00
24,000.00
10,000.00
6,250,000.00
5,500,000.00
7,975,000.00
1,400,000.00
350,000.00
1,500,000.00
6,960,000.00
5,950,000.00
8,375,000.00
HSD.Pus Air.59
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
KELOMPOK LOGAM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
m3
bt
bt
bt
bt
m3
m3
lbr
lbr
lbr
lbr
m2
lbr
lbr
lbr
lbr
m
m
lbr
lbr
bh
M.35.e
M.36.a
M.36.b
M.36.c
M.36.d
M.37.a
M.37.b
M.38.a
M.38.b
M.38.c
M.38.d
M.39
M.40.a
M.40.b
M.40.c
M.40.d
M.41.a
M.42.b
M.42.a
M.42.b
M.42.c
1,500,000.00
25,000.00
55,000.00
85,000.00
155,000.00
5,870,000.00
1,400,000.00
55,000.00
80,000.00
125,000.00
135,000.00
25,000.00
200,000.00
125,000.00
112,000.00
67,500.00
11,550.00
42,000.00
1,275,000.00
45,000.00
1,000.00
m2
m2
m2
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
bh
bh
bh
kg
kg
kg
kg
kg
kg
kg
M.53.a
M.53.b
M.53.c
M.53.d
M.53.e
M.53.f
M.54.a
M.54.b
M.54.c
M.54.d
M.54.e
M.54.f
M.54.g
M.54.h
M.55.a
M.55.b
M.55.c
M.55.d
M.55.e
M.56.a
M.56.a
M.56.b
M.56.c
M.56.d
M.57
M.58
M.59
M.60
M.61
M.62
M.63
M.64.a
157,000.00
235,500.00
392,500.00
475,000.00
628,000.00
12,000.00
15,000.00
14,000.00
16,500.00
12,000.00
17,500.00
16,500.00
12,000.00
16,500.00
11,000.00
13,000.00
16,000.00
9,000.00
10,000.00
2,200.00
3,200.00
5,600.00
8,600.00
10,500.00
5,000.00
30,000.00
36,500.00
15,000.00
19,350.00
24,750.00
25,000.00
23,100.00
HSD.Pus Air.60
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Paku biasa 4 cm - 7 cm
Paku seng gelombang
Pintu Angkat Type I.B = 0,30 m
Pintu Angkat Type I.B = 0,40 m
Pintu Angkat Type I.B = 0,50 m
Pintu Angkat Type II.B = 0,30 m
Pintu Angkat Type II.B = 0,40 m
Pintu Angkat Type II.B = 0,50 m
Pintu Sorong Baja (satu draad) stang
b = 0,30 , h = 0,30
b = 0,30 , h = 0,50
b = 0,30 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,40 , h = 0,30
b = 0,40 , h = 0,50
b = 0,40 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,50 , h = 0,30
B = 0,50, h = 0,50
b = 0,50 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,60 , h = 0,30
b = 0,60 , h = 0,50
b = 0,60 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,70 , h = 0,30
b = 0,70 , h = 0,50
b = 0,70 , h =1,00
Pintu Sorong Baja (satu draad) stang
b = 0,80, h = 0,30
b = 0,80, h = 0,50
b = 0,80, h =1,00
Pintu Sorong Baja (satu draad) stang
b = 0,90 , h = 0,30
b = 0,90 , h = 0,50
b = 0,90, h = 1,00
Pintu Sorong Baja (satu draad) stang
b =1,00 , h = 0,30
b =1,00 , h = 0,50
b =1,00 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 1,50, h = 0,30
b = 1,50, h = 0,50
b = 1,50, h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 2.00 h = 0.30
b = 2.00 h = 0.50
b = 2,00, h = 1,00
Pintu Sorong Baja (dua draad) stang
b = 1,20, h = 1,00
b = 1,20, h = 1,50
b = 1,20, h = 2.00
Pintu Sorong Baja (dua draad) stang
b = 1,30, h = 1,00
b = 1,30, h = 1,50
b = 1,30, h = 2,00
kg
kg
buah
buah
buah
buah
buah
buah
M.65.b
M.66.c
M.67.a
M.67.b
M.67.c
M.68.a
M.68.b
M.68.c
12,500.00
14,500.00
1,500,000.00
1,800,000.00
2,700,000.00
2,100,000.00
2,700,000.00
3,300,000.00
buah
buah
buah
M.69.a
M.69.b
M.69.c
7,300,000.00
8,200,000.00
10,400,000.00
buah
buah
buah
M.70.a
M.70.b
M.70.c
7,700,000.00
8,600,000.00
11,000,000.00
buah
buah
buah
M.71.a
M.71.b
M.71.c
8,200,000.00
9,100,000.00
11,700,000.00
buah
buah
buah
M.72.a
M.72.b
M.72.c
8,450,000.00
9,550,000.00
12,300,000.00
buah
buah
buah
M.73.a
M.73.b
M.73.c
8,850,000.00
10,100,000.00
12,900,000.00
buah
buah
buah
M.74.a
M.74.b
M.74.c
9,300,000.00
10,500,000.00
13,500,000.00
buah
buah
buah
M.75.a
M.75.b
M.75.c
9,700,000.00
11,000,000.00
14,150,000.00
buah
buah
buah
M.76.a
M.76.b
M.76.c
10,350,000.00
11,600,000.00
14,800,000.00
buah
buah
buah
M.77.a
M.77.b
M.77.c
12,150,000.00
13,800,000.00
17,950,000.00
buah
buah
buah
M.78.a
M.78.b
M.78.c
14,200,000.00
16,150,000.00
20,950,000.00
buah
buah
buah
M.79.a
M.79.b
M.79.c
72,500,000.00
77,100,000.00
81,100,000.00
buah
buah
buah
M.80.a
M.80.b
M.80.c
74,600,000.00
78,450,000.00
83,200,000.00
HSD.Pus Air.61
53 Pintu Sorong Baja (dua draad) stang
b = 1,40, h = 1,00
b = 1,40, h = 1,50
b = 1,40, h = 2,00
54 Pintu Sorong Baja (dua draad) stang
b = 1,50, h = 1,00
b = 1,50, h = 1,50
b = 1,50, h = 2,00
55 Pintu Sorong Baja (dua draad) stang
b = 1,60, h = 1,00
b = 1,60, h = 1,50
b = 1,60, h = 2,00
56 Pintu Sorong Baja (dua draad) stang
b = 1,70, h = 1,00
b = 1,70, h = 1,50
b = 1,70, h = 2,00
57 Pintu Sorong Baja (dua draad) stang
b = 1,80, h = 1,00
b = 1,80, h = 1,50
b = 1,80, h = 2,00
58 Pintu Sorong Baja (dua draad) stang
b = 1,90, h = 1,00
b = 1,90, h = 1,50
b = 1,90, h = 2,00
59 Pintu Sorong Baja (dua draad) stang
b = 2,00, h = 1,00
b = 2,00, h = 1,50
b = 2,00, h = 2,00
60 Seng gelombang uk. 0,9 x 1,8, t=0,02
61 Seng gelombang uk. 0,9 x 1,8, t=0,025
62 Seng gelombang uk. 0,9 x 1,8, t=0,03
63 Seng gelombang uk. 0,9 x 1,8, t=0,05
64 Seng pelat BJLS-30 lebar 0,6 m'
65 Seng pelat BJLS-30 lebar 0,9 m'
66 Seng pelat lebar 0,9 m' t=0,02
67 Seng pelat lebar 0,9 m' t=0,025
68 Seng pelat lebar 0,9 m' t=0,03
69 Seng pelat lebar 0,9 m' t=0,04
70 Seng pelat lebar 0,9 m' t=0,05
71 Stang besi polos diameter 12 mm
72 Stang besi ulir diameter 16 mm
73 Stang besi ulir diameter 16 mm + gear
74 Stang besi ulir diameter 20 mm
75 Stang ulir diameter 20 mm + gear
76 Tiang Pancang Baja dia 30 cm
77 Tiang Pancang baja kotak 30 x 30 cm
78 Turap baja profi larsen lebar 350 mm
83 Wiremesh untuk pelat lantai beton
84 Wiremesh utk bronjong dia 6 mm (buatan pabrik)
85 Wiremesh utk bronjong dia 8 mm (buatan pabrik)
86 Wiremesh utk bronjong dia 10 mm (buatan pabrik)
D
KELOMPOK PIPA
1
2
buah
buah
buah
M.81.a
M.81.b
M.81.c
75,800,000.00
82,150,000.00
90,050,000.00
buah
buah
buah
M.82.a
M.82.b
M.82.c
77,050,000.00
83,650,000.00
94,050,000.00
buah
buah
buah
M.83.a
M.83.b
M.83.c
78,250,000.00
85,150,000.00
95,900,000.00
buah
buah
buah
M.84.a
M.84.b
M.84.c
79,450,000.00
83,950,000.00
89,650,000.00
buah
buah
buah
M.85.a
M.85.b
M.85.c
80,650,000.00
85,400,000.00
91,250,000.00
buah
buah
buah
M.86.a
M.86.b
M.86.c
81,850,000.00
86,750,000.00
92,900,000.00
buah
buah
buah
lbr
lbr
lbr
lbr
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
m
m
m
kg
kg
kg
kg
M.87.a
M.87.b
M.87.c
M.88.a
M.88.b
M.88.c
M.88.d
M.89.a
M.89.b
M.90.a
M.90.b
M.90.c
M.90.d
M.90.e
M.91.a
M.91.b
M.91.c
M.91.d
M.91.e
M.92.a
M.92.b
M.93
M.94.a
M.94.b
M.94.c
M.94.d
83,100,000.00
105,250,000.00
112,850,000.00
36,000.00
50,000.00
50,000.00
60,200.00
30,000.00
45,000.00
22,000.00
26,250.00
29,000.00
29,000.00
35,000.00
55,000.00
125,000.00
175,000.00
250,000.00
300,000.00
500,000.00
575,000.00
140,000.00
24,750.00
26,350.00
26,350.00
26,350.00
m'
m'
M.104.a
M.104.b
1,600.00
2,900.00
HSD.Pus Air.62
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
III
KELOMPOK PERALATAN
1
2
3
4
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
M.104.c
M.104.d
M.104.e
M.104.f
M.104.g
M.104.h
M.104.i
M.104.j
M.105.a
M.105.b
M.105.c
M.105.d
M.105.e
M.105.f
M.105.g
M.105.h
M.105.i
M.105.j
M.105.k
M.106.a
M.106.b
M.106.c
M.106.d
M.106.e
M.106.f
M.106.g
M.106.h
M.107.a
M.107.b
M.107.c
M.107.d
M.107.e
M.107.f
M.107.g
M.107.h
M.107.i
M.107.j
M.107.k
M.107.l
M.107.m
M.107.n
M.107.o
M.107.p
M.107.q
M.107.r
M.107.s
M.108.a
M.108.b
M.108.c
Sewa-hari
Sewa-hari
Sewa-jam
Sewa-jam
E.01.a
E.01.b
E.01.c
E.01.d
4,400.00
8,400.00
12,400.00
17,000.00
27,600.00
46,500.00
88,300.00
152,300.00
97,600.00
219,500.00
390,600.00
550,000.00
732,000.00
940,000.00
1,730,000.00
2,585,000.00
3,460,000.00
4,320,000.00
5,190,000.00
18,700.00
18,133.33
25,600.00
52,283.33
64,016.67
81,800.00
106,700.00
155,600.00
14,150.00
19,455.00
26,630.00
39,990.00
45,925.00
58,610.00
85,705.00
115,580.00
75,000.00
115,000.00
125,000.00
231,000.00
290,500.00
335,500.00
522,000.00
787,500.00
960,000.00
1,635,000.00
2,602,000.00
750,000.00
1,500,000.00
3,250,000.00
450,000.00
750,000.00
110,000.00
180,000.00
HSD.Pus Air.63
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
bh
bh
bh
bh
Sewa-hari
Sewa-jam
Sewa-hari
Sewa-jam
Sewa-jam
Sewa-jam
Sewa-hari
Sewa-hari
m
bh
jam
jam
bh
bh
Sewa-hari
Sewa-hari
Sewa-hari
bh
unit
unit
bh
bh
bh
Sewa-hari
Sewa-jam
bh
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
bh
bh
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-jam
Sewa-jam
Sewa-hari
bh
Sewa-hari
E.02.a
E.02.b
E.02.c
E.03
E.04
E.05
E.06
E.07.a
E.07.b
E.07.c
E.08.a
E.08.b
E.09
E.10
E.11.a
E.11.b
E.12
E.13
E.14
E.15
E.16
E.17.a
E.17.b
E.18
E.19
E.20
E.21
E.22
E.23
E.24
E.25a
E.25b
E.26
E.27.a
E.27.b
E.27.c
E.28.a
E.28.b
E.29
E.30
E.31
E.32
E.33
E.34.a
E.34.b
E.34.c
E.35
E.36
E.37.a
E.37.b
E.37.c
E.38.a
E.38.b
E.39
E.40
E.41
200,000.00
100,000.00
25,000.00
52,250.00
20,000.00
190,000.00
160,000.00
200,000.00
270,000.00
375,000.00
470,800.00
539,000.00
120,000.00
5,000.00
168,000.00
275,000.00
17,500.00
2,500,000.00
135,000.00
135,000.00
250,000.00
5,000.00
12,000.00
8,000.00
25,000.00
1,500.00
5,000.00
385,000.00
340,000.00
251,150.00
168,000.00
225,000.00
100,000.00
750,000.00
850,000.00
735,000.00
134,750.00
400,000.00
225,000.00
100,000.00
150,000.00
382,800.00
136,500.00
225,000.00
442,000.00
830,000.00
200,000.00
250,000.00
750,000.00
750,000.00
750,000.00
400,000.00
700,000.00
1,200,000.00
12,000.00
150,000.00
HSD.Pus Air.64
61
62
63
64
65
66
67
68
69
70
71
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Timbris
Tongkang 500 ton
Tongkang 1000 ton
Tongkang 2000 ton
Trawl diameter lubang 5mm
Tripod tinggi 5 m
Tusuk bambu
Vibrator beton (portable)
Vibro Roller
Water Tank
Waterpass
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
Sewa-hari
bh
Sewa-hari
Sewa-jam
Sewa-jam
Sewa-hari
E.42
E.43a
E.43b
E.43c
E.44
E.45
E.46
E.47
E.48
E.49
E.50
15,000.00
850,000.00
1,550,000.00
2,750,000.00
785,000.00
450,000.00
10,000.00
134,750.00
350,000.00
203,500.00
100,000.00
bh
lbr
lbr
lbr
kg
ltr
ltr
pohon
lbr
lbr
lbr
kg
kg
kg
kg
kg
bh
ltr
bh
rol
rol
lbr
lbr
lbr
Sewa-hari
m2
m2
m2
m
Sewa-hari
bh
m2
lbr
lbr
lbr
lbr
lbr
lbr
rol
rol
m2
bh
M.109
M.110.a
M.110.b
M.110.c
M.111
M.112.a
M.112.b
M.113
M.114.a
M.114.b
M.114.c
M.115.a
M.115.b
M.115.c
M.115.d
M.116
M.117
M.118
M.119a
M.119b
M.119c
M.119d
M.120.a
M.120.b
M.121
M.122.a
M.122.b
M.122.c
M.122.d
M.122.e
M.123.a
M.123.b
M.124.a
M.125.b
M.125.c
M.125.d
M.125.e
M.125.f
M.125.g
M.125.h
M.126
M.127.a
2,000.00
50,000.00
40,000.00
7,500.00
9,130.00
6,500.00
10,000.00
3,500.00
2,600.00
2,000.00
1,250.00
45,500.00
37,450.00
22,500.00
25,200.00
250,000.00
10,000.00
25,000.00
75,000.00
55,000.00
75,000.00
1,500.00
6,500.00
250.00
2,500,000.00
60,000.00
120,500.00
225,000.00
3,500.00
250,000.00
2,500.00
3,500.00
3,500.00
1,850.00
1,000.00
500.00
250.00
200.00
120,000.00
75,000.00
7,500.00
7,500.00
LAIN-LAIN
Ajir acuan tanaman
Asbes gelombang besar uk. 105 x 180, 5mm
Asbes gelombang kecil uk. 80 x 180, 4mm
Asbes uk 1 x 1 m2
Aspal Panas
Bensin/Premiun/BBM bersubsidi
Bensin/Premiun/BBM non subsidi
Bibit Mangrove
Blue/black print uk A1
Blue/black print uk A2
Blue/black print uk A3
Cat besi
Cat kayu
Cat meni
Cat tembok
Cetakan armor
Copy CD (soft file)
Cuka Bibit
Foto Album
Foto cuci film Selulosa Kimia
Foto Film Selulosa Kimia
Foto printing
Foto copy kalkir A1 ke kalkir
Foto copy kertas Letter, Legal, A4
Geo Listrik
Geotekstil A
Geotekstil B (Polyfelt, dll.)
Geotekstil C
Geotekstil tali
Geotekstil mesin jahit
Karung plastik / bagor
Karung goni/terpal
Kertas HVS 80 gr ukuran A0
Kertas HVS 80 gr ukuran A1
Kertas HVS 80 gr ukuran A2
Kertas HVS 80 gr ukuran A3
Kertas HVS 70 gr ukuran A4/legal/letter/B5
Kertas HVS 80 gr ukuran A4/legal/letter/B5
Kertas Kalkir 80 gr ukuran A0 (lebar 90 cm)
Kertas Kalkir 80 gr ukuran A1 (lebar 60 cm)
Laburan meni / ter / solinem
Menjilid pakai kertas di lakban A4
HSD.Pus Air.65
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
bh
bh
bh
bh
bh
set
ltr
ltr
bh
bh
bh
ltr
ltr
ltr
bh
bh
set
bh
lbr
lbr
bh
sewa-bulan
sewa-bulan
sewa-bulan
ltr
ltr
m
botol
botol
m
m
m
m
M.127.b
M.127.c
M.127.d
M.127.e
M.127.f
M.128
M.129
M.130
M.131.a
M.131.b
M.131.c
M.132a
M.132b
M.132c
M.133
M.134
M.135
M.136
M.137.a
M.137.b
M.138
M.139.a
M.139.b
M.139.c
M.140a
M.140b
M.141
M.143a
M.143b
M.144.a
M.144.b
M.144.c
M.144.d
10,000.00
13,500.00
17,500.00
11,500.00
6,750.00
120,000,000.00
40,000.00
7,150.00
10,000,000.00
40,000,000.00
100,000,000.00
30,250.00
37,500.00
38,500.00
1,000,000.00
75,000.00
1,000,000.00
300,000.00
16,500.00
12,500.00
75,000.00
1,000,000.00
250,000.00
5,000,000.00
5,500.00
10,800.00
2,500.00
35,000.00
40,000.00
75,000.00
90,000.00
115,000.00
125,000.00
AHSP.Pus Air.66
A.
UMUM
(Normatif)
A.1
A.1.1
T.01
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.060
50,000.00
0.006
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
T.02
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
B
1
Bahan
Minyak tanah
M.130
Peralatan
D
E
Harga Satuan
(Rp)
6
0.0750
50,000.00
0.0075
75,000.00
Jumlah Harga Tenaga Kerja
0.01
7,150.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
T.03
15% x D
Cabut 1 tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul kayu dan a
No
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
AHSP.Pus Air.67
1
A
1
3
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
C
1
Peralatan
Chainsaw
D
E
0.200
50,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
E.06
Sewa-hari
0.100
160,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Pembantu Juru Ukur
Juru Ukur
L.01
L.06
L.05
OH
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.012
50,000.00
0.004
50,000.00
0.004
100,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
2
Peralatan
Waterpass
Theodolith
D
E
E.50
E.41
Sewa-hari
Sewa-hari
0.004
100,000.00
0.004
150,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.68
T.05
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang kayu
Mandor
Juru Ukur
Pembantu juru ukur
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
0.060
50,000.00
0.020
60,000.00
0.006
75,000.00
0.020
100,000.00
0.020
50,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Kaso 4/6 cm
Papan 2/20
Paku
M.33.d
M.35.e
M.65.b
m3
m3
kg
0.0025 1,400,000.00
0.0042 1,500,000.00
0.200
12,500.00
Jumlah Harga Bahan
C
1
Peralatan
Waterpass
E.50
Sewa-hari
0.004
100,000.00
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.69
Pelaksanaan galian tanah T.06 s.d T.11 secara umum sudah termasuk pembuang
galian dengan jarak angkut L < 3 m serta perataan dan perapihan, jika diperlukan
dengan jarak laninnya lihat T.15: angkutan material dan/atau hasil galian
Jika pada pelaksanaan penggalian tanah diperlukan perkuatan dinding galian tana
ditambah dengan analisa pada T.12.
c.1. Galian tanah
T.06
Pekerjaan Galian Tanah Biasa
T.06a 1 m3 Galian tanah biasa sedalam < 1 m
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
0.5630
50,000.00
0.0563
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
T.06b
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.6750
50,000.00
0.0675
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
T.06c
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
AHSP.Pus
Air.70
Harga
Satuan
(Rp)
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.7600
50,000.00
0.0760
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.06d
15% x D
1 m3 Galian tanah biasa dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan keda
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
0.0700
50,000.00
0.0070
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.71
T.07
T.07a
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
1.3510
50,000.00
0.1351
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer **
D
E
T.07b
E.14
Sewa-hari
0.150
135,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Tukang gali
Mandor
L.02
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
1.500
60,000.00
0.150
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer **
D
E
E.14
Sewa-hari
0.150
135,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.72
T.07c
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.650
50,000.00
0.165
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.150
135,000.00
Jumlah Harga Peralatan
15% x D
*** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.07d
1 m3 Galian tanah berbatu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan ked
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.150
50,000.00
0.015
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.150
135,000.00
Jumlah Harga Peralatan
15% x D
*** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.08
T.08a
Galian Batu
1 m3 Galian batu sedalam < 1 m
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
L.01
L.04
OH
OH
Tenaga Kerja
Pekerja
Mandor
3.3780
0.3378
Harga Satuan
(Rp)
6
50,000.00
75,000.00
AHSP.Pus Air.73
Bahan
C
1
Peralatan
Jack hammer **
D
E
T.08b
E.14
Sewa-hari
0.330
135,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
3.750
50,000.00
0.375
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer **
D
E
T.08c
E.14
Sewa-hari
0.330
135,000.00
Jumlah Harga Peralatan
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
4.125
50,000.00
0.413
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer **
D
E
E.14
Sewa-hari
0.330
135,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.74
T.08d
1 m3 Galian batu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.3750
50,000.00
0.0375
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer **
D
E
E.14
Sewa-hari
0.330
135,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.75
T.09
T.09a
Uraian
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.250
50,000.00
0.125
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.125
135,000.00
Jumlah Harga Peralatan
15% x D
T.09b
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
1.3920
50,000.00
0.1392
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.125
135,000.00
Jumlah Harga Peralatan
15% x D
T.09c
Tenaga Kerja
Pekerja
Mandor
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.500
50,000.00
0.150
75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.76
Bahan
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.125
135,000.00
Jumlah Harga Peralatan
15% x D
*** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.09d
1 m3 Galian tanah cadas atau tanah keras dengan kedalaman > 3m, tambahan koefisien untuk setiap p
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Jack hammer ***
D
E
E.14
Sewa-hari
0.125
135,000.00
Jumlah Harga Peralatan
15% x D
*** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.10
T.10a
Galian Lumpur
1 m3 Galian lumpur sedalam < 1 m
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
0.833
50,000.00
0.083
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.77
T.10b
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.220
50,000.00
0.122
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.10c
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
1.550
50,000.00
0.155
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.78
T.10d
1 m3 Galian tanah lumpur dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan ked
No
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.11
T.11a
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.663
50,000.00
0.066
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.11b
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.795
50,000.00
0.080
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.79
T.11c
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
0.900
50,000.00
0.090
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
T.11d
D
E
15% x D
1m3 Galian pasir untuk fondasi bangunan dengan kedalaman > 3m, tambahan koefisien untuk setiap p
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
T.12
D
E
15% x D
AHSP.Pus Air.80
AHSP.Pus Air.81
T.12a
No
Uraian
Kode
Satuan
Koefisien
5
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor
L.01
L.02
L.04
OH
OH
OH
B
1
2
M.xx
M.xx
m3 atau kg
m2 atau m3
Harga Satuan
(Rp)
6
b) + q)
c) + r)
d) + s)
Jumlah Harga Tenaga Kerja
a)
p)
Jumlah Harga Bahan
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.xx
D
E
Sewa-hari
e) + t)
Jumlah Harga Peralatan
15% x D
T.12a
Contoh 1m perkuatan dinding galian untuk 1 m' paling bawah, menggunakan Baja INP-10 dan Balok Kayu 8
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor
B
1
2
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.54.g
M.33.b
kg
m3
Harga Satuan
(Rp)
6
1.6600
50,000.00
0.8300
60,000.00
0.1660
75,000.00
Jumlah Harga Tenaga Kerja
5.240
0.109
12,000.00
5,500,000.00
AHSP.Pus Air.82
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.07.a
D
E
Sewa-hari
0.1900
1,400,000.00
Jumlah Harga Peralatan
15% x D
T.12b
No
Uraian
Kode
Satuan
Koefisien
5
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor
L.01
L.02
L.04
OH
OH
OH
B
1
2
M.xx
M.xx
m3 atau kg
m2 atau m3
Harga Satuan
(Rp)
6
g) + v)
50,000.00
h) + w)
i) + x)
75,000.00
Jumlah Harga Tenaga Kerja
f)
u)
Jumlah Harga Bahan
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.xx
D
E
Sewa-hari
j) + y)
Jumlah Harga Peralatan
15% x D
T.12b
Contoh 1 m penambahan setiap tinggi 1 m' perkuatan dinding galian, menggunakan Tiang INP-10 dan Balo
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor
B
1
2
Peralatan
Tripod/Tackle&handle/Crane 2T *)
Harga Satuan
(Rp)
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1.1980
50,000.00
0.5990
60,000.00
0.1198
75,000.00
Jumlah Harga Tenaga Kerja
M.54.g
M.33.b
kg
m3
12,000.00
3.500
0.091
5,500,000.00
Jumlah Harga Bahan
E.xx
Sewa-hari
0.1700
1,400,000.00
AHSP.Pus Air.83
T.12c
D
E
15% x D
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor
B
1
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.xx
m3 atau kg
Harga Satuan
(Rp)
6
b)
c)
d)
Jumlah Harga Tenaga Kerja
a)
T.12c
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.xx
D
E
Sewa-hari
e)
Jumlah Harga Peralatan
15% x D
Contoh 1 m perkuatan dinding galian dengan Turap untuk 1 m' paling bawah, dg turap INP-8
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor
B
1
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.54.f
kg
Harga Satuan
(Rp)
6
1.5000
50,000.00
0.5000
60,000.00
0.1500
75,000.00
Jumlah Harga Tenaga Kerja
15.00
16,500.00
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.45
D
E
Sewa-hari
0.1500
450,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.84
T.12d
1 m perkuatan dinding galian dengan Turap untuk setiap penambahan tinggi 1 m'
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor
B
1
Bahan
Perkuatan Dinding Galian dengan Turap
(Lihat Tabel A.3)
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.xx
m3 atau kg
Harga Satuan
(Rp)
6
g)
h)
i)
Jumlah Harga Tenaga Kerja
f)
T.12d
Peralatan
Tripod/Tackle&handle/Crane 2T *)
E.xx
D
E
Sewa-hari
j)
Jumlah Harga Peralatan
15% x D
Contoh 1 m perkuatan dinding galian dengan Turap INP-8 untuk setiap penambahan tinggi 1 m'
No
Uraian
1
A
1
2
3
2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor
B
1
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.54.f
kg
Harga Satuan
(Rp)
6
1.2000
50,000.00
0.4000
60,000.00
0.1200
75,000.00
Jumlah Harga Tenaga Kerja
10.00
16,500.00
Peralatan
Tripod/Tackle&handle/Crane 2T *)
M.125.b
D
E
Sewa-hari
0.1100
450,000.00
Jumlah Harga Peralatan
15% x D
CATATAN:
Perkuatan dinding galian selain menggunakan T.12, dapat pula menggunakan AHSP F.01 s.d. F.18 sesu
kebutuhan pelaksanaan pekerjaan
AHSP.Pus Air.85
T.13
Peledakan batuan
Pelaksanaan peledakan batuan biasanya harus dilakukan oleh suatu badan yang berwenang atau perus
mempunyai izin resmi misalnya PT. Dahana, Tasikmalaya, Indonesia. Perhitungan biaya untuk cara ini, s
oleh tingkat kekerasan atau jenis batuannya, posisi lokasi dan dimensi batuannya. Untuk keperluan harg
diperlukan deskripsi kondisi-kondisi tersebut yang kemudian akan dapat dihitung harga satuannya dari p
peledakannya
T.14
T.14a
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.330
50,000.00
0.033
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.14b
15% x D
1 m3 Pemadatan tanah
No
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.500
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
T.14c
C
1
Peralatan
Pemadat Timbunan (Stamper)
D
E
E.31
Sewa-hari
0.050
150,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
AHSP.Pus
Air.86
Harga
Satuan
(Rp)
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.400
50,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
Bahan
Pasir pasang
M.14.b
m3
1.200
90,000.00
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
T.14d
D
E
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.100
50,000.00
0.010
400,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
C
1
Peralatan
Pemadat Timbunan (Stamper)
D
E
E.31
Sewa-hari
0.100
150,000.00
Jumlah Harga Peralatan
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.2480
50,000.00
0.0124
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
AHSP.Pus Air.87
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
0.2680
50,000.00
0.0134
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.2860
50,000.00
0.0143
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
Uraian
Kode
Satuan
Koefisien
1
A
1
2
L.01
L.04
OH
OH
Tenaga Kerja
Pekerja
Mandor
0.3560
0.0178
Harga Satuan
(Rp)
6
50,000.00
75,000.00
AHSP.Pus Air.88
Bahan
Peralatan
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.4220
50,000.00
0.0211
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.6000
50,000.00
0.0300
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
Uraian
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
AHSP.Pus Air.89
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
L.01
L.04
OH
OH
0.9500
50,000.00
0.0475
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
D
E
15% x D
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.3000
50,000.00
0.0650
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
6
1.6500
50,000.00
0.0825
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
D
E
15% x D
AHSP.Pus Air.90
No
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
1.9500
50,000.00
0.0975
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
D
E
T.15a.11) Mengangkut 1 m3 hasil galian > 500m untuk setiap penambahan jarak angkut 100 m
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Harga Satuan
(Rp)
6
0.3520
50,000.00
0.0176
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Peralatan
Jumlah Harga Peralatan
A.1.2
D
E
15% x D
AHSP.Pus Air.91
Jumlah
(Rp)
7
3,000.00
450.00
3,450.00
3,450.00
517.50
3,967.50
an diameter < 15 cm
Jumlah
(Rp)
7
3,750.00
562.50
4,312.50
71.50
71.50
4,384.00
657.60
5,041.60
AHSP.Pus Air.92
7
10,000.00
1,500.00
11,500.00
16,000.00
16,000.00
27,500.00
4,125.00
31,625.00
Jumlah
(Rp)
7
600.00
200.00
400.00
1,200.00
400.00
600.00
1,000.00
2,200.00
330.00
2,530.00
AHSP.Pus Air.93
Jumlah
(Rp)
7
3,000.00
1,200.00
450.00
2,000.00
1,000.00
7,650.00
3,500.00
6,300.00
2,500.00
12,300.00
400.00
400.00
20,350.00
3,052.50
23,402.50
AHSP.Pus Air.94
pembuangan hasil
diperlukan angkutan
Jumlah
(Rp)
7
28,150.00
4,222.50
32,372.50
32,372.50
4,855.88
37,228.38
Jumlah
(Rp)
7
33,750.00
5,062.50
38,812.50
38,812.50
5,821.88
44,634.38
Jumlah
(Rp)
Jumlah
(Rp)
AHSP.Pus Air.95
7
38,000.00
5,700.00
43,700.00
43,700.00
6,555.00
50,255.00
mbahan kedalaman 1 m
Jumlah
(Rp)
7
3,500.00
525.00
4,025.00
4,025.00
603.75
4,628.75
AHSP.Pus Air.96
Jumlah
(Rp)
7
67,550.00
10,132.50
77,682.50
20,250.00
20,250.00
97,932.50
14,689.88
112,622.38
Jumlah
(Rp)
7
90,000.00
11,250.00
101,250.00
20,250.00
20,250.00
121,500.00
18,225.00
139,725.00
AHSP.Pus Air.97
Jumlah
(Rp)
7
82,500.00
12,375.00
94,875.00
20,250.00
20,250.00
115,125.00
17,268.75
132,393.75
ambahan kedalaman 1 m
Jumlah
(Rp)
7
7,500.00
1,125.00
8,625.00
20,250.00
20,250.00
28,875.00
4,331.25
33,206.25
Jumlah
(Rp)
7
168,900.00
25,335.00
AHSP.Pus Air.98
194,235.00
44,550.00
44,550.00
238,785.00
35,817.75
274,602.75
Jumlah
(Rp)
7
187,500.00
28,125.00
215,625.00
44,550.00
44,550.00
260,175.00
39,026.25
299,201.25
Jumlah
(Rp)
7
206,250.00
30,937.50
237,187.50
44,550.00
44,550.00
281,737.50
42,260.63
323,998.13
AHSP.Pus Air.99
kedalaman 1 m
Jumlah
(Rp)
7
18,750.00
2,812.50
21,562.50
44,550.00
44,550.00
66,112.50
9,916.88
76,029.38
85,946.25
AHSP.Pus Air.100
Jumlah
(Rp)
7
62,500.00
9,375.00
71,875.00
16,875.00
16,875.00
88,750.00
13,312.50
102,062.50
Jumlah
(Rp)
7
69,600.00
10,440.00
80,040.00
16,875.00
16,875.00
96,915.00
14,537.25
111,452.25
Jumlah
(Rp)
7
75,000.00
11,250.00
86,250.00
AHSP.Pus Air.101
16,875.00
16,875.00
103,125.00
15,468.75
118,593.75
Jumlah
(Rp)
7
41,650.00
6,247.50
47,897.50
47,897.50
7,184.63
55,082.13
AHSP.Pus Air.102
Jumlah
(Rp)
7
61,000.00
9,150.00
70,150.00
70,150.00
10,522.50
80,672.50
Jumlah
(Rp)
7
77,500.00
11,625.00
89,125.00
89,125.00
13,368.75
102,493.75
AHSP.Pus Air.103
ambahan kedalaman 1 m
Jumlah
(Rp)
7
5,000.00
750.00
5,750.00
5,750.00
862.50
6,612.50
Jumlah
(Rp)
7
33,150.00
4,972.50
38,122.50
38,122.50
5,718.38
43,840.88
Jumlah
(Rp)
7
39,750.00
5,962.50
45,712.50
-
AHSP.Pus Air.104
45,712.50
6,856.88
52,569.38
Jumlah
(Rp)
7
45,000.00
6,750.00
51,750.00
51,750.00
7,762.50
59,512.50
AHSP.Pus Air.105
AHSP.Pus Air.106
Jumlah
(Rp)
7
Jumlah
(Rp)
7
83,000.00
49,800.00
12,450.00
145,250.00
62,880.00
599,500.00
AHSP.Pus Air.107
662,380.00
266,000.00
266,000.00
1,073,630.00
161,044.50
1,234,674.50
Jumlah
(Rp)
7
Jumlah
(Rp)
7
59,900.00
35,940.00
8,985.00
104,825.00
42,000.00
500,500.00
542,500.00
238,000.00
AHSP.Pus Air.108
238,000.00
885,325.00
132,798.75
1,018,123.75
Jumlah
(Rp)
7
Jumlah
(Rp)
7
75,000.00
30,000.00
11,250.00
116,250.00
247,500.00
247,500.00
67,500.00
67,500.00
431,250.00
64,687.50
495,937.50
AHSP.Pus Air.109
Jumlah
(Rp)
7
Jumlah
(Rp)
7
60,000.00
24,000.00
9,000.00
93,000.00
165,000.00
165,000.00
49,500.00
49,500.00
307,500.00
46,125.00
353,625.00
AHSP.Pus Air.110
Jumlah
(Rp)
7
16,500.00
2,475.00
18,975.00
18,975.00
2,846.25
21,821.25
Jumlah
(Rp)
7
25,000.00
3,750.00
28,750.00
7,500.00
7,500.00
36,250.00
5,437.50
41,687.50
Jumlah
(Rp)
Jumlah
(Rp)
AHSP.Pus Air.111
7
20,000.00
3,000.00
23,000.00
108,000.00
108,000.00
131,000.00
19,650.00
150,650.00
Jumlah
(Rp)
7
5,000.00
4,000.00
9,000.00
15,000.00
15,000.00
24,000.00
3,600.00
27,600.00
Jumlah
(Rp)
7
12,400.00
930.00
13,330.00
-
AHSP.Pus Air.112
13,330.00
1,999.50
15,329.50
Jumlah
(Rp)
7
13,400.00
1,005.00
14,405.00
14,405.00
2,160.75
16,565.75
Jumlah
(Rp)
7
14,300.00
1,072.50
15,372.50
15,372.50
2,305.88
17,678.38
Jumlah
(Rp)
7
17,800.00
1,335.00
AHSP.Pus Air.113
19,135.00
19,135.00
2,870.25
22,005.25
Jumlah
(Rp)
7
21,100.00
1,582.50
22,682.50
22,682.50
3,402.38
26,084.88
Jumlah
(Rp)
7
30,000.00
2,250.00
32,250.00
32,250.00
4,837.50
37,087.50
Jumlah
(Rp)
7
AHSP.Pus Air.114
47,500.00
3,562.50
51,062.50
51,062.50
7,659.38
58,721.88
Jumlah
(Rp)
7
65,000.00
4,875.00
69,875.00
69,875.00
10,481.25
80,356.25
Jumlah
(Rp)
7
82,500.00
6,187.50
88,687.50
88,687.50
13,303.13
101,990.63
Jumlah
AHSP.Pus Air.115
Jumlah
(Rp)
7
97,500.00
7,312.50
104,812.50
104,812.50
15,721.88
120,534.38
Jumlah
(Rp)
7
17,600.00
1,320.00
18,920.00
18,920.00
2,838.00
21,758.00
AHSP.Pus Air.116
secara manual
AHSP.Pus Air.117
AHSP.Pus Air.118
AHSP.Pus Air.119
AHSP.Pus Air.120
AHSP.Pus Air.121
AHSP.Pus Air.122
AHSP.Pus Air.123
01 '======================
AHSP.Pus Air.124
AHSP.Pus Air.125
mbahan kedalaman 1 m
AHSP.Pus Air.126
AHSP.Pus Air.127
AHSP.Pus Air.128
02 '======================
bahan kedalaman 1 m
AHSP.Pus Air.129
AHSP.Pus Air.130
AHSP.Pus Air.131
AHSP.Pus Air.132
AHSP.Pus Air.133
AHSP.Pus Air.134
03 '======================
AHSP.Pus Air.135
AHSP.Pus Air.136
AHSP.Pus Air.137
AHSP.Pus Air.138
04 '======================
No
1
A
1
2
B
C
D
E
F
AHSP.Pus Air.139
AHSP.Pus Air.140
46
05 '======================
A.2
P.01
P.01a
No
P.01b
P.01c
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.700
0.900
0.090
0.270
Jumlah Harga Tenaga Ke
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
Bahan
Batu
Pasir Pasang
Portland Cement
M.05
M.14.b
M.15
m3
m3
kg
1.200
0.440
252
Jumlah Harga Bah
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.167
Jumlah Harga Perala
D
E
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.70
0.90
0.09
0.270
Jumlah Harga Tenaga Ke
B
1
2
3
Bahan
Batu
Pasir Pasang
Portland Cement
M.05
M.14.b
M.15
m3
m3
kg
1.200
0.485
202
Jumlah Harga Bah
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.167
Jumlah Harga Perala
D
E
15%
Uraian
Kode
Satuan
Koefisien
P.01d
P.01e
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.700
0.900
0.090
0.270
Jumlah Harga Tenaga Ke
Bahan
Batu kali
Pasir Pasang
Portland Cement
M.05
M.14.b
M.15
m3
m3
kg
1.200
0.520
163
Jumlah Harga Bah
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.167
Jumlah Harga Perala
D
E
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.700
0.900
0.090
0.270
Jumlah Harga Tenaga Ke
B
1
2
3
Bahan
Batu kali
Pasir Pasang
Portland Cement
M.05
M.14.b
M.15
m3
m3
kg
1.200
0.544
135.000
Jumlah Harga Bah
C
1
Peralatan
Molen
E.28.b
Sewa-hari
D
E
0.167
Jumlah Harga Perala
15%
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
L.01
L.04
OH
OH
Koefisien
5
2.000
0.200
Jumlah Harga Tenaga Ke
Peralatan
*)
Palu/Godam (Baja keras)
Pahat Beton (Baja keras)
Linggis (Baja keras)
D
E
P.01f
E.30
E.29
E.29
bh
bh
bh
0.008
0.012
0.020
Jumlah Harga Perala
15%
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
L.01
L.04
OH
OH
Koefisien
5
1.800
0.180
Jumlah Harga Tenaga Ke
Peralatan
*)
Palu/Godam (Baja keras)
Pahat Beton (Baja keras)
Linggis (Baja keras)
D
E
E.30
E.29
E.29
bh
bh
bh
0.006
0.009
0.020
Jumlah Harga Perala
15%
P.01g
Tenaga Kerja
Pekerja
Mandor
Bahan
Uraian
Kode
Satuan
L.01
L.04
OH
OH
Koefisien
5
0.600
0.060
Jumlah Harga Tenaga Ke
P.01h
C
1
Peralatan
Jack Hammer
D
E
E.14
Sewa-hari
0.05
Jumlah Harga Perala
15%
1 m3 Pembersihan untuk pemanfaatan kembali material batu dari bekas bongkaran pasangan ba
No
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
C
1
2
Peralatan
*)
Palu/Godam (Baja keras)
Pahat Beton (Baja keras)
D
E
Koefisien
5
0.200
0.020
Jumlah Harga Tenaga Ke
E.30
E.29
bh
bh
0.002
0.003
Jumlah Harga Perala
15%
P.01i
P.02
P.02a
Uraian
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
M.04.c
M.15
M.14.b
bh
kg
m3
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
Bahan
Bata merah
Portland Cement
Pasir pasang
Peralatan
D
E
Koefisien
5
2.400
1.200
0.240
0.240
Jumlah Harga Tenaga Ke
500
132
0.37
P.02b
15%
Tenaga Kerja
Uraian
Kode
Satuan
Koefisien
5
1
2
3
4
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B
1
2
3
Bahan
Bata merah
Portland Cement
Pasir pasang
M.04.c
M.15
M.14.b
bh
kg
m3
Peralatan
D
E
2.400
1.200
0.240
0.240
Jumlah Harga Tenaga Ke
500
106.5
0.375
P.02c
15%
Uraian
Kode
Satuan
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B
1
2
3
Bahan
Bata merah
Portland Cement
Pasir pasang
M.04.c
M.15
M.14.b
bh
kg
m3
Peralatan
D
E
Koefisien
5
2.400
1.200
0.240
0.240
Jumlah Harga Tenaga Ke
500
89.0
0.410
P.02d
15%
Uraian
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
M.04.c
M.15
M.14.b
bh
kg
m3
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
Bahan
Bata merah
Portland Cement
Pasir pasang
Peralatan
Koefisien
5
2.400
1.200
0.240
0.240
Jumlah Harga Tenaga Ke
500
75
0.49
P.02e
15%
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Koefisien
5
0.600
0.060
Jumlah Harga Tenaga Ke
P.02f
C
1
2
3
Peralatan
Palu / Godam
Pahat Beton (Baja keras)
Linggis (Baja keras)
D
E
E.30
E.29
E.24
bh
bh
bh
0.002
0.003
0.007
Jumlah Harga Perala
15%
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Koefisien
5
0.200
0.020
Jumlah Harga Tenaga Ke
P.03
P.03a
C
1
Peralatan
Jack Hammer
D
E
E.14
bh
0.020
Jumlah Harga Perala
15%
Uraian
Kode
Satuan
1
A
1
2
3
4
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
Koefisien
5
0.300
0.150
0.015
0.030
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
Peralatan
M.14.b
M.15
m3
kg
0.012
6.340
Jumlah Harga Bah
P.03b
D
E
15%
Siaran dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
0.150
0.015
0.030
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.018
4.840
Jumlah Harga Bah
Peralatan
D
E
P.04
P.04a
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
0.150
0.015
0.030
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.014
7.240
Jumlah Harga Bah
Peralatan
D
E
15%
P.04b
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
0.150
0.015
0.030
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.016
5.840
Jumlah Harga Bah
Peralatan
P.04c
D
E
15%
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
0.150
0.015
0.030
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.018
4.450
Jumlah Harga Bah
Peralatan
P.04d
D
E
15%
Trasraam tebal 1,5 cm, dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campur
No
Uraian
Kode
Satuan
1
A
1
2
3
4
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
Koefisien
5
0.384
0.192
0.019
0.019
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
Peralatan
M.14.b
M.15
m3
kg
0.020
10.224
Jumlah Harga Bah
P.04e
D
E
15%
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campur
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.384
0.192
0.019
0.019
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.030
7.776
Jumlah Harga Bah
Peralatan
D
E
P.04f
15%
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campur
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.384
0.192
0.019
0.019
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Pasir Pasang
Portland Cement
M.14.b
M.15
m3
kg
0.024
6.280
Jumlah Harga Bah
Peralatan
P.05
D
E
15%
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.000
0.500
0.050
0.100
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Batu/batu belah
Pasir Pasang
M.05
M.14.b
m3
m3
1.200
0.432
Jumlah Harga Bah
Peralatan
15%
P.06
P.06a
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
M.131
M.132
M.133.a
OH
OH
OH
OH
3.270
1.090
1.400
0.467
Jumlah Harga Tenaga Ke
Bahan
1
2
M.135.a
M.135.b
m3
kg
2.800
21.710
Jumlah Harga Bah
Peralatan
M.135.d
D
E
M.134
P.06a.1.b
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
1
A
1
2
L.01
L.02
OH
OH
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Koefisien
5
3.360
1.120
3
4
Bahan
1
2
Peralatan
L.01
L.04
OH
OH
1.400
0.476
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
2.800
22.355
Jumlah Harga Bah
P.06a.1.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
5.730
1.910
1.400
0.710
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
2.80
38.15
Jumlah Harga Bah
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
Koefisien
5
P.06a.2.a
D
E
15%
2) Bentuk I, Tipe B Bronjong kawat uk. L=3,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat se
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
4.740
1.580
2.100
0.684
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
4.200
31.358
Jumlah Harga Bah
Peralatan
P.06a.2.b
D
E
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
4.860
1.620
2.100
0.696
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
4.200
32.296
Jumlah Harga Bah
Peralatan
P.06a.2.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
8.250
2.750
2.100
1.035
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
4.20
55.10
Jumlah Harga Bah
Peralatan
15%
Bentuk I, Tipe C Bronjong kawat uk. L=4,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat se
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm
3)
P.06a.3.a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
2
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
6.180
2.060
2.800
0.898
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
5.600
41.011
Jumlah Harga Bah
P.06a.3.b (b)
15%
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
6.360
2.120
2.800
0.916
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
5.600
42.237
Jumlah Harga Bah
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
Koefisien
5
P.06a.3.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
10.800
3.600
2.800
1.360
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
5.600
72.100
Peralatan
15%
Bentuk I, Tipe D Bronjong kawat uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat se
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm
4)
P.06a.4.a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
2.280
0.760
0.700
0.298
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
1.400
15.100
Jumlah Harga Bah
Peralatan
D
E
P.06a.4.b (b)
15%
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
2.340
0.780
0.700
0.304
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
1.400
15.551
Jumlah Harga Bah
Peralatan
P.06a.4.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
3.960
1.320
0.700
0.466
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
1.40
26.53
Jumlah Harga Bah
Peralatan
D
E
Bentuk I, Tipe E Bronjong kawat uk. L=3,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat se
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm
5)
P.06a.5.a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
3.330
1.110
1.050
0.438
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
2.100
21.987
Jumlah Harga Bah
Peralatan
P.06a.5.b
D
E
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
1
A
1
2
3
4
L.01
L.02
L.01
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Koefisien
5
3.390
1.130
1.050
0.440
Bahan
1
2
Peralatan
M.05
M.61
m3
kg
2.100
22.644
Jumlah Harga Bah
P.06a.5.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
5.250
1.750
1.050
0.630
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
2.100
38.620
Jumlah Harga Bah
Peralatan
15%
Bentuk I, Tipe F Bronjong kawat uk. L=4,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat se
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm
6)
P.06a.6.a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
4.350
1.450
1.400
0.575
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
2.800
28.858
Jumlah Harga Bah
Peralatan
P.06a.6.b
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
4.470
1.490
1.400
0.587
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
2.800
29.721
Jumlah Harga Bah
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Peralatan
Koefisien
5
P.06a.6.c
D
E
15%
(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
6.81
2.27
1.40
0.82
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
2.800
50.720
Jumlah Harga Bah
Peralatan
D
E
7)
P.06a.7
15%
No
Uraian
Kode
Satuan
Koefisien
5
A
1
2
Tenaga Kerja *)
Pekerja (isian batu dan pemasangan)
Mandor
B
1
2
Bahan
Batu / batu belah
Kawat Bronjong
Peralatan
L.01
L.04
OH
OH
0.500
0.050
Jumlah Harga Tenaga Ke
M.05
P.06a.x
m3
bh
1.4
1.00
Jumlah Harga Bah
15%
P.06b
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
7.650
2.550
1.428
0.908
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
2.856
37.326
Jumlah Harga Bah
Peralatan
P.06b.1.b
D
E
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
6.300
2.100
1.428
0.773
Jumlah Harga Tenaga Ke
M.05
M.61
m3
kg
2.856
50.696
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Bahan
1
2
Koefisien
5
Peralatan
P.06b.2.a
D
E
15%
2) Bentuk II, Tipe H Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,23 m berisi batu kali/belah (buat
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
8.040
2.680
1.932
0.997
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
3.864
39.265
Jumlah Harga Bah
Peralatan
P.06b.2.b (b)
15%
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
7.200
2.400
1.932
0.913
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
3.864
53.329
Jumlah Harga Bah
Peralatan
D
E
P.06b.3.a
15%
3) Bentuk II, Tipe I Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,30 m berisi batu kali/belah (buat s
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
8.520
2.840
2.520
1.104
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
5.040
41.520
Jumlah Harga Bah
Peralatan
P.06b.3.b
D
E
15%
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm da
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
L.01
L.02
L.01
L.04
OH
OH
OH
OH
6.300
2.100
2.520
0.882
Jumlah Harga Tenaga Ke
Bahan
1
2
M.05
M.61
m3
kg
5.040
56.392
Jumlah Harga Bah
Peralatan
D
E
4)
P.06b.4
15%
No
Uraian
Kode
Satuan
A
1
2
Tenaga Kerja *)
Pekerja (isian batu dan pemasangan)
Mandor
L.01
L.04
OH
OH
B
1
Bahan
Batu / batu belah *)
M.05
m3
Koefisien
5
0.600
0.060
Jumlah Harga Tenaga Ke
1.40
Kawat Bronjong
Peralatan
P.06b.x
bh
1.00
Jumlah Harga Bah
P.07
P.07.a
15%
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)
L.01
L.04
L.05
OH
OH
OH
B
1
Bahan
Kayu Galam dia 8 - 10 cm
M.31.b
C
1
2
3
Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken
E.45
E.01.a
E.02.c
Sewa-hari
Sewa-hari
Sewa-hari
D
E
Koefisien
5
0.030
0.003
0.005
Jumlah Harga Tenaga Ke
1.05
Jumlah Harga Bah
0.005
0.005
0.250
Jumlah Harga Perala
15%
*) Jika tidak menggunakan tripod/crane maka HSD peralatan = 0, dan koefisien pekerja (L.01) diubah menja
P.07.b
Uraian
Kode
Satuan
1
A
1
2
3
2
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)
L.01
L.04
L.05
OH
OH
OH
B
1
Bahan
Kayu Galam dia 8 - 10 cm
M.31.b
C
1
2
3
Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken
E.45
E.01.a
E.02.c
Sewa-hari
Sewa-hari
Sewa-hari
D
E
Koefisien
5
0.036
0.004
0.006
Jumlah Harga Tenaga Ke
1.05
Jumlah Harga Bah
0.006
0.006
0.250
Jumlah Harga Perala
15%
F
P.07.c
P.07.d
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)
L.01
L.04
L.05
OH
OH
OH
B
1
Bahan
Kayu Galam dia 8 cm
M.31.b
C
1
2
2
Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken
E.45
E.01.a
E.02.c
Sewa-hari
Sewa-hari
Sewa-hari
D
E
Koefisien
5
0.040
0.004
0.010
Jumlah Harga Tenaga Ke
1.03
Jumlah Harga Bah
0.010
0.010
0.250
Jumlah Harga Perala
15%
Uraian
Kode
Satuan
1
A
1
2
3
L.01
L.04
L.05
OH
OH
OH
M.32
m2
Tenaga Kerja
Pekerja
Mandor
Operator Crane *)
B
1
Bahan
Lapisan ijuk 5 cm (hanya untuk bronjong
yang menempel dengan tanah)
Koefisien
5
0.120
0.012
0.010
Jumlah Harga Tenaga Ke
1.150
Peralatan
Crane daya angkat 5 ton (long arm)15 m
D
E
P.08
P.08a
E.07.b
Sewa-hari
0.01
Jumlah Harga Perala
15%
Tenaga Kerja
Uraian
Kode
Satuan
Koefisien
5
1
2
3
4
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
Bahan
Batu muka
Pasir Pasang
Portland Cement
Peralatan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.240
0.120
0.012
0.024
Jumlah Harga Tenaga Ke
M.07b
M.14.b
M.15
m2
m3
kg
1.250
0.025
5.000
Jumlah Harga Bah
P.08b
D
E
F
-
15%
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
3
Bahan
Batu candi
Pasir Pasang
Portland Cement
Peralatan
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.240
0.120
0.012
0.024
Jumlah Harga Tenaga Ke
M.07a
M.14.b
M.15
m2
m3
kg
1.200
0.025
5.000
Jumlah Harga Bah
15%
P.09
P.09a
Pasangan Geotekstil
Pemasangan Geotekstil (1 m2) Tipe-A
No
Uraian
Kode
Satuan
1
A
1
2
L.01
L.02
OH
OH
Tenaga Kerja
Pekerja
Tukang tembok/gali
Koefisien
5
0.100
0.020
Mandor
L.04
OH
0.010
Jumlah Harga Tenaga Ke
B
1
Bahan
Geotekstil
M.122.a
m2
1.050
Jumlah Harga Bah
Peralatan
D
E
P.09b
15%
Uraian
Kode
Satuan
L.01
L.02
L.04
OH
OH
OH
0.160
0.032
0.016
Jumlah Harga Tenaga Ke
M.122.b
m2
1.080
Jumlah Harga Bah
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok/gali
Mandor
B
1
Bahan
Geotekstil
Peralatan
Koefisien
5
P.09c
D
E
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok/gali
Mandor
L.01
L.02
L.04
OH
OH
OH
0.240
0.048
0.024
Jumlah Harga Tenaga Ke
B
1
Bahan
Geotekstil
M.122.c
m2
1.100
Jumlah Harga Bah
Peralatan
Pasangan Bar Screen (saringan kasar) Bangunan Intake, Pengukur, dan Pengatur
P.10
15%
Saringan kasar terbuat dari besi beton sesuai dengan kebutuhan, misalnya menggunakan besi beton
as ke as satu sama lain 3,5 cm dihitung dalam m2, AHSP-nya sebagai berikut:
P.11
No
Uraian
Kode
Satuan
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B
1
2
Bahan
Besi beton dia 12 mm
Baja profil L.40.40.4
M.55.d
M.54.g
m
m
C
1
2
Peralatan
Alat las listrik atau las diesel
Bor listrik
E.22
E.04
Sewa-hari
Sewa-hari
D
E
Koefisien
5
0.750
0.250
0.025
0.075
Jumlah Harga Tenaga Ke
30
4
Jumlah Harga Bah
0.15
0.02
Jumlah Harga Perala
15%
1 buah
ambang ukur pada
dan/atau
pengatur
dan
pemasangannya
pakaibangunan
dynabolt pengukur
atau raamset
setiap
20 cm. Masing-masing tipe sesuai denga
maka AHSP ambang ukur dapat dihitung sebagai berikut
No
Uraian
Kode
Satuan
1
A
1
2
3
4
L.01
L.02
L.03
L.04
OH
OH
OH
OH
M.57
bh
21
M.54.g
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
B
1
2
Bahan
Dynabolt / raamset dia 8 mm *)
panjang 4 - 5 cm
Baja profil L.40.40.4
*)
C
1
2
Peralatan
Alat las listrik atau las diesel
Bor listrik
D
E
Koefisien
5
0.250
0.125
0.013
0.025
Jumlah Harga Tenaga Ke
P.12
P.12a
E.22
E.04
Sewa-hari
Sewa-hari
0.050
0.060
Jumlah Harga Perala
15%
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.100
0.010
Jumlah Harga Tenaga Ke
B
1
Bahan
Gebalan rumput
M.13
m2
1.10
Jumlah Harga Bah
Peralatan
D
E
P.12b
15%
Pembabadan rumput
No
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Koefisien
5
0.0070
0.0007
Jumlah Harga Tenaga Ke
P.13
P.13a
P.13b
C
1
Peralatan
Alat potong rumput
D
E
M.133
sewa-hari
0.007
Jumlah Harga Perala
15%
Pekerjaan Pantai
Penanaman 1 pohon Bakau
No
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.0080
0.0008
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Bibit Mangrove
Ajir tinggi 2m
M.113
M.109
phn
bh
1
1
Jumlah Harga Bah
C
1
2
Peralatan
Kendaraan pengangkut
Rakit
M.138
M.136
sewa-hari
sewa-hari
D
E
Matras Bambu
Koefisien
5
0.002
0.005
Jumlah Harga Perala
15%
P.14
P.14a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.5000
0.0500
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Bambu
Tali pengikat
M.30.a
M.141
bh
m
4
5
Jumlah Harga Bah
C
1
Peralatan
Alat bantu
LS
1
Jumlah Harga Perala
D
E
15%
Pasangan
Armor
Berbagai jenis
armor yang terbuat dari beton diantaranya berbentuk kubus, 3B, Quadripod, tetrapod, d
pembuatan dan pemasangan berbagai jenis armor sebagai berikut:
Pembuatan 1 bh Kubus Beton ukuran 30 x 30 x 30 cm
No
Uraian
Kode
Satuan
L.01
L.02
L.04
OH
OH
OH
0.050
0.010
0.005
Jumlah Harga Tenaga Ke
0.027
3.24
Jumlah Harga Bah
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
B.17
m3
kg
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
D
E
Koefisien
5
0.0054
0.0027
0.002
Jumlah Harga Perala
15%
P.14b
P.14c
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
0.100
0.020
0.010
Jumlah Harga Tenaga Ke
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
M.55.d
m3
kg
0.064
7.68
Jumlah Harga Bah
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
0.016
0.016
0.002
Jumlah Harga Perala
D
E
15%
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
L.01
L.02
L.04
OH
OH
OH
0.120
0.024
0.012
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
M.55.d
m3
kg
0.100
12.00
Jumlah Harga Bah
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor 3B
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
0.025
0.025
0.002
Jumlah Harga Perala
D
E
Koefisien
5
15%
P.14d
Pembuatan Blok beton berat 0,5 ton Quadripod, tetrapod, dolos, tribar dll.
No
P.14e
Uraian
Kode
Satuan
L.01
L.02
L.04
OH
OH
OH
0.190
0.038
0.019
Jumlah Harga Tenaga Ke
0.227
27.27
Jumlah Harga Bah
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
M.55.d
m3
kg
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
D
E
Koefisien
5
0.0455
0.0227
0.0020
Jumlah Harga Perala
15%
Pembuatan Blok beton berat 0,75 ton Quadripod, tetrapod, dolos, tribar dll.
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
L.01
L.02
L.04
OH
OH
OH
0.280
0.056
0.028
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
M.55.d
m3
kg
0.341
40.91
Jumlah Harga Bah
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
D
E
0.0852
0.0852
0.0020
Jumlah Harga Perala
15%
P.14f
Pembuatan Blok beton berat 1,0 ton Quadripod, tetrapod, dolos, tribar dll.
No
P.14g
Uraian
Kode
Satuan
L.01
L.02
L.04
OH
OH
OH
0.400
0.080
0.040
Jumlah Harga Tenaga Ke
0.227
27.27
Jumlah Harga Bah
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
B
1
2
Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3
B.07b
M.55.d
m3
kg
C
1
2
3
Peralatan
Molen
Vibrator
Cetakan Armor
E.28.b
E.47
M.116
sewa-hari
sewa-hari
bh
D
E
Koefisien
5
0.0568
0.0568
0.002
Jumlah Harga Perala
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor
L.01
L.02
L.04
OH
OH
OH
0.520
0.104
0.052
Jumlah Harga Tenaga Ke
B
1
2
Bahan
Armor
Pasir pasang
P.14x
M.14.b
m3
m3
1.050
0.07
Jumlah Harga Bah
Peralatan
D
E
P.14h
15%
No
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Koefisien
5
1.000
0.100
Jumlah Harga Tenaga Ke
P.14i
Batu 1 kg - 3 kg
M.05
m3
1.1
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.1
Jumlah Harga Perala
D
E
No
P.14j
P.14k
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.000
0.200
0.100
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 3 kg - 5 kg
M.05
m3
1.15
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.1
Jumlah Harga Perala
D
E
15%
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.100
0.220
0.110
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 5 kg - 10 kg
M.05
m3
1.2
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.11
Jumlah Harga Perala
D
E
15%
No
1
A
1
2
Tenaga Kerja
Pekerja
Tukang batu
Uraian
Kode
Satuan
L.01
L.02
OH
OH
Koefisien
5
1.100
0.220
P.14l
P.14m
Mandor
L.04
OH
0.110
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 10 kg - 30 kg
M.05
m3
1.25
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.11
Jumlah Harga Perala
D
E
No
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.200
0.240
0.120
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 30 kg - 50 kg
M.05
m3
1.28
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.12
Jumlah Harga Perala
D
E
Koefisien
5
15%
No
P.14n
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.200
0.240
0.120
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 50 kg - 100 kg
M.05
m3
1.3
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.12
Jumlah Harga Perala
D
E
15%
No
Uraian
Kode
Satuan
Koefisien
5
P.14o
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.200
0.240
0.120
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 100 kg - 200 kg
M.05
m3
1.32
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.12
Jumlah Harga Perala
D
E
No
P.14p
P.14q
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.200
0.240
0.120
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 100 kg - 200 kg
M.05
m3
1.35
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.12
Jumlah Harga Perala
D
E
15%
No
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.300
0.260
0.130
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 100 kg - 200 kg
M.05
m3
1.38
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.13
Jumlah Harga Perala
D
E
Koefisien
5
15%
P.15
P.15a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang batu
Mandor
L.01
L.02
L.04
OH
OH
OH
1.300
0.260
0.130
Jumlah Harga Tenaga Ke
B
1
Bahan
Batu 100 kg - 200 kg
M.05
m3
1.4
Jumlah Harga Bah
C
1
Peralatan
Wheel Loader
E.25a
jam
0.13
Jumlah Harga Perala
D
E
15%
Uraian
Kode
Satuan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Koefisien
5
0.200
0.020
Jumlah Harga Tenaga Ke
Peralatan
P.15b
D
E
15%
Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c= 7,4MPa(K-100)
No
Uraian
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
M.15
M.14.a
M.12
M.02
kg
kg
kg
ltr
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
Koefisien
5
1.200
0.200
0.020
0.120
Jumlah Harga Tenaga Ke
247
869
999
215
P.16
Molen
E.28.b
Sewa-hari
D
E
0.250
Jumlah Harga Perala
15%
Uraian
Kode
Satuan
1
A
1.
2.
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
B
1.
2.
3.
Bahan
Pipa PVC dia. 2"
Ijuk
Kerikil
M.107.e
M.32
M.12
m
kg
m3
Koefisien
5
0.10
0.01
Jumlah Harga Tenaga Ke
1.050
0.100
0.018
Peralatan
P.17
D
E
15%
Uraian
Kode
Satuan
1
A
1
2
3
Tenaga Kerja
Pekerja
Mandor
Akhli madya (sipil/hidrologi)
L.01
L.04
L.08
OH
OH
OH
B
1
2
3
4
5
Bahan
Mistar Ukur besi/allumunium pelat
Pasangan bata merah 1pc: 4ps
(*
Batang skoor L.40.40.4
(*
Pelat setrip / 3x30x300mm
Dynabolt/raamset dia 8 mm panjang 4-5 cm
P.02b
M.54.g
M.53.f
M.57
m'
m3
kg
kg
bh
Koefisien
5
0.250
0.025
0.025
Jumlah Harga Tenaga Ke
1
0.09
5.50
0.50
4.00
Peralatan
Alat bantu
D
E
LS
1.00
Jumlah Harga Perala
15%
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
135,000.00
54,000.00
6,300.00
20,250.00
215,550.00
95,000.00
90,000.00
1,240.00
Jumlah Harga Bahan
114,000.00
39,600.00
312,480.00
466,080.00
400,000.00
Jumlah Harga Peralatan
66,800.00
66,800.00
748,430.00
112,264.50
xD
860,694.50
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
135,000.00
54,000.00
6,300.00
20,250.00
215,550.00
95,000.00
90,000.00
1,240.00
Jumlah Harga Bahan
114,000.00
43,650.00
250,480.00
408,130.00
400,000.00
Jumlah Harga Peralatan
66,800.00
66,800.00
690,480.00
103,572.00
xD
794,052.00
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
135,000.00
54,000.00
6,300.00
20,250.00
215,550.00
95,000.00
90,000.00
1,240.00
Jumlah Harga Bahan
114,000.00
46,800.00
202,120.00
362,920.00
400,000.00
Jumlah Harga Peralatan
66,800.00
66,800.00
645,270.00
96,790.50
xD
742,060.50
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
135,000.00
54,000.00
6,300.00
20,250.00
215,550.00
95,000.00
90,000.00
1,240.00
Jumlah Harga Bahan
114,000.00
48,960.00
167,400.00
330,360.00
400,000.00
Jumlah Harga Peralatan
66,800.00
66,800.00
612,710.00
91,906.50
xD
704,616.50
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
100,000.00
15,000.00
115,000.00
100,000.00
225,000.00
225,000.00
Jumlah Harga Peralatan
800.00
2,700.00
4,500.00
8,000.00
123,000.00
18,450.00
xD
141,450.00
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
umlah Harga Tenaga Kerja
90,000.00
13,500.00
103,500.00
100,000.00
225,000.00
225,000.00
Jumlah Harga Peralatan
600.00
2,025.00
4,500.00
7,125.00
110,625.00
16,593.75
xD
127,218.75
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
umlah Harga Tenaga Kerja
7
30,000.00
4,500.00
34,500.00
6,750.00
6,750.00
41,250.00
6,187.50
47,437.50
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
1,500.00
11,500.00
200.00
675.00
875.00
12,375.00
1,856.25
14,231.25
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
120,000.00
72,000.00
16,800.00
18,000.00
226,800.00
450.00
1,240.00
90,000.00
Jumlah Harga Bahan
225,000.00
163,680.00
33,300.00
421,980.00
648,780.00
97,317.00
xD
746,097.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
120,000.00
72,000.00
16,800.00
18,000.00
226,800.00
450.00
1,240.00
90,000.00
Jumlah Harga Bahan
225,000.00
132,060.00
33,750.00
390,810.00
617,610.00
92,641.50
xD
710,251.50
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
120,000.00
72,000.00
16,800.00
18,000.00
226,800.00
450.00
1,240.00
90,000.00
Jumlah Harga Bahan
225,000.00
110,360.00
36,900.00
372,260.00
599,060.00
89,859.00
xD
688,919.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
120,000.00
72,000.00
16,800.00
18,000.00
226,800.00
450.00
1,240.00
90,000.00
Jumlah Harga Bahan
225,000.00
93,000.00
44,100.00
362,100.00
588,900.00
xD
88,335.00
677,235.00
01 '======================
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
30,000.00
4,500.00
34,500.00
200.00
675.00
1,758.05
2,633.05
37,133.05
5,569.96
42,703.01
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
1,500.00
11,500.00
2,700.00
2,700.00
14,200.00
2,130.00
16,330.00
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
15,000.00
9,000.00
1,050.00
2,250.00
27,300.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,080.00
7,861.60
8,941.60
36,241.60
5,436.24
xD
41,677.84
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
15,000.00
9,000.00
1,050.00
2,250.00
27,300.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,620.00
6,001.60
7,621.60
34,921.60
5,238.24
xD
40,159.84
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
15,000.00
9,000.00
1,050.00
2,250.00
27,300.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,260.00
8,977.60
10,237.60
37,537.60
5,630.64
xD
43,168.24
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
15,000.00
9,000.00
1,050.00
2,250.00
27,300.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,440.00
7,241.60
8,681.60
35,981.60
5,397.24
xD
41,378.84
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
15,000.00
9,000.00
1,050.00
2,250.00
27,300.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,620.00
5,518.00
7,138.00
34,438.00
5,165.70
xD
39,603.70
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
19,200.00
11,520.00
1,330.00
1,425.00
33,475.00
90,000.00
1,240.00
Jumlah Harga Bahan
1,800.00
12,677.76
14,477.76
47,952.76
7,192.91
xD
55,145.67
setara dengan campuran 1 PC:3 PP)
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
19,200.00
11,520.00
1,330.00
1,425.00
33,475.00
90,000.00
1,240.00
Jumlah Harga Bahan
2,700.00
9,642.24
12,342.24
45,817.24
6,872.59
xD
52,689.83
setara dengan campuran 1 PC:4 PP)
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
19,200.00
11,520.00
1,330.00
1,425.00
33,475.00
90,000.00
1,240.00
Jumlah Harga Bahan
2,160.00
7,787.20
9,947.20
43,422.20
6,513.33
xD
49,935.53
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
50,000.00
30,000.00
3,500.00
7,500.00
91,000.00
95,000.00
90,000.00
Jumlah Harga Bahan
114,000.00
38,880.00
152,880.00
243,880.00
36,582.00
xD
280,462.00
02 '======================
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
163,500.00
65,400.00
70,000.00
35,025.00
333,925.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
420,088.50
686,088.50
1,020,013.50
153,002.03
xD
1,173,015.53
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
6
50,000.00
60,000.00
Jumlah
(Rp)
7
168,000.00
67,200.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
70,000.00
35,700.00
340,900.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
432,569.25
698,569.25
1,039,469.25
155,920.39
xD
1,195,389.64
lubang kotak 100 x 100 mm;
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
286,500.00
114,600.00
70,000.00
53,250.00
524,350.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
738,202.50
1,004,202.50
1,528,552.50
229,282.88
xD
1,757,835.38
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
237,000.00
94,800.00
105,000.00
51,300.00
488,100.00
95,000.00
19,350.00
Jumlah Harga Bahan
399,000.00
606,777.30
1,005,777.30
1,493,877.30
224,081.60
xD
1,717,958.90
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
243,000.00
97,200.00
105,000.00
52,200.00
497,400.00
95,000.00
19,350.00
Jumlah Harga Bahan
399,000.00
624,927.60
1,023,927.60
1,521,327.60
228,199.14
xD
1,749,526.74
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
412,500.00
165,000.00
105,000.00
77,625.00
760,125.00
95,000.00
19,350.00
Jumlah Harga Bahan
399,000.00
1,066,185.00
1,465,185.00
2,225,310.00
333,796.50
xD
2,559,106.50
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
309,000.00
123,600.00
140,000.00
67,350.00
639,950.00
95,000.00
19,350.00
Jumlah Harga Bahan
532,000.00
793,562.85
1,325,562.85
1,965,512.85
294,826.93
xD
2,260,339.78
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
318,000.00
127,200.00
140,000.00
68,700.00
653,900.00
95,000.00
19,350.00
Jumlah Harga Bahan
532,000.00
817,285.95
1,349,285.95
2,003,185.95
300,477.89
xD
2,303,663.84
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
95,000.00
19,350.00
Jumlah
(Rp)
7
540,000.00
216,000.00
140,000.00
102,000.00
998,000.00
532,000.00
1,395,135.00
1,927,135.00
2,925,135.00
438,770.25
xD
3,363,905.25
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
114,000.00
45,600.00
35,000.00
22,350.00
216,950.00
95,000.00
19,350.00
Jumlah Harga Bahan
133,000.00
292,185.00
425,185.00
642,135.00
96,320.25
xD
738,455.25
03 '======================
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
7
117,000.00
46,800.00
35,000.00
22,800.00
221,600.00
No
1
A
1
2
3
4
B
95,000.00
19,350.00
Jumlah Harga Bahan
133,000.00
300,911.85
433,911.85
1
2
655,511.85
98,326.78
D
E
753,838.63
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
198,000.00
79,200.00
35,000.00
34,950.00
347,150.00
95,000.00
19,350.00
Jumlah Harga Bahan
133,000.00
513,355.50
646,355.50
993,505.50
149,025.83
xD
1,142,531.33
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
166,500.00
66,600.00
52,500.00
32,850.00
318,450.00
95,000.00
19,350.00
Jumlah Harga Bahan
199,500.00
425,448.45
624,948.45
943,398.45
141,509.77
xD
1,084,908.22
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
6
50,000.00
60,000.00
50,000.00
75,000.00
Jumlah
(Rp)
7
169,500.00
67,800.00
52,500.00
33,000.00
4.440
322,800.00
95,000.00
19,350.00
Jumlah Harga Bahan
199,500.00
438,161.40
637,661.40
960,461.40
144,069.21
xD
1,104,530.61
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
262,500.00
105,000.00
52,500.00
47,250.00
467,250.00
95,000.00
19,350.00
Jumlah Harga Bahan
199,500.00
747,297.00
946,797.00
1,414,047.00
212,107.05
xD
1,626,154.05
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
217,500.00
87,000.00
70,000.00
43,125.00
417,625.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
558,402.30
824,402.30
1,242,027.30
xD
186,304.10
1,428,331.40
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
223,500.00
89,400.00
70,000.00
44,025.00
426,925.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
575,101.35
841,101.35
1,268,026.35
190,203.95
xD
1,458,230.30
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
340,500.00
136,200.00
70,000.00
61,575.00
608,275.00
95,000.00
19,350.00
Jumlah Harga Bahan
266,000.00
981,432.00
1,247,432.00
1,855,707.00
278,356.05
xD
2,134,063.05
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
umlah Harga Tenaga Kerja
95,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
xD
25,000.00
3,750.00
28,750.00
133,000.00
133,000.00
161,750.00
24,262.50
186,012.50
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
382,500.00
153,000.00
71,400.00
68,085.00
674,985.00
95,000.00
19,350.00
Jumlah Harga Bahan
271,320.00
722,258.10
993,578.10
1,668,563.10
250,284.47
xD
1,918,847.57
04 '======================
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;
Harga Satuan
(Rp)
6
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
95,000.00
19,350.00
Jumlah
(Rp)
7
315,000.00
126,000.00
71,400.00
57,960.00
570,360.00
271,320.00
980,967.60
1,252,287.60
1,822,647.60
273,397.14
xD
2,096,044.74
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
402,000.00
160,800.00
96,600.00
74,790.00
734,190.00
95,000.00
19,350.00
Jumlah Harga Bahan
367,080.00
759,777.75
1,126,857.75
1,861,047.75
279,157.16
xD
60 x 80mm;
2,140,204.91
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
360,000.00
144,000.00
96,600.00
68,490.00
669,090.00
95,000.00
19,350.00
Jumlah Harga Bahan
367,080.00
1,031,916.15
1,398,996.15
2,068,086.15
310,212.92
xD
2,378,299.07
Jumlah
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
426,000.00
170,400.00
126,000.00
82,800.00
805,200.00
95,000.00
19,350.00
Jumlah Harga Bahan
478,800.00
803,412.00
1,282,212.00
2,087,412.00
313,111.80
xD
2,400,523.80
m, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
50,000.00
75,000.00
umlah Harga Tenaga Kerja
315,000.00
126,000.00
126,000.00
66,150.00
633,150.00
95,000.00
19,350.00
Jumlah Harga Bahan
478,800.00
1,091,185.20
1,569,985.20
2,203,135.20
330,470.28
xD
2,533,605.48
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
95,000.00
Jumlah
(Rp)
7
30,000.00
4,500.00
34,500.00
133,000.00
133,000.00
167,500.00
25,125.00
xD
192,625.00
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
100,000.00
umlah Harga Tenaga Kerja
1,500.00
225.00
500.00
2,225.00
23,416.67
Jumlah Harga Bahan
24,587.50
24,587.50
450,000.00
450,000.00
25,000.00
Jumlah Harga Peralatan
2,250.00
2,250.00
6,250.00
10,750.00
37,562.50
5,634.38
xD
43,196.88
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
100,000.00
umlah Harga Tenaga Kerja
1,800.00
300.00
600.00
2,700.00
23,416.67
Jumlah Harga Bahan
24,587.50
24,587.50
450,000.00
450,000.00
25,000.00
Jumlah Harga Peralatan
2,700.00
2,700.00
6,250.00
11,650.00
38,937.50
5,840.63
xD
44,778.13
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
100,000.00
umlah Harga Tenaga Kerja
2,000.00
300.00
1,000.00
3,300.00
23,416.67
Jumlah Harga Bahan
24,119.17
24,119.17
450,000.00
450,000.00
25,000.00
Jumlah Harga Peralatan
4,500.00
4,500.00
6,250.00
15,250.00
42,669.17
6,400.38
xD
49,069.54
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
100,000.00
umlah Harga Tenaga Kerja
10,000.00
6,000.00
900.00
1,000.00
7,900.00
11,500.00
11,500.00
270,000.00
Jumlah Harga Peralatan
2,700.00
2,700.00
22,100.00
3,315.00
xD
25,415.00
operator Crane = 0
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
05 '======================
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
12,000.00
7,200.00
840.00
1,800.00
21,840.00
100,000.00
90,000.00
1,240.00
Jumlah Harga Bahan
125,000.00
2,250.00
6,200.00
133,450.00
155,290.00
23,293.50
xD
178,583.50
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
12,000.00
7,200.00
840.00
1,800.00
21,840.00
140,500.00
90,000.00
1,240.00
Jumlah Harga Bahan
168,600.00
2,250.00
6,200.00
177,050.00
198,890.00
29,833.50
xD
228,723.50
Harga Satuan
(Rp)
6
50,000.00
60,000.00
Jumlah
(Rp)
7
5,000.00
1,200.00
75,000.00
umlah Harga Tenaga Kerja
750.00
6,950.00
60,000.00
Jumlah Harga Bahan
63,000.00
63,000.00
69,950.00
10,492.50
xD
80,442.50
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
8,000.00
1,920.00
1,200.00
11,120.00
120,500.00
Jumlah Harga Bahan
130,140.00
130,140.00
141,260.00
21,189.00
xD
162,449.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
12,000.00
2,880.00
1,800.00
16,680.00
225,000.00
Jumlah Harga Bahan
247,500.00
247,500.00
264,180.00
39,627.00
xD
303,807.00
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
37,500.00
15,000.00
1,750.00
5,625.00
59,875.00
9,000.00
12,000.00
Jumlah Harga Bahan
270,000.00
48,000.00
318,000.00
385,000.00
20,000.00
Jumlah Harga Peralatan
57,750.00
400.00
58,150.00
436,025.00
65,403.75
xD
501,428.75
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
5,000.00
Jumlah
(Rp)
7
12,500.00
7,500.00
875.00
1,875.00
22,750.00
105,000.00
12,000.00
Jumlah Harga Bahan
48,000.00
153,000.00
385,000.00
20,000.00
Jumlah Harga Peralatan
19,250.00
1,200.00
20,450.00
196,200.00
29,430.00
xD
225,630.00
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
umlah Harga Tenaga Kerja
5,000.00
750.00
5,750.00
2,000.00
Jumlah Harga Bahan
2,200.00
2,200.00
xD
9,142.50
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
umlah Harga Tenaga Kerja
350.00
52.50
402.50
7,000.00
7,402.50
7,805.00
1,170.75
xD
8,975.75
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
75,000.00
umlah Harga Tenaga Kerja
400.00
60.00
460.00
3,500.00
2,000.00
Jumlah Harga Bahan
3,500.00
2,000.00
5,500.00
75,000.00
300,000.00
Jumlah Harga Peralatan
150.00
1,500.00
1,650.00
7,610.00
1,141.50
xD
8,751.50
Harga Satuan
Jumlah
06 '======================
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
umlah Harga Tenaga Kerja
25,000.00
3,750.00
28,750.00
60,000.00
2,500.00
Jumlah Harga Bahan
240,000.00
12,500.00
252,500.00
1,000.00
Jumlah Harga Peralatan
1,000.00
1,000.00
282,250.00
42,337.50
xD
324,587.50
Quadripod, tetrapod, dolos, tribar dll. Untuk
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
2,500.00
600.00
375.00
3,475.00
957,389.69
9,000.00
Jumlah Harga Bahan
25,849.52
29,160.00
29,160.00
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
2,160.00
363.83
500.00
3,023.83
35,658.83
5,348.82
xD
41,007.65
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
5,000.00
1,200.00
750.00
6,950.00
957,389.69
9,000.00
Jumlah Harga Bahan
61,272.94
69,120.00
69,120.00
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
6,400.00
2,156.00
500.00
9,056.00
85,126.00
12,768.90
xD
97,894.90
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
6,000.00
1,440.00
900.00
8,340.00
957,389.69
9,000.00
Jumlah Harga Bahan
95,738.97
108,000.00
108,000.00
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
10,000.00
3,368.75
500.00
13,868.75
130,208.75
19,531.31
xD
149,740.06
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
9,500.00
2,280.00
1,425.00
13,205.00
957,389.69
9,000.00
Jumlah Harga Bahan
217,588.57
245,454.55
245,454.55
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
18,181.82
3,062.50
500.00
21,744.32
280,403.86
42,060.58
xD
322,464.44
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
14,000.00
3,360.00
2,100.00
19,460.00
957,389.69
9,000.00
Jumlah Harga Bahan
326,382.85
368,181.82
368,181.82
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
34,080.00
11,480.70
500.00
46,060.70
433,702.52
65,055.38
xD
498,757.90
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
20,000.00
4,800.00
3,000.00
27,800.00
957,389.69
9,000.00
Jumlah Harga Bahan
217,588.57
245,454.55
245,454.55
400,000.00
134,750.00
250,000.00
Jumlah Harga Peralatan
22,720.00
7,653.80
500.00
30,873.80
304,128.35
45,619.25
xD
349,747.60
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
26,000.00
6,240.00
3,900.00
36,140.00
304,128.35
90,000.00
Jumlah Harga Bahan
319,334.76
6,300.00
325,634.76
xD
416,040.98
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
50,000.00
7,500.00
57,500.00
95,000.00
Jumlah Harga Bahan
104,500.00
104,500.00
168,000.00
Jumlah Harga Peralatan
16,800.00
16,800.00
178,800.00
26,820.00
xD
205,620.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
50,000.00
12,000.00
7,500.00
69,500.00
95,000.00
Jumlah Harga Bahan
109,250.00
109,250.00
168,000.00
Jumlah Harga Peralatan
16,800.00
16,800.00
195,550.00
29,332.50
xD
224,882.50
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
55,000.00
13,200.00
8,250.00
76,450.00
95,000.00
Jumlah Harga Bahan
114,000.00
114,000.00
168,000.00
Jumlah Harga Peralatan
18,480.00
18,480.00
208,930.00
31,339.50
xD
240,269.50
Harga Satuan
(Rp)
6
50,000.00
60,000.00
Jumlah
(Rp)
7
55,000.00
13,200.00
07 '======================
75,000.00
umlah Harga Tenaga Kerja
8,250.00
76,450.00
95,000.00
Jumlah Harga Bahan
118,750.00
118,750.00
168,000.00
Jumlah Harga Peralatan
18,480.00
18,480.00
213,680.00
32,052.00
xD
245,732.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
60,000.00
14,400.00
9,000.00
83,400.00
95,000.00
Jumlah Harga Bahan
121,600.00
121,600.00
168,000.00
Jumlah Harga Peralatan
20,160.00
20,160.00
225,160.00
33,774.00
xD
258,934.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
60,000.00
14,400.00
9,000.00
83,400.00
95,000.00
Jumlah Harga Bahan
123,500.00
123,500.00
168,000.00
Jumlah Harga Peralatan
20,160.00
20,160.00
227,060.00
34,059.00
xD
261,119.00
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
60,000.00
14,400.00
9,000.00
83,400.00
95,000.00
Jumlah Harga Bahan
125,400.00
125,400.00
168,000.00
Jumlah Harga Peralatan
20,160.00
20,160.00
228,960.00
34,344.00
xD
263,304.00
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
60,000.00
14,400.00
9,000.00
83,400.00
95,000.00
Jumlah Harga Bahan
128,250.00
128,250.00
168,000.00
Jumlah Harga Peralatan
20,160.00
20,160.00
231,810.00
34,771.50
xD
266,581.50
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
65,000.00
15,600.00
9,750.00
90,350.00
95,000.00
Jumlah Harga Bahan
131,100.00
131,100.00
168,000.00
Jumlah Harga Peralatan
21,840.00
21,840.00
243,290.00
36,493.50
xD
279,783.50
Harga Satuan
Jumlah
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
75,000.00
umlah Harga Tenaga Kerja
65,000.00
15,600.00
9,750.00
90,350.00
95,000.00
Jumlah Harga Bahan
133,000.00
133,000.00
168,000.00
Jumlah Harga Peralatan
21,840.00
21,840.00
245,190.00
36,778.50
xD
281,968.50
ntai (1 buah)
Harga Satuan
(Rp)
6
50,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
1,500.00
11,500.00
11,500.00
1,725.00
13,225.00
MPa(K-100)
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
60,000.00
12,000.00
1,400.00
9,000.00
82,400.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
306,280.00
86,900.00
103,600.00
5,375.00
502,155.00
400,000.00
Jumlah Harga Peralatan
xD
100,000.00
100,000.00
684,555.00
102,683.25
787,238.25
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
umlah Harga Tenaga Kerja
5,000.00
750.00
5,750.00
45,925.00
10,000.00
140,000.00
Jumlah Harga Bahan
48,221.25
1,000.00
2,520.00
51,741.25
57,491.25
8,623.69
xD
08 '======================
66,114.94
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
650,000.00
umlah Harga Tenaga Kerja
12,500.00
1,875.00
16,250.00
30,625.00
150,000.00
710,251.50
12,000.00
12,000.00
5,000.00
Jumlah Harga Bahan
150,000.00
63,922.64
66,000.00
6,000.00
20,000.00
305,922.64
10,000.00
Jumlah Harga Peralatan
10,000.00
10,000.00
346,547.64
51,982.15
xD
398,529.78
082 '======================
082 '======================
Kode
Satuan
L.01
L.02
L.01
L.04
OH
OH
OH
OH
2.340
0.780
0.700
0.304
Jumlah Harga Tenaga Kerja
M.05
M.61
m3
kg
1.400
15.551
Jumlah Harga Bahan
Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor
Koefisien
Harga Satuan
(Rp)
Uraian
Bahan
Batu / batu belah
Kawat Bronjong dia 3 mm
Peralatan
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - bh (D+E)
15%
xD
Jumlah
(Rp)
7
-
AHSP.Pus Air.281
A.3
A.3.1
B.01
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.320
0.220
0.022
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
m3
m3
L
247
0.621
0.74
215
Jumlah Harga Bahan
Peralatan
B.02
B.02a
15%
1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Bahan
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.282
1
2
3
4
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
M.15
M.14.a
M.12
M.02
kg
m3
m3
L
247
0.621
0.74
215
Jumlah Harga Bahan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
m3
m3
L
247
0.621
0.74
215
Jumlah Harga Bahan
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
B.03
B.03a
Peralatan
1 Molen 0,35 m3
15%
1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
L.01
L.02
L.03
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
1.650
0.275
0.028
AHSP.Pus Air.283
Mandor
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
L.04
OH
0.165
Jumlah Harga Tenaga Kerja
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
276
828
1012
215
Jumlah Harga Bahan
B.04
B.04a
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
276
828
1012
215
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
15%
1 m3 beton mutu fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
Tenaga Kerja
AHSP.Pus Air.284
1
2
3
4
Pekerja
Tukang batu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
299
799
1017
215
Jumlah Harga Bahan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
299
799
1017
215
Jumlah Harga Bahan
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
B.05
B.05a
Peralatan
1 Molen
15%
1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66
Manual
No
Uraian
Kode
Satuan
Koefisien
AHSP.Pus Air.285
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
326
760
1029
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
326
760
1029
215
Jumlah Harga Bahan
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
B.06
Peralatan
1 Molen
1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61
15%
AHSP.Pus Air.286
B.06a
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
352
731
1031
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
352
731
1031
215
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
15%
AHSP.Pus Air.287
B.07
B.07a
1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
371
698
1047
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
371
698
1047
215
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
AHSP.Pus Air.288
D
E
F
B.08
B.08a
15%
1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
384
692
1039
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
384
692
1039
215
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.289
B.09
B.09a
Molen
E.28.b
Sewa-hari
D
E
F
0.250
Jumlah Harga Peralatan
15%
1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
406
684
1026
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B
1
2
3
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
M.15
M.14.a
M.12
kg
kg
kg
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
406
684
1026
AHSP.Pus Air.290
B.10
B.10a
Air
M.02
C
1
Peralatan
Molen
E.28.b
Sewa-hari
D
E
F
215
Jumlah Harga Bahan
0.250
Jumlah Harga Peralatan
15%
1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
0.275
0.028
0.165
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
413
681
1021
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Bahan
1.323
0.189
0.019
0.132
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.291
B.11
B.11a
1
2
3
4
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
C
1
Peralatan
Molen
E.28.b
Sewa-hari
D
E
F
413
681
1021
215
Jumlah Harga Bahan
0.250
Jumlah Harga Peralatan
15%
1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.100
0.350
0.035
0.210
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
439
670
1006
215
Jumlah Harga Bahan
Peralatan
B.11b
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
L.01
L.02
OH
OH
Tenaga Kerja
Pekerja
Tukang batu
1.680
0.240
AHSP.Pus Air.292
3
4
Kepala tukang
Mandor
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
D
E
F
B.12
B.12a
Peralatan
1 Molen
L.03
L.04
OH
OH
0.024
0.168
Jumlah Harga Tenaga Kerja
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
439
670
1006
215
Jumlah Harga Bahan
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
15%
1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48
Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2.100
0.350
0.035
0.210
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
448
667
1000
215
Jumlah Harga Bahan
Peralatan
15%
Menggunakan Molen
No
Uraian
Kode
Satuan
Koefisien
1
A
Tenaga Kerja
AHSP.Pus Air.293
B.13
B.13.a
1
2
3
4
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.680
0.240
0.024
0.168
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
M.15
M.14.a
M.12
M.02
kg
kg
kg
L
448
667
1000
215
Jumlah Harga Bahan
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0.250
Jumlah Harga Peralatan
D
E
F
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.000
0.250
0.025
0.100
Jumlah Harga Tenaga Kerja
B
1
Bahan *
Campuran Beton Ready Mixed
M.09.x
m3
1.02
Jumlah Harga Bahan
E.35
Sewa-hari
0.120
Jumlah Harga Peralatan
D
E
F
*
B.13.b
15%
Peralatan
1 Pompa dan conveyor beton
15%
AHSP.Pus Air.294
Semua tipe mutu beton dapat menggunakan bahan aditif, kebutuhan dan waktu serta pelaksana
dengan spesifikasi teknik dari pabrik pembuat bahan aditifnya. Prosedur pencampurannya di
pencampuran bahan, dan sebagai contoh untuk bahan aditif pengerasan dibutuhkan 1,2 L/m.
admixture sebagai bahan kimia tambahan untuk berbagai keperluan diantaranya:
-Meningkatkan kinerja kelecakan (kematangan) adukan beton tanpa menambah air;
-Mengurangi penggunaan air dalam campuran beton tanpa mengurangi kelecakan;
-Mempercepat pengikatan hidrasi semen atau pengerasan beton;
-Memperlambat pengikatan hidrasi semen atau pengerasan beton;
-Meningkatkan kinerja kemudahan pemompaan beton;
-Mengurangi kecepatan terjadinya slump loss;
-Mengurangi susut beton atau memberikan sedikit pengembangan volume beton (ekspansi);
-Mengurangi terjadinya bleeding;
-Mengurangi terjadinya segregasi.
B.13.b
Uraian
Kode
Satuan
Koefisien
1
A
Tenaga Kerja
Bahan
Bahan Aditif *
Peralatan
M.03
1.2
Jumlah Harga Bahan
A.3.2
B.14
B.14.a
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.410
0.041
Jumlah Harga Tenaga Kerja
Peralatan
AHSP.Pus Air.295
15%
B.14.b
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal)
B.14.b.1) Manual
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.500
0.050
Jumlah Harga Tenaga Kerja
Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.200
0.020
Jumlah Harga Tenaga Kerja
B.15
B.15a
C
1
Peralatan
Pompa dan Conveyor beton
D
E
F
E.35
Sewa-hari
0.120
Jumlah Harga Peralatan
15%
Penggunaan vibrator
Vibrator
No
Uraian
Kode
Satuan
Koefisien
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
AHSP.Pus Air.296
0.250
0.025
Jumlah Harga Tenaga Kerja
B.15b
C
1
Peralatan
Vibrator
D
E
F
E.47
Sewa-hari
0.100
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.500
0.050
Jumlah Harga Tenaga Kerja
B.16
B.16a
C
1
Peralatan
Vibrator
D
E
F
E.47
Sewa-hari
0.100
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.250
0.025
Jumlah Harga Tenaga Kerja
Peralatan
AHSP.Pus Air.297
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.200
0.020
Jumlah Harga Tenaga Kerja
A.3.3
B.17
C
1
Peralatan
Pompa dan conveyor beton
D
E
F
E.35
Sewa-hari
0.120
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang besi
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.700
0.700
0.070
0.070
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Besi Beton (polos/ulir)
Kawat Ikat
M.55.d
M.60
kg
kg
105
1.5
Jumlah Harga Bahan
Peralatan
15%
AHSP.Pus Air.298
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang besi
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.250
0.250
0.025
0.025
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Wiremesh
Kawat Ikat
M.94.a
M.60
kg
kg
102
0.5
Jumlah Harga Bahan
Peralatan
B.20
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang besi
Kepala Tukang besi
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.500
0.500
0.050
0.050
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Kabel prestres
Besi beton
Kawat beton
M.59
M.55.d
M.60
kg
kg
kg
105
12.5
1
Jumlah Harga Bahan
C
1
Peralatan
Jack Tension/stressing
E.15
Sewa-hari
0.150
Jumlah Harga Peralatan
D
E
F
15%
Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikkan 100 kg tulang
vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan
AHSP.Pus Air.299
B.20a
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
L.01
L.02
L.04
OH
OH
OH
Bahan
0.300
0.100
0.030
Jumlah Harga Tenaga Kerja
Peralatan
B.20b
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
L.01
L.02
L.04
OH
OH
OH
Bahan
0.200
0.040
0.020
Jumlah Harga Tenaga Kerja
B.20c
C
1
Peralatan
Crane*
D
E
F
E.07.a
Sewa-hari
0.025
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
L.01
OH
Tenaga Kerja
Pekerja
0.300
AHSP.Pus Air.300
2
3
Tukang besi
Mandor
Bahan
L.02
L.04
OH
OH
0.100
0.030
Jumlah Harga Tenaga Kerja
B.20d
C
1
Peralatan
Crane*
D
E
F
E.07.a
Sewa-hari
0.025
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
L.01
L.02
L.04
OH
OH
OH
Bahan
0.300
0.100
0.030
Jumlah Harga Tenaga Kerja
A.3.4
B.21
C
1
Peralatan
Lift*
D
E
F
E.23
Sewa-hari
0.025
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.500
0.250
0.025
0.050
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.301
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
M.38.d
M.33.d
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0135
0.25
0.2
Jumlah Harga Bahan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,020 (Kaso)
B.22
1 m2 Bekisting untuk lantai permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa peranc
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.600
0.300
0.030
0.060
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.35.e
M.37.a
M.65.b
M.129
m3
m3
kg
L
0.028
0.0135
0.4
0.2
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,040 (papan) dan 0,020 (Kaso)
B.23
Uraian
Kode
Satuan
Koefisien
AHSP.Pus Air.302
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.200
0.600
0.099
0.120
Jumlah Harga Tenaga Kerja
M.38.d
M.37.a
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0169
0.35
0.2
Jumlah Harga Bahan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,025 (Kaso)
B.24
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.800
0.800
0.080
0.080
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm
M.37.a
M.65.b
m3
kg
0.0567
0.35
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan dapat digunakan untuk yang ke-1 sebanyak 0,10 , ke-2, menjadi 0,0675 dan ke-3 menjadi 0,0
Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, m
tinggi 2m, maka digunakan koefisien 2/4 x 0,10 = 50% x 0,10 yaitu 0,05 m3 kayu kaso 5/7.
AHSP.Pus Air.303
B.25
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.000
1.000
0.100
0.100
Jumlah Harga Tenaga Kerja
Bahan
1
2
M.31.b
M.65.b
btg
kg
3.4
0.35
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan dapat digunakan untuk yang ke-1 sebanyak 6 batang, ke-2, menjadi 4 batang dan ke-3 menja
Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, m
tinggi 2m, maka digunakan koefisien 2/4 x 6 = 50% x 6 yaitu 3 batang kayu dolken 8-10 cm.
B.26
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.600
0.300
0.030
0.060
Jumlah Harga Tenaga Kerja
B
1
2
4
5
Bahan *
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.38.d
M.37.a
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0945
0.35
0.2
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.304
E
F
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,140 (Kaso)
B.27
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.600
0.600
0.060
0.060
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm
M.37.a
M.65.b
m3
kg
0.0945
0.35
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan dapat digunakan untuk yang ke-1 sebanyak 0,14 , ke-2, menjadi 0,0945 dan ke-3 menjadi 0,0
Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, m
tinggi 2m, maka digunakan koefisien 2/4 x 0,14 = 50% x 0,14 yaitu 0,07 m3 kayu kaso 5/7.
B.28
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.660
0.660
0.066
0.066
Jumlah Harga Tenaga Kerja
Bahan
M.31.b
M.65.b
btg
kg
4
0.35
Jumlah Harga Bahan
AHSP.Pus Air.305
Peralatan
15%
CATATAN: * Bahan dapat digunakan untuk yang ke-1 sebanyak 6 batang, ke-2, menjadi 4 batang dan ke-3 menja
Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, m
tinggi 2m, maka digunakan koefisien 2/4 x 6 = 50% x 6 yaitu 3 batang kayu dolken 8-10 cm.
B.29
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.600
0.300
0.030
0.060
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.38.d
M.37.a
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0945
0.25
0.2
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,140 (Kaso)
B.30
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.660
0.330
0.033
0.066
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.306
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
M.35.e
M.37.a
M.65.b
M.129
m3
m3
kg
L
0.028
0.122
0.4
0.2
Jumlah Harga Bahan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,040 (papan) dan 0,180 (Kaso)
B.31
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.560
0.280
0.028
0.056
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.38.d
M.37.a
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0945
0.25
0.2
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,140 (Kaso)
B.32
Uraian
Kode
Satuan
Koefisien
AHSP.Pus Air.307
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
Peralatan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.620
0.310
0.031
0.062
Jumlah Harga Tenaga Kerja
M.35.e
M.37.a
M.65.b
M.129
m3
m3
kg
L
0.028
0.122
0.4
0.2
Jumlah Harga Bahan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,040 (papan) dan 0,180 (Kaso)
B.33
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.480
0.240
0.024
0.048
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.38.d
M.37.a
M.65.b
M.129
lbr
m3
kg
L
0.245
0.0945
0.25
0.2
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,35 (multiflex) dan 0,140 (Kaso)
AHSP.Pus Air.308
B.34
1 m2 Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.540
0.270
0.027
0.054
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting
M.35.e
M.37.a
M.65.b
M.129
m3
m3
kg
L
0.028
0.122
0.4
0.2
Jumlah Harga Bahan
Peralatan
15%
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,040 (papan) dan 0,180 (Kaso)
B.35
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.040
0.004
Jumlah Harga Tenaga Kerja
Peralatan
15%
AHSP.Pus Air.309
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.100
0.010
Jumlah Harga Tenaga Kerja
Peralatan
A.3.5
B.37
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.800
0.040
Jumlah Harga Tenaga Kerja
B
1
Bahan
Air
M.02
m3
5.0
Jumlah Harga Bahan
Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
0.800
0.080
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.310
Karung goni
Peralatan
M.123.b
m2
102
Jumlah Harga Bahan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
2.000
0.100
Jumlah Harga Tenaga Kerja
B
1
Bahan
Air
M.02
m3
20.0
Jumlah Harga Bahan
Peralatan
A.3.6
B.39
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
L.01
L.04
OH
OH
M.118
1.2
Jumlah Harga Bahan
E.30
E.12
E.29
E.29
bh
bh
bh
bh
0.02
0.1
0.03
0.05
Jumlah Harga Peralatan
C
1
2
3
4
Tenaga Kerja
Pekerja
Mandor
Bahan *)
Cuka Bibit
Peralatan *)
Palu / Godam
Gergaji Besi
Pahat Beton (Baja keras)
Linggis (Baja keras)
3.600
0.360
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.311
D
E
F
B.40
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
1.200
0.120
Jumlah Harga Tenaga Kerja
B.41
C
1
Peralatan
Jack Hammer
D
E
F
E.14
Sewa-hari
0.16
Jumlah Harga Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.060
0.030
0.003
0.006
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Water Stop PVC lebar 150 mm
Kawat Beton
M.144.a
M.60
m
kg
1.05
0.01
Jumlah Harga Bahan
Peralatan
15%
AHSP.Pus Air.312
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
0.035
0.0035
0.0070
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Water Stop PVC lebar 200 mm
Kawat Beton
M.144.b
M.60
m
kg
1.05
0.01
Jumlah Harga Bahan
Peralatan
15%
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.080
0.040
0.004
0.008
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Water Stop PVC lebar 230-320 mm
Kawat Beton
M.144.c
M.60
m
kg
1.05
0.01
Jumlah Harga Bahan
Peralatan
15%
Uraian
Kode
Satuan
Koefisien
AHSP.Pus Air.313
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor
B
1
2
Bahan
Rubber Water Stop lebar 150-200 mm
Kawat Beton
Peralatan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0700
0.0350
0.0035
0.0070
Jumlah Harga Tenaga Kerja
M.144.d
M.60
m
kg
1.05
0.02
Jumlah Harga Bahan
AHSP.Pus Air.314
15%
AHSP.Pus Air.315
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,000.00
13,200.00
1,540.00
9,900.00
90,640.00
1,240.00
140,000.00
140,000.00
25.00
Jumlah Harga Bahan
306,280.00
86,940.00
103,600.00
5,375.00
502,195.00
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
82,500.00
16,500.00
1,925.00
12,375.00
113,300.00
AHSP.Pus Air.316
1,240.00
140,000.00
140,000.00
25.00
Jumlah Harga Bahan
306,280.00
86,940.00
103,600.00
5,375.00
502,195.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,922.50
88,742.50
1,240.00
140,000.00
140,000.00
25.00
Jumlah Harga Bahan
306,280.00
86,940.00
103,600.00
5,375.00
502,195.00
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
690,937.50
103,640.63
794,578.13
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
70,000.00
Jumlah
(Rp)
7
82,500.00
16,500.00
1,960.00
AHSP.Pus Air.317
75,000.00
Jumlah Harga Tenaga Kerja
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
342,240.00
82,800.00
104,948.15
5,375.00
535,363.15
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
342,240.00
82,800.00
104,948.15
5,375.00
535,363.15
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
724,083.15
108,612.47
832,695.62
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
AHSP.Pus Air.318
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
370,760.00
79,900.00
105,466.67
5,375.00
561,501.67
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
370,760.00
79,900.00
105,466.67
5,375.00
561,501.67
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
750,221.67
112,533.25
862,754.92
xD
Harga Satuan
(Rp)
Jumlah
(Rp)
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
404,240.00
76,000.00
106,711.11
5,375.00
592,326.11
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,922.50
88,742.50
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
404,240.00
76,000.00
106,711.11
5,375.00
592,326.11
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
781,068.61
117,160.29
898,228.90
xD
AHSP.Pus Air.319
AHSP.Pus Air.320
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
436,480.00
73,100.00
106,918.52
5,375.00
621,873.52
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,922.50
88,742.50
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
436,480.00
73,100.00
106,918.52
5,375.00
621,873.52
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
810,616.02
121,592.40
932,208.42
xD
01 '======================
AHSP.Pus Air.321
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
460,040.00
69,800.00
108,577.78
5,375.00
643,792.78
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
460,040.00
69,800.00
108,577.78
5,375.00
643,792.78
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
AHSP.Pus Air.322
832,512.78
124,876.92
957,389.69
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
476,160.00
69,200.00
107,748.15
5,375.00
658,483.15
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
476,160.00
69,200.00
107,748.15
5,375.00
658,483.15
AHSP.Pus Air.323
400,000.00
Jumlah Harga Peralatan
xD
Harga Satuan
(Rp)
6
100,000.00
100,000.00
847,203.15
127,080.47
974,283.62
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
503,440.00
68,400.00
106,400.00
5,375.00
683,615.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
1,240.00
100.00
103.70
503,440.00
68,400.00
106,400.00
AHSP.Pus Air.324
25.00
Jumlah Harga Bahan
5,375.00
683,615.00
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
872,335.00
130,850.25
1,003,185.25
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
82,500.00
16,500.00
1,960.00
12,375.00
113,335.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
512,120.00
68,100.00
105,881.48
5,375.00
691,476.48
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
66,150.00
11,340.00
1,330.00
9,900.00
88,720.00
AHSP.Pus Air.325
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
512,120.00
68,100.00
105,881.48
5,375.00
691,476.48
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
880,196.48
132,029.47
1,012,225.95
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
105,000.00
21,000.00
2,450.00
15,750.00
144,200.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
544,360.00
67,000.00
104,325.93
5,375.00
721,060.93
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
Jumlah
(Rp)
7
84,000.00
14,400.00
02 '======================
AHSP.Pus Air.326
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
1,680.00
12,600.00
112,680.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
544,360.00
67,000.00
104,325.93
5,375.00
721,060.93
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
933,740.93
140,061.14
1,073,802.06
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
105,000.00
21,000.00
2,450.00
15,750.00
144,200.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
555,520.00
66,700.00
103,703.70
5,375.00
731,298.70
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
AHSP.Pus Air.327
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
84,000.00
14,400.00
1,680.00
12,600.00
112,680.00
1,240.00
100.00
103.70
25.00
Jumlah Harga Bahan
555,520.00
66,700.00
103,703.70
5,375.00
731,298.70
400,000.00
Jumlah Harga Peralatan
100,000.00
100,000.00
943,978.70
141,596.81
1,085,575.51
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
50,000.00
15,000.00
1,750.00
7,500.00
74,250.00
875,000.00
Jumlah Harga Bahan
892,500.00
892,500.00
200,000.00
Jumlah Harga Peralatan
24,000.00
24,000.00
990,750.00
148,612.50
1,139,362.50
xD
AHSP.Pus Air.328
menambah air;
gi kelecakan;
Harga Satuan
(Rp)
Jumlah
(Rp)
35,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan
42,000.00
6,300.00
48,300.00
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah
(Rp)
7
20,500.00
3,075.00
23,575.00
AHSP.Pus Air.329
xD
m (horizontal)
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
25,000.00
3,750.00
28,750.00
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
1,500.00
11,500.00
Harga Satuan
(Rp)
24,000.00
24,000.00
35,500.00
5,325.00
40,825.00
Jumlah
(Rp)
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
AHSP.Pus Air.330
7
12,500.00
1,875.00
14,375.00
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
13,475.00
13,475.00
27,850.00
4,177.50
32,027.50
Jumlah
(Rp)
7
25,000.00
3,750.00
28,750.00
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
13,475.00
13,475.00
42,225.00
6,333.75
48,558.75
Jumlah
(Rp)
7
12,500.00
1,875.00
14,375.00
03 '======================
AHSP.Pus Air.331
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
1,500.00
11,500.00
Harga Satuan
(Rp)
6
24,000.00
24,000.00
35,500.00
5,325.00
40,825.00
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
35,000.00
42,000.00
4,900.00
5,250.00
87,150.00
9,000.00
15,000.00
Jumlah Harga Bahan
945,000.00
22,500.00
967,500.00
1,054,650.00
158,197.50
1,212,847.50
AHSP.Pus Air.332
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
12,500.00
15,000.00
1,750.00
1,875.00
31,125.00
24,750.00
15,000.00
Jumlah Harga Bahan
2,524,500.00
7,500.00
2,532,000.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
25,000.00
30,000.00
3,500.00
3,750.00
62,250.00
36,500.00
9,000.00
15,000.00
Jumlah Harga Bahan
3,832,500.00
112,500.00
15,000.00
3,960,000.00
135,000.00
Jumlah Harga Peralatan
20,250.00
20,250.00
4,042,500.00
606,375.00
4,648,875.00
xD
AHSP.Pus Air.333
Harga Satuan
(Rp)
6
50,000.00
60,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
15,000.00
6,000.00
2,250.00
23,250.00
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
10,000.00
2,400.00
1,500.00
13,900.00
Harga Satuan
(Rp)
6
50,000.00
5,000.00
5,000.00
18,900.00
2,835.00
21,735.00
Jumlah
(Rp)
7
15,000.00
AHSP.Pus Air.334
60,000.00
75,000.00
Jumlah Harga Tenaga Kerja
6,000.00
2,250.00
23,250.00
5,000.00
5,000.00
28,250.00
4,237.50
32,487.50
xD
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
75,000.00
Jumlah Harga Tenaga Kerja
15,000.00
6,000.00
2,250.00
23,250.00
8,500.00
8,500.00
31,750.00
4,762.50
36,512.50
xD
Jumlah
(Rp)
7
25,000.00
15,000.00
1,750.00
3,750.00
45,500.00
AHSP.Pus Air.335
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
18,900.00
3,125.00
8,000.00
63,100.00
xD
04 '======================
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
30,000.00
18,000.00
2,100.00
4,500.00
54,600.00
1,500,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
42,000.00
18,900.00
5,000.00
8,000.00
73,900.00
xD
Jumlah
(Rp)
7
AHSP.Pus Air.336
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
60,000.00
36,000.00
6,930.00
9,000.00
111,930.00
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
23,660.00
4,375.00
8,000.00
69,110.00
xD
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
40,000.00
48,000.00
5,600.00
6,000.00
99,600.00
1,400,000.00
12,500.00
Jumlah Harga Bahan
79,380.00
4,375.00
83,755.00
183,355.00
27,503.25
210,858.25
AHSP.Pus Air.337
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
50,000.00
60,000.00
7,000.00
7,500.00
124,500.00
70,250.00
12,500.00
Jumlah Harga Bahan
238,850.00
4,375.00
243,225.00
xD
mm (tanpa perancah)
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
30,000.00
18,000.00
2,100.00
4,500.00
54,600.00
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
132,300.00
4,375.00
8,000.00
177,750.00
AHSP.Pus Air.338
xD
34,852.50
267,202.50
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
30,000.00
36,000.00
4,200.00
4,500.00
74,700.00
1,400,000.00
12,500.00
Jumlah Harga Bahan
132,300.00
4,375.00
136,675.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
33,000.00
39,600.00
4,620.00
4,950.00
82,170.00
70,250.00
12,500.00
Jumlah Harga Bahan
281,000.00
4,375.00
285,375.00
AHSP.Pus Air.339
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
30,000.00
18,000.00
2,100.00
4,500.00
54,600.00
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
132,300.00
3,125.00
8,000.00
176,500.00
xD
Harga Satuan
(Rp)
6
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
33,000.00
19,800.00
2,310.00
4,950.00
60,060.00
AHSP.Pus Air.340
1,500,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
42,000.00
170,800.00
5,000.00
8,000.00
225,800.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
28,000.00
16,800.00
1,960.00
4,200.00
50,960.00
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
132,300.00
3,125.00
8,000.00
176,500.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
05 '======================
AHSP.Pus Air.341
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
31,000.00
18,600.00
2,170.00
4,650.00
56,420.00
1,500,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
42,000.00
170,800.00
5,000.00
8,000.00
225,800.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
24,000.00
14,400.00
1,680.00
3,600.00
43,680.00
135,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
33,075.00
132,300.00
3,125.00
8,000.00
176,500.00
220,180.00
33,027.00
253,207.00
AHSP.Pus Air.342
Harga Satuan
(Rp)
Jumlah
(Rp)
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
27,000.00
16,200.00
1,890.00
4,050.00
49,140.00
1,500,000.00
1,400,000.00
12,500.00
40,000.00
Jumlah Harga Bahan
42,000.00
170,800.00
5,000.00
8,000.00
225,800.00
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
2,000.00
300.00
2,300.00
2,300.00
345.00
2,645.00
AHSP.Pus Air.343
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
5,000.00
750.00
5,750.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
40,000.00
3,000.00
43,000.00
25,000.00
Jumlah Harga Bahan
125,000.00
125,000.00
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
40,000.00
6,000.00
46,000.00
AHSP.Pus Air.344
3,500.00
Jumlah Harga Bahan
357,000.00
357,000.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
100,000.00
7,500.00
107,500.00
25,000.00
Jumlah Harga Bahan
500,000.00
500,000.00
xD
==============================
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
180,000.00
27,000.00
207,000.00
25,000.00
Jumlah Harga Bahan
30,000.00
30,000.00
100,000.00
17,500.00
225,000.00
225,000.00
Jumlah Harga Peralatan
2,000.00
1,750.00
6,750.00
11,250.00
21,750.00
AHSP.Pus Air.345
258,750.00
38,812.50
297,562.50
xD
Harga Satuan
(Rp)
6
50,000.00
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
60,000.00
9,000.00
69,000.00
Harga Satuan
(Rp)
6
21,600.00
21,600.00
90,600.00
13,590.00
104,190.00
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
3,000.00
1,800.00
210.00
450.00
5,460.00
75,000.00
15,000.00
Jumlah Harga Bahan
78,750.00
150.00
78,900.00
84,360.00
12,654.00
97,014.00
06 '======================
AHSP.Pus Air.346
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
3,500.00
2,100.00
245.00
525.00
6,370.00
90,000.00
15,000.00
Jumlah Harga Bahan
94,500.00
150.00
94,650.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
4,000.00
2,400.00
280.00
600.00
7,280.00
115,000.00
15,000.00
Jumlah Harga Bahan
120,750.00
150.00
120,900.00
xD
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
AHSP.Pus Air.347
50,000.00
60,000.00
70,000.00
75,000.00
Jumlah Harga Tenaga Kerja
3,500.00
2,100.00
245.00
525.00
6,370.00
125,000.00
15,000.00
Jumlah Harga Bahan
131,250.00
300.00
131,550.00
AHSP.Pus Air.348
137,920.00
20,688.00
158,608.00
064 '======================
A.4
A.4.1
F.01
F.02
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Tiang Pancang kayu dia 15-20 cm
M.42.b
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang
E.45
E.01.b
E.02.c
Sewa-hari
Sewa-hari
bh
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.2496
50,000.00
0.0312
60,000.00
0.0250
75,000.00
Jumlah Harga Tenaga Kerja
12,480.00
1,872.00
1,872.00
16,224.00
1.05
42,000.00
Jumlah Harga Bahan
44,100.00
44,100.00
0.0312
450,000.00
0.0312
750,000.00
0.2500
25,000.00
Jumlah Harga Peralatan
14,040.00
23,400.00
6,250.00
43,690.00
104,014.00
15,602.10
119,616.10
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.02
L.04
OH
OH
OH
OH
0.1680
50,000.00
0.0210
60,000.00
0.0210
60,000.00
0.0168
75,000.00
Jumlah Harga Tenaga Kerja
8,400.00
1,260.00
1,260.00
1,260.00
12,180.00
1.02
500,000.00
0.15
24,750.00
Jumlah Harga Bahan
510,000.00
3,712.50
513,712.50
0.0210
450,000.00
0.0210
750,000.00
0.0210
385,000.00
Jumlah Harga Peralatan
9,450.00
15,750.00
8,085.00
33,285.00
559,177.50
83,876.63
643,054.13
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang tembok
Tukang las listrik
Mandor
B
1
2
Bahan
Tiang Pancang baja dia/kotak 30 cm
Kawat las listrik
M.92.a
M.62
m
kg
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Las listrik diesel (termasuk solar)
E.45
E.01.b
E.22
Sewa-hari
Sewa-hari
Sewa-hari
D
E
F
15% x D
F.03
F.04
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.18.c
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang
E.45
E.01.b
E.02.a
Sewa-hari
Sewa-hari
bh
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.2500
50,000.00
0.0312
60,000.00
0.0250
75,000.00
Jumlah Harga Tenaga Kerja
12,500.00
1,872.00
1,875.00
16,247.00
1.03
315,000.00
Jumlah Harga Bahan
324,450.00
324,450.00
0.0312
450,000.00
0.0312
750,000.00
0.2500
200,000.00
Jumlah Harga Peralatan
14,040.00
23,400.00
50,000.00
87,440.00
428,137.00
64,220.55
492,357.55
15% x D
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.18.f
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang
E.45
E.01.b
E.02.a
Sewa-hari
Sewa-hari
bh
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.4208
50,000.00
0.0526
60,000.00
0.0421
75,000.00
Jumlah Harga Tenaga Kerja
21,040.00
3,156.00
3,157.50
27,353.50
1.03
240,000.00
Jumlah Harga Bahan
247,200.00
247,200.00
0.0526
450,000.00
0.0526
750,000.00
0.2500
200,000.00
Jumlah Harga Peralatan
23,670.00
39,450.00
50,000.00
113,120.00
387,673.50
58,151.03
445,824.53
15% x D
0.2496
8.012821
F.05
F.06
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.31.a
E.45
E.01.b
E.02.c
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
Bahan
1 Kayu dolken dia 10 cm
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.400
50,000.00
0.050
60,000.00
0.040
75,000.00
Jumlah Harga Tenaga Kerja
20,000.00
3,000.00
3,000.00
26,000.00
10.50
38,333.33
Jumlah Harga Bahan
402,500.00
402,500.00
Sewa-hari
Sewa-hari
bh
0.050
450,000.00
0.050
750,000.00
0.250
25,000.00
Jumlah Harga Peralatan
22,500.00
37,500.00
6,250.00
66,250.00
494,750.00
74,212.50
568,962.50
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang
D
E
F
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor
L.01
L.02
L.02
L.04
OH
OH
OH
OH
B
1
Bahan
Turap baja profi larsen lebar 350 mm
M.93
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Las listrik diesel (termasuk solar)
E.45
E.01.b
E.22
Sewa-hari
Sewa-hari
Sewa-hari
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.1664
50,000.00
0.0208
60,000.00
0.0208
60,000.00
0.0166
75,000.00
Jumlah Harga Tenaga Kerja
8,320.00
1,248.00
1,248.00
1,245.00
12,061.00
1.05
140,000.00
Jumlah Harga Bahan
147,000.00
147,000.00
0.0208
450,000.00
0.0208
750,000.00
0.0208
385,000.00
Jumlah Harga Peralatan
9,360.00
15,600.00
8,008.00
32,968.00
192,029.00
28,804.35
220,833.35
15% x D
F.07
F.08
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.19.a
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton
E.45
E.01.b
E.02.b
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.1336
50,000.00
0.0167
60,000.00
0.0134
75,000.00
Jumlah Harga Tenaga Kerja
6,680.00
1,002.00
1,005.00
8,687.00
1.030
55,000.00
Jumlah Harga Bahan
56,650.00
56,650.00
Sewa-hari
Sewa-hari
bh
0.0167
450,000.00
0.0167
750,000.00
0.2500
100,000.00
Jumlah Harga Peralatan
7,515.00
12,525.00
25,000.00
45,040.00
110,377.00
16,556.55
126,933.55
15% x D
F.09
Uraian
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Turap beton tulang pre-cast 40x15 cm
M.19.d
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton
E.45
E.01.b
E.02.b
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.200
50,000.00
0.025
60,000.00
0.020
75,000.00
Jumlah Harga Tenaga Kerja
10,000.00
1,500.00
1,500.00
13,000.00
1.030
210,000.00
Jumlah Harga Bahan
216,300.00
216,300.00
Sewa-hari
Sewa-hari
bh
0.025
450,000.00
0.025
750,000.00
0.25
100,000.00
Jumlah Harga Peralatan
11,250.00
18,750.00
25,000.00
55,000.00
284,300.00
42,645.00
326,945.00
15% x D
Turap
Bertulang
Pre-cast
(50beton
x 22 cm)
Per-m' Beton
panjang
pemancangan
turap
bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-satuan 1
ton daya dukung tiang pancang beban normal
No
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang tembok
Mandor
B
1
Bahan
Turap beton tulang pre-cast 40x15 cm
M.19.d
C
1
2
3
Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton
E.45
E.01.b
E.02.b
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.3336
50,000.00
0.0417
60,000.00
0.0334
75,000.00
Jumlah Harga Tenaga Kerja
16,680.00
2,502.00
2,505.00
21,687.00
1.030
210,000.00
Jumlah Harga Bahan
216,300.00
216,300.00
Sewa-hari
Sewa-hari
bh
0.0417
450,000.00
0.0417
750,000.00
0.2500
100,000.00
Jumlah Harga Peralatan
18,765.00
31,275.00
25,000.00
75,040.00
313,027.00
46,954.05
359,981.05
15% x D
A.4.2
F.10
F.11
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator
B
1
Bahan
Tiang Pancang kayu dia 15-20 cm
M.42.b
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.c
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.0520
50,000.00
0.0104
60,000.00
0.0052
75,000.00
0.0104
100,000.00
0.0104
50,000.00
Jumlah Harga Tenaga Kerja
2,600.00
624.00
390.00
1,040.00
520.00
5,174.00
1.050
42,000.00
Jumlah Harga Bahan
44,100.00
44,100.00
Sewa-jam
Sewa-jam
bh
0.0728
455,000.00
0.0728
210,000.00
0.2500
25,000.00
Jumlah Harga Peralatan
33,124.00
15,288.00
6,250.00
54,662.00
103,936.00
15,590.40
119,526.40
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
OH
0.0345
50,000.00
0.0069
60,000.00
0.0069
60,000.00
0.0035
75,000.00
0.0069
100,000.00
0.0069
50,000.00
Jumlah Harga Tenaga Kerja
1,725.00
414.00
414.00
258.75
690.00
345.00
3,846.75
1
A
1
2
3
4
5
6
Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor
Operator Crane
Pembantu operator
B
1
2
Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik
M.92.a
M.62
m
kg
1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan
505,000.00
3,712.50
508,712.50
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Las listrik diesel (termasuk solar)
E.07.b
E.01.d
E.22
Sewa-jam
Sewa-jam
Sewa-jam
0.0483
455,000.00
0.0483
210,000.00
0.0483
55,000.00
Jumlah Harga Peralatan
D
E
F
21,976.50
10,143.00
2,656.50
34,776.00
547,335.25
82,100.29
629,435.54
15% x D
F.12
F.13
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu operator
B
1
Bahan
Tiang Pancang beton tulang 30x30 cm
M.18.c
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.a
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.0520
50,000.00
0.0104
60,000.00
0.0052
75,000.00
0.0104
100,000.00
0.0104
50,000.00
Jumlah Harga Tenaga Kerja
2,600.00
624.00
390.00
1,040.00
520.00
5,174.00
1.030
315,000.00
Jumlah Harga Bahan
324,450.00
324,450.00
Sewa-jam
Sewa-jam
bh
0.0728
455,000.00
0.0728
210,000.00
0.250
200,000.00
Jumlah Harga Peralatan
33,124.00
15,288.00
50,000.00
98,412.00
428,036.00
64,205.40
492,241.40
15% x D
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu operator
B
1
Bahan
Tiang Pancang beton tulang 40x40 cm
M.18.d
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.b
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.0945
50,000.00
0.0189
60,000.00
0.0095
75,000.00
0.0189
100,000.00
0.0189
50,000.00
Jumlah Harga Tenaga Kerja
4,725.00
1,134.00
712.50
1,890.00
945.00
9,406.50
1.030
550,000.00
Jumlah Harga Bahan
566,500.00
566,500.00
Sewa-jam
Sewa-jam
bh
0.1323
455,000.00
0.1323
210,000.00
0.2500
100,000.00
Jumlah Harga Peralatan
60,196.50
27,783.00
25,000.00
112,979.50
688,886.00
103,332.90
792,218.90
15% x D
F.14
F.15
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator
B
1
Bahan
Kayu dolken dia 8 - 10 cm
M.31.a
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.c
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.0835
50,000.00
0.0167
60,000.00
0.0084
75,000.00
0.0167
100,000.00
0.0167
50,000.00
Jumlah Harga Tenaga Kerja
4,175.00
1,002.00
630.00
1,670.00
835.00
8,312.00
1.050
38,333.33
Jumlah Harga Bahan
40,250.00
40,250.00
Sewa-jam
Sewa-jam
bh
0.1169
455,000.00
0.1169
210,000.00
0.2500
25,000.00
Jumlah Harga Peralatan
53,189.50
24,549.00
6,250.00
83,988.50
132,550.50
19,882.58
152,433.08
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
5
6
Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor
Operator Crane
Pembatu operator
L.01
L.02
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
OH
B
1
Bahan
Turap baja profi larsen lebar 350 mm
M.93
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Las listrik diesel (termasuk solar)
E.07.b
E.01.d
E.22
D
E
F
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.0345
50,000.00
0.0069
60,000.00
0.0069
60,000.00
0.0034
75,000.00
0.0069
100,000.00
0.0069
50,000.00
Jumlah Harga Tenaga Kerja
1,725.00
414.00
414.00
255.00
690.00
345.00
3,843.00
1.050
140,000.00
Jumlah Harga Bahan
147,000.00
147,000.00
Sewa-jam
Sewa-jam
Sewa-jam
0.0483
455,000.00
0.0483
210,000.00
0.0483
55,000.00
Jumlah Harga Peralatan
21,976.50
10,143.00
2,656.50
34,776.00
185,619.00
27,842.85
213,461.85
15% x D
F.16
F.17
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembatu operator
B
1
Bahan
Turap beton tulang pre-cast 30x12 cm
M.19.c
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung turap
E.07.b
E.01.d
E.02.b
D
E
F
Jumlah
(Rp)
7
0.0280
50,000.00
0.0056
60,000.00
0.0028
75,000.00
0.0056
100,000.00
0.0056
50,000.00
Jumlah Harga Tenaga Kerja
1,400.00
336.00
210.00
560.00
280.00
2,786.00
1.030
125,000.00
Jumlah Harga Bahan
128,750.00
128,750.00
Sewa-jam
Sewa-jam
bh
0.0392
455,000.00
0.0392
210,000.00
0.250
100,000.00
Jumlah Harga Peralatan
17,836.00
8,232.00
25,000.00
51,068.00
182,604.00
27,390.60
209,994.60
15% x D
F.18
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
0.0415
50,000.00
0.0083
60,000.00
0.0042
75,000.00
0.0083
100,000.00
0.0083
50,000.00
Jumlah Harga Tenaga Kerja
2,075.00
498.00
315.00
830.00
415.00
4,133.00
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator
B
1
Bahan
Turap beton tulang pre-cast 40x15 cm
M.19.d
m'
1.030
210,000.00
Jumlah Harga Bahan
216,300.00
216,300.00
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.b
Sewa-jam
Sewa-jam
bh
0.0581
455,000.00
0.0581
210,000.00
0.250
100,000.00
Jumlah Harga Peralatan
D
E
F
26,435.50
12,201.00
25,000.00
63,636.50
284,069.50
42,610.43
326,679.93
15% x D
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.04
L.05
L.06
OH
OH
OH
OH
OH
1
A
1
2
3
4
5
Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator
B
1
Bahan
Turap beton tulang pre-cast 50x22 cm
M.19.e
C
1
2
3
Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang
E.07.b
E.01.d
E.02.a
D
E
Jumlah
(Rp)
7
0.0700
50,000.00
0.0140
60,000.00
0.0070
75,000.00
0.0140
100,000.00
0.0140
50,000.00
Jumlah Harga Tenaga Kerja
3,500.00
840.00
525.00
1,400.00
700.00
6,965.00
1.050
385,000.00
Jumlah Harga Bahan
404,250.00
404,250.00
Sewa-jam
Sewa-jam
bh
0.098
455,000.00
0.098
210,000.00
0.250
200,000.00
Jumlah Harga Peralatan
44,590.00
20,580.00
50,000.00
115,170.00
526,385.00
78,957.75
15% x D
605,342.75
AHSP.Pus Air.357
A.1
D.01
D.01a
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0.040
50,000.00
0.004
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Karung plastik / bagor
Tali rapia / plastik
Sewa pasir *
M.123.a
M.141
M.14.a
bh
m
m3
1.000
2,500.00
2.000
2,500.00
0.120
70,000.00
Jumlah Harga Bahan
Peralatan
D.01b
1 bh Kistdam pasir/tanah dibungkus karung plastik bagor atau terpal uk. 45 x 120 cm
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang jahit
Mandor
L.01
L.02
L.04
OH
OH
OH
0.100
50,000.00
0.025
60,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Karung terpal
Tali/benang pengikat
Sewa pasir *
M.123.b
M.141
M.14.a
m2
m
m3
1.300
3,500.00
2.000
2,500.00
0.030
70,000.00
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.358
D.01c
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang Jahit
Mandor
L.01
L.02
L.04
OH
OH
OH
0.600
50,000.00
0.100
60,000.00
0.060
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
3
Bahan
Geotekstil
Tali/benag geotekstil (pengikat)
Sewa pasir *
M.122.a
M.122.d
M.14.a
m2
m'
m3
7.500
60,000.00
3.200
3,500.00
0.275
70,000.00
Jumlah Harga Bahan
C
1
Peralatan
Mesin jahit geotekstil
M.122.e Sewa-hari
D
E
F
D.02
Harga Satuan
(Rp)
No
0.1
250,000.00
Jumlah Harga Peralatan
Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau untuk 36
setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan dalam pancangan kayu
1 m ke dalam tanah
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang kayu
Mandor
L.01
L.02
L.04
OH
OH
OH
0.050
50,000.00
0.100
60,000.00
0.005
75,000.00
Jumlah Harga Tenaga Kerja
B
1
2
Bahan
Kayu kaso ukuran 5/7 kelas II *
Paku campuran 5 cm & 7 cm
M.37.b
M.65.b
m3
kg
0.0756 1,400,000.00
0.325
12,500.00
Jumlah Harga Bahan
Peralatan
AHSP.Pus Air.359
D.03
Kerangka baja profil L.50.50.5 atau L.60.60.6 atau besi profil berlubang untuk 1 m3 kistdam pasir/tanah u
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Tukang besi
Mandor
L.01
L.02
L.04
OH
OH
OH
0.050
0.100
0.005
B
1
2
Bahan
Baja profil L.50.50.5 *
Baut dia 12 mm panjang 5 cm
M.54.g
M.56.b
kg
bh
24.13
12,000.00
8
5,600.00
Jumlah Harga Bahan
Peralatan
6
50,000.00
60,000.00
75,000.00
m
D.04
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 5 kW dengan suction head max. 3m
discharge head max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (mis
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
L.01
L.05
L.04
OH
OH
OH
B
1
Bahan
Solar
M.140b
ltr
C
1
Peralatan
Pompa air diesel 5 KW
E.34.a
Sewa-hari
Harga Satuan
(Rp)
6
1.000
50,000.00
3.000
100,000.00
0.100
75,000.00
Jumlah Harga Tenaga Kerja
42.400
10,800.00
Jumlah Harga Bahan
1.2
225,000.00
AHSP.Pus Air.360
D.06
15% x D
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 10 kW dengan suction head max. 3
discharge head max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (mis
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
Harga Satuan
(Rp)
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
L.01
L.05
L.04
OH
OH
OH
B
1
2
Bahan
Solar
Oli
M.140b
M.132a
ltr
ltr
72.600
10,800.00
0.300
30,250.00
Jumlah Harga Bahan
C
1
Peralatan
Pompa air diesel 10 KW
E.34.b
bh
1.2
442,000.00
Jumlah Harga Peralatan
D
E
F
1.000
50,000.00
3.000
100,000.00
0.100
75,000.00
Jumlah Harga Tenaga Kerja
15% x D
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 20 kW dengan suction head max. 3
discharge head max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (mis
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor
L.01
L.05
L.04
OH
OH
OH
B
1
2
Bahan
Solar
Oli
M.140b
M.132a
ltr
ltr
Harga Satuan
(Rp)
6
1.000
50,000.00
4.000
100,000.00
0.100
75,000.00
Jumlah Harga Tenaga Kerja
132.800
10,800.00
0.500
30,250.00
Jumlah Harga Bahan
AHSP.Pus Air.361
C
1
Peralatan
Pompa air diesel 20 KW
D
E
F
E.34.c
bh
1.2
830,000.00
Jumlah Harga Peralatan
15% x D
AHSP.Pus Air.362
k. 43 x 65 cm
Jumlah
(Rp)
7
2,000.00
300.00
2,300.00
2,500.00
5,000.00
8,400.00
15,900.00
18,200.00
2,730.00
20,930.00
ali, gunakan HS pasir 100%
Jumlah
(Rp)
7
5,000.00
1,500.00
750.00
7,250.00
4,550.00
5,000.00
2,100.00
11,650.00
18,900.00
2,835.00
21,735.00
ali, gunakan HS pasir 100%
AHSP.Pus Air.363
Jumlah
(Rp)
7
30,000.00
6,000.00
4,500.00
40,500.00
450,000.00
11,200.00
19,250.00
480,450.00
25,000.00
520,950.00
78,142.50
599,092.50
ali, gunakan HS pasir 100%
118,777.50
17,816.63
136,594.13
6) dan untuk ke-3 (0,0635)
AHSP.Pus Air.364
x 30 cm x 50 cm atau untuk 36
dengan dalam pancangan baja
Jumlah
(Rp)
7
2,500.00
6,000.00
375.00
8,875.00
289,536.00
44,800.00
334,336.00
343,211.00
51,481.65
394,692.65
besi profil berlubang:
-3(24,128 kg)
-3(34,688 kg)
AHSP.Pus Air.365
270,000.00
1,085,420.00
162,813.00
1,248,233.00
AHSP.Pus Air.366
996,000.00
996,000.00
2,902,865.00
435,429.75
3,338,294.75
A.6
H.01
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.620
0.310
0.031
0.062
Jumlah Harga Tenaga Kerja
1.860
0.413
0.012
0.025
Jumlah Harga Bahan
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
B
1
2
3
4
Bahan
Besi Pengaku
Kawat Las Listrik
Campuran beton fc'= 19,3 Mpa (K-225)
Pas. Bata, mortar tipe N (1pc : 4 pp)
M.54.g
M.62
B.07a
P.02b
kg
kg
m3
m3
C
1
2
3
Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel
M.69xx
E.45
E.22
bh
Sewa-hari
Sewa-hari
D
E
1.000
0.093
0.093
Jumlah Harga Peralatan
15%
H.02
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
Uraian
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
15.400
7.700
0.770
1.540
Jumlah Harga Tenaga Kerja
B
1
2
3
4
Bahan
Besi Pengaku
Kawat Las Listrik
Campuran beton fc'= 19,3 Mpa (K-225)
Pas. Bata, mortar tipe N (1pc : 4 pp)
M.54.g
M.62
B.07a
P.02b
kg
kg
m3
m3
1.860
10.267
0.310
0.620
Jumlah Harga Bahan
C
1
2
3
Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel
M.69xx
E.45
E.22
bh
Sewa-hari
Sewa-hari
1.000
2.310
2.310
Jumlah Harga Peralatan
D
E
15%
H.03
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B
1
Bahan
Besi Pengaku
M.54.g
kg
2.940
1.470
0.147
0.294
Jumlah Harga Tenaga Kerja
8.820
2
3
4
M.62
B.07a
P.02b
kg
m3
m3
C
1
2
3
Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel
M.69xx
E.45
E.22
bh
Sewa-hari
Sewa-hari
D
E
1.960
0.088
0.176
Jumlah Harga Bahan
1.000
0.441
0.441
Jumlah Harga Peralatan
15%
TR = 1050mm
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
31,000.00
18,600.00
2,170.00
4,650.00
56,420.00
12,000.00
24,750.00
870,696.94
710,251.50
Jumlah Harga Bahan
22,320.00
10,221.75
10,448.36
17,756.29
60,746.40
450,000.00
385,000.00
Jumlah Harga Peralatan
xD
41,850.00
35,805.00
77,655.00
194,821.40
29,223.21
224,044.61
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
Jumlah
(Rp)
7
770,000.00
462,000.00
53,900.00
115,500.00
1,401,400.00
12,000.00
24,750.00
870,696.94
710,251.50
Jumlah Harga Bahan
450,000.00
385,000.00
Jumlah Harga Peralatan
xD
22,320.00
254,100.83
269,916.05
440,355.93
986,692.81
1,039,500.00
889,350.00
1,928,850.00
4,316,942.81
647,541.42
4,964,484.23
Harga Satuan
(Rp)
6
50,000.00
60,000.00
70,000.00
75,000.00
umlah Harga Tenaga Kerja
12,000.00
Jumlah
(Rp)
7
147,000.00
88,200.00
10,290.00
22,050.00
267,540.00
105,840.00
24,750.00
870,696.94
710,251.50
Jumlah Harga Bahan
450,000.00
385,000.00
Jumlah Harga Peralatan
xD
48,510.00
76,621.33
125,004.26
355,975.60
198,450.00
169,785.00
368,235.00
991,750.60
148,762.59
1,140,513.18
A.6
A.6.1
Pintu Angkat
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
H1
TR
(mm)
(mm)
(mm)
(mm)
250
200
250
300
300
300
400
500
600
300
350
400
300
400
500
600
400
500
600
300
300
300
350
350
350
400
400
400
400
500
500
500
500
600
600
800
1000
1200
600
700
800
600
800
1000
1200
800
1000
1200
1050
1150
1150
1350
1550
1750
1150
1250
1350
1150
1350
1550
1750
1350
1550
1750
Pekerja
(OH)
(a).
0.620
0.620
0.680
0.740
0.750
0.800
0.660
0.680
0.720
0.670
0.730
0.780
0.840
0.770
0.830
0.900
A.6.2
A.6.2.a
No.
1
2
3
4
5
6
H1
TR
(mm)
(mm)
(mm)
(mm)
1500
2000
2000
2000
2500
2500
1500
1000
1500
2000
2000
2500
3000
2000
3000
3800
4000
5000
3800
2800
3800
4600
4800
5800
Pekerja
(OH)
(a).
15.40
15.60
16.40
18.20
20.00
22.00
Tukang
(OH)
(b).
0.310
0.310
0.340
0.370
0.375
0.400
0.330
0.340
0.360
0.335
0.365
0.390
0.420
0.385
0.415
0.450
Tukang
(OH)
(b).
7.70
7.80
8.20
9.10
10.00
11.00
Kepala
Tukang
(OH)
(c).
0.0310
0.0310
0.0340
0.0370
0.0375
0.0400
0.0330
0.0340
0.0360
0.0335
0.0365
0.0390
0.0420
0.0385
0.0415
0.0450
Kepala
Tukang
(OH)
(c).
0.77
0.78
0.82
0.91
1.00
1.10
A.6.2.b
No.
A.6.3
A.6.3.a
H1
TR
(mm)
(mm)
(mm)
(mm)
Pekerja
1
2
3
4
600
800
900
1000
1000
1000
1000
1000
1800
1800
2000
2100
2600
2700
2800
2900
(OH)
(a).
7.00
7.60
8.20
9.00
1200
1500
3000
3800
12.60
Tukang
Kepala
Tukang
(OH)
(b).
3.50
3.80
4.10
4.50
(OH)
(c).
0.35
0.38
0.41
0.45
6.30
0.63
No.
1
2
3
4
5
6
A.6.3.b
H1
TR
(mm)
(mm)
(mm)
(mm)
1000
1000
1000
1000
1000
1000
800
900
1000
1200
1500
1000
1400
1400
1450
1900
1900
2000
2200
2200
2250
2700
2700
2900
Pekerja
(OH)
(a).
2.30
2.42
2.50
2.42
2.52
2.58
Tukang
(OH)
(b).
1.15
1.21
1.25
1.21
1.26
1.29
Kepala
Tukang
(OH)
(c).
0.115
0.121
0.125
0.121
0.126
0.129
No.
1
2
3
4
5
6
7
8
9
10
11
H1
TR
(mm)
(mm)
(mm)
(mm)
500
500
500
600
600
600
600
700
700
700
800
500
600
700
500
600
1000
800
600
700
800
600
1000
1000
1200
1000
1200
1800
1200
1200
1400
1400
1200
1900
2100
2000
2100
2100
2600
2000
2000
2200
2200
2000
Pekerja
(OH)
(a).
2.94
2.60
2.46
2.60
2.64
2.56
2.60
2.68
3.14
2.62
2.68
Tukang
(OH)
(b).
1.47
1.30
1.23
1.30
1.32
1.28
1.30
1.34
1.57
1.31
1.34
Kepala
Tukang
(OH)
(c).
0.147
0.130
0.123
0.130
0.132
0.128
0.130
0.134
0.157
0.131
0.134
12
13
14
15
16
17
18
19
20
21
22
800
800
800
900
900
900
900
900
900
900
900
700
800
1000
600
700
900
900
1000
600
700
800
1200
1400
1800
1200
1200
1200
1400
2100
1200
1200
1300
2000
2000
2700
2000
2000
2000
2200
2200
2000
2000
2100
2.78
2.86
2.76
2.82
2.96
3.12
3.24
6.40
6.60
6.70
6.84
1.39
1.43
1.38
1.41
1.48
1.56
1.62
3.20
3.30
3.35
3.42
0.139
0.143
0.138
0.141
0.148
0.156
0.162
0.320
0.330
0.335
0.342
23
900
900
1400
2200
7.20
3.60
0.360
asangan)
Mandor
(OH)
(d).
0.0620
0.0620
0.0680
0.0740
0.0750
0.0800
0.0660
0.0680
0.0720
0.0670
0.0730
0.0780
0.0840
0.0770
0.0830
0.0900
Mandor
(OH)
(d).
1.54
1.56
1.64
1.82
2.00
2.20
Besi
Pengaku
Kawat
Las
(kg)
(kg)
(e).
1.860
1.860
2.040
2.220
2.250
2.400
1.980
2.040
2.160
2.010
2.190
2.340
2.520
2.310
2.490
2.700
(f).
0.413
0.413
0.453
0.493
0.500
0.533
0.440
0.453
0.480
0.447
0.487
0.520
0.560
0.513
0.553
0.600
Besi
Pengaku
Kawat
Las
(kg)
(kg)
(e).
1.86
1.86
2.04
2.22
2.25
2.40
(f).
10.27
10.40
10.93
12.13
13.33
14.67
Camp.
Beton
(m3)
(g).
0.012
0.012
0.014
0.015
0.015
0.016
0.013
0.014
0.014
0.013
0.015
0.016
0.017
0.015
0.017
0.018
Camp.
Beton
(m3)
(g).
0.31
0.31
0.33
0.36
0.40
0.44
Pas. Bata
Tackle
Mesin Las
/Tripod
(m3)
Sewa-hari Sewa-hari
(h).
(i).
(j).
0.025
0.093
0.093
0.025
0.093
0.093
0.027
0.102
0.102
0.030
0.111
0.111
0.030
0.113
0.113
0.032
0.120
0.120
0.026
0.099
0.099
0.027
0.102
0.102
0.029
0.108
0.108
0.027
0.101
0.101
0.029
0.110
0.110
0.031
0.117
0.117
0.034
0.126
0.126
0.031
0.116
0.116
0.033
0.125
0.125
0.036
0.135
0.135
Pas. Bata
Tackle
Mesin Las
/Tripod
(m3)
Sewa-hari Sewa-hari
(h).
(i).
(j).
0.62
2.31
2.31
0.62
2.34
2.34
0.66
2.46
2.46
0.73
2.73
2.73
0.80
3.00
3.00
0.88
3.30
3.30
Mandor
(OH)
(d).
0.70
0.76
0.82
0.90
1.26
Mandor
(OH)
(d).
0.230
0.242
0.250
0.242
0.252
0.258
Mandor
(OH)
(d).
0.294
0.260
0.246
0.260
0.264
0.256
0.260
0.268
0.314
0.262
0.268
Besi
Pengaku
Kawat
Las
(kg)
(kg)
Camp.
Beton
(e).
21.00
22.80
24.60
27.00
(f).
4.67
5.07
5.47
6.00
(m3)
(g).
0.14
0.15
0.16
0.18
37.80
8.40
0.25
Pas. Bata
Tackle
Mesin Las
/Tripod
(m3)
Sewa-hari Sewa-hari
(h).
(i).
(j).
0.28
1.05
1.05
0.30
1.14
1.14
0.33
1.23
1.23
0.36
1.35
1.35
0.50
1.89
1.89
Kawat
Las
(kg)
(f).
1.53
1.61
1.67
1.61
1.68
1.72
Camp.
Tackle
Pas. Bata
Mesin Las
Beton
/Tripod
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.069
0.138
0.345
0.345
0.073
0.145
0.363
0.363
0.075
0.150
0.375
0.375
0.073
0.145
0.363
0.363
0.076
0.151
0.378
0.378
0.077
0.155
0.387
0.387
Besi
Pengaku
Kawat
Las
Camp.
Beton
(kg)
(kg)
Besi
Pengaku
(kg)
(e).
6.90
7.26
7.50
7.26
7.56
7.74
(e).
8.82
7.80
7.38
7.80
7.92
7.68
7.80
8.04
9.42
7.86
8.04
(f).
1.96
1.73
1.64
1.73
1.76
1.71
1.73
1.79
2.09
1.75
1.79
(m3)
(g).
0.088
0.078
0.074
0.078
0.079
0.077
0.078
0.080
0.094
0.079
0.080
Pas. Bata
Tackle
Mesin Las
/Tripod
(m3)
Sewa-hari Sewa-hari
(h).
(i).
(j).
0.176
0.441
0.441
0.156
0.390
0.390
0.148
0.369
0.369
0.156
0.390
0.390
0.158
0.396
0.396
0.154
0.384
0.384
0.156
0.390
0.390
0.161
0.402
0.402
0.188
0.471
0.471
0.157
0.393
0.393
0.161
0.402
0.402
0.278
0.286
0.276
0.282
0.296
0.312
0.324
0.640
0.660
0.670
0.684
8.34
8.58
8.28
8.46
8.88
9.36
9.72
19.20
19.80
20.10
20.52
1.85
1.91
1.84
1.88
1.97
2.08
2.16
4.27
4.40
4.47
4.56
0.083
0.086
0.083
0.085
0.089
0.094
0.097
0.192
0.198
0.201
0.205
0.167
0.172
0.166
0.169
0.178
0.187
0.194
0.384
0.396
0.402
0.410
0.417
0.429
0.414
0.423
0.444
0.468
0.486
0.960
0.990
1.005
1.026
0.417
0.429
0.414
0.423
0.444
0.468
0.486
0.960
0.990
1.005
1.026
0.720
21.60
4.80
0.216
0.432
1.080
1.080
AHSP.Pus Air.388
A.8
LA.01
PEKERJAAN LAIN-LAIN
(INFORMATIF)
Pemagaran daerah kerja
LA.01a
1 m' pemagaran daerah kerja dengan seng gelombang BJLS-30, tinggi 1,8 m pakai rangka kayu atau baja
Rangka baja L.40.40.4
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
3
L.01
L.02
L.02
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang besi
Tukang tembok
Mandor
Harga Satuan
(Rp)
Jumlah
(Rp)
0.20
50,000.00
0.10
60,000.00
0.10
60,000.00
0.02
75,000.00
Jumlah Harga Tenaga Kerja
10,000.00
6,000.00
6,000.00
1,500.00
23,500.00
B
1
Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m
M.88.d
lbr
1.200
60,200.00
72,240.00
2
3
4
Baja L 40.40.4
Kawat seng 3mm
Pas. Batu uk. 20/50, t=40cm
M.54.g
M.63
P.01d
kg
kg
m3
13.500
0.300
0.150
12,000.00
25,000.00
612,710.00
162,000.00
7,500.00
91,906.50 *
333,646.50
Peralatan
357,146.50
53,571.98
410,718.48
15% x D
Rangka Kayu
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
3
L.01
L.02
L.02
L.04
OH
OH
OH
OH
Tenaga Kerja
Pekerja
Tukang kayu
Tukang tembok
Mandor
Harga Satuan
(Rp)
Jumlah
(Rp)
0.180
50,000.00
0.100
60,000.00
0.080
60,000.00
0.018
75,000.00
Jumlah Harga Tenaga Kerja
B
1
Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m
M.88.d
lbr
1.200
M.35.a
M.54.h
M.54.g
P.01d
m3
kg
kg
m3
0.035
3
4
5
Peralatan
9,000.00
6,000.00
4,800.00
1,350.00
21,150.00
60,200.00
72,240.00
1,500,000.00
0.300
16,500.00
0.120
12,000.00
0.150
612,710.00
Jumlah Harga Bahan
52,500.00
4,950.00
1,440.00
91,906.50
223,036.50
LA.02
D
E
244,186.50
36,627.98
15% x D
280,814.48
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
3
4
Tenaga Kerja
Pekerja
Tukang Tembok/batu
Kepala tukang batu
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B.
1
2
3
5
6
7
8
9
10
11
12
Bahan
Kaso 5/7
Dinding triplek 4mm
Fondasi pas. Batu
Plafon asbes 3 mm (1x1 m)
Paku
Asbes gelombang
Paku asbes
Floor lantai (Beton lantai kerja)
Pintu double teakwood rangka kayu
Jendela kaca nako
Cat dinding/plafon
M.33.d
M.42.b
P.01d
M.66.c
M.110.a
M.54.f
B.01
M.40.a
M.115.d
m3
lbr
m3
lbr
kg
lbr
kg
m3
m2
daun
m2
Peralatan
D
E
F
Harga Satuan
(Rp)
Jumlah
(Rp)
1.20
50,000.00
0.40
60,000.00
0.04
70,000.00
0.12
75,000.00
Jumlah Harga Tenaga Kerja
60,000.00
24,000.00
2,800.00
9,000.00
95,800.00
0.35
1,400,000.00
1.00
45,000.00
0.17
612,710.00
1.24
25,000.00
0.75
14,500.00
0.30
50,000.00
0.10
16,500.00
0.15
592,835.00
0.10
200,000.00
1.00
25,000.00
16.50
25,200.00
Jumlah Harga Bahan
490,000.00 *
45,000.00
101,097.15
31,000.00
10,875.00
15,000.00
1,650.00
88,925.25 *
20,000.00
25,000.00
415,800.00
1,244,347.40
LA.03
0
1,340,147.40
201,022.11
1,541,169.51
15% x D
Uraian
Harga Satuan
(Rp)
Jumlah
(Rp)
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.02
L.04
OH
OH
OH
OH
OH
1.00
50,000.00
1.00
60,000.00
0.10
70,000.00
1.50
60,000.00
0.1
75,000.00
Jumlah Harga Tenaga Kerja
50,000.00
60,000.00
7,000.00
90,000.00
7,500.00
164,500.00
M.38.d
M.33.a
M.65.b
M.115.b
Lbr
m3
kg
kg
1.00
135,000.00
0.077
6,250,000
1.25
12,500.00
2.50
37,450.00
Jumlah Harga Bahan
135,000.00
481,250.00
15,625.00
93,625.00
725,500.00
1
A.
1
2
3
4
5
2
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang kayu
Tukang Cat dan Tulis
Mandor
B.
1
2
3
4
Bahan
Multiplek tebal 18 mm
Kayu 8/12 kelas II
Paku campuran 5 cm dan 7cm
Cat kayu
Peralatan
D
E
F
15% x D
LA.04
Mobilisasi
LA.04a
Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
No
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
3
L.08
L.08
L.07
OH
OH
OH
Tenaga Kerja
Akhli alat berat (akhli madya)
Pelaksana kegiatan (pemberi tugas)
Staf (Kontraktor)
Harga Satuan
(Rp)
Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
Jumlah
(Rp)
2
650,000.00
3
450,000.00
4
450,000.00
Jumlah Harga Tenaga Kerja
1,300,000.00
1,350,000.00
1,800,000.00
4,450,000.00
B. Bahan
No
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
3
Tenaga Kerja
Akhli alat berat (akhli madya)
Pelaksana kegiatan (pemberi tugas)
Staf (Kontraktor)
L.08
L.08
L.07
OH
OH
OH
B.
Bahan
Peralatan
Peralatan
15% x D
D
E
F
*) disesuaikan dengan waktu pencapaian ke lokasi pekerjaan yang mempertimbangkan kesulitan transportasi
LA.04b
No
1
A. Tenaga Kerja
Uraian
Kode
Satuan
15% x D
*) disesuaikan dengan waktu pencapaian ke lokasi pekerjaan yang mempertimbangkan kesulitan transportasi
Sewa Lahan
- Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha atau sesuai kebutuhan
- lama waktu penyewaan harus menghitung 1 bulan sebelum dan sesudah pelaksanaan pekerjaan
Harga Satuan
Koefisien
(Rp)
Sewa Lahan
- Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha atau sesuai kebutuhan
- lama waktu penyewaan harus menghitung 1 bulan sebelum dan sesudah pelaksanaan pekerjaan
Jumlah
(Rp)
No
Uraian
Kode
Satuan
Koefisien
1
A.
Tenaga Kerja
B.
Bahan
C
1
Peralatan
Sewa lahan
D
E
F
LA.04c
Peralatan
Sewa lahan
D
E
F
ha-bulan
18
36,000,000.00
36,000,000.00
36,000,000.00
5,400,000.00
41,400,000.00
15% x D
Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.
No
1
A. Tenaga Kerja
Uraian
Kode
Satuan
ha-bulan
2 - 10
Jumlah Harga Peralatan
Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.
Jumlah
(Rp)
7
No
Uraian
Kode
Satuan
Koefisien
1
A.
Harga Satuan
(Rp)
6
Tenaga Kerja
Jumlah Harga Tenaga Kerja
B. Bahan
1 Base Camp
2 Kantor
m2
m2
60
30
670,073.70
1,340,147.40
40,204,422.00
40,204,422.00
B.
1
2
Bahan
Base Camp
Kantor
m2
m2
50 - 300
10 - 60
3
4
Barak
Bengkel
m
m2
30
20
1,340,147.40
1,340,147.40
40,204,422.00
26,802,948.00
3
4
Barak
Bengkel
m2
m2
10 - 60
20 - 100
m2
40
1,340,147.40
53,605,896.00
m2
20 - 100
m2
20
1,340,147.40
26,802,948.00
m2
10 - 50
set
set
1.00
1.00
..
..
Peralatan
Peralatan laboratorium
Perabotan & layanan
..
..
set
set
1.00
1.00
15% x D
C
1
2
Jumlah
(Rp)
2,000,000.00
Jumlah Harga Peralatan
Harga Satuan
Koefisien
(Rp)
Harga Satuan
(Rp)
B. Bahan
C
1
1-5
1-5
1-5
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
Harga Satuan
(Rp)
227,825,058.00
40,000,000.00
12,500,000.00
40,000,000.00
12,500,000.00
Peralatan
Peralatan laboratorium
Perabotan & layanan
Jumlah
(Rp)
7
AHSP.Pus Air.389
52,500,000.00
79,302,948.00
11,895,442.20
91,198,390.20
15% x D
D
E
F
Kebutuhan lain-lain
No
15% x D
Kebutuhan lain-lain
Uraian
Kode
Satuan
Koefisien
1
A. Tenaga Kerja
Harga Satuan
(Rp)
6
Jumlah
(Rp)
No
1
A.
Uraian
Kode
Satuan
Koefisien
Bahan
Perkuatan jalan yang dilalui
Perkuatan jembatan yang dilalui
Biaya pengaturan lalu lintas
Biaya transportasi peralatan *
Peralatan K3 **
Peralatan
LS
LS
LS
LS
LS
25,000,000.00
42,000,000.00
6,750,000.00
125,000,000.00
12,500,000.00
25,000,000.00
42,000,000.00
6,750,000.00
125,000,000.00
12,500,000.00
211,250,000.00
LA.05
B.
1
2
3
4
5
Bahan
Perkuatan jalan yang dilalui
Perkuatan jembatan yang dilalui
Biaya pengaturan lalu lintas
Biaya transportasi peralatan *
Peralatan K3 **
Peralatan
LS
LS
LS
LS
LS
Jumlah Harga Bahan
D
E
F
Foto dokumentasi
1 Set foto dokumentasi menggunakan Camera
Jika menggunakan Camera dengan isi film selulosa
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
L.02
OH
2
60,000.00
Jumlah Harga Tenaga Kerja
120,000.00
120,000.00
M.119c
M.119b
M.119d
M.119a
roll
roll
lbr
bh
3
3
300
6
75,000.00
55,000.00
1,500.00
75,000.00
225,000.00
165,000.00
450,000.00
450,000.00
1,290,000.00
2
750,000.00
Jumlah Harga Peralatan
1,500,000.00
1,500,000.00
1
A. Tenaga Kerja
1 Tukang foto
LA.05b
211,250,000.00
31,687,500.00
242,937,500.00
B.
1
2
3
4
Bahan
Film Selulosa isi 36
Cuci film
Foto printing
Foto Album
C
1
Peralatan
Kamera SLR
D
E
F
E.16
Sewa-hari
2,910,000.00
291,000.00
3,201,000.00
15% x D
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
OH
2
60,000.00
Jumlah Harga Tenaga Kerja
120,000.00
120,000.00
M.117
M.119d
M.119a
bh
lbr
bh
3
300
6
10,000.00
1,500.00
75,000.00
Jumlah Harga Bahan
30,000.00
450,000.00
450,000.00
930,000.00
2
250,000.00
Jumlah Harga Peralatan
500,000.00
500,000.00
Bahan
CD copy soft file foto image
Foto printing
Foto Album
C
1
Peralatan
Kamera SLR
D
E
F
E.16
Sewa-hari
Kode
Satuan
Koefisien
Tenaga Kerja
Tukang foto
L.02
OH
B.
1
2
3
4
Bahan
Film Selulosa isi 36
Cuci film
Foto printing
Foto Album
M.119c
M.119b
M.119d
M.119a
roll
roll
lbr
bh
C
1
Peralatan
Kamera SLR
D
E
F
No
L.02
B.
1
2
3
Uraian
1
A.
1
E.16
15% x D
1,550,000.00
232,500.00
1,782,500.00
15% x D
L.02
OH
2
Jumlah Harga Tenaga Kerja
M.117
M.119d
M.119a
bh
lbr
bh
1-3
120 - 360
LS
Jumlah Harga Bahan
B.
1
2
3
Bahan
CD copy soft file foto image
Foto printing
Foto Album
C
1
Peralatan
Kamera SLR
D
E
F
E.16
Sewa-hari
Penggambaran
Peta situasi atau peta steak out bangunan
Satuan
Koefisien
L.14
L.15
OH
OH
Harga Satuan
(Rp)
6
1.00
100,000.00
0.5
400,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
100,000.00
200,000.00
300,000.00
B. Bahan
LA.07b
D
E
F
sewa-bulan
sewa-bulan
0.04
1,000,000.00
0.025
250,000.00
Jumlah Harga Peralatan
Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi bentuk gambar ukuran A1
No
Uraian
1
A. Tenaga Kerja
1 Drafter
2 Desain engineer
Kode
Satuan
Koefisien
Harga Satuan
(Rp)
6
Jumlah
(Rp)
15% x D
Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1
OH
OH
1.25
100,000.00
0.1
400,000.00
Jumlah Harga Tenaga Kerja
125,000.00
40,000.00
165,000.00
M.125.b
M.143b
M.134
lbr
bh
bh
1.2
1,850.00
0.05
40,000.00
0.01
75,000.00
Jumlah Harga Bahan
2,220.00
2,000.00
750.00
4,970.00
Bahan
Kertas HVS atau kalkir (A1)
Tinta Rapido
Pena Rapido
Peralatan
D
E
F
LA.07c
Kode
Satuan
Koefisien
Tenaga Kerja
Drafter CAD
Desain engineer
0
0
OH
OH
1.00
0.5
Jumlah Harga Tenaga Kerja
B.
Bahan
C
1
2
Peralatan
Sewa komputer
Sewa scanner ukuran A4
0
0
sewa-bulan
sewa-bulan
0.04
0.025
Jumlah Harga Peralatan
D
E
F
1
A. Tenaga Kerja
1 Operator printer
Uraian
Kode
Satuan
Koefisien
B. Bahan
1 Kertas HVS atau kalkir
2 Tinta printer/plotter
LA.08
LA.08a
OH
M.125.b
M.143a
m
set
Peralatan
Sewa komputer
Sewa scanner ukuran A4
D
E
F
M.139.a
M.139.b
4,000.00
4,000.00
555.00
1,750.00
2,305.00
0.001
1,000,000.00
0.01
250,000.00
Jumlah Harga Peralatan
1,000.00
2,500.00
3,500.00
9,805.00
1,470.75
11,275.75
15% x D
No
Uraian
Kode
Satuan
M.120.b
M.127.c
halaman
buah
Harga Satuan
Koefisien
(Rp)
5*
200.00
1.00
250.00
13,500.00
15% x D
Jumlah
(Rp)
7
50,000.00
13,500.00
27,000.00
4,050.00
31,050.00
1 set As built drawing (reduce dan copy kalkir serta blue/black print)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
1
A
5*
M.120.a
M.137.a
lembar
lembar
40
40
6,500.00
16,500.00
260,000.00
660,000.00
M.137.b
M.114.a
M.114.b
M.114.c
M.127.d
M.127.e
M.127.f
lembar
lembar
lembar
lembar
buah
buah
buah
40
40
40
40
1
1
1
12,500.00
2,600.00
2,000.00
1,250.00
17,500.00
11,500.00
6,750.00
500,000.00
104,000.00
80,000.00
50,000.00
17,500.00
11,500.00
6,750.00
1,689,750.00
253,462.50
1,943,212.50
blue/black print Ac
blue/black print A2
blue/black print A3
Menjilid A1
Menjilid A2
Menjilid A3
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan per - set ( D + E )
* Jumlah exemplar/lembar disesuaikan dengan kebutuhan
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
0
0
OH
OH
1.25
0.1
Jumlah Harga Tenaga Kerja
0
0
0
lbr
bh
bh
1.2
0.05
0.01
1
A.
1
2
Tenaga Kerja
Drafter
Desain engineer
B.
1
2
3
Bahan
Kertas HVS atau kalkir (A1)
Tinta Rapido
Pena Rapido
Peralatan
D
E
F
7
-
0
-
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
Uraian
Kode
Satuan
Koefisien
OH
Bahan
Kertas HVS atau kalkir
Tinta printer/plotter
0
0
m
set
0.3
0.05
C
1
2
Peralatan
Sewa komputer
Sewa scanner ukuran A4
0
0
Sewa-bulan
Sewa-bulan
0.001
0.01
Jumlah Harga Peralatan
D
E
F
1
A.
1
Tenaga Kerja
Operator printer
B.
1
2
0.08
15% x D
No
Uraian
Kode
Satuan
Koefisien
5*
0
0
halaman
buah
Lain-lain
Fotocopy kertas A4
Menjilid
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah halaman
Harga Satuan
(Rp)
Jumlah
(Rp)
7
-
200.00
1.00
15% x D
1 set As built drawing (reduce dan copy kalkir serta blue/black print)
Harga Satuan
(Rp)
No
Lain-lain
Copy kalkir Ac
copy kalkir reduce z1%
Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi bentuk gambar ukuran A1
No
0.3
1,850.00
0.05
35,000.00
Jumlah Harga Bahan
Sewa-bulan
Sewa-bulan
Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
Jumlah
(Rp)
0.08
50,000.00
Jumlah Harga Tenaga Kerja
C
1
2
Lain-lain
Fotocopy kertas A4
Menjilid
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah halaman
LA.08b
L.16
Harga Satuan
(Rp)
Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
No
Jumlah
(Rp)
Uraian
1
A.
1
2
0
169,970.00
25,495.50
195,465.50
15% x D
Harga Satuan
(Rp)
No
No
L.14
L.15
B.
1
2
3
15% x D
2
Jumlah Harga Peralatan
Jumlah
(Rp)
Koefisien
Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1
Kode
Harga Satuan
(Rp)
Satuan
Penggambaran
Peta situasi atau peta steak out bangunan
Peralatan
Sewa komputer
Sewa scanner ukuran A4
LA.07
1)
C
1
2
2
Jumlah Harga Peralatan
Kode
LA.07a
1-3
1-3
100 - 350
3-9
2
Tenaga Kerja
Tukang foto
1
A. Tenaga Kerja
1 Drafter CAD
2 Desain engineer
Uraian
1
A.
1
Uraian
Jumlah
(Rp)
2
Jumlah Harga Tenaga Kerja
Sewa-hari
LA.06
No
Harga Satuan
(Rp)
Uraian
1
A. Tenaga Kerja
1 Tukang foto
No
Foto dokumentasi
1 Set foto dokumentasi menggunakan Camera
LA.05a
Jumlah
(Rp)
Harga Satuan
(Rp)
Tenaga Kerja
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
No
Uraian
Kode
Satuan
Koefisien
1
A
5*
0
0
lembar
lembar
40
40
0
0
0
0
0
0
0
lembar
lembar
lembar
lembar
buah
buah
buah
40
40
40
40
1
1
1
Lain-lain
Copy kalkir Ac
copy kalkir reduce z1%
copy kalkir reduce z2%
blue/black print Ac
blue/black print A2
blue/black print A3
Menjilid A1
Menjilid A2
Menjilid A3
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan per - set ( D + E )
* Jumlah exemplar/lembar disesuaikan dengan kebutuhan
15% x D
AHSP.Pus Air.390
z1
z2
LA.09
LA.09a
z1
z2
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
D
E
Harga Satuan
(Rp)
6
Jumlah
(Rp)
7
0.030
50,000.00
0.003
75,000.00
Jumlah Harga Tenaga Kerja
1,500.00
225.00
1,725.00
LA.09b
1,725.00
258.75
15% x D
1,983.75
Secara Mekanis
No
Satuan
Harga Satuan
Koefisien
(Rp)
Uraian
Kode
L.01
L.04
OH
OH
0.0040
50,000.00
0.0004
75,000.00
Jumlah Harga Tenaga Kerja
E.39
E.44
LS
sewa-hari
bh
0.0001
5,000,000
0.0001
525,000.00
0.0001
3,250,000.00
Jumlah Harga Peralatan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
C
1
2
3
Peralatan
Mobilisasi peralatan
Speed boat, motor 10 HP
Trawl diameter lubang 5mm
D
E
Jumlah
(Rp)
7
200.00
30.00
230.00
LA.10
LA.10a
500.00
52.50
325.00
877.50
1,107.50
166.13
15% x D
1,273.63
No
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
Peralatan
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
Harga Satuan
(Rp)
6
0.500
50,000.00
0.050
75,000.00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
25,000.00
3,750.00
28,750.00
LA.10b
D
E
15% x D
28,750.00
4,312.50
33,062.50
Secara Mekanis
No
Harga Satuan
(Rp)
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
0.100
50,000.00
0.010
75,000.00
Jumlah Harga Tenaga Kerja
E.11.a
E.37.a
LS
sewa-hari
sewa-hari
0.0001
15,000,000
0.0260
168,000.00
0.0260
107,142.86
Jumlah Harga Peralatan
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
Bahan
C
1
2
3
Peralatan
Mobilisasi peralatan
Exavator
Ponton
D
E
15% x D
Jumlah
(Rp)
7
5,000.00
750.00
5,750.00
1,500.00
4,368.00
2,785.71
8,653.71
14,403.71
2,160.56
16,564.27
AHSP.Pus Air.391
AHSP.Pus Air.392
AHSP.Pus Air.393
AHSP.Pus Air.394
AHSP.Pus Air.395
AHSP.Pus Air.396
AHSP.Pus Air.397
Pekerjaan Rawa
L.14
Pekerjaan Airtanah
L.15
PP
PEKERJAAN PERPIPAAN
(Normatif)
PP.01
Uraian
1
A
1
2
3
2
Tenaga Kerja
Pekerja
Tukang pipa
Mandor
B
1
2
Bahan
GIP dia. 4"
Asesories
Kode
Satuan
Koefisien
L.01
L.02
L.04
OH
OH
OH
M.106.h
Harga Satuan
(Rp)
6
0.4180
50,000.00
0.3470
60,000.00
0.0420
75,000.00
Jumlah Harga Tenaga Kerja
1.02
155,600.00
Peralatan
Sewa Tripod/Tackel &
handle crane 2 T
E.45
Sewa-hari
D
E
0.0500
450,000.00
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
Overhead + Profit (Contoh 15%)
15% x D
Jumlah
(Rp)
7
20,900.00
20,820.00
3,150.00
44,870.00
158,712.00
47,613.60
158,712.00
22,500.00
22,500.00
226,082.00
33,912.30
259,994.30
LAMPIRAN A.10
(Informatif)
CONTOH DAFTAR HSP-SDA, KOTA BANDUNG-JAWA BARAT
No
1
A
1
Satuan
Kode
(AHSP)
m2
m2
pohon
T.01
T.02
T.03
3,967.50
5,041.60
31,625.00
Uraian
2
Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
UMUM
PEKERJAAN TANAH (T.xx)
** Semua pekerjaan tanah sudah termasuk perataan dan perapihan
1.1 PEKERJAAN PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH
1.1.1 1 m2 Pembersihan dan striping/kosrekan
1.1.2 1 m2 tebas tebang berupa memotong dan membersihkanlokasi dari tanaman/tumbuhan diameter < 15 cm
1.1.3 Cabut 1 tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul kayu dan akar-akarnya
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
1.2.10
1.2.11
1.2.12
1.2.13
1.2.14
1.2.15
1.2.16
1.2.17
1.2.18
GALIAN TANAH
1 m2 Uitzet trase saluran
Pasang 1 m' profil melintang galian tanah
1 m3 Galian tanah biasa sedalam < 1 m
1 m3 Galian tanah biasa sedalam s.d. 2 m
1 m3 Galian tanah biasa sedalam s.d. 3 m
1 m3 Galian tanah biasa dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian tanah berbatu sedalam < 1 m
1 m3 Galian tanah berbatu sedalam s.d. 2 m
1 m3 Galian tanah berbatu sedalam s.d. 3 m
1 m3 Galian tanah berbatu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian batu sedalam < 1 m
1 m3 Galian batu sedalam s.d. 2 m
1 m3 Galian batu sedalam s.d. 3 m
1 m3 Galian batu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian tanah cadas atau tanah keras sedalam < 1 m
1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 2 m
1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 3 m
1 m3 Galian tanah cadas atau tanah keras dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
m2
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
T.04
T.05
T.06a
T.06b
T.06c
T.06d
T.07a
T.07b
T.07c
T.07d
T.08a
T.08b
T.08c
T.08d
T.09a
T.09b
T.09c
T.09d
2,530.00
23,402.50
37,228.38
44,634.38
50,255.00
16,565.75
112,622.38
139,725.00
132,393.75
33,206.25
274,602.75
299,201.25
323,998.13
85,946.25
102,062.50
111,452.25
118,593.75
26,018.75
1.2.19
1.2.20
1.2.21
1.2.22
1.2.23
1.2.24
1.2.25
1.2.26
m3
m3
m3
m3
m3
m3
m3
m3
T.10a
T.10b
T.10c
T.10d
T.11a
T.11b
T.11c
T.11d
55,082.13
80,672.50
102,493.75
6,612.50
43,840.88
52,569.38
59,512.50
6,612.50
1.2.27
1.2.28
1.2.29
1.2.30
1.2.31
Contoh 1m perkuatan dinding galian untuk 1 m' paling bawah, menggunakan Baja INP-10 dan Balok Kayu 8/12
Contoh 1 m penambahan setiap tinggi 1 m' perkuatan dinding galian, menggunakan Tiang INP-10 dan Balok Kayu 8/12
Contoh 1 m perkuatan dinding galian dengan Turap untuk 1 m' paling bawah, dg turap INP-8
Contoh 1 m perkuatan dinding galian dengan Turap INP-8 untuk setiap penambahan tinggi 1 m'
Peledakan batuan
m3
m'
m'
m'
m3
T.12a
T.12b
T.12c
T.12d
T.13
1,234,674.50
1,018,123.75
495,937.50
353,625.00
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.3.7
1.3.8
1.3.9
1.3.10
1.3.11
1.3.12
1.3.13
1.3.14
1.3.15
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
T.14a
T.14b
T.14c
T.14d
T.15a.1)
T.15a.2)
T.15a.3)
T.15a.4)
T.15a.5)
T.15a.6)
T.15a.7)
T.15a.8)
T.15a.9)
T.15a.10)
T.15a.11)
21,821.25
41,687.50
150,650.00
27,600.00
15,329.50
16,565.75
17,678.38
22,005.25
26,084.88
37,087.50
58,721.88
80,356.25
101,990.63
120,534.38
21,758.00
m3
m3
m3
m3
m3
m3
P.01a
P.01b
P.01c
P.01d
P.01e
P.01f
860,694.50
794,052.00
742,060.50
704,616.50
141,450.00
127,218.75
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
m3
m3
m3
m3
m3
P.02a
P.02b
P.02c
P.02d
P.02e
746,097.00
710,251.50
688,919.00
677,235.00
42,703.01
m2
m2
P.03a
P.03b
41,677.84
40,159.84
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
m2
m2
m2
m2
m2
m2
P.04a
P.04b
P.04c
P.04d
P.04e
P.04f
43,168.24
41,378.84
39,603.70
55,145.67
52,689.83
49,935.53
2.5
m3
P.05
280,462.00
2.6
No
Satuan
Kode
(AHSP)
bh
P.06a.1.a
1,173,015.53
bh
P.06a.1.b
1,195,389.64
bh
P.06a.1.c
1,757,835.38
bh
P.06a.2.a
1,717,958.90
bh
P.06a.2.b
1,749,526.74
bh
P.06a.2.c
2,559,106.50
bh
P.06a.3.a
2,260,339.78
bh
P.06a.3.b
2,303,663.84
bh
P.06a.3.c
3,363,905.25
bh
P.06a.4.a
738,455.25
bh
P.06a.4.b
753,838.63
bh
P.06a.4.c
1,142,531.33
bh
P.06a.5.a
1,084,908.22
bh
P.06a.5.b
1,104,530.61
bh
P.06a.5.c
1,626,154.05
bh
P.06a.6.a
1,428,331.40
bh
P.06a.6.b
1,458,230.30
bh
m2
P.06a.6.c
P.06a.7
2,134,063.05
186,012.50
bh
P.06b.1.a
1,918,847.57
bh
P.06b.1.b
2,096,044.74
bh
P.06b.2.a
2,140,204.91
bh
P.06b.2.b
2,378,299.07
bh
P.06b.3.a
2,400,523.80
2,533,605.48
Uraian
1
2
2.6.1 Pasangan batu bronjong kawat Bentuk I
2.6.1.1 Bentuk I, Tipe A Bronjong kawat uk. L=2,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.2 Bentuk I, Tipe B Bronjong kawat uk. L=3,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.3 Bentuk I, Tipe C Bronjong kawat uk. L=4,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.4 Bentuk I, Tipe D Bronjong kawat uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.5 Bentuk I, Tipe E Bronjong kawat uk. L=3,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.6 Bentuk I, Tipe F Bronjong kawat uk. L=4,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 80 x 100mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 100 x 120 mm;
c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
2.6.1.7 1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06a
2.6.2 Pasangan bronjong kawat Bentuk II
2.6.2.1 Bentuk II, Tipe G Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,17 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 60 x 80mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 80 x 100 mm;
2.6.2.2 Bentuk II, Tipe H Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,23 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 60 x 80mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 80 x 100 mm;
2.6.2.3 Bentuk II, Tipe I Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,30 m berisi batu kali/belah (buat sendiri)
a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran
lubang heksagonal 60 x 80mm;
b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran lubang
heksagonal 80 x 100 mm;
2.6.2.4 1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06b
Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
bh
P.06b.3.b
m2
P.06b.4
192,625.00
m
m
m
m3
P.07.a
P.07.b
P.07.c
P.07.d
43,196.88
44,778.13
49,069.54
25,415.00
m2
m2
P.08
P.08a
P.08b
178,583.50
228,723.50
2.9
2.9.1
2.9.2
2.9.3
m2
m2
m2
P.09a
P.09b
P.09c
80,442.50
162,449.00
303,807.00
bh
P.10
501,428.75
bh
P.11
225,630.00
m2
m2
P.12a
P.12b
9,142.50
8,975.75
m2
m2
P.13a
P.13b
8,751.50
324,587.50
bh
bh
bh
bh
bh
bh
m3
m3
m3
m3
m3
m3
P.14a
P.14b
P.14c
P.14d
P.14e
P.14f
P.14g
P.14h
P.14i
P.14j
P.14k
P.14l
41,007.65
97,894.90
149,740.06
322,464.44
498,757.90
349,747.60
416,040.98
205,620.00
224,882.50
240,269.50
245,732.00
258,934.00
2.7
a)
b)
c)
d)
Pasangan Geotekstil
Pemasangan Geotekstil (1 m2) Tipe-A
Pemasangan Geotekstil (1 m2), Tipe-B
Pemasangan Geotekstil (1 m2), Tipe-C
Satuan
Kode
(AHSP)
3
m3
m3
m3
m3
m3
4
P.14m
P.14n
P.14o
P.14p
P.14q
Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
261,119.00
263,304.00
266,581.50
279,783.50
281,968.50
bh
bh
P.15a
P.15b
13,225.00
787,238.25
m'
P.16
66,114.94
m'
P.17
398,529.78
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
B.01
B.02a
B.02b
B.03a
B.03b
B.04a
B.04b
B.05a
B.05b
B.06a
B.06b
B.07a
B.07b
B.08a
B.08b
B.09a
B.09b
B.10a
B.10b
B.11a
B.11b
B.12a
B.12b
B.13.a
B.13.b
Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikan campuran beton setiap kenaikan vertikal 4 m
dan jarak horizontal setiap 25 m ke tapak pengecoran
1 m3 beton dicorkan pada tapak berjarak < 10 m atau dengan ketinggian/kedalaman < 1 m, secara manual
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), secara manual
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan pompa beton
Penggunaan vibrator
Tenaga kerja manual + vibrator
1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal), manual
1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal), menggunakan pompa beton
m3
m3
m3
m3
m3
m3
m3
B.14.a
B.14.b.1)
B.14.b.2)
B.15a
B.15b
B.16a
B.16b
100 kg
100 kg
100 kg
B.17
B.18
B.19
1,212,847.50
2,947,593.75
4,648,875.00
100 kg
100 kg
100 kg
100 kg
B.20a
B.20b
B.20c
B.20d
26,737.50
21,735.00
32,487.50
36,512.50
No
Uraian
1
2.14.13 Pasangan 1m3 batu 50 kg - 100 kg
2.14.14 Pasangan 1m3 batu 100 kg - 200 kg
2.14.15 Pasangan 1m3 batu 200 kg - 300 kg
2.14.16 Pasangan 1m3 batu 300 kg - 400 kg
2.14.17 Pasangan 1m3 batu 400 kg - 500 kg
681,760.25
707,819.25
794,578.13
746,002.87
832,695.62
776,062.17
862,754.92
811,510.28
898,228.90
845,489.80
932,208.42
870,696.94
957,389.69
887,590.87
974,283.62
916,492.50
1,003,185.25
925,533.20
1,012,225.95
995,050.06
1,073,802.06
1,006,823.51
1,085,575.51
1,139,362.50
48,300.00
27,111.25
33,062.50
40,825.00
32,027.50
48,558.75
16,531.25
40,825.00
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
3.4.6
3.4.7
3.4.8
3.4.9
3.4.10
3.4.11
3.4.12
3.4.13
3.4.14
3.4.15
3.4.16
3.4.17
3.4.18
3.4.19
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
B.21
B.22
B.23
B.24
B.25
B.26
B.27
B.28
B.29
B.30
B.31
B.32
B.33
B.34
B.35
B.36
B.37
B.38a
B.38b
124,890.00
147,775.00
208,196.00
210,858.25
422,883.75
267,202.50
243,081.25
422,676.75
265,765.00
328,739.00
261,579.00
324,553.00
253,207.00
316,181.00
2,645.00
6,612.50
193,200.00
463,450.00
698,625.00
3.5
3.5.1
3.5.2
3.5.3
3.5.4
3.5.5
3.5.6
m2
m2
m'
m'
m'
m'
B.39
B.40
B.41
B.42
B.43
B.44
297,562.50
104,190.00
97,014.00
116,173.00
147,407.00
158,608.00
1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
3
m'
m'
m'
m'
m'
m'
m'
m'
4
F.01
F.02
F.03
F.04
F.05
F.06
F.07
F.08
Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
119,616.10
643,054.13
492,357.55
445,824.53
568,962.50
220,833.35
126,933.55
326,945.00
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
m'
m'
m'
m'
m'
m'
m'
m'
F.10
F.11
F.12
F.13
F.14
F.15
F.16
F.17
119,526.40
629,435.54
492,241.40
792,218.90
152,433.08
213,461.85
209,994.60
326,679.93
5.1
5.1.1
5.1.2
5.1.3
bh
bh
m3
D.01
D.01a
D.01b
D.01c
20,930.00
21,735.00
599,092.50
5.2
m3
D.02
136,594.13
5.3
Kerangka baja profil L.50.50.5 atau L.60.60.6 atau besi profil berlubang untuk 1 m3 kistdam pasir/tanah ukuran
hari
D.03
394,692.65
5.4
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 5 kW dengan suction head max. 3m dan discharge head max. 20m
(kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
hari
D.04
1,248,233.00
5.5
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 10 kW dengan suction head max. 3m dan discharge head max. 20m
(kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
hari
D.05
1,933,213.25
5.6
Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 20 kW dengan suction head max. 3m dan discharge head max. 20m
(kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)
hari
D.06
3,338,294.75
bh
H.01
224,044.61
bh
H.02
4,964,484.23
bh
H.03
1,140,513.18
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m3
jam
jam
lokasi
sampel
bh
titik
AT.01
AT.02
AT.03
AT.04
AT.05
AT.06
AT.07
AT.08
AT.09
AT.10
AT.11
AT.12
AT.13
AT.14
AT.15
AT.16
AT.17
AT.18
301,587.50
542,142.87
501,396.90
506,594.33
336,504.49
336,812.11
245,880.19
1,817,244.38
358,556.86
4,070,262.36
68,923.28
2,051,025.47
940,872.81
333,082.97
701,500.00
1,822,750.00
281,865.00
1,423,240.00
m'
m'
LA.01a
LA.01b
410,718.48
280,814.48
No
6
6.1
6.2
6.3
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
8
Satuan
Kode
(AHSP)
Uraian
2
PEKERJAAN LAIN-LAIN
7.1 Pemagaran daerah kerja
7.1.1 Rangka baja L.40.40.4
7.1.2 Rangka Kayu
7.2
m2
LA.02
1,541,169.51
7.3
bh
LA.03
1,023,500.00
paket
paket
paket
paket
L.04
LA.04a
LA.04b
LA.04c
LA.04d
5,117,500.00
41,400,000.00
91,198,390.20
242,937,500.00
paket
paket
LA.05a
LA.05b
3,201,000.00
1,782,500.00
7.4
7.4.1
7.4.2
7.4.3
7.4.4
Mobilisasi
Investigasi Lapangan
Sewa Lahan
Fasilitas
Kebutuhan lain-lain
7.7 Penggambaran
7.7.1 Peta situasi atau peta steak out bangunan
7.7.2 Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak
bentuk-bentuk duplikasi ukuran A1
7.7.3 Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi
bentuk gambar ukuran A1
7.7.4 Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
7.8
LA.06
lbr
lbr
1)
LA.07a
398,187.50
lbr
LA.07b
195,465.50
lbr
LA.07c
11,275.75
Satuan
Kode
(AHSP)
1
2
7.8.1 Fotocopy dan jilid
7.8.2 1 set As built drawing (reduce dan copy kalkir serta blue/black print)
3
jilid
set
4
LA.08a
LA.08b
Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
31,050.00
1,943,212.50
m2
m2
LA.09a
LA.09b
1,983.75
1,273.63
m3
m3
LA.10a
LA.10b
33,062.50
16,564.27
No
Uraian