Sabp Z 002e PDF
Sabp Z 002e PDF
Sabp Z 002e PDF
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS 1]
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
SABP-Z-002E [Issue Date: 14 October 2014, Revision #
PROJECT NAME
PROJECT SPECIFICATION FOR
COMPRESSOR CONTROL SYSTEM (CCS)
SAUDI ARABIA
DOC
FOR
(CCS)
[BI-10-XXXXX]
GEN
[PROJECT NAME]
JO / EWO:
BI-10-XXXXX
COMPRESSOR CONTROL SYSTEM
DRAWING NO.
PP-XXXX
1
38
OF
SHT.NO.
A
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SABP-Z-002E [Issue Date: 14 October 2014, Revision #
1]
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
TABLE OF CONTENTS
4.4 HIGH SPEED DATA AND TRIP EVENT CAPTURING SYSTEM ..... 22
EDSD
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
DISCIPLINE
ENGINEER APPENDIX A: ACRONYMS AND DEFINITIONS .................................... 33
DATE: APPENDIX B: APPLICABLE DOCUMENTS ........................................... 37
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
1.0 INTRODUCTION
1.1 PURPOSE
The purpose of this specification is to define the minimum functional and
technical requirements for the Compressor Control System(s) (CCS) required for
[…] <INSERT PROJECT TITLE>.
This document together with the project specification for Scope of Work and the
DESCRIPTION
When used in this or referenced documents the following words are used in the
manner described below:
NO.
REV
‘CCS VENDOR’ means the company providing the system to which this
EDSD
specification is applicable.
DATE:
‘PCS VENDOR’ means the company with the overall responsibility for the
BY:
PCS order
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
See Appendix A of this document for acronyms and definition of terms used in
(DCC) NO. _____________________
this document.
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Project Specifications:
Project specification for Scope of Work: [document #]
Project specification for Process Control System (PCS) […]
Project specification for PCS Vendor Services: […]
Project specification for System Design Document (SDD): […]
Reference Documents:
DESCRIPTION
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
2.0
ENGG CERT
SCOPE
2.1 GENERAL
CCS VENDOR scope includes all aspects of CCS hardware, software and
engineering services required to meet the functionality described in this
document and the Scope of Work included in the project Scope of Work
document.
CCS VENDOR shall supply all elements of the CCS systems including design,
DESCRIPTION
CCS VENDOR shall develop the optimal control system design that shall protect
NO.
REV
the compressors from surge and provide performance control based on the
DISCIPLINE
ENGINEER
application and control objectives. The control schemes shall be developed as
necessary to suit the characteristics of the final selected compressors and
DATE: drivers.
PROJECT
ENGINEER
Additional requirements regarding the scope of work for CCS VENDOR are
DATE:
included in the Project Specification for Scope of Work and the Project
CERTIFIED Specification for PCS Vendor Services.
PCS VENDOR to incorporate it into the overall PCS System Design Document
EDSD
CCS VENDOR shall provide input to PCS VENDOR to enable to timely design
BY:
and configuration of the PCS to CCS Interface. The submittal time for each
APPROVAL/CERTIFICATION REQUIREMENTS,
revision of these deliverables shall be agreed between PCS VENDOR and CCS
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
VENDOR.
(DCC) NO. _____________________
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
CCS VENDOR shall be responsible for the supply of all aspects of the CCS
ENGG CERT
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
level at the time of the hardware freeze date as defined in the contract purchase
order or the Preliminary Design Review (PDR) whichever is later.
All CCS software shall be the latest revision level at the time of the Critical
Design Review (CDR). CCS VENDOR shall obtain an approval of software
version of CCS from PCS VENDOR / CONTRACTOR(s) / COMPANY prior to
implementation.
Key elements of the CCS, including hardware and software, shall be from the
JO/EWO
CCS Systems shall be technically qualified for use in Saudi Aramco by Process
NO.
REV
& Control Systems Department, Saudi Aramco, Dhahran and shall be listed as
DISCIPLINE
ENGINEER
technically acceptable according to SAES-Z-002.
is the latter. Support shall include spare parts and technical support. This
EDSD
software.
BY:
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Final CCS design for each individual application shall be reviewed and approved
by the PCS VENDOR / CONTRACTOR(s) / COMPANY.
CCS VENDOR shall review the piping configuration and locations of vessels,
flow elements, control valves and check valves, compressor performance
curves, compressor driver characteristics, and line lengths and volumes, for
compatibility with optimum surge protection and energy efficiency.
CCS VENDOR shall ensure that the selection, location, orientation and range of
DESCRIPTION
field transmitters, flow elements, control valves and valve positioners are
compatible. The CCS VENDOR shall also check and advise on the Recycle
valve sizing criteria provided by the compressor vendor.
CCS VENDOR shall provide support to PCS VENDOR to conduct dynamic
simulation of critical compressor configuration if required by CONTRACTOR /
Vendor.
3.4 SEGREGATION
JO/EWO
Risk Areas
Parallel Equipment
NO.
REV
DISCIPLINE CCS VENDOR shall segregate the design and configuration of the CCS
ENGINEER
hardware and software to provide risk isolation for common or parallel plant
DATE: equipment.
PROJECT
ENGINEER
Individual control algorithms for compressors installed in series within a single
train or operating area, using either multiple independent compressors or multi-
DATE:
CERTIFIED stage compression with a common driver, may be installed within a single CCS.
Where a CCS is used to control more than one compressor, I/O associated with
DATE: each compressor or compression stage shall be segregated into separate IO
CONSTRUCTION
AGENCY modules.
DATE:
Parallel Compressors within a train or between trains shall not be assigned to
OPERATIONS the same CCS.
Where a Process Interface Building (PIB) covers two or more Risk areas and/or
DATE: Operating Areas, all control equipment required for compressors located in
CONTROL NUMBER
VERIFICATION
3.5 REDUNDANCY
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Controllers and I/O shall be fully hot swappable. They shall be capable of being
replaced on-line without interfering with the operation of the active module and
without causing a disturbance to the operation of the compressor.
The failure of both the primary and redundant controllers shall cause the IO
module to drive the anti-surge recycle valve to its fail-safe position, fully open.
In the case of failure (loss of signal) of the supervisory or remote DCS setpoint,
the controller(s) shall retain the last valid setpoint.
JO/EWO
Any failure in any component of CCS shall initiate an alarm to identify the trouble
even if the controllers or other I/O system cards have already taken over.
NO.
REV
DATE:
PROJECT
INTERFACE TO DCS
ENGINEER
DATE:
The CCS shall pass to the DCS all data required for monitoring, alarming and
CONSTRUCTION
AGENCY
supervisory control of the compressor systems. In case of failure of
communication with the DCS, the controller operation shall not be impacted
DATE: and shall retain the last valid setpoint.
OPERATIONS
Data required to be exchanged between the CCS and DCS shall include but
DATE: not limited to the following:
CONTROL NUMBER
VERIFICATION
All process signals wired directly to the CCS shall be transmitted to the
EDSD
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
All data required to display the dynamic compressor operating map at the
DCS Operator Workstation.
CCS alarms to be communicated to the DCS shall include but not limited to
the following:
BY:
Purge Signal
Low Fuel supply pressure (for gas turbine)
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
The I/O’s for these connection shall be shown in the respective I/O list
developed by CONTRACTOR(s). CCS VENDOR shall review and advice the
I/O signals required.
INTERFACE TO IAMS
DESCRIPTION
All HART field devices, including transmitters and positioners, that are
connected to CCS shall be interfaced with the IAMS. Refer to the Project
Specification for Instrument Asset Management System for further details.
DISCIPLINE
shall be provided by the CONTRACTOR(s) based on network cable
ENGINEER
requirements provided by CCS VENDOR.
DATE:
PROJECT 3.8 CCS ENGINEERING WORKSTATION (EWS)
ENGINEER
GENERAL
DATE:
CERTIFIED
Each Risk Area containing a CCS shall have a dedicated Engineering
Workstation (EWS) to provide monitoring, configuration and diagnostic
DATE:
CONSTRUCTION information. Where a single PIB covers more than one risk area, a separate
AGENCY
EWS shall be provided for each risk area.
DATE:
OPERATIONS The CCS EWS shall have software and capabilities to perform the following:
DATE:
CCS Application / Program development
CCS System diagnostics
CONTROL NUMBER
VERIFICATION
One master CCS EWS shall be provided in the engineering console located
in the CCR. The CCR EWS shall be connected to each individual EWS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
configured with full monitoring and trouble shooting capabilities for all CCS
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
systems provided.
ENGG CERT
CCS VENDOR shall configure CCS application database and logics and build
all required graphics for each equipment connected to that EWS to facilitate
monitoring and troubleshooting activities.
The CCS EWS shall be located in the consoles using console furniture which
is the same design as that used to house other PCS workstations.
Console furniture for the CCS EWS(s) shall be provided by the PCS Vendor.
DESCRIPTION
HARDWARE
CCS Workstations shall be the latest available CPU processor at the time of
PDR.
CCS Vendor shall provide 20” LCD flat screen monitors for all CCS
JO/EWO
DISCIPLINE
ENGINEER
Each CCS Workstation shall include the following as minimum.
DATE:
PROJECT
ENGINEER
4 GB of RAM.
300 GB Hard-drive
DATE: One (1) CD/DVD Read/Writer.
CERTIFIED
One (1) removable mass media storage drive. The removable mass
media storage drive shall be capable of backing up the hard disk on a
DATE:
CONSTRUCTION single device.
AGENCY
DATE: SOFTWARE
OPERATIONS
CCS EWS shall be configured with multiple access levels with appropriate
EDSD
privileges for each access level. Multiple access levels shall include
DATE:
The EWS shall have provision to edit, upload and download application
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Program development software shall be the latest model and revision level at
ENGG CERT
CDR time.
Each CCS workstation shall be installed and configured with latest available
anti-virus software.
Each EWS shall be equipped with all necessary software packages, options
and utilities required to perform application development, on-line compressor
monitoring, CCS system diagnostics and high-speed data and alarm/event
logging.
a Compressor Map
DATE
media. The program shall also have the ability to be used as a trend
DATE:
d Alarm Information
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
display the status of all alarms. The facility shall provide a means of
ENGG CERT
displaying all current points, which are in alarm and shall distinguish
between acknowledged and unacknowledged status.
e Controller Configuration
3.9 DISPLAYS
DESCRIPTION
CCS VENDOR shall build all required standard and specific application displays
required to control and monitor the equipment.
The following display types shall be provided as a minimum:
DATE: d. System monitoring display which shows the status of all CCS
PROJECT
ENGINEER modules.
DATE:
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Server for user account and password administration of the PCS workstations
and servers, CCS workstations shall be integrated into the PCS Domain
Controller(s) by PCS VENDOR.
Access to CCS workstations shall be configured as per the requirements defined
in Saudi Aramco Engineering Standard, SAES-Z-001 section 14, “System
Access and Security”.
User Accounts and User Account Passwords shall be configured as per the
DESCRIPTION
3.11 DIAGNOSTICS
Each CCS shall employ self-diagnostics, which continuously monitor its own
status and indicate any fault that might occur. A fault indicator on the controller’s
operator interface shall be provided. Faults shall be communicated to the DCS
and configured as alarms with in the DCS.
The self diagnostics shall include, but not be limited to, the following failures:
JO/EWO
DISCIPLINE
ENGINEER CONTRACTOR(s) shall provide the anti-surge recycle valves. Prior to procuring
the valves, CONTRACTOR shall submit recycle valve data sheets to CCS
DATE:
PROJECT
VENDOR for review. CCS VENDOR shall review the valve data sheets for the
ENGINEER
following valve requirements as a minimum.
DATE: The valve trim characteristic shall be equal percentage or linear (as
CERTIFIED
recommended by the compressor or CCS VENDOR);
The response time from fully closed to fully open shall be a nominal three
DATE:
CONSTRUCTION seconds or less (accomplished by using volume boosters, close tubing
AGENCY
connections and the correct orifice Cv, in accordance with the Compressor
DATE:
Manufacturer’s recommendations)
OPERATIONS The ratio of the maximum selected valve capacity to the valve capacity
demanded by the compressor surge curve (worst case scenario) shall fall
DATE: between 1.8 and 2.2.
CONTROL NUMBER
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
CONTROL OBJECTIVES
CCS shall meet or exceed the following control objectives:
a. Capacity Control
The performance control algorithm shall be designed to provide precise
capacity control for its associated compressor or compressor train.
JO/EWO
b. Temperature Control
Performance control for propane compressors shall include propane chiller
drum temperature control. CCS VENDOR shall implement drum temperature
DATE
DISCIPLINE
c. Process Limiting Variables
ENGINEER Maintain selected process limiting variables, such as compressor suction
and/or discharge pressure, gas turbine power and electric motor driver
DATE:
PROJECT current or power, within safe and acceptable operating ranges.
ENGINEER
DATE:
d. Overrides
CERTIFIED Electric motor driver current control loops, for motor-driven compressors, shall
override pressure control and/or load sharing for all compressors to limit
DATE: motor current to an acceptable level.
CONSTRUCTION
AGENCY
unloading functions for bringing flow rates and discharge pressure up and
down smoothly during normal start-ups and shutdowns while maintaining
DATE:
BY:
within safe operating ranges. Actual start-up and shutdown sequencing shall
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
g. Start-up
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
There shall be an input signal to the CCS to indicate start-up. The CCS shall
ENGG CERT
Prior to compressor start-up, the anti-surge controller shall permit the recycle
valve to be driven fully open. Once the anti-surge controller is activated, it will
resume control of the recycle valve to maintain compressor minimum flow
requirements.
DESCRIPTION
h. Normal Shutdown
There shall be an input signal from ESD to CCS to indicate a normal
compressor shutdown has been initiated from the ESD system. CCS shall be
configured to automatically unload the compressor by ramping the recycle
JO/EWO
i. Emergency Shutdown
There shall be an input signal from ESD to CCS to indicate an emergency
shutdown has been initiated from the ESD system. CCS shall be configured
NO.
REV
DISCIPLINE to immediately drive the recycle valve to fully open upon receipt of this signal.
ENGINEER
DATE:
4.2 ANTI-SURGE CONTROL
CONTROL NUMBER
VERIFICATION
SURGE MONITORING
EDSD
Surge detection and protection algorithms shall monitor one or more coincident
DATE:
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
PROXIMITY TO SURGE
The anti-surge control algorithm shall continuously calculate the proximity of the
compressor operating point to the predetermined surge control line or other
DESCRIPTION
ANTI-SURGE STRATEGIES
Anti-surge controllers shall utilize either an open loop or closed loop adaptive
gain strategy to prevent a compressor from approaching or entering surge.
JO/EWO
Anti-surge control inputs include suction pressure (Ps), discharge pressure (Pd),
suction temperature (Ts), discharge temperature (Td), and differential pressure
DATE
across suction flow measuring element (Dp), compressor speed, and driver
power.
NO.
REV
DISCIPLINE The anti-surge control strategy shall have multiple levels of handling a
ENGINEER
compressor surge.
DATE:
PROJECT
ENGINEER
The first level shall monitor the compressor’s rate of advance
towards its surge margin/control line and arrest the advance through
DATE: manipulation of its recycle valve, its driver speed, or compressor load.
CERTIFIED
The second level shall rapidly advance manipulation of the recycle
valve, reset control margins, or adjust compressor operating parameters
DATE:
CONSTRUCTION whenever a compressor enters the operating region between its surge
AGENCY
margin/control line and its actual configured surge line.
DATE:
The third level shall detect when the compressor has entered
OPERATIONS surge, generate an alarm, increment a counter, and immediately drive
the compressor to a safe operating region. All surge control margins and
DATE: advance response control margins shall be increased appropriately to
CONTROL NUMBER
The CCS shall be configured to automatically increase the safety margin (ie the
DATE:
margin between the surge limit line and the surge control line) whenever the
BY:
compressor operating point moves past the surge limit line. It shall be possible
APPROVAL/CERTIFICATION REQUIREMENTS,
to adjust the percentage increase to the safety margin which is applied and to
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Recovery from an anti-surge control action, which causes the recycle valve to
ENGG CERT
gas.
The anti-surge control module shall incorporate a surge detector and surge cycle
counter.
It shall be possible to reset the surge counter from the control module front panel
or from the DCS via redundant serial link.
The controller shall employ dedicated microprocessor based technology that
executes its algorithms and adjusts the controller output at least 10 times per
second.
JO/EWO
The anti-surge controller full cycle scan time shall not exceed 100 milliseconds.
DATE
Each anti-surge control algorithm shall exchange information with all other
stages of anti-surge and performance controllers controlling the same
compressor in order to implement feed forward control responses that help
NO.
REV
DISCIPLINE prevent loop interactions that might degrade the quality of surge protection.
ENGINEER
Each anti-surge controller shall exchange information with all other anti-surge
DATE:
PROJECT
controllers controlling other compressors operating in parallel. This shall prevent
ENGINEER
interactions between compressors degrading the quality of surge protection.
DATE: The output of the anti-surge controller shall be adapted to the size and speed of
CERTIFIED
the process disturbance as follows:
DATE:
CONSTRUCTION
Minor disturbances shall be countered by smoothing algorithm that shall
AGENCY manipulate the recycle valve or other control variables to minimize
operational upsets.
DATE:
OPERATIONS
Fast or large magnitude disturbances or the rapid movement of the
compressor towards its surge line shall be countered by a step change
DATE:
or dynamic gain element that causes the anti-surge valve to be driven
CONTROL NUMBER
VERIFICATION
manually set a low-limit for the Recycle valve position. This function shall not
inhibit the opening of the recycle valve by the automatic anti-surge controller
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
the compressor’s operating point relative to the surge control line shall be shall
be provided. This information shall be available from the CCS Engineering
Workstation (EWS) and at the DCS Operator Console.
FALLBACK STRATEGIES
available as a minimum.
pressure.
DATE
Load redistribution shall occur automatically, even when compressors are being
DATE:
brought off or online, if gas inlet process conditions change or in the event of a
BY:
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
It shall be possible to switch any of the compressors within a train between load
ENGG CERT
sharing and stand-alone operation (in either automatic or manual control), via a
command issued through the DCS.
Load-sharing algorithms shall be provided for controlling interactions between
each combination of parallel compressors identified within the scope of the
project.
minutes prior and one (1) minute after the critical event.
The CCS shall incorporate ‘Trip Event Replay’ functionality to enable replay of
DATE
DISCIPLINE minimum. The system shall automatically overwrite older trip event data in order
ENGINEER
to automatically manage hard-disk storage requirements.
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
5.1 GENERAL
Start-up and shutdown of compressors shall be in accordance with the general
philosophy described below. CONTRACTOR(s) shall develop the final detailed
start-up and shutdown requirements for each compressor service to suit
particular application and the actual compressor chosen.
5.2 START-UP
DESCRIPTION
Start-up of a compressor shall take place primarily in the field at the local control
panel adjacent to the machine, with supervision from the control room operator
via the DCS. Start-up sequence logic shall also be provided to ensure the
compressor is started in a safe manner.
If necessary the operator in the field shall purge the compressor with process
gas by opening the suction EIV bypass valve and opening the vent valve to HP
flare either on compressor discharge or downstream of the after cooler.
JO/EWO
across the bypass valve falls below its trip value the operator can open the main
suction EIV and close the bypass valve.
NO.
REV
DISCIPLINE
With the compressor pressurized, the field operator drains the casing of any
ENGINEER condensed liquid. When the draining is complete the field operator confirms the
operation by pressing the local ‘Casing Drain Acknowledge’ button, which sends
DATE:
PROJECT a signal to the start-up logic and is indicated on the DCS.
ENGINEER
VERIFICATION
Provided all permissives are healthy and have been cleared, the 'Permissives
Cleared' indication at the local control panel (LCP) and DCS console are
DATE:
BY:
activated.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Once the ‘Permissives Cleared’ indication is set, the field operator presses the
ENGG CERT
‘Ready to Start Request’ button on the LCP. When the request is received in the
DCS, the control room operator confirms the request by pressing the DCS
‘Ready to Start’ button. This sets the ‘Ready to Start’ indications on the LCP
and the DCS, and provides a final permissive to the start-up logic.
The field operator presses the ‘Start’ button on the LCP. This will start the
applicable driver. The compressor will start in full recycle.
When the compressor is running, the field operator opens the bypass valve of
DESCRIPTION
discharge ZV. Once the differential pressure across the bypass valve falls below
its trip value the operator can open the discharge ZV and close the bypass
valve.
When the compressor discharge ZV is open the compressor can be loaded as
required, utilizing the ramp-up/ramp down function of the performance controller,
and transferred to automatic control.
5.3 SHUTDOWN
JO/EWO
A normal stop can be initiated from the CCR Operator console or the LCP, which
will shutdown the compressor in a planned sequence. Logic shall be
implemented within the CCS and ESD to automatically unload the compressor to
DATE
DISCIPLINE panel, or automatically by the ESD system due to improper process conditions.
ENGINEER
ESD shutdown will cause the compressor to stop immediately. CCS shall be
DATE: configured with an input from ESD sytem to indicate an ESD shutdown has
PROJECT
ENGINEER occurred. The CCS anti-surge control will open the recycle valve fully to prevent
surge occurring upon receipt of this signal.
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
CCS cabinets shall comply with the requirements specified in Saudi Aramco
Material Standard for Instrument control cabinets, 34-SAMSS-820 “Instrument
Control Cabinet – Indoor” for construction, wiring, layout, terminal block design,
tagging and power distribution.
CCS Cabinets shall have front and rear access. Each cabinet shall be supplied
with full width removable top and bottom entry plates.
CCS VENDOR shall provide detailed cabinet layout drawings which meet the
requirements specified in 34-SAMSS-820.
JO/EWO
DISCIPLINE Dedicated terminal strips shall be provided in the backside of CCS system
ENGINEER
cabinets to enable marshalling of field cables. Marshalling of field cables in the
DATE:
CCS cabinets shall comply with the requirements specified in 34-SAMSS-820.
PROJECT
ENGINEER CCS cabinets shall be provided with HART Multiplexors to interface SMART
Transmitters and Valve Positioners related to CCS to the Instrument Asset
DATE:
CERTIFIED
Management System (IAMS). PCS VENDOR shall interface the HART
Multiplexors with the IAMS.
DATE:
CONSTRUCTION
AGENCY
6.3 INTER-CABINET WIRING
CCS VENDOR shall provide all required intra-cabinet wiring for the CCS within
DATE:
OPERATIONS
the process interface buildings. Where there is a requirement for
interconnection of CCS cabinets between different buildings, CONTRACTOR(s)
shall be responsible for installation of cabling between the buildings.
DATE:
CONTROL NUMBER
CCS VENDOR shall specify the type and permissible maximum length of cable
VERIFICATION
that can be installed between units without affecting the rated performance,
EDSD
CCS VENDOR shall also specify the maximum allowable resistive and
capacitive loads that can be used together with the required cable screening and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
shielding.
(DCC) NO. _____________________
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
CCS VENDOR shall provide a report in tabular format to show power, heat
dissipation, and weight by cabinet.
CCS VENDOR shall submit the calculation basis for computing the UPS power
required on an individual cabinet basis.
Syswtem and field power supplies shall be fully redundant and sized to
continuously supply 125% of its connected load while one power supply unit is
removed (at rated voltage, ampacity, and at maximum ambient temperature of
DATE
50°C).
NO.
REV
Each power supply shall be protected by a properly sized circuit breaker or fuse.
DISCIPLINE
ENGINEER
Output protection shall be provided via a combination of strategies (i.e., diode
auctioning/isolation - where diodes are rated at not less than 300% of the
DATE: maximum power supply current delivery and time-over voltage/over-current
PROJECT
ENGINEER protection).
DATE:
One 230 VAC, 60 Hz utility power circuit from the utility power distribution panel
CERTIFIED shall be provided for each CCS cabinet. This circuit shall be provided for
cabinet lighting and convenience outlets. Two (2) convenience outlets shall be
DATE:
CONSTRUCTION
provided in each CCS cabinet.
AGENCY
Supplies.
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Each cabinet containing power supplies shall be equipped with High Sensitivity
ENGG CERT
Local control panels shall contain all hardware, cabinets, cabinet wiring, power
supplies, internal power distribution, pushbuttons, switches and indicators
DATE
necessary to safely start, stop and monitor the equipment from the field.
Local control panels shall comply with 34-SAMSS-821 “Instrument Control
NO.
REV
6.8 GROUNDING
DATE:
OPERATIONS CCS VENDOR shall issue a document detailing the manufacturer’s standard
and recommended grounding for the CCS system to CONTRACTOR(s).
DATE:
CCS VENDOR, PCS VENDOR and CONTRACTOR(s) shall ensure that the
CONTROL NUMBER
VERIFICATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
system.
CCS Vendor shall comply with requirements for “Staging, Inspection and
Testing” of the CCS equipment. Specifications for staging, inspection and
testing are detailed in the project specification for PCS Vendor Services as
applicable.
CCS Vendor shall deliver one (1) representative CCS cabinet to PCS VENDOR
FAT location to facilitate the Integrated Factory Acceptance Testing (IFAT).
JO/EWO
Factory Acceptance Test (FAT) of the System hardware and software at the
factory prior to shipment. The FAT shall be witnessed by COMPANY and
CONTRACTOR(s) representatives.
NO.
REV
DISCIPLINE
ENGINEER FAT shall be conducted to prove / validate the system hardware, software and
application / logic programming including functional testing, reliability testing,
DATE:
PROJECT
and application logic testing.
ENGINEER
FAT testing shall be conducted in compliance with SAEP-1634 requirements.
DATE: The following requirements are additional mandatory requirements to be tested
CERTIFIED
during FAT.
DATE: The FAT shall test the complete CCS including all composite modules,
CONSTRUCTION
AGENCY
interconnecting wiring, and associated circuitry shall be subject to both hardware
and software functional tests. These tests shall demonstrate the functionality of
DATE: each individual component module within the integrated CCS, including
OPERATIONS
individual I/O point tests.
DATE:
All CCS software and application logic shall be verified and tested using
dynamic simulation techniques to ensure the proper functioning of the system.
CONTROL NUMBER
VERIFICATION
The ability to make and save application program changes online without
EDSD
All diagnostic routines shall be tested by simulating CPU, I/O module failures,
(DCC) NO. _____________________
field input failures, power supply failure, and communications interface failures.
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
8.0 DOCUMENTATION
ENGG CERT
CCS VENDOR shall provide all documentation as specified in the related Saudi
Aramco Material System Specifications and Non-Material Requirement Forms
for the CCS.
CCS VENDOR shall provide the following typical documents as a minimum:
CCS Cabinet Dimensional Outline drawings
CCS Cabinet Detailed Layout drawings
DESCRIPTION
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
performance test to verify the ability of the system to meet the stated
performance objectives.
NO.
REV
CONSTRUCTION
AGENCY CCS VENDOR shall participate in ‘Surge’ testing under the supervision
of CONTRACTOR(s).
DATE:
OPERATIONS
CCS VENDOR shall update the CCS configuration parameters with
actual compressor surge curve data established during actual compressor
DATE:
surge testing.
CONTROL NUMBER
VERIFICATION
EDSD
objectives.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
testing and tuning adjustments have been made, noting any potential control
systems or operational problems.
NO. DESCRIPTION
JO/EWO
DATE
REV
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ACRONYMS
AC Alternating current
BSCFD Billion standard cubic feet per day
CCS Compressor Control Systems
CCR Central Control Room
CD Compact Disk
DESCRIPTION
I/O Input/output
LCD Liquid Crystal Display
NO.
REV
LP Low Pressure
DISCIPLINE
ENGINEER LSTK Lump Sum Turn Key
MB Mega Byte
DATE:
PROJECT
MTBF Mean Time Between Failures
ENGINEER
MTTF Mean Time to Failure
MTTR Mean Time to Repair
DATE:
CERTIFIED OPC Object embedded Linking for Process Control
P&ID Piping and Instrument Diagram
DATE: PC Personal Computer
CONSTRUCTION
AGENCY PCS Process Control System
ADS Program Development Workstation
DATE: PIB Process Interface Building
OPERATIONS
QA/QC Quality Assurance/Quality Control
SAES SAUDI ARAMCO Engineering Standard
DATE:
SAMSS SAUDI ARAMCO Materials System Specification
CONTROL NUMBER
VERIFICATION
ZV
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
DEFINITIONS
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
DISCIPLINE Rack Cabinet used for mounting enclosure for the monitoring
ENGINEER
system. The racks to be used for these systems shall be
DATE: 19” wide.
PROJECT
ENGINEER
Reliability The probability that when operating under stated
DATE: environmental conditions, the system will perform
CERTIFIED
continuously, as specified, over a specific time interval.
DATE:
CONSTRUCTION Surge Dynamic self-oscillation of pressure and flow which can
AGENCY
occur across a single stage, or across multiple stages, of
DATE:
a compressor in response to low or high discharge
OPERATIONS pressure.
DATE: Surge Curve(s) Curve(s) which delineate the points at which a compressor
experiences a flow reversal due to its inability to impart
CONTROL NUMBER
VERIFICATION
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Surge Limit Line A linearised control line inserted between the anti-surge
margin line and the actual compressor surge curve, which
has the function of initiating an open-loop step change to
drive the anti-surge Recycle Valve open.
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
The design, materials and construction of the equipment described herein shall be in
accordance with the latest revision of the documents listed below which are part of
this specification.
Association (NEMA)
EDSD
DATE:
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Association (NFPA)
Tests
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
PROJECT SPECIFICATION FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.