Nothing Special   »   [go: up one dir, main page]

Tugas 2 Tebal Plat (BKI 2006)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 43

Diketahui

L=
H=
B=
T=
CB =

DECK LONGITUDINAL

123
11.5
20.2
8.8
0.713

m
m
m
m

DECK TRANSVERSE

DECK GIRDER
LONGITUDINAL BULKHEAD TRANSVERSE

SIDE BULKHEAD LONGITUDINAL


SIDE TRANSVERSE

SIDE LONGITUDINAL

INNER BOTTOM LONGITUDINAL

BKI 2006 Section 5


Wave Induced Loads
Vertical Wave Bending Moment

BOTTOM LONGITUDINAL

C0 = 13.1048318411
C1 =
0.13547
-0.15543
CL =
1
CM =
1
MWV =
=

542545.51
-622483.57

where,
MSW = 1/3 x MWV
=
180848.50
= -207494.522774
So,
Mtot = MSW + MWV
=
723394.02
= -829978.091094

Vertical Wave Shear Force


C0 = 25.3144422921
CL =
1
CQ =
0.21
QWV = 18663.2082147
where,
QSW = 1/2 x QWV
= 9331.60410733
So,
Qtot = QSW + QWV
=

27994.812322

P0 =
CS =
fr =

175
1
1

P =

175

Section Moduli as function of Longitudinal Bending Moments

W=

4.1336800949

-4.7427319491

Midship Section Moment of Inertia

Iy = 15.2532795501
= -17.5006808922

Normal Stress from Vertical Bending Moment


e=
2.718
SW = 32.2256097561
= -36.9736954631

WV = 96.6768292683
= -110.921086389

Plate Thickness based on Load Stress Criteria


Load on the Ship's Bottom
BKI 2006 section 4.3

P0 = Basic external dynamic load


= 2.1 x (CB + 0.7) x C0 x CL x f x CRW
= 75.11554 kN/m2
PB = 163.1155 kN/m2
where,

Ship with lengt L 90


BKI Section 6.B

where,
tK =
a=

1.5 mm
1m

BKI section 3.F

tb2 = 16.95372 mm
Load on the Ship's Side
BKI 2006 section 4.3

z=
PS =

4.47 m
156.5708 kN/m2

PS = 264.9578 kN/m2
Ship with lengt L 90
BKI section 6.C

ts2 = 16.64052 mm
= 21.19581 mm

Below the Load Water Line


Above the Load Water Line

tmin = 11.09053651 mm

NAL

RSE

(C1H)
(C1S)

hogging condition
sagging condition
x/L = 0.55

kNm
kNm

hogging condition
sagging condition

kNm
kNm

hogging condition
sagging condition

kNm
kNm

hogging condition
sagging condition

x/L = 0.55
kN

kN

kN

k=1
x/L = 5.5
(in general)
N/mm2
m3

hogging condition

m3

sagging condition

m4

hogging condition

m4

sagging condition

Euler number
N/m

hogging condition

N/m

sagging condition

N/m2

hogging condition

N/m

sagging condition

2
2

Spesifikasi
L=
H=
B=
T=
CB =

123
11.5
20.2
7.36
0.713

Bab dalam BKI


BKI (89) I;H;3

VI B; 5.1

m
m
m
m

Ukuran u
Jarak Gading a
Jarak yang diukur dari pinggir mal ke pinggir mal gading.
ao = L/500 + 0,48 m ( dari BKI 89 )
=
0.73
m
diambil :
a=
0.70
Pelat Lunas alas dan bilga

b = 800 + 5L (mm)
= 800 + 5 x 0.00
=
1415
mm
*midship

tfk =
=

VI C;3.1

Pelat Atas (sheer strakes)

IV B;2.1.

b=
bmax =
maka b=
Beban pada sisi

1503.1 mm
1500 mm

1415 (mm)
1800 (mm)
1500 mm
kapal

* Di bawah garis air :


Ps' = 10 (T - Z) + Po x Cf x (1 + Z / T)
* Di atas garis air :

Ps = 20 x Po x Cf / (10 + Z - T)
dimana :
Z = jarak vertikal dari pusat beban terhadap base line untuk beban pada
pelat diukur dari paling bawah untuk sistem konstruksi melintang (dibawah a
Z' = jarak vertikal pusat beban profil terhadap base line di atas draft

P0 = 2,1.(CB + 0,7). Co . CL .f .cRW

[kN/m2]

*keterangan=

P0 = basic external dynamic load (arah gelom


C0 = 10.75 - (300 - L/100)1,5 ; untuk 90
C0 =
8.395
f =
f =
f =
CL =
CL =
Crw =

1
0.75
0.6

(L/90)1/2
1
1

untuk pelat kulit, geladak


secondary member stiffening
girder, frame
L < 90 m
L > 90m

, untuk pelayaran tak ter

*maka:
P0 = 24.91098248 kN/m2
P0 = 18.68323686 kN/m2
P0 = 14.94658949 kN/m2

nilai Cf diperoleh dari tabel 4.1 ; section 4-B.1.

Range 0.2 x/L < 0.7 [M]


P0 =
24.9109825 kN/m2
A. Di bawah garis air
Z' =
1.53 m
Ps' = 10 (T - Z) + Po x Cf x (1 + Z / T)

= 88.3894883 kN/m2

B. Di atas garis air


Z=
7.53 m
Ps = 20 x Po x Cf / (10 + Z - T)

=
IV B;3

48.989 kN/m2

Beban Pada Dasar Kapal


PB = 10 . T + Po . CF

dimana:
T = Sarat kapal
=
7.36
dan harga Cf diperoleh dari Tabel 4.1 (section 4-B.1.)
Maka besarnya PB dapat di hitung yaitu:

Range 0.2 x/L < 0.7 [M]


untuk Pelat kulit
Po = 24.9109825 kN/m2
maka,
PB = 10 x 7.36 + 24,911x 1
= 98.5109825 kN/m2
untuk Stiffener
Po = 13.3483408 kN/m2
maka,
PB = 10 x 7.36 + 13.35 x 1
= 86.9683408 kN/m2
IV B; 1.1

Cf =

Beban Pada Geladak Cuaca (Pd)

Ditentukan dengan rumus :


Pd = (Po x 20 x T x Cd) / ((10 + Z - T)H)
dimana:
Po =
24.9
Untuk Pelat
kN/m2
2
Po =
18.7
Untuk Balok Geladak, pembuju
kN/m
2
Po =
14.9
Untuk Penumpu
kN/m
T=
0.00
m
CD diperoleh dari tabel. 1 (halaman 2)
Z=
H=

11.50
11.50

maka, besarnya beban geladak cuaca dapat dihitung sebagai berikut:


CD =
Bagian 0.2 x/L < 0.7 [M]
untuk Pelat kulit
Po =
24.9
kN/m2
Pd = (Po x 20 x T x Cd) / ((10 + Z - T)H)
= (025 x 20 x 007 x 001) / [(10 + 012 - 007) x 12]
=
22.55
kN/m2

IV A;2

Perencanaan tebal plat


Keterangan :
K=
K=
PB =
PS =
nf =
nf =
Perm =
LB =
LB =

Faktor material berdasarkan section 2.B.2


1
Beban alas
Beban sisi
1
Untuk Konstruksi melintang
0.83
Untuk Konstruksi memanjang
230/k (N/m2), untuk L>90 m
Bending stress max pada hull girder
120/k (N/m2) untuk pendekatan awal
a = jarak gading
= 0.70
m
diruang Muat
= 0.70
m
ceruk haluan dan buritan, Kama

tk = 1.5

VI B; 1.2

untuk t< 10 mm

tk = 0,1.t' + 0,5
untuk t > 10 mm (max 3 mm)
0.5
k
Pelat alas
Tebal pelat alas di ruang muat L > 90m
120
tB1 = 1.83. nf .a. ( PB/pl )0.5 + tK
[ N / mm2 ]
LB =

atau
tB2 = 1.21.a.( PB.k) + tk

pl =
=

p e rm =
=
L =

2perm - 33.2L 123.2

0,89. LB N/mm2

( N/mm2)

230
N / m m2 fo rL 90 m
K

230
0

N/mm2

, k = 1 untuk ordinary hu

dimana PB adalah beban pada dasar kapal untuk pelat kulit, yaitu
PB =

86.968

kN/m2

(Midship)

Tebal pelat minimum


tB1 =
(L.k)0.5
tB1 =

11.091

11

untuk bagian [ M ] (0,2 x/L < 0,7)


tB1 = 18.3. nf .a. ( PB/pl )0.5 + tK
tB1 = 10.4331054
tB1 = 11.976416 mm

VIII B;6

tk =
12

Tebal Wrang
Tebal pelat wrang tidak boleh kurang dari :
tpf =
tm - 2.0
tm = Tebal dari center girder
Tebal tidak lebih 16.0 mm

VI B;5.1

VI C; 1.2

Pelat Lunas
Tebal pelat lunas tidak kurang dari :
tFK = t + 2,0 [mm]
t = tebal plat bottom yang berdekatan
Bagian [ M ] 0,2 x/L < 0,7
mm
t = 11.09
tFK = 13.09
mm

13

Tebal Pelat sisi


Tebal diambil terbesar dari rumus :
tS1 = 18.3 nf .a. (Ps / pl)0.5 + tK

L 90m

tS2 = 1,21. a ( Ps .k ) + tk [ mm ]
pl = permL2LS
=
148.83
( N/mm2 )
k=
1
untuk bagian [ M ] (0.2 x/L < 0,7)

PS1 =

88.39

kN/m2

tS1 = 18.3 nf .a. (Ps / pl)0.5 + tK


= 18.3 x 0.83 x 0.7 x (88.39 / 149)^0.5 + tk

+ tK

8.19
t' =

8.19

sehingga tk =

1.50

mm, t' < 10mm


mm

jadi, tS1 =

008 + 002
mm
=
9.69
mm
tS2 = 1,21. a ( Ps .k ) + tk
= 1.21 x 01 x (088 x 1)+ tk
=

+ tK

7.96
t' =

7.96

sehingga tk =

1.50

jadi, tS2 = 008 + 002

mm, t' < 10mm


mm
=

mm

PS2 =

kN/m
78.66
tS1 = 18.3 nf .a. (Ps / pl)0.5 + tK
2

= 18.3 x 001 x 01 x (079 / 123)^0.5 + tk

= 8.49595901 + tK
t' =

8.50

sehingga tk =

1.50

mm, t' < 10mm


mm

jadi, tS1 =

008 + 002
mm
=
10.00
mm
tS2 = 1,21. a ( Ps .k ) + tk
= 1.21 x 01 x (079 x 1)^0,5+ tk
=

+ tK

8.98
t' =

8.98

sehingga tk =

1.50

jadi, tS2 =

8.98 + 1.50

mm
tS =

diambil yang terbesar, yait

VI B; 4.1

mm, t' < 10mm


mm

10.48

Lajur Bilga
Tebal lajur bilga yang melengkung tidak boleh kurang
dari tebal pelat alas atau plat sisi diambil yang terbesar.
untuk daerah [ M ] (0.2 x/L < 0,7)
Tebal pelat alas =
mm
12.00
Tebal pelat sisi =
mm
10.00

12.00

jadi, t =
VII A; 5.2

mm

Tebal Pelat geladak kekuatan


t crit = c . 2,32 . . LB + tk
t crit = c . 1,57 . .ReH/1,474-( LB/ReH) + tk
Dimana :
c =
LB =
ReH =

0.5
120/k
235

a/b

( longitudinal framing )
=
120
, 0,6 ReH =
141

a= panjang single atau parsial lembaran pe


=
3
m
b= lebar single atau parsial lembaran pelat
=
3
m
=
maka :

1
t crit =

7.6243

+ tk

t' =
sehingga tk =
jadi, tcrit =

VII A;7

9.12

7.62
1.50
mm

Tebal pelat geladak


tebal pelat geladak ditentukan dari nilai terbesar dari formula berikut:
tE1 = 1,21.a. PD k + tK
tEmin = (5,5 + 0,02L) k
tmin = (4.5 + 0.05L) k

untuk daerah 0.4L

dimana,
a = jarak dgading
m
= 0.70
PD = beban pada geladak
k= 1
untuk daerah [ M ] (0.2 x/L < 0,7)
PD =
kN/m2
22.55
tE1 = 1,21.a. PD k + tK
= 1.21 x 001 x (023)^0.5 + tk
=

+ tK

4.02
t' =

4.02

sehingga tk =
1.50
jadi, tE1 = 004 + 002
mm
mm
=
5.52
tEmin = (5,5 + 0,02L) k
= 5.5 + 0.02x123.00
=
7.96
mm
tmin = (4.5 + 0.05L) k
= 4.5 + 0.05 x 123.00
=
10.65
mm
diambil yang terbesar, yaitu:
t=
mm
10.65

mm, t' < 10mm


mm

11

MIDSHIP
Tinggi dasar ganda
untuk kapal > 5000 DWT
h = B / 15
atau 2 m
=
1.35
m
h min =
1.00
m
Penumpu tengah (centre girder)
Tinggi dari penumpu tengah tidak boleh kurang dari
h = hdb =
1.35
m
=
1346.67
hdb diambil=
1.40
m
=
1400
Tebal pelat penumpu tengah pada 0,7 L amidship tidak boleh kurang dari :
Untuk h 1200 mm
t = [ h / 120 + 3.0 ] k
;
k =
=
14.67
( mm )
15
Penumpu samping ( side girder)
Dipasang 3 side girder untuk jarak centre girder ke samping kapal

melampaui 10.5 m.
Jarak side girder dari centre girder tidak boleh lebih dari 3.5 m
Tebal pelat side girder
T = ( h2 / 120.ha ) k
=
11.67
( mm )
12

Ukuran utama

*maka =

Lebar pelat lunas alas =

1500 mm

Lebar pelat bilga =

1500 mm

ne untuk beban pada


nstruksi melintang (dibawah air)
line di atas draft

CL .f .cRW

[kN/m2]

ynamic load (arah gelombang sejajar dengan arah gerak kapal)


)1,5 ; untuk 90 L 300 m

ntuk pelat kulit, geladak


econdary member stiffening

untuk pelayaran tak terbatas


untuk pelat kulit, geladak
secondary member stiffening
girder, frame

untuk pelat kulit, geladak


NO
1
2
3
4
5
6

Z
1.50
3.00
4.50
6.00
7.50
8.80

Ps
88.5879490154
78.664915553
68.7418820906
58.8188486282
48.8958151658
43.5506686675

Satuan
kN/m2
kN/m2
kN/m2
kN/m3
kN/m2
kN/m2

di bawah garis
air

di atas garis air

ntuk Balok Geladak, pembujur geladak


ntuk Penumpu

ng sebagai berikut:
1.00

eruk haluan dan buritan, Kamar mesin

LB =

120
k

[ N / mm2 ] forL 90 m
120
N/mm2

k = 1 untuk ordinary hull steel

elat kulit, yaitu

mm

1.543311 mm
mm

mm

49)^0.5 + tk

LS 0.76 . LB

= 91.2

( N/mm2)

z
1.50
3.00

Ps
88.59
78.66

Ts1

Ts2

9.702881 9.472063
9.229824 9.012318

Satuan
kN/m2
kN/m2

di bawah garis
air

4.50
6.00
7.50
8.80

m, t' < 10mm

68.74
58.82
48.90
43.55

m, t' < 10mm


9.46

mm

10.48

mm

^0.5 + tk

m, t' < 10mm

m, t' < 10mm

mm

10.00

mm

ng terbesar.

untuk LB < 0,6 ReH


untuk LB > 0,6 ReH

N/mm4

atau parsial lembaran pelat

u parsial lembaran pelat

8.725864
8.184014
7.594175
7.251438

8.522538
7.995935
7.422693
7.089601

kN/m2
kN/m3
kN/m2
kN/m2

di bawah garis
air

di atas garis air

mm, t' < 10mm


mm

9 mm

ri formula berikut:

ntuk daerah 0.4L

m, t' < 10mm

mm

mm
mm
idak boleh kurang dari :
1
mm

samping kapal

12.12
6.06

mm

di bawah garis
air

di bawah garis
air

di atas garis air

Spesifikasi
L=
H=
B=
T=
CB =

123
11.5
20.2
7.36
0.713

Bab dalam BKI


BKI (89) I;H;3

VI B; 5.1

m
m
m
m

Ukura
Jarak Gading a
Jarak yang diukur dari pinggir mal ke pinggir mal gading.
ao = L/500 + 0,48 m ( dari BKI 89 )
=
0.73
m
diambil :
a=
Pelat Lunas alas dan bilga

b = 800 + 5L (mm)
= 800 + 5 x 0.00
=
1415
*midship

VI C;3.1

Pelat Atas (sheer strakes)

IV B;2.1.

b=
bmax =
maka b=
Beban pada sisi kapal

0.70

mm

tfk =
=

1503.1
1500

1415 (mm)
1800 (mm)
1500 mm

* Di bawah garis air :


Ps' = 10 (T - Z) + Po x Cf x (1 + Z / T)
* Di atas garis air :

Ps = 20 x Po x Cf / (10 + Z - T)
dimana :
Z = jarak vertikal dari pusat beban terhadap base line untuk beban pada
pelat diukur dari paling bawah untuk sistem konstruksi melintang (dibawah a
Z' = jarak vertikal pusat beban profil terhadap base line di atas draft

P0 = 2,1.(CB + 0,7). Co . CL .f .c
*keterangan=

P0 = basic external dynamic load (a


C0 = 10.75 - (300 - L/100)
C0 =
8.395
f =
f =
f =
CL =
CL =

1
0.75
0.6

(L/90)1/2
1

Crw =

*maka:
P0 = 24.91098248
P0 = 18.68323686
P0 = 14.94658949

nilai Cf diperoleh dari tabel 4.1 ; section 4-B.1.

Range 0.2 x/L < 0.7 [M]


P0 =
24.9109824778 kN/m2
A. Di bawah garis air
Z' =

1.53 m

Ps' = 10 (T - Z) + Po x Cf x (1 + Z / T)

= 88.3894883462 kN/m2

B. Di atas garis air


Z=

7.53 m

Ps = 20 x Po x Cf / (10 + Z - T)

=
IV B;3

48.989 kN/m2

Beban Pada Dasar Kapal


PB = 10 . T + Po . CF

dimana:
T = Sarat kapal
=
dan harga Cf diperoleh dari Tabel 4.1 (section 4-B.1.)
Maka besarnya PB dapat di hitung yaitu:

Range 0.2 x/L < 0.7 [M]


untuk Pelat kulit
Po = 24.9109824778 kN/m2
maka,
PB = 10 x 7.36 + 24,911x 1
= 98.5109824778 kN/m2
untuk Stiffener
Po = 13.348340802 kN/m2
maka,
PB = 10 x 7.36 + 13.35 x 1
= 86.968340802 kN/m2
IV B; 1.1

Beban Pada Geladak Cuaca (Pd)


Ditentukan dengan rumus :
Pd = (Po x 20 x T x Cd) / ((10 + Z - T)H)
dimana:
Po =
24.9
kN/m2
Po =
18.7
kN/m2
Po =
14.9
kN/m2
T=
0.00
m
CD diperoleh dari tabel. 1 (halaman 2)
Z=
H=

11.50
11.50

maka, besarnya beban geladak cuaca dapat dihitung sebagai berikut:


Bagian 0.2 x/L < 0.7 [M]
untuk Pelat kulit
Po =
24.9
kN/m2
Pd = (Po x 20 x T x Cd) / ((10 + Z - T)H)
= (025 x 20 x 007 x 001) / [(10 + 012 - 007) x 12]
=
22.55
kN/m2

IV A;2

Perencanaan tebal plat


Keterangan :
K=
K=
PB =
PS =
nf =
nf =
Perm =
LB =
LB =
a=
=

Faktor material berdasarkan section 2.B.2


1
Beban alas
Beban sisi
1
Untuk Konstruksi melintang
0.83
Untuk Konstruksi memanjang
230/k (N/m2), untuk L>90 m
Bending stress max pada hull girder
120/k (N/m2) untuk pendekatan awal
jarak gading
0.70
m
0.70
m

VI B; 1.2

tk = 1.5

untuk t< 10 mm

tk = 0,1.t' + 0,5
k0.5

untuk t > 10 mm (max 3 mm)

Pelat alas
Tebal pelat alas di ruang muat L > 90m
tB1 = 1.83. nf .a. ( PB/pl )0.5 + tK

atau
tB2 = 1.21.a.( PB.k) + tk

2perm -

pl =

123.2

p e rm =

33.2L -

0,89. LB N /mm2
( N/mm2)

23 0
N / m m2 fo rL 90 m
K

230
0

=
L =

N/mm2

dimana PB adalah beban pada dasar kapal untuk pelat kulit, yaitu
PB =

86.968

Tebal pelat minimum


tB1 =
tB1 =

kN/m2

(L.k)0.5

11.091

untuk bagian [ M ] (0,2 x/L < 0,7)


tB1 = 18.3. nf .a. ( PB/pl )0.5 + tK
tB1 = 10.433105448
tB1 = 11.976415993 mm

VIII B;6

Tebal Wrang
Tebal pelat wrang tidak boleh kurang dari :
tpf =
tm - 2.0
tm = Tebal dari center girder
Tebal tidak lebih 16.0 mm

VI B;5.1

Pelat Lunas
Tebal pelat lunas tidak kurang dari :
tFK = t + 2,0 [mm]
t = tebal plat bottom yang berdekatan
Bagian [ M ] 0,2 x/L < 0,7
mm
t = 11.09
tFK = 13.09
mm

VI C; 1.2

Tebal Pelat sisi


Tebal diambil terbesar dari rumus :
tS1 = 18.3 nf .a. (Ps / pl)0.5 + tK
tS2 = 1,21. a ( Ps .k ) + tk [ mm ]
pl = permL2LS
=
148.83
( N/mm2 )
k=
1
untuk bagian [ M ] (0.2 x/L < 0,7)

z
1.50

Ps
88.59

3.00
4.50
6.00
7.50
8.80

78.66
68.74
58.82
48.90
43.55

tS =

diambil yang terbesar, yaitu:

VI B; 4.1

Lajur Bilga
Tebal lajur bilga yang melengkung tidak boleh kurang
dari tebal pelat alas atau plat sisi diambil yang terbesar.
untuk daerah [ M ] (0.2 x/L < 0,7)
Tebal pelat alas =
12.00
Tebal pelat sisi =
10.00

12.00

jadi, t =
VII A; 5.2

Tebal Pelat geladak kekuatan


t crit = c . 2,32 . . LB + tk
t crit = c . 1,57 . .ReH/1,474-( LB/ReH) + tk
Dimana :
c =
LB =
ReH =

0.5
120/k
235

a/b

( longitudinal framing )
=
, 0,6 ReH =

a= panjang single atau parsial lem


=
3
b= lebar single atau parsial lemba
=
3
=

1
t crit =

maka :

7.6243
t' =
sehingga tk =

jadi, tcrit =

VII A;7

9.12

Tebal pelat geladak


tebal pelat geladak ditentukan dari nilai terbesar dari formula berikut:
tE1 = 1,21.a. PD k + tK
tEmin = (5,5 + 0,02L) k
tmin = (4.5 + 0.05L) k
dimana,
a = jarak dgading
m
= 0.70
PD = beban pada geladak
k= 1
untuk daerah [ M ] (0.2 x/L < 0,7)
PD =
kN/m2
22.55
tE1 = 1,21.a. PD k + tK
= 1.21 x 001 x (023)^0.5 + tk
=

4.02

+ tK

t' =

4.02

sehingga tk =

1.50

jadi, tE1 = 004 + 002


mm
mm
=
5.52
tEmin = (5,5 + 0,02L) k
= 5.5 + 0.02x123.00
=
7.96
mm
tmin = (4.5 + 0.05L) k
= 4.5 + 0.05 x 123.00
=
10.65
mm
diambil yang terbesar, yaitu:
t=
mm
10.65

Perhitungan Pembujur secara Umum


Modulus penampang pembujur tidak boleh kurang dari :
W = ( 83,3 / spr ).m.a.l2.P
Dimana :
2
2
2
m = (mk -ma ) ; m >(mk /2)
mk = 1-[(lk/l)sin2 ak]
ma = 0,204.(a/)[4-(a/)2] :a/ 1
Untuk pembujur dibawah netral absis ditentukan rumus:
pr = perm - LB + Z.( LB + LD ) / H [ N/mm2]
Untuk pembujur diatas netral absis ditentukan rumus
pr = perm + LB - Z.( LB + LD ) / H
Ditentukan LD= Lmax ; LB = 0,8 Lmax
(Lmax dihitung pada bab 5.E.4)
Lmax = ( 6 / 7 ) p
Dimana,
p = cs. po

po = 175/k

cs = 0.50 + 5/3. x/L untuk x/L< 0,4 =


p =
175
Lmax = (6/7) p
Maka:
LD =

150

LB =
120
perm = [0,8+L/450]230/k
perm =
234.65

permmax=

230

N/mm2
=
N/mm2
N/mm2
N/mm2
N/mm2

Modulus Pembujur alas


Modulus pembujur alas ditentukan rumus:
W = (83,3/pr).m.a.l2.P
dimana,
z=
0
dibawah netral axis
H=
11.50
m
pr = perm-LB + z.(LB +LD)/H [ N/mm
= 234.65 - 120 + 0 x (120 + 150)/11.5
=
110.000

a=
=
a/ =

0.6
m
3
m
0.2
2
2
2
m = (mk -ma ) ; m >(mk /2)
mk = 1-[(lk/l)sin2 k]
dimana

lk =

0.15

mk = 0.95
ma = 0,204.(a/)[4-(a/)2] :a/ 1
= 0.162
m=
0.876
> mk^2/2
P = beban pada alas
P=
86.968
KN/m2
sehingga modulus pembujur alas dapat dihitung sebagai berikut
W = (83,3/pr).m.a.l2.P
= (83.3/(83,3/spr).m.a.l2.P ) x 0.876 x 0.6 x 3.0^2 86.968
=
311.679
cm3

Pemilihan profil:
BKI 2006, Annex,A - 2
Modulus :
330.0
cm3
L 180 x 90 x 14
Profile :
Resume Pelat
Bagian
Pelat alas
Pelat sisi
Pelat geladak
Pelat bilga
Profile

t plat
12
10
11
12

L 180 x 90 x 14

Ukuran utama

*maka =
mm
mm

e line untuk beban pada


konstruksi melintang (dibawah air)
ase line di atas draft

Lebar pelat lunas alas =

1500 mm

Lebar pelat bilga =

1500 mm

CB + 0,7). Co . CL .f .cRW

[kN/m2]

c external dynamic load (arah gelombang sejajar dengan arah gerak kapal)
- (300 - L/100)1,5 ; untuk 90 L 300 m
untuk pelat kulit, geladak
secondary member stiffening
girder, frame
L < 90 m
L > 90m

, untuk pelayaran tak terbatas


kN/m2
kN/m2
kN/m2

untuk pelat kulit, geladak


secondary member stiffening
girder, frame

untuk pelat kulit, geladak


NO
1
2
3
4
5
6

Z
1.50
3.00
4.50
6.00
7.50
8.80

Ps
88.5879490154
78.664915553
68.7418820906
58.8188486282
48.8958151658
43.5506686675

Satuan
kN/m2
kN/m2
kN/m2
kN/m3
kN/m2
kN/m2

di bawah garis
air

di atas garis air

7.36

ction 4-B.1.)

Cf = 1

Untuk Pelat
Untuk Balok Geladak, pembujur geladak
Untuk Penumpu

hitung sebagai berikut:


CD =

1.00

0 + 012 - 007) x 12]

n section 2.B.2

Konstruksi melintang
Konstruksi memanjang

diruang Muat
ceruk haluan dan buritan, Kamar mesin

t > 10 mm (max 3 mm)

LB =

89. LB N /mm2

120
k

[ N / mm2 ] forL 90 m
120
N/mm2

, k = 1 untuk ordinary hull steel

k pelat kulit, yaitu

(Midship)

11 mm

tk = 1.543311 mm
12 mm

13

mm

Tk =

L 90m
LS 0.76 . LB

= 91.2

Ts1

Ts2

9.702881 9.472063

( N/mm2)

Satuan
kN/m2

di bawah garis air

1.5 mm

9.229824
8.725864
8.184014
7.594175
7.251438

9.70

9.012318
8.522538
7.995935
7.422693
7.089601

mm

di bawah garis air

kN/m2
kN/m2
kN/m3
kN/m2
kN/m2

10.00

di atas garis air

mm

oleh kurang
yang terbesar.
mm
mm

mm

untuk LB < 0,6 ReH


untuk LB > 0,6 ReH

itudinal framing )
120
141

N/mm4

ang single atau parsial lembaran pelat


m
r single atau parsial lembaran pelat
m
+ tk
7.62
1.50

mm, t' < 10mm


mm

mm

r dari formula berikut:

untuk daerah 0.4L

9 mm

mm, t' < 10mm


mm

11

[ cm3]
ak =45 o

1.000
150.000

[ cm3]

ah netral axis

)/H

mm

[ N/mm2]

N/mm2

k =

.(a/)[4-(a/)2] :a/ 1

(dari halaman 3)
g sebagai berikut

x 0.876 x 0.6 x 3.0^2 86.968

90

You might also like