Welding Calculation

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 32
At a glance
Powered by AI
The document discusses various welding processes and provides calculations to estimate welding times for different components based on parameters like thickness, length, diameter etc.

Some of the welding processes discussed are SMAW, SAW, GTAW, FCAW for different welding positions.

Parameters like thickness, length, diameter, welding process, heat input, preheating etc. are considered for estimating weld times.

OVERLAY WELD KG & RUN TIME ESTIMATION

TOME REQUIRED FOR RADIOGRAPHY TEST


C/SEAM OR L/SEAM OR T-FRAME (LS/CS/TF)?
LG OF SHELL/NOZZLE=
LOWER THK INCLUDING RAINFORCEMENT
RADIOGRAPHY BY IRIDIUM/COBALT(I/C)?
SPOT RT OR PENOROMIC RT (S/P)?

LG OF SHELL/NOZZLE=
SPOT LENGTH=
NO. OF SPOT=

3000
300
10

LS
TIME REQUIRED FOR RT=

3000
50
I
S

THK=

50

TIME CALCUCATION
SPOT
SPOT FOR FILLET IN T-FRAMES
PEMOROMIC

297503042.xls

IRIDIUM
86.4
691.2
2592.0

COBALT
23.8
113.0
458.2

12/06/2015

864
14.4
0.60

MIN
HRS
DAYS

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION


SINGLE 'V'

RUN TIME TIME REQUIRED FOR


L/SEAM OR C/SEAM (LS/CS)=

LS

HRS/KG

1). SMAW
2). SAW

45

52
R.F.=

R.G.=

PARAMETERS SETTING
PROCESS
KG/SHIFT

THK= 54
LG OF LONG SEAM= 58000
MATERIAL (SS/STEEL)= ss

DENSITY= 0.000008

4
2.00
(C/S)
30
0.27
(L/S)
18
0.44
3).FCAW (1.2 )
6
1.33
4). GTAW
1.6
5.00
5). TWIN HD. (C/S 24 48
0.330.66
SAW **
(L/S) 14.428.8
0.561.11
** WITH 2 OPERATORS
POSITION OF
MULTIPLICATION
WELDING
FACTOR
1). 1G
1
2). 2G
1.6
3). 3G
1.3

ALL DIMENSIONS ARE IN MM


PREHEATING
REQUIRED?
YES
NO

CROSS SEC. AREA TOTAL WELD KG


O/S WELDING=
C/B WELDING=
TOTAL WELDING=

1420.3
298.2
1718.5

LONG SEAM

659.0
138.4
797.4

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

20%

0.444

1.0

OUT SIDE BALANCE

80%

1.0

CHIP BACK WELDING

100%

1.0

TOTAL =

297503042.xls

MULTIPLICATION
FACTOR
1.15
1

12/06/2015

RUN TIME
(min)
(Hrs)
3514.7
58.6
63264.4
1054.4
16603.5
276.7
83382.6
1389.7

6
12

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

0.66
1.11

297503042.xls

12/06/2015

LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION


DOUBLE 'V'

RUN TIME TIME REQUIRED FOR


L/SEAM OR C/SEAM (LS/CS)=

PARAMETERS SETTING
PROCESS
KG/SHIFT HRS/KG

ls

45

1). SMAW
2). SAW

36.0
THK= 54
R.F.=

LG OF LONG SEAM= 1364


MATERIAL (SS/STEEL)= steel

15.0

R.G.=

60

DENSITY= 0.00000785

ALL DIMENSIONS ARE IN MM

PREHEATING
REQUIRED?
YES
NO

CROSS SEC. AREA TOTAL WELD KG


O/S WELDING=
C/B WELDING=
TOTAL WELDING=

710.3
514.4
1224.7

LONG SEAM

7.6
5.5
13.1

MULTIPLICATION
FACTOR
1.15
1

CHIP BACK DEPTH(MM)


THK <= 30
6
THK > 30
12

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

12%

1.0

1.15

OUT SIDE BALANCE

88%

0.444

1.0

CHIP BACK WELDING

100%

0.444

1.0

TOTAL =

297503042.xls

4
2.00
(C/S)
30
0.27
(L/S)
18
0.44
3).FCAW (1.2 )
6
1.33
4). GTAW
1.6
5.00
5). TWIN HD. (C/S 24 48
0.330.66
SAW **
(L/S) 14.4
0.561.11
28.8
** WITH 2 OPERATORS
POSITION OF
MULTIPLICATION
WELDING
FACTOR
1). 1G
1
2). 2G
1.6
3). 3G
1.3

12/06/2015

RUN TIME
(min)
(Hrs)
120.7
2.0
178.5
3.0
146.9
2.4
446.1
7.4

LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION

0.66
1.11

297503042.xls

12/06/2015

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION


BACKING STRIP
10

PARAMETERS SETTING
PROCESS
KG/SHIFT

cs

RUN TIME TIME REQUIRED FOR


L/SEAM OR C/SEAM (LS/CS)=

1). SMAW
2). SAW
THK= 8
I/D OF SHELL 5486
MATERIAL (SS/STEEL)= STEEL

R.G.=

4
(C/S)
30
(L/S)
18
3).FCAW (1.2 )
6
5). TWIN HD. (C/S) 24 48
SAW **
(L/S) 14.428.8
** WITH 2 OPERATORS

10

DENSITY= 0.00000785

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

ALL DIMENSIONS ARE IN MM


CROSS SEC. AREA

TOTAL WELD KG

O/S WELDING=

119.8

16.2

TOTAL WELDING=

119.8

16.2

CIRC SEAM
OUT SIDE BALANCE

100%

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

0.267

1.6

TOTAL =

297503042.xls

12/06/2015

RUN TIME
(min)
(Hrs)
0.0
0.0
0.0
0.0

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

ETTING
HRS/KG

48
28.8

2.00
0.27
0.44
1.33
0.330.66
0.561.11

MULTIPLICATION
FACTOR

1.3
MULTIPLICATION
FACTOR
1.15
1

297503042.xls

12/06/2015

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION


J GROOVE

RUN TIME TIME REQUIRED FOR


L/SEAM OR C/SEAM (LS/CS)=

PARAMETERS SETTING
PROCESS
KG/SHIFT HRS/KG

CS

10

1). SMAW
2). SAW

59.0
THK= 80
R= 12

11.0
R.F.=

R.G.=

I/D OF SHELL 379


MATERIAL (SS/STEEL)= STEEL
DENSITY= 0.00000785

10

ALL DIMENSIONS ARE IN MM

PREHEATING
REQUIRED?
YES
NO

CROSS SEC. AREA TOTAL WELD KG


O/S WELDING=
C/B WELDING=
TOTAL WELDING=

2186.6
486.7
2673.3

CIRC SEAM

24.8
5.5
30.3

MULTIPLICATION
FACTOR
1.15
1

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

20%

1.0

1.15

OUT SIDE BALANCE

80%

1.0

1.15

CHIP BACK WELDING

100%

1.0

1.15

TOTAL =

297503042.xls

4
2.00
30
0.27
18
0.44
3). FCAW
6
1.33
4). GTAW
1.6
5.00
5). TWIN HD. (C/S) 24 48
0.33
0.66
SAW **
(L/S) 14.428.8
0.56
1.11
** WITH 2 OPERATORS
POSITION OF
MULTIPLICATION
WELDING
FACTOR
1). 1G
1
2). 2G
1.6
3). 3G
1.3
(C/S)
(L/S)

12/06/2015

RUN TIME
(min)
(Hrs)
683.1
11.4
2732.5
45.5
760.3
12.7
4175.9
69.6

6
12

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION


HRS/KG

0.66

297503042.xls

12/06/2015

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION


COMPOUND 'V'

RUN TIME TIME REQUIRED FOR


L/SEAM OR C/SEAM (LS/CS)=
10

45
12
R.F.=

R.G.=

O/S WELDING=
C/B WELDING=
TOTAL WELDING=

738.6
298.2
1036.8

CIRC SEAM

HRS/KG

2.00
(C/S)
0.27
(L/S)
0.44
3).FCAW (1.2 )
1.33
4). GTAW
5.00
THK= 50
I/D OF SHELL= 2600
5). TWIN HD. (C/S) 24 48
0.330.66
SAW **
(L/S) 14.4 28.8
MATERIAL (SS/STEEL)= STEEL
0.56
1.11
** WITH 2 OPERATORS
DENSITY= 0.00000785
POSITION OF
MULTIPLICATION
WELDING
FACTOR
1). 1G
1
ALL DIMENSIONS ARE IN MM
2). 2G
1.6
3). 3G
1.3
PREHEATING
REQUIRED?
YES
NO

CROSS SEC. AREA TOTAL WELD KG


48.3
19.5
67.8

4
30
18
6
1.6

MULTIPLICATION
FACTOR
1.15
1

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

20%

1.0

1.15

OUT SIDE BALANCE

80%

0.267

1.0

CHIP BACK WELDING

100%

0.267

1.0

TOTAL =

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
2). SAW

36

CS

12/06/2015

RUN TIME
(min)
(Hrs)
1332.3
22.2
617.9
10.3
311.8
5.2
2262.0
37.7

6
12

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION

HRS/KG

0.66

297503042.xls

12/06/2015

NOZZLE WELD KG & RUN TIME ESTIMATION


SINGLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 10
INC. ANG=45

MATERIAL (SS/STEEL)= STEEL


DENSITY= 7.85E-006
NOZZLE O/D=
60

OFF SET=
0

THK= 26
SHELL I/D=
4300

R.F.= 2
R.G=
4

NOZ O/D
60

ELLIPSE DIMENSION
MAJOR AXIS=
64.0
MINOR AXIS=
64
LG. OF WELDING= 201.066

WELD KG
WEIGHT
CROSS SEC.
ON SHELL ON D/END
CALCULATION
AREA
O/S WELDING=
338.00
0.53
0.53
C/B WELDING=
56.55
0.09
0.09
TOTAL WELDING=
0.62
0.62
PROCESS
POSITION
HEATING
ON SHELL
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN 20%
1
2.5
1
1.0
Y
1.15
OUT SIDE BALANCE 80%
1
2.5
1
1.0
Y
1.15
CHIP BACK WELDING 100%
1
2.5
1
1.0
Y
1.15
TOTAL =

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
3.2
2). SAW
14.4
3). FCAW (1.2 )
6.0
4). GTAW
1.3

12/06/2015

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR

1
1.6
1.3

1.15

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30
RUN TIME
(min)
(Hrs)
18.4
0.3
73.6
1.2
15.4
0.3
107.4
1.8

NOZZLE WELD KG & RUN TIME ESTIMATION

TTING
HRS/KG
2.50
0.56
1.33
6.25

MULTIPLICATION
FACTOR
1
1.6
1.3

MULTIPLICATION
FACTOR
1.15

K DEPTH(MM)
6
12

297503042.xls

12/06/2015

NOZZLE WELD KG & RUN TIME ESTIMATION


BACKING STRIP

NOZZLE ON SHELL/DEND) (D/S) ?

MATERIAL (SS/STEEL)= STEEL


CFW= 9
INC. ANG= 15

DENSITY= 0.00000785
NOZZLE O/D=
300

SHELL I/D=
6800

R.G=
10

NOZ O/D
300

CROSS SEC.
AREA
875.44

WELD KG
ON SHELL ON D/END
7.63
7.63

TOTAL WELDING=

ON D/END
OUT SIDE BALANCE 100%

BACKING STRIPP DIMENSION


OUTER MAJOR AXIS 358.4
OUTER MINOR AXIS
340.0
WIDTH=
32.3

297503042.xls

PROCESS
CODE
1
2.5

3).FCAW (1.2 )

HRS/KG
2.50
0.56
1.33

6.0

OFF SET=
1100

THK= 50

ELLIPSE DIMENSIO o/d


I/d
MAJOR AXIS=
353.4
303.4
WEIGHT
MINOR AXIS=
353.4 303.377 CALCULATION
LG. OF WELDING= 1110.17
O/S WELDING=

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
3.2
2). SAW
14.4

7.63
POSITION
CODE
1

1.0

O/D= 358.4
I/D= 275.4

12/06/2015

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR

1
1.6
1.3

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

7.63
HEATING
(Y/N)
Y
1.15
TOTAL =

1.15

RUN TIME
(min)
(Hrs)
1316.0
21.9
1316.0
21.9

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION

DOUBLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 9
INC. ANG= 45

MATERIAL (SS/STEEL)= STEEL

1). SMAW
2). SAW
3).FCAW (1.2 )
4). GTAW

DENSITY= 0.00000785
NOZZLE O/D=

OFF SET=

194

44
THK= 65

R.F.= 2

3020

SHELL I/D=

19
R.G=

NOZ O/D

194

INC. ANG= 35

ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

197.1
197
619.1137

ON SHELL
OUTSIDE ROOT RUN

WEIGHT
CALCULATION
O/S WELDING=
C/B WELDING=
TOTAL WELDING=

WELD KG
CROSS SEC. AREA ON SHELL ON D/END
1146.50
5.57
5.57
336.45
1.64
1.63
7.21
7.20

PROCESS

POSITION

CODE

(Y/N)

20%

2.50

1.0

1.15

OUT SIDE BALANCE

80%

2.5

1.0

CHIP BACK WELDING

100%

2.5

1.0

TOTAL =

297503042.xls

12/06/2015

3.2
14.4
6.0
1.3

HRS/KG
2.50
0.56
1.33
6.25

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

CHIP BACK DEPTH(MM)


THK <= 30
6
THK > 30
12

HEATING

CODE

PARAMETERS SETTING
PROCESS
KG/SHIFT

RUN TIME
(min)
(Hrs)
192.2
3.2
668.6
11.1
245.3
4.1
1106.2
18.4

NOZZLE WELD KG & RUN TIME ESTIMATION


'J' GROOVE

NOZZLE ON SHELL/DEND) (D/S) ?

PARAMETERS SETTING
PROCESS
HRS/KG
KG/SHIFT

MATERIAL (SS/STEEL)= STEEL

1). SMAW
2). SAW
DENSITY= 0.00000785 3).FCAW (1.2 )
4). GTAW

NOZZLE LIP O/D=

R.G=

369

3
R.F.= 10

3.2
14.4
6.0
1.3

2.50
0.56
1.33
6.25

OFF SET=

0
R= 12

4644

SHELL I/D=

THK= 80

INC. ANG.= 5

369
INC. ANG.= 5

372.4
372
1169.3

ON SHELL
OUTSIDE ROOT RUN

WEIGHT
CALCULATION
I/S WELDING=
C/B WELDING=
TOTAL WELDING=

CROSS SEC. AREA


1456.86
414.69

PROCESS

WELD KG
ON SHELL ON D/END
13.37
13.37
3.81
3.80
17.18
17.17

POSITION

CODE

HEATING

CODE

(Y/N)

20%

2.5

1.0

1.15

OUT SIDE BALANCE

80%

2.5

1.0

1.15

CHIP BACK WELDING

100%

2.5

1.0

1.15

TOTAL =

297503042.xls

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

NOZ O/D

ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

12/06/2015

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

RUN TIME
(min)
(Hrs)
461.4
7.7
1845.4
30.8
656.6
10.9
2963.4
49.4

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION

R.F. PAD +SINGLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 9
INC. ANG= 35

MATERIAL (SS/STEEL)= STEEL


DENSITY= 0.00000785

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
2). SAW
3).FCAW (1.2 )
4). GTAW

INC. ANG= 5
OFF SET=

HRS/KG

3.2
14.4
6.0
1.3

2.50
0.56
1.33
6.25

0
THK= 16
R.F.PAD

5
NOZZLE O/D=

0
00
=2
D
/
DO
PA

602
THK= 20

NOZ O/D

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION FACTOR
1.15
1

602
FILLET SIZE=30

ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

4300

SHELL I/D=

R.F.= 2
R.G=
3

WEIGHT
CALCULATION
O/S WELDING=
C/B WELDING=
R.F.PAD WELDING=
TOTAL WELDING=

607.0
605
1903.83

ON SHELL

WELD KG
CROSS SEC. AREA ON SHELL ON D/END
554.79
8.29
8.28
56.55
0.85
0.84
450.00
22.42
22.42
31.55
31.54

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

20%

2.5

1.0

OUT SIDE BALANCE

80%

2.5

1.0

CHIP BACK WELDING

100%

2.5

1.0

R.F.PAD WELDING

100%

2.5

1.0

TOTAL =

297503042.xls

12/06/2015

RUN TIME
(min)
(Hrs)
248.7
4.1
995.0
16.6
126.8
2.1
3362.6
56.0
1370.5
22.8

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION


R.F. PAD +SINGLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 9
INC. ANG= 45

MATERIAL (SS/STEEL)= STEEL

1). SMAW
2). SAW
3).FCAW (1.2 )

10
INC. ANG= 5

PARAMETERS SETTING
PROCESS
KG/SHIFT

DENSITY= 0.00000785

HRS/KG

3.2
14.4
6.0

2.50
0.56
1.33

OFF SET=

330
THK= 90
R.F.PAD

10
NOZZLE O/D=

/D=
DO
A
P

0
10

345
THK= 90

NOZ O/D

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION FACTOR
1.15
1

345
FILLET SIZE=40

2450

SHELL I/D=

R.F.= 2
R.G=
3

WEIGHT
CALCULATION
ELLIPSE DIMENSION o/d
I/d
O/S WELDING=
MAJOR AXIS=
381.2
331.2 R.F.PAD WELDING=
MINOR AXIS=
381.2 331.1593 TOTAL WELDING=
LG. OF WELDING=
1197.447

ON D/END

WELD KG
CROSS SEC. AREA ON SHELL ON D/END
13984.83
131.46
131.46
800.00
20.26
20.26
151.71
151.71

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUT SIDE BALANCE

100%

0.56

1.0

R.F.PAD WELDING

100%

2.50

1.3

1.15

TOTAL =
BACKING STRIPP DIMENSION
OUTER MAJOR AXIS=
386.2
OUTER MINOR AXIS=
371.0
WIDTH=
25.2

297503042.xls

12/06/2015

RUN TIME
(min)
(Hrs)
4381.9
73.0
4542.3
75.7
8924.1
148.7

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION


R.F. PAD +SINGLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 9
MATERIAL (SS/STEEL)= STEEL
INC. ANG= 35

5
DENSITY= 0.00000785
OFF SET=

THK= 16
R.F.PAD

PARAMETERS SETTING
PROCESS
KG/SHIFT

HRS/KG

1). SMAW
2). SAW
3).FCAW (1.2 )
4). GTAW

3.2
14.4
6.0
1.3

2.50
0.56
1.33
6.25

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

545
5
R.F.= 2

NOZZLE O/D=

407

=2
O/D
D
PA

00

THK= 17

NOZ O/D

407
4300

SHELL I/D=

FILLET SIZE=30

R.G=
3

INC. ANG=

35
ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

424.7
410
1311.309

ON SHELL

WELD KG
WEIGHT
CALCULATION
CROSS SEC. AREA ON SHELL ON D/END
I/S WELDING=
129.77
0.42
1.36
C/B(O/S) WELDING=
314.68
1.01
3.30
R.F. PAD WELDING
450.00
22.42
22.42
TOTAL WELDING=
23.85
27.07

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN

20%

2.5

1.0

OUT SIDE BALANCE

80%

2.5

1.0

CHIP BACK WELDING

100%

2.5

1.0

R.F.PAD WELDING

100%

2.5

1.0

TOTAL =

297503042.xls

12/06/2015

RUN TIME
(min)
(Hrs)
12.5
0.2
50.1
0.8
151.9
2.5
3362.6
56.0
3577.2
59.6

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION

297503042.xls

12/06/2015

NOZZLE WELD KG & RUN TIME ESTIMATION

R.F.PAD + DOUBLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ?

CFW= 9
INC. ANG= 60

MATERIAL (SS/STEEL)= STEEL

INC. ANG= 10

10
DENSITY= 0.00000785

THK= 30
R.F.PAD

HRS/KG

1). SMAW
2). SAW
3).FCAW (1.2 )
4). GTAW

3.2
14.4
6.0
1.3

2.50
0.56
1.33
6.25

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

OFF SET=

10

330
NOZZLE O/D=

345

40
THK= 60

=
O/D
D
PA

20

00

R.F.= 2

18

NOZ O/D

ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

2450

SHELL I/D=

345

INC. ANG=

45
363.0
348
1117.086

OUTSIDE ROOT RUN

FILLET SIZE=30

R.G=

WEIGHT
CALCULATION
O/S WELDING=
C/B WELDING=
R.F. PAD WELDING
TOTAL WELDING=

WELD KG
CROSS SEC. AREA ON SHELL ON D/END
4099.95
35.95
35.19
450.00
3.95
3.86
450.00
22.42
22.42
39.90
39.05

PROCESS

ON D/END

POSITION

CODE

CHIP BACK DEPTH(MM)


THK <= 30
THK > 30

HEATING

CODE

(Y/N)

20%

0.56

1.0

OUT SIDE BALANCE

80%

2.5

1.6

1.15

CHIP BACK WELDING

100%

2.5

1.6

1.15

R.F.PAD WELDING

100%

2.5

1.0

1.15

TOTAL =

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT

12/06/2015

RUN TIME
(min)
(Hrs)
234.6
3.9
7769.2
129.5
1065.9
17.8
3867.0
64.4
12936.7
215.6

6
12

NOZZLE WELD KG & RUN TIME ESTIMATION


SET ON

NOZZLE IN SHELL/DEND) (D/S) ?

50

35

NOZ I/D

MATERIAL (SS/STEEL)=

19

STEEL

DENSITY= 0.00000785
`

INC. ANG.=

15

CFW= 9
INC. ANG.= 50

3
NOZ I/D
203
NOZ O/D

3400

SHELL
I/D=

THK= 70

273

ELLIPSE DIMENSION
MAJOR AXIS=
MINOR AXIS=
LG. OF WELDING=

238.2
238
748.0

WEIGHT CALCULATION
O/S WELDING=

CROSS SEC. AREA


716.09

WELD KG
ON SHELL ON D/END
4.20
4.20

TOTAL WELDING=

ON SHELL

4.20

3.2
14.4
6.0
1.3

POSITION OF
WELDING
1). 1G
2). 2G
3). 3G

MULTIPLICATION
FACTOR
1
1.6
1.3

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

4.20

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

OUTSIDE ROOT RUN 20%

6.25

1.0

OUT SIDE BALANCE 80%

2.5

1.0

1.15
1.15

TOTAL =

297503042.xls

HRS/KG

1). SMAW
2). SAW
3).FCAW (1.2 )
4). GTAW

2.50
0.56
1.33
6.25

OFFSET=
0

R.F.= 1

R.G.=

PARAMETERS SETTING
PROCESS
KG/SHIFT

12/06/2015

RUN TIME
(min)
(Hrs)
362.6
6.0
580.2
9.7
942.9
15.7

FILLET WELD KG & RUN TIME ESTIMATION


PARAMETERS SETTING
PROCESS
KG/SHIFT

WELD LG (CALCULATED/MANUAL) (C/M?) M


MANUAL LENGTH OF WELDING(MM)=

33615

HRS/KG

1). SMAW
2). SAW
3).FCAW (1.2 )

3.2
14.4
6.0

2.50
0.56
1.33

POSITION OF
WELDING
1). 1F/2F
2) 3F

MULTIPLICATION
FACTOR
1
1.1

PREHEATING
REQUIRED?
YES
NO

MULTIPLICATION
FACTOR
1.15
1

MATERIAL (SS/STEEL)= STEEL


DENSITY= 0.00000785
FOR CALCULATING WELD LENGTH
RADIUS OF WELDING(MM)=
0
INCLUDED ANGLE OF WELDING(DEG)=
0
CALCULATED LENGTH OF WELDING(MM)=
0.000

LENGTH OF WELDING(MM)=

WELD CALCULATION
CROSS SEC. AREA
TOTAL WELDING
18.00

FILLET WELD

297503042.xls

TOTAL WELD KG
4.75

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

2.50

33615.000

1.0

12/06/2015

(min)
712.5
712.5

RUN TIME
(Hrs)
11.9
11.9

FILLET WELD KG & RUN TIME ESTIMATION


DOUBLE SIDE FILLET JOINT
WELDING BY SINGLE OPERATOR/
DOUBLE OPERATOR(S/D)?
WELD LG (CALCULATED/AMNUAL) (C/M?) m
MANUAL LENGTH OF WELDING(MM)=

HRS/KG

1). SMAW
2). SAW
3).FCAW (1.2 )

3.2
14.4
6.0

2.50
0.56
1.33

POSITION OF
WELDING
1). 1F/2F
2) 3F

MULTIPLICATION
FACTOR
1
1.1

PREHEATING
REQUIRED?

MULTIPLICATION
FACTOR

YES

1.15

NO

1000

MATERIAL (SS/STEEL)= STEEL

13

DENSITY= 0.00000785
FOR CALCULATING WELD LENGTH
RADIUS OF WELDING(MM)=
0
INCLUDED ANGLE OF WELDING(DEG)=
0
CALCULATED LENGTH OF WELDING(MM)=
0.000
LG OF WELDING=
1000.000

13

WELD CALCULATION
FIRST SIDE WELDING
SECOND SIDE WELDING
TOTAL WELDING=

CROSS SEC. AREA


84.50
84.50

TOTAL WELD KG
0.66
0.66

169.00

1.33

DOUBLE OPERATOR

PROCESS

POSITION

CODE

HEATING

CODE

(Y/N)

FIRST SIDE

100%

2.50

1.0

SECOND SIDE SIDE

100%

2.50

1.0

1
1
TOTAL=

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT

12/06/2015

(min)
99.5
99.5
99.5

RUN TIME
(Hrs)
1.7
1.7
1.7

FILLET WELD KG & RUN TIME ESTIMATION


DOUBLE SIDE FILLET JOINT
WELDING BY SINGLE OPERATOR/
DOUBLE OPERATOR(S/D)?

PARAMETERS SETTING
PROCESS
KG/SHIFT

HRS/KG

1). SMAW
2).FCAW (1.2 )

3.2
6.0

2.50
1.33

POSITION OF
WELDING
1). 1F/2F
2) 3F

MULTIPLICATION
FACTOR
1
1.1

PREHEATING
REQUIRED?

MULTIPLICATION
FACTOR

YES

1.15

NO

MATERIAL (SS/STEEL)= STEEL


SECOND SIDE
20CFW

20CFW
FIRST SIDE

WELD CALCULATION
FIRST SIDE WELDING
SECOND SIDE WELDING
TOTAL WELDING=

DENSITY= 0.00000785

O/D= 400

CROSS SEC. AREA


200.00
200.00

TOTAL WELD KG
1.94
2.01

400.00

3.95

SINGLE OPERATOR

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

FIRST SIDE

100%

2.50

1.0

SECOND SIDE SIDE

100%

2.50

1.0

1.1
1.1
TOTAL=

297503042.xls

12/06/2015

(min)
320.1
331.0
651.1

RUN TIME
(Hrs)
5.3
5.5
10.9

FILLET WELD KG & RUN TIME ESTIMATION


DOUBLE SIDE + FULL PENETATION JOINT
PARAMETERS SETTING
PROCESS
KG/SHIFT

PROCESS? (DOT/ WITH CHIP


BACK/TIG+SMAW) (D/C/T) ?
WELD LG (CALCULATED/AMNUAL) (C/M?) C
MANUAL LENGTH OF WELDING(MM)=
MATERIAL (SS/STEEL)= STEEL

20

60

10
RG=

DEG

2
2
20

10000

DENSITY= 0.00000785
FOR CALCULATING WELD LENGTH
RADIUS OF WELDING(MM)=
1000
INCLUDED ANGLE OF WELDING(DEG)=
360
CALCULATED LENGTH OF WELDING(MM)=
6283.185
LENGTH OF WELDING(MM)=
6283.185

HRS/KG

1). SMAW
2). SAW (TWIN HEAD)
3).FCAW (1.2 )
4). GTAW+SMAW

3.2
14.4
6.0
1.3

2.50
0.56
1.33
6.25
FOR TIG

POSITION OF
WELDING
1). 1F/2F
2) 3F

MULTIPLICATION
FACTOR
1
1.1

PREHEATING
REQUIRED?

MULTIPLICATION
FACTOR

YES

1.15

NO

CHIP BACK DEPTH(MM)= 6

WELD CALCULATION
FIRST SIDE WELDING
SECOND SIDE WELDING

CROSS SEC. AREA


137.59
194.14

TOTAL WELD KG
6.79
9.58

331.73

16.36

TOTAL WELDING=

WITH CHIP BACK

(INCLUDING CHIP BACK)

PROCESS

POSITION

HEATING

CODE

CODE

(Y/N)

FIRST SIDE

100%

2.63

1.0

1.1

SCOND SIDE SIDE

100%

2.63

1.0

1.1
TOTAL=

297503042.xls

12/06/2015

(min)
1175.7
1658.9
2834.7

RUN TIME
(Hrs)
19.6
27.6
47.2

OVERLAY WELD KG & RUN TIME ESTIMATION


FORGING
GASKET FACE O/LAY
O/D OF GASKET FACE O/LAY=
BORE OF FLANGE AFTER O/L=
MEAN DIA OF GASKER GROOVE=
DEPTH OF GASKET GROOVE=
WIDTH OF GROOVE AT TOP=
THK OF O/LAY=
GASKET FACE O/LAY=

BORE O/LAY
229
165
200
10
23
8

BORE OF FLANGE AFTER O/LAY=


LENGTH OF FLANGE/FORG=
THK OF O/LAY=

2.423601 KG

BORE O/LAY=

165
1234
8

42.9231 KG

BACK FACE O/LAY


O/D OF LIP =
BORE OF FORG AFTER O/L=
THK OF O/LAY=
BACK FACE O/LAY=
TOTAL O/LAY=

487
381
6
3.46862 KG
48.81532 KG

KG

PROCESS

GASKET FACE OVER LAY

2.4

2.00

1.00

BORE OVER LAY

42.9

1.14

1.15

BACK FACE (PROFILE) OVER LAY

3.5

1.33

CODE

(Y/N)

1.00
TOTAL=

297503042.xls

RUN TIME

HEATING

(min)
291
3385
277
3953.1

12/06/2015

(Hrs)
4.8
56.4
4.6
65.9

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
2).FCAW (1.2 )(M/C)
3). FCAW (MANUAL)

HRS/KG

4
7
6

2.00
1.14
1.33

PREHEATING
REQUIRED?
YES

MULTIPLICATION
FACTOR
1.15

NO

OVERLAY WELD KG & RUN TIME ESTIMATION


FLANGE
GASKET FACE O/LAY
O/D OF GASKET FACE O/LAY=
BORE OF FLANGE AFTER O/L=
DIA OF GASKER GROOVE=
DEPTH OF GASKET GROOVE=
WIDTH OF GROOVE AT TOP=
THK OF O/LAY=

BORE O/LAY
483
381
450
0
0
7

BORE OF FLANGE AFTER O/LAY=


LENGTH OF FLANGE=
THK OF O/LAY=

GASKET FACE O/LAY=

3.876072 KG

TOTAL O/LAY=

13.68025 KG

KG

BORE O/LAY=

PROCESS

HEATING

CODE

(Y/N)

GASKET FACE OVER LAY

3.9

2.00

1.00

BORE OVER LAY

9.8

1.14

1.00

9.804182 KG

RUN TIME

TOTAL=

297503042.xls

381
168
6

(min)
465
672
1137.4

12/06/2015

(Hrs)
7.8
11.2
19.0

PARAMETERS SETTING
PROCESS
KG/SHIFT
1). SMAW
2).FCAW (1.2 )(M/C)
3). FCAW (MANUAL)

PREHEATING
REQUIRED?
YES
NO

4
7
6

HRS/KG
2.00
1.14
1.33

MULTIPLICATION
FACTOR
1.15
1

OVERLAY WELD KG & RUN TIME ESTIMATION


ELBOW
I/D O/LAY
BORE OF ELBOW AFTER O/LAY=
RADIUS OF ELBOW
INCLUDED ANGLE OF ELBOW=
THK OF O/LAY=

BORE O/LAY=

448
1176
90
8

1). SMAW
2). FCAW (MANUAL)

PREHEATING
REQUIRED?
YES
NO

169.3643 KG

BORE OVER LAY

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT

KG

PROCESS

HEATING
(Y/N)

169.4

CODE
1.33

1.00

12/06/2015

4
6

2.00
1.33

MULTIPLICATION
FACTOR
1.15
1

RUN TIME
(min)
13549

HRS/KG

(Hrs.)
225.8

OVERLAY WELD KG & RUN TIME ESTIMATION


PIPE
I/D O/LAY
BORE OF PIPE AFTER O/LAY=
LENGTH OF PIPE=
THK OF O/LAY=

BORE O/LAY=

381
463
6

1). SMAW
2).FCAW (1.2 )(M/C)
3). FCAW (MANUAL)

27.01986 KG

KG

BORE OVER LAY

297503042.xls

PARAMETERS SETTING
PROCESS
KG/SHIFT HRS/KG

27.0

PREHEATING
REQUIRED?
YES
NO

PROCESS

HEATING

CODE

(Y/N)

1.14

1.15

12/06/2015

4
7
6

MULTIPLICATION
FACTOR
1.15
1

RUN TIME
(min)
2131

2.00
1.14
1.33

(Hrs.)
35.5

OVERLAY WELD KG & RUN TIME ESTIMATION


CIRC. SEAM/ LONG SEAM OVERLAY
I/D OF SHELL=
THK OF O/LAY=
CLAD STRIP ANG.=
THK OF CLAD=
CALCULATION
WIDTH OF O/LAY=
R.F. WIDTH=
AREA OF O/LAY=

3400
6
45
5

THK=
I/S INC. ANG.=
I/S 'V' HEIGHT=
CLAD STRIPPING=
ROOT GAP=
LG OF CEAM=

65
78
364.5095

C/SEAM O/LAY=

PARAMETERS SETTING
PROCESS
KG/SHIFT

70
35
47
15
3
10697.12

1). SMAW
2).FCAW (1.2 )(M/C)
3). FCAW (MANUAL)

PREHEATING
REQUIRED?
YES
NO

30.60874

THK=

C/SEAM OR L/SEAM (LS/CS)?

70
47

35

5
R.G.=

3
5

15

45

O/L THK=
6
35

I/D OF SHELL= 3400

KG

CIRC. SEAM OVER LAY

297503042.xls

30.6

PROCESS

HEATING

CODE

(Y/N)

2.00

1.15

12/06/2015

RUN TIME
(min)
4224

(Hrs.)
70.4

4
7
6

HRS/KG
2.00
1.14
1.33

MULTIPLICATION
FACTOR
1.15
1

CS

SHELL ESSC OVERLAY WELD KG & RUN TIME ESTIMATION

SHELL ESSC OVERLAY


I/D OF SHELL BEFORE O/LAY=
LENGTH OF SHELL=
THK OF O/LAY=

BORE O/LAY=

PARAMETERS SETTING
PROCESS
KG/SHIFT

4500
2250
8

1) ESSC (60 WD)


2) ESSC (90WD)
3) ESSC (120 WD)

2032.133 KG

KG

PROCESS
CODE

I/D OVER LAY(WITH 2 OPERATOR)

297503042.xls

2032.1

0.18

RUN TIME
(min)
44337

12/06/2015

(Hrs.)
739.0

44
66
84

HRS/KG
0.18
0.12
0.10

You might also like