Initial Environmental Examination (IEE) Checklist Report For Corn and Rice Mill Projects
Initial Environmental Examination (IEE) Checklist Report For Corn and Rice Mill Projects
Initial Environmental Examination (IEE) Checklist Report For Corn and Rice Mill Projects
Capacity
Facilities
No. of (ton/hour) Specification/Description
please enumerate; use separate sheet, if
Units or Area
necessary)
(sq./M)
1. Main Components 22 pcs 7 to 8 tons per hr comprises of screw conveyor driven by various hp's ranges 1 to 5 hp , bucket
a, Conveying Systems 8 pcs on paddy elevators from 2 to 7.5 hp . Construction : Mild steel , tool steel shafts, PE
b. holding tanks/bins buckets, steel rollers and PVC food grade flat belts
Construction bins : mild steel , complete with pneumatic gates
a. Drying (method)
b. Cleaning/Hulling 7 pcs 7 to 8 tons per hr comprises of 1 unit siever or pre cleaner 1700 X 1750 X 3250 mm size model
on paddy SLT1-60NA, 3 units paddy husker model clc 600C 1020x755x1320 mm size, 1
unit husk blower FLG -C150 A , 2 sets cyclone for husk C-170LB , 2 units
airlocks, 1 set husk aspirator HR 6O A
c. Shaking/Separating 2 units 9.6 tons each mdel BG 24C , paddy separator complete with feeding tanks and destoner
e. Grinding
none
f. All in one machine for 1 lot 6 to 8 tons 1. hopper scale 2 paddy husker 3 husk aspirator 4 paddy cleaner 5 rice
cleaning/polishing/grinding cleaner 6 paddy separator , 7 whitening 8 destoner 11 rice polishing
12 length grader
g. Weighing and Packaging 1 unit 15 tons shutter scale , complete with belt conveyor, sewing machine , electronic
control, industrial sewing machine
h. Others, specify 1 unit 6 - 8 tons electronic control, complete with chute, tank and compressed air pipeline
color sorter
2. Storage Facility
a. Fuel Storage
none
c. Palay/corn Storage
d. Others, specify
b. Rice Hulls Storage Bins 2 units each 40 tons each hull bin , mild steel contruction
4. Power source/supply
a. Electric source 440 VAC, 3 phase , 60 hz
8. Drainage System
9. Support Facilities
a. Workers quarters
b. Admin building
d. Others, specify
KWh
m3/day
Well in: (specify location): m3/day
KWh
b. Operation