Detail Design: Instrument Air Back Up System by Nitrogen (N2) Gas
Detail Design: Instrument Air Back Up System by Nitrogen (N2) Gas
Detail Design: Instrument Air Back Up System by Nitrogen (N2) Gas
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER
RTD
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
20/05/2018
CERTIFIED
20/05/2018
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
RABIGH
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
PETRO RABIGH
C070
WBS # 30-17107
REQUISITION FOR
CONTROL VALVES
J
DETAIL DESIGN
XXXX
DRAWING NO.
1 1111-8550-RQ-C070-
INSTRUMENT AIR BACK UP SYSTEM BY
OF
16
SHT.NO.
00A
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER
RTD
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
20/05/2018
CERTIFIED
20/05/2018
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
RABIGH
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
PETRO RABIGH
J C070
DWG.TYPE PLANT NO. INDEX
2 1111-8550-RQ-C070-
OF
16
SHT.NO.
00A
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
PETRO RABIGH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
TABLE OF CONTENTS
RTD
1 GENERAL 3
2 SCOPE OF VENDOR'S SUPPLY 3
2.1 Equipment / Materials 3
ISSUED FOR 90% REVIEW
DISCIPLINE
ENGINEER
6 EXCEPTIONS, ALTERNATIVES AND CLARIFICATIONS 7
RTD
20/05/2018 6.1 Base Proposal 7
DATE:
PROJECT
ENGINEER
6.2 Exception to the Proposal7
7 QUALITY ASSURANCE 7
20/05/2018
DATE:
CERTIFIED 8 PRECEDENCE OF DOCUMENTS 8
9 SUB VENDOR 8
DATE:
CONSTRUCTION
AGENCY 10 SPECIAL NOTE 8
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
1 GENERAL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This requisition covers specific purchase conditions pertaining to the purchase of materials
ENGG CERT
and/or equipment to be used for Installation of the Instrument Air (IA) backup system by nitrogen
gas. As such, it is a supplement to the "Request for Quotation" and/or the "General Purchase
RTD
Note: Unless otherwise specified, the latest issue of all documents shall be applied.
The terms of “Company” means PetroRabigh.
ISSUED FOR 90% REVIEW
DISCIPLINE
Equipment and/or Materials to be covered by this requisition are;
ENGINEER
RTD [X] As per ATTACHMENT-1: “Equipment/Materials List”
20/05/2018
DATE: [] As per “Equipment Items” mentioned below
PROJECT
ENGINEER
Item No. Description Quantity Equipment
20/05/2018 Category
DATE:
CERTIFIED
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
1.0.1.1 Vendor shall recommend the start-up spare parts of the equipment, and provide a
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
price list.
ENGG CERT
1.0.1.3 Vendor shall submit “Equipment Spare Parts Interchangeability Record (SPIR)”
1.0.1.4 These spare parts may be purchased by Company in accordance with the
approved
ISSUED FOR 90% REVIEW
E-SPIR Package.
DESCRIPTION
Vendor shall supply special tools and devices necessary for fabrication, lifting, erection, testing
and maintenance of the equipment and materials of Vendor's supply. These shall be easily
20/05/2018
DATE
identifiable and shall be supplied in a lockable steel box except large devices. Vendor shall also
provide a list and documentation of such special tools. The price shall be indicated separately
and included in the lump sum price.
00A
NO.
REV
DISCIPLINE
ENGINEER
RTD 2.4 Operational Materials (Consumables)
20/05/2018
DATE:
Vendor shall supply operational materials (consumables) as per the list of consumables.
PROJECT
ENGINEER
1.0.1.5 Vendor shall inform Purchaser of the specifications, quantities and maintenance
DATE:
20/05/2018 frequency of operational consumables, such as chemicals, lubricants, catalyst, fillings and
CERTIFIED recording chart, if any, for 90 days operation including initial charge and for continuous
operation thereafter.
DATE:
CONSTRUCTION
1.0.1.6 If the consumables are Vendor’s exclusive products, Vendor shall provide the price
AGENCY list.
DATE: 1.0.1.7 Purchaser will purchase the consumables listed in accordance with the above item
OPERATIONS (2) after Purchaser’s review.
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
In accordance with: [] Vendor recommendation approved by Purchaser,
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
[X] Applicable Saudi Aramco standard
ENGG CERT
RTD
substances.
Rust prevention effective up to and including two (2) months ocean transportation and six (6)
DESCRIPTION
It should be noted that proposal documents requested in Attachment-1 are inevitable for
bid evaluation. Lack of any of these documents in his proposal may cause the rejection of
00A
NO.
REV
DATE:
20/05/2018 1.0.1.2 Manufacturing Schedule and Status Report
PROJECT
ENGINEER
Vendor shall provide in the proposal a time schedule for the submission of documents,
fabrication including order and material delivery from sub vendors, testing and inspection,
20/05/2018
DATE: ready for shipment at workshop and port for export, etc.
CERTIFIED
Vendor shall supply Purchaser with electronic data of their documents / drawings, and the
DATE:
BY:
requirements specified in the table “Vendor Drawing and Documents” in this requisition.
REVISIONCERTIFICATION
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
Bentley Micro station :Drawings
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Microsoft WORD :Text Document, Operating Instruction
ENGG CERT
of their packing list as soon as possible when it became available, but not later than 10
days before contracted delivery date.
DESCRIPTION
plan) for review and Approval in accordance with requirements of SAEP-1151 and the
Purchase Order and particularly SAUDI ARAMCO Inspection & Testing Requirements,
Forms-175. ITP shall be submitted to PetroRabigh for review and approval prior to Pre-
20/05/2018
DATE
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
The maximum weight and measurement of any item of cargo shall be as follows:
Measurements: Length 11.8 m, Width 2.3 m, Height 2.3 m, Weight 20 metric tons
(DCC) NO. _____________________
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0.1.8 In the event that the cargo exceeds the above figures, Vendor shall prepare its plan for
ENGG CERT
Vendor agrees that the only exceptions and alternatives to be considered by Purchaser shall be
limited to those separately specified in a proposed exception list accompanying Vendor's
00A
NO.
REV
DATE:
20/05/2018 Note: Alternative proposal is evaluated only in the case where a base proposal is submitted.
CERTIFIED
DATE:
CONSTRUCTION 7 QUALITY ASSURANCE
AGENCY
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
Vendor shall submit the Quality Plan for this Purchase Order to Purchaser for review and
(DCC) NO. _____________________
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
Even if Vendor is certified under ISO 9001 by an inter-nationally recognized certification body,
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Company and Purchaser reserve the right to monitor Vendor’s quality system and carry out the
ENGG CERT
quality audits.
RTD
Monitoring or inspection by Company and Purchaser does not relieve Vendor of:
8 PRECEDENCE OF DOCUMENTS
DESCRIPTION
In the event of conflict between any of the requirements of the applicable documents, including
the documents, specifications, and standards referenced herein, for purpose of determining the
requirements of the applicable documents, the order of precedence of the documents shall be as
follows:
1 This requisition
2 Purchaser's drawing/data sheet/specifications
3 Applicable Company general specifications
30-17107
JO/EWO
DISCIPLINE
ENGINEER
8 Company’s standard drawings (Non-mandatory)
RTD
20/05/2018
9 Industrial code standard, e.g. ASME, ANSI (Note)
DATE:
PROJECT
ENGINEER
If Vendor discovers any inconsistency or conflict within the documents comprising this
20/05/2018 Requisition he shall forthwith in writing notify Purchaser of the details of such inconsistency or
DATE:
CERTIFIED conflict and shall be resolved by Purchaser.
DATE:
Note: Where Company’s Standards/Specifications (SAES & SAMSS) call for specific revision
CONSTRUCTION numbers or date of industrial codes, such versions of industrial codes shall govern.
AGENCY
Where no specific revision numbers or dates for industrial codes are specified in the Company’s
DATE:
Standards/Specifications, the latest versions of the industrial codes shall govern.
OPERATIONS
9 SUB VENDOR
DATE:
Vendor shall submit the list for sub-vendors based on Vendor’s quotation.
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
10 SPECIAL NOTE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0.1.14 Vendor shall input the unit price in List of Control Valves, shall select the
ENGG CERT
1.0.1.15 If there are any tapped (threaded) bolt holes of end flanges, Vendor shall provide
the machine bolts for the tapped hole.
1.0.1.16 Vendor shall input all the diagnostic data of the valve origin after the positioner
setting and the vendor have a responsibility to guarantee all the required function.
ISSUED FOR 90% REVIEW
1.0.1.17 Purchaser shall have rights to specify actuator orientation until Purchaser approves
the drawings as “For Construction”.
DESCRIPTION
1.0.1.21 Materials for pneumatic tubing shall be 316L SS, while 316 SS for valves and
30-17107
JO/EWO
fittings, and air tubing, fitting or connection nipple sizes shall not be less than 1/4" NPT.
Compression fittings shall be double ferrule type.
All instrument tubing fittings shall be selected preferably from Swagelok (US).
20/05/2018
DATE
1.0.1.22 Generally, Equal percentage flow characteristic shall be selected except for level
control applications which should be Linear (unless indicated otherwise) and that of On-off
00A
NO.
REV
20/05/2018 1.0.1.25 Vendor shall supply control valve with permanently attached 316SS tag plate
DATE:
CERTIFIED indicating, as minimum:
-Tag Number
DATE: - Manufacturer’s Name
CONSTRUCTION
AGENCY
- Model No.
- Serial No.
DATE: - Body Material, Size and Flange Rating
OPERATIONS - Trim material
- Trim Size
DATE:
- Actuator Model. Size and Bench Set
- Rated Cv value
CONTROL NUMBER
VERIFICATION
- Failure mode
EDSD
- Input Signal
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
ATTACHMENT-1
30-17107
JO/EWO
ZCOM NO.:
DATE
Item Type of
DISCIPLINE Tag No. Qty Data sheet No Data sheet No
ENGINEER No. Valve
RTD
20/05/2018
PRESSURE CONTROL VALVE 1111-8550-DS-C070-XX11 SH.1
DATE: 1 C070-PV-0502A 1 12”, CL 150#, RF FLANGED GLOBE OF 1 REV.00A
PROJECT
ENGINEER 1a,2a For above tags CALCULATION/SIZING SHEETS
1b,2b For above tags DIMENSIONAL DRAWINGS
20/05/2018
DATE: Total 1
CERTIFIED
DATE:
CONTROL NUMBER
VERIFICATION
Note: Data Sheets and P&IDs are attached at end of this document.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
SAUDI ARAMCO ENGINEERING PROCEDURE:
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
SA-7928, SA-7925
DESCRIPTION
175-340100
INSPECTION LEVEL:
LEVEL- 2
ATTACHMENT-2
30-17107
JO/EWO
Submission of documents shall be in accordance below table. "Instructions for Vendor Documentation".
4) Sectional dwg and part lists for spare parts --- 12W E E E
5) Special tool list --- --- --- --- ---
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
For For As-Built
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For Approval Const.
Proposal Doc.
ENGG CERT
after P.O
ENGINEERING
3.
DOCUMENTS/DRAWINGS (GENERAL)
DRAWINGS
1) Control Valve Specification E 4W E E E
ISSUED FOR 90% REVIEW
12) --- E E E
procedure
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
5W
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
For For As-Built
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For Approval Const.
Proposal Doc.
ENGG CERT
after P.O 3X + E
1) Inspection Record Book (IRB)
(note-5)
8. MISCELLANEOUS DOCUMENTS
1) Scope of Supply List E 2W E E E
2) Deviation / Clarification List E --- --- --- ---
3) Vendor's Document and Drawing List --- 2W E E ---
ISSUED FOR 90% REVIEW
procurement )
5) Manufacturing status report --- --- ---
6) Minutes of meeting --- (note-6) E E ---
7) Sub-vendor’s List E 2W E E ---
8) Inspection and Test Plan --- 8W E E E
9) IRB Index --- 8W E E ---
10) Certificate of explosion proof type electrical
--- 4W E E E
equipment
11) Copy of ISO 9001 certificate E --- --- --- ---
12) Vendor's Quality Manual E --- --- --- ---
30-17107
JO/EWO
NOTES:
00A
NO.
REV
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PETRO RABIGH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
ATTACHMENT-3
DATE
DISCIPLINE
ENGINEER This lists all Vendor’s proposed exceptions to JOB SPECIFICATION. Vendor agrees that its PROPOSAL is
RTD
in full compliance with the JOB SPECIFICATION except for the exceptions described below. If an exception
20/05/2018
DATE: is rejected, Vendor’s PROPOSAL will be adjusted pursuant to the effects noted.
PROJECT
ENGINEER
Effect on Base
Recommended Revision
DATE:
20/05/2018 Item Description of Reason for PROPOSAL if
To JOB
CERTIFIED No. Proposed Exception Proposed Exception OWNER Rejects
SPECIFICATION
Exception
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL
MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER
RTD
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
20/05/2018
CERTIFIED
20/05/2018
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
RABIGH
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
PETRO RABIGH
J C070
DWG.TYPE PLANT NO. INDEX
16 1111-8550-RQ-C070-
OF
16
SHT.NO.
00A
REV.NO.
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.