Nothing Special   »   [go: up one dir, main page]

WO2018066037A1 - 貯湯式給湯機、給湯方法及びプログラム - Google Patents

貯湯式給湯機、給湯方法及びプログラム Download PDF

Info

Publication number
WO2018066037A1
WO2018066037A1 PCT/JP2016/079309 JP2016079309W WO2018066037A1 WO 2018066037 A1 WO2018066037 A1 WO 2018066037A1 JP 2016079309 W JP2016079309 W JP 2016079309W WO 2018066037 A1 WO2018066037 A1 WO 2018066037A1
Authority
WO
WIPO (PCT)
Prior art keywords
hot water
storage tank
water storage
temperature
water supply
Prior art date
Application number
PCT/JP2016/079309
Other languages
English (en)
French (fr)
Inventor
啓輔 ▲高▼山
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2018543493A priority Critical patent/JP6682002B2/ja
Priority to PCT/JP2016/079309 priority patent/WO2018066037A1/ja
Publication of WO2018066037A1 publication Critical patent/WO2018066037A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters

Definitions

  • the present invention relates to a hot water storage type water heater, a hot water supply method, and a program.
  • Patent Document 1 There is known a hot water storage type hot water supply machine that stores hot water generated by heating water in a hot water storage tank and supplies the hot water from the hot water storage tank (see, for example, Patent Document 1).
  • Patent Document 1 describes a system in which water in a hot water storage tank is boiled and supplied by a heat pump. In this system, when the amount of heat stored in the hot water storage tank is insufficient, the water taken out from the hot water storage tank is heated by the burner without supplying water in the hot water storage tank over time, and hot water is supplied.
  • the present invention has been made in view of the above circumstances, and an object thereof is to improve the energy consumption efficiency of a hot water storage type water heater.
  • a hot water storage type water heater of the present invention comprises a first heating means for heating water to generate first hot water, a hot water storage tank for storing the first hot water, and a first water intake from the hot water storage tank.
  • a heat exchanger that preheats the city water by heat exchange between the 1 hot water and the city water, and a second heating means that heats the city water preheated by the heat exchanger to generate the second hot water.
  • the present invention when the amount of the first hot water supplied from the hot water storage tank to the hot water outlet within a preset time is smaller than the capacity of the hot water storage tank, heat exchange with the first hot water taken from the hot water storage tank is performed.
  • the city water preheated by is heated and supplied to the hot water outlet. For this reason, the water temperature in the hot water storage tank can be lowered while supplying hot water using the heat quantity of the relatively high temperature in the hot water storage tank. Thereby, the energy consumption efficiency of a hot water storage type hot water heater can be improved.
  • FIG. Flow chart showing control process of hot water supply switching valve Flow chart showing operation process in tank hot water supply mode Flow chart showing operation process in preheating hot water supply mode Diagram showing temperature change of water passing through heat exchanger
  • the figure which shows the relationship between the primary side flow rate and secondary side flow rate of a heat exchanger Flow chart showing heat treatment
  • Flow diagram showing hot water operation Diagram for explaining actuator control The figure for demonstrating control of a discharge switching valve Flow chart showing high-temperature boiling operation process
  • the figure which shows the relationship between the water temperature of a 1st heating unit, and COP Figure showing changes in hot water supply load, amount of heat stored in hot water storage tank, and heating capacity The figure which shows the structure of the hot water storage type water heater which concerns on Embodiment 2.
  • FIG. FIG. 1 shows the configuration of hot water storage type hot water supply apparatus 1000 according to Embodiment 1.
  • the hot water storage type water heater 1000 is a water heater that heats water obtained from the water supply port 101 and supplies hot water from the hot water supply port 102.
  • the water supply port 101 is a water supply end connected to the water supply system, and receives city water as water supply from the water supply system. City water is, for example, tap water or clean water.
  • the hot water supply port 102 is a hot water supply end connected to a hot water use location represented by a hot water tap such as a faucet and a shower.
  • the thick continuous line in FIG. 1 shows a water pipe, and a broken line shows a signal line.
  • the hot water storage water heater 1000 passes through a hot water storage unit 100 that stores hot water in the hot water storage tank 120, a first heating unit 210 that heats water stored in the hot water storage tank 120, and the hot water storage tank 120.
  • a second heating unit 220 for heating and supplying the water supply, and a terminal 40 for the user to set the hot water supply temperature.
  • the hot water storage unit 100 includes a hot water storage tank 120 that stores water supplied through the water supply pipe 110 and hot water generated from the water, a circulation pump 130 that circulates stored water in the hot water storage tank 120, and hot water in the hot water storage tank 120.
  • a mixing valve 140 that mixes city water, a heat exchanger 160 that preheats city water using heat stored in the hot water storage tank 120, a hot water supply switching valve 180 that switches a flow path communicating with the hot water supply pipe 190, and the hot water storage unit 100
  • a control unit 11 for controlling the components.
  • the water supply pipe 110 is connected to the lower part of the water supply port 101 and the hot water storage tank 120.
  • a temperature sensor 111 for measuring the temperature of city water and a pressure reducing valve 112 for setting the pressure of the hot water storage tank 120 are attached to the water supply pipe 110.
  • the temperature sensor 111 transmits a signal indicating the measurement result to the control unit 11.
  • the water supply pipe 110 branches between the water supply port 101 and the pressure reducing valve 112 and is connected to the secondary side inlet of the heat exchanger 160.
  • the water supply pipe 110 branches between the pressure reducing valve 112 and the hot water storage tank 120 and is connected to the inlet of the mixing valve 140.
  • the water supply pipe 110 introduces city water from the water supply port 101 to the hot water storage tank 120, the heat exchanger 160, and the mixing valve 140.
  • the hot water storage tank 120 is a tank having a capacity in the range of 150 to 600L, for example, 300L or 500L.
  • the hot water storage tank 120 normally stores water up to full water. City water is supplied to the lower part of the hot water storage tank 120 to form a low temperature layer, and hot water generated by the first heating unit 210 is supplied to the upper part of the hot water storage tank 120 to form a high temperature layer. Due to the temperature gradient of these layers, temperature stratification is formed inside the hot water storage tank 120.
  • a plurality of temperature sensors 121, 122, 123, and 124 for measuring the temperature of the hot water are attached in the height direction. These temperature sensors 121 to 124 transmit signals indicating measurement results to the control unit 11.
  • the suction port of the circulation pump 130 is connected to the lower part of the hot water storage tank 120 and the primary side outlet of the heat exchanger 160 via a suction switching valve 131.
  • the suction switching valve 131 switches the flow path so that either the hot water storage tank 120 or the heat exchanger 160 and the circulation pump 130 communicate with each other in accordance with a control command from the control unit 11.
  • the discharge port of the circulation pump 130 is connected to the lower part of the hot water storage tank 120 and the first heating unit 210 via the discharge switching valve 132.
  • the discharge switching valve 132 switches the flow path so that either the hot water storage tank 120 or the first heating unit 210 and the circulation pump 130 communicate with each other in accordance with a control command from the control unit 11.
  • the circulation pump 130 operates at a rotational speed according to a control command from the control unit 11 and sends out water to generate a water flow that flows in a circulation path described later.
  • the suction port of the mixing valve 140 is connected to the upper part of the water supply pipe 110 and the hot water storage tank 120, and the discharge port of the mixing valve 140 is connected to the suction port of the hot water supply switching valve 180.
  • the mixing valve 140 discharges hot water generated by mixing hot water flowing out from the upper part of the hot water storage tank 120 and city water to the hot water supply switching valve 180.
  • the ratio of mixing by the mixing valve 140 is variable and follows a control command from the control unit 11.
  • a temperature sensor 141 that measures the temperature of hot water taken out from the hot water storage tank 120 is attached to a water distribution pipe that connects the mixing valve 140 and the hot water storage tank 120.
  • the temperature sensor 141 transmits a signal indicating the measurement result to the control unit 11.
  • the heat exchanger 160 preheats city water by exchanging heat between hot water in the hot water storage tank 120 flowing on the primary side and city water flowing on the secondary side.
  • the primary side inlet of the heat exchanger 160 is connected to the upper part of the hot water storage tank 120, and the primary side outlet is connected to the suction port of the suction switching valve 131.
  • a temperature sensor 161 for measuring the temperature of water flowing out from the primary side outlet is attached to the water distribution pipe connecting the primary side outlet and the suction switching valve 131.
  • the secondary inlet of the heat exchanger 160 is connected to the water supply pipe 110, and a flow rate sensor 163 for measuring the amount of water flowing into the secondary inlet is attached to the water supply pipe 110 near the secondary inlet. ing.
  • the secondary outlet of the heat exchanger 160 is connected to the second heating unit 220, and a temperature sensor 162 that measures the temperature of water flowing out from the secondary outlet is provided in the water distribution pipe near the secondary outlet. Is attached.
  • the temperature sensors 161 and 162 and the flow sensor 163 transmit a signal indicating the measurement result to the control unit 11.
  • the suction port of the hot water supply switching valve 180 is connected to the discharge port of the mixing valve 140 and the second heating unit 220, and the discharge port of the hot water supply switching valve 180 is connected to the hot water supply pipe 190.
  • the hot water supply switching valve 180 switches the hot water supply source to be introduced into the hot water supply pipe 190 to either the hot water storage tank 120 or the second heating unit 220 in accordance with a control command from the control unit 11.
  • a pressure reducing valve 170 for setting a hot water supply pressure is attached to a water distribution pipe that guides hot water from the second heating unit 220 to the hot water supply switching valve 180.
  • the hot water supply pipe 190 is connected to the discharge port of the hot water supply switching valve 180 and the hot water supply port 102, and guides the hot water discharged from the hot water supply switch valve 180 to the hot water supply port 102.
  • a temperature sensor 191 that measures the temperature of the hot water supply and a flow rate sensor 192 that measures the amount of hot water are attached to the hot water supply pipe 190.
  • the temperature sensor 191 and the flow rate sensor 192 transmit a signal indicating the measurement result to the control unit 11.
  • the control unit 11 includes a microprocessor that executes a program, a RAM (Random Access Memory), and an EEPROM (Electrically Erasable Programmable Read-Only Memory) that stores the program.
  • the control unit 11 acquires the measurement results of the temperature sensors 111, 121 to 124, 141, 161, 162, 191 and the flow rate sensors 163, 192.
  • the control unit 11 acquires information including the hot water supply temperature from the terminal 40.
  • the control unit 11 controls the rotation speed of the circulation pump 130, the flow path communicated by the suction switching valve 131, the discharge switching valve 132, and the hot water switching valve 180, and the mixing ratio by the mixing valve 140. Details of the control processing by the control unit 11 will be described later.
  • the first heating unit 210 is a main heat source that generates hot water by heating the stored water in the hot water storage tank 120 with a heat pump.
  • the first heating unit 210 is connected to the hot water storage unit 100 via a water inlet pipe that introduces water from the lower part of the hot water storage tank 120 and a hot water outlet pipe that supplies the generated hot water to the upper part of the hot water storage tank 120.
  • the first heating unit 210 controls a refrigerant circulation path in which the compressor 211, the heat exchanger 212, the expansion valve 213, and the evaporator 214 are connected in this order by refrigerant piping, and components of the first heating unit 210.
  • Part 21 for example, CO2, HFC, HC, and HFO can be used as the refrigerant to be circulated in the refrigerant circuit, but the invention is not limited to this, and the type of refrigerant is arbitrary.
  • the compressor 211 compresses the refrigerant and discharges it to the heat exchanger 212 as a high-temperature and high-pressure gas.
  • the compressor 211 according to the present embodiment has an inverter and sets the rotation speed in accordance with a control command from the control unit 21.
  • the heat exchanger 212 heats the water on the secondary side to generate hot water by exchanging heat between the high-temperature refrigerant on the primary side and the water on the secondary side.
  • the secondary side inlet of the heat exchanger 212 is connected to the discharge port of the discharge switching valve 132 via the water inlet pipe.
  • the secondary side exit of the heat exchanger 212 is connected to the upper part of the hot water storage tank 120 through the hot water piping.
  • the refrigerant flowing into the heat exchanger 212 is cooled to become a low-temperature and high-pressure liquid, and is discharged to the expansion valve 213.
  • the expansion valve 213 depressurizes the refrigerant and discharges it to the evaporator 214 as a low-temperature and low-pressure liquid.
  • the expansion valve 213 according to the present embodiment can adjust the opening degree, and adjusts the opening degree so that the suction temperature or the discharge temperature of the compressor 211 becomes a constant temperature in accordance with an instruction from the control unit 21.
  • the evaporator 214 is a heat exchanger that performs heat exchange between the outside air guided by a blower (not shown) and the refrigerant.
  • the refrigerant flowing into the evaporator 214 is discharged into the suction port of the compressor 211 as a high-temperature and low-pressure gas by heat exchange with the outside air.
  • the control unit 21 includes a microprocessor that executes a program, a RAM, and an EEPROM that stores the program.
  • the control unit 21 acquires information from the terminal 40. This information includes instructions for starting and ending the heating operation by the first heating unit 210.
  • the control part 21 adjusts the heating capability of the 1st heating unit 210 by controlling the rotation speed of the compressor 211, and the opening degree of the expansion valve 213. FIG. This heating capacity may be kept constant by the control unit 21 or may be changed by the control unit 21 cooperating with the terminal 40 and the control unit 11.
  • the second heating unit 220 is an auxiliary heat source that generates hot water by heating city water by burning fuel represented by gas and kerosene with a burner.
  • the second heating unit 220 is connected to the hot water storage unit 100 via a water inlet pipe for introducing city water preheated by the heat exchanger 160 and a hot water outlet pipe for supplying the generated hot water to the hot water supply switching valve 180.
  • the second heating unit 220 is connected to the bathtub 50 via an outgoing pipe that supplies hot water to the bathtub 50 and a return pipe that guides water from the bathtub 50.
  • the second heating unit 220 includes a heat exchanger 221 that heats city water, a heat exchanger 222 and a pump 223 for supplying hot water to the bathtub, and a controller 22 that controls components of the second heating unit 220. ,have.
  • the heat exchanger 221 heats the city water to generate hot water by exchanging heat between the exhaust generated by the combustion by the burner and the city water.
  • a flow rate sensor 224 that measures the amount of city water flowing from the hot water storage unit 100 is attached to a water intake pipe connected to the heat exchanger 221 and the hot water storage unit 100. The flow sensor 224 transmits a signal indicating the measurement result to the control unit 22.
  • a variable opening control valve 225 for adjusting the amount of water is attached between the flow rate sensor 224 and the heat exchanger 221 in the water intake pipe. The adjustment valve 225 adjusts the water flow rate according to a control command from the control unit 22.
  • the incoming water pipe is branched between the control valve 225 and the heat exchanger 221 and connected to a bypass path that bypasses the heat exchanger 221.
  • This bypass passage is provided with a variable opening degree bypass valve 226 connected in parallel with the heat exchanger 221.
  • the bypass valve 226 sets the opening according to a control command from the control unit 22.
  • the hot water piping connected to the heat exchanger 221 and the hot water storage unit 100 merges with the bypass passage provided with the bypass valve 226.
  • This hot water supply pipe sends hot water mixed with hot water discharged from the heat exchanger 221 and city water passing through the bypass to the hot water storage unit 100.
  • a temperature sensor 228 for measuring the temperature of the mixed hot water is attached to the hot water piping. The temperature sensor 228 transmits a signal indicating the measurement result to the control unit 22.
  • the hot water supply pipe branches downstream from the junction with the bypass passage, and is connected to the return pipe of the bathtub 50 via a hot water filling valve 227 having a variable opening degree. The hot water filling valve 227 sets the opening according to a control command from the control unit 22.
  • the heat exchanger 222 heats water to generate hot water by exchanging heat between the exhaust gas generated by combustion by the burner and water.
  • the return pipe connected to the heat exchanger 222 and the bathtub 50 is branched in the middle of the return pipe and connected to the hot water supply pipe, and a pump 223 is attached between the connection portion with the hot water supply pipe and the heat exchanger 222. Yes.
  • the pump 223 operates at a rotational speed according to a control command from the control unit 22, and sends water discharged from the hot water filling valve 227 or water taken out from the bathtub 50 to the heat exchanger 222.
  • Hot water generated by the heat exchanger 222 is supplied to the bathtub 50 via a return pipe.
  • the control unit 22 includes a microprocessor that executes a program, a RAM, and an EEPROM that stores the program.
  • the control unit 22 acquires the measurement result from the flow sensor 224 and acquires information from the terminal 40. This information includes the hot water supply temperature input to the terminal 40, the start command for the hot water operation, and the start command for the reheating operation. Then, the control unit 22 instructs the burner to start and end combustion, and controls the opening degree of the adjustment valve 225, the bypass valve 226 and the hot water filling valve 227 and the rotational speed of the pump 223. Details of the control processing by the control unit 22 will be described later.
  • the hot water storage operation is a boiling operation in which the first heating unit 210 generates hot water by boiling water stored in the hot water storage tank 120.
  • the hot water storage operation starts according to the amount of heat stored in the hot water storage tank 120.
  • the amount of heat stored in the hot water storage tank 120 is calculated by the control unit 11 calculating the amount of heat stored in the hot water in the hot water storage tank 120 that is effective for the hot water supply load, based on the measurement results of the temperature sensors 121-124. Obtainable. For example, when a relatively small amount of general hot water supply load is generated, the thermal energy of the hot water in the hot water storage tank 120 is utilized by mixing the hot water and city water. Therefore, the heat storage amount is calculated by integrating the difference between the measurement results of the temperature sensors 121 to 124 and the reference value with respect to the volume of the hot water storage tank 120, with the reference value of the thermal energy as the temperature of the city water.
  • the reference value may be a predetermined value.
  • the hot water supply temperature set by the user is 40 ° C.
  • the 38 ° C. hot water stored in the hot water storage tank 120 cannot be used, so that the hot water stored in the hot water storage tank 120 exceeds a specific temperature.
  • the amount of heat storage may be calculated by integrating only for hot water.
  • the specific temperature may be a value determined in advance as 45 ° C., for example, or may be a value determined according to the hot water supply temperature.
  • the hot water supply load means demand for hot water supply, and the general hot water supply load may be a hot water supply load other than the hot water supply load by the hot water filling operation and the reheating operation.
  • the control unit 11 monitors the heat storage amount of the hot water storage tank 120 calculated from the measurement results of the temperature sensors 121 to 124, and starts the hot water storage operation when the heat storage amount falls below a predetermined threshold value. Specifically, the control unit 11 causes the first heating unit 210 to generate hot water in cooperation with the terminal 40 and the control unit 21.
  • the threshold value for starting the hot water storage operation corresponds to, for example, 10% of the maximum heat storage amount of the hot water storage tank 120.
  • the terminal 40 determines a target temperature of hot water to be generated according to the hot water supply temperature set by the user.
  • the hot water supply temperature is set to 40 ° C.
  • a positive value is A and (40 + A) ° C. is calculated as the target temperature.
  • the terminal 40 transmits the target temperature to the control unit 11.
  • the control unit 11 controls the suction switching valve 131 so that the lower part of the hot water storage tank 120 communicates with the suction port of the circulation pump 130, and the discharge port of the circulation pump 130, the first heating unit 210, and the like.
  • the discharge switching valve 132 is controlled so as to communicate with each other. Thereby, as shown by the solid line arrow in FIG. 1, the upper part of the hot water storage tank 120 passes through the suction switching valve 131, the circulation pump 130, the discharge switching valve 132, and the heat exchanger 212 from the lower part of the hot water storage tank 120. A circulation path returning to is formed.
  • control part 11 sends out the low temperature water which exists in the lower part of the hot water storage tank 120 to the heat exchanger 212 by operating the circulation pump 130. Thereby, the hot water produced
  • the control unit 11 adjusts the rotation speed of the circulation pump 130 so that hot water having a target temperature is generated.
  • the target hot water storage amount is calculated, for example, from the difference between the hot water supply load expected to occur from the present to a specific time in the future and the current heat storage amount of the hot water storage tank 120.
  • the future hot water supply load is preferably estimated by learning from actual hot water supply loads in the past several days.
  • the hot water supply load actually generated is the integrated value of the hot water supply amount measured by the flow sensor 192 and the integrated value of the difference between the hot water temperature measured by the temperature sensor 191 and the city water temperature measured by the temperature sensor 111. Is calculated from
  • control unit 11 may execute the hot water storage operation in a specific time period regardless of the heat storage amount of the hot water storage tank 120.
  • the specific time zone is, for example, a time zone in which the late-night electricity rate is low, or a time zone in which surplus of generated power generated by the power generation device installed together with the hot water storage type hot water heater 1000 occurs.
  • Control processing of hot water supply switching valve 180 Then, the control process of the hot water supply switching valve 180 by the control part 11 is demonstrated using FIG.
  • the control process shown in FIG. 2 is repeatedly executed at a constant cycle.
  • the fixed period is, for example, 1 minute.
  • control unit 11 determines whether or not the amount of heat stored in the hot water storage tank 120 exceeds a preset threshold value (step S1).
  • This threshold value corresponds to, for example, the maximum load as one hot water supply load among the hot water supply loads generated in the past several days among the general hot water supply loads. Further, the control unit 11 determines that the amount of stored heat exceeds the threshold when the measurement result by any of the temperature sensors 121 to 124 is higher than (hot water supply temperature + B) ° C., where B is a constant positive value. Good. Moreover, you may employ
  • the control part 11 controls the hot water supply switching valve 180 so that the hot water supply port 102 and the discharge port of the mixing valve 140 may connect, and an operation mode is set.
  • the tank hot water supply mode is set (step S2).
  • the tank hot water supply mode is an operation mode in which hot water in the hot water storage tank 120 is supplied from the hot water supply port 102. Details of the tank hot water supply mode will be described later.
  • the control part 11 controls the hot water supply switching valve 180 so that the hot water supply port 102 and the discharge port of the pressure-reduction valve 170 may communicate,
  • the operation mode is set to the preheating hot water supply mode (step S3).
  • the preheating hot water supply mode is an operation mode in which hot water generated by the second heating unit 220 from city water preheated by the heat exchanger 160 is supplied from the hot water supply port 102. Details of the preheating hot water supply mode will be described later.
  • control unit 11 ends the control process of the hot water supply switching valve 180.
  • the control unit 11 determines whether or not the hot water supply flow rate exceeds a threshold value (step S11). Specifically, when the hot water tap connected to the hot water supply port 102 is opened, the amount of hot water measured by the flow rate sensor 192 becomes greater than zero. The control unit 11 determines whether or not the measured value by the flow sensor 192 is equal to or greater than a certain threshold that can be detected stably.
  • step S11; No When it determines with the hot water supply flow volume not exceeding a threshold value (step S11; No), the control part 11 repeats determination of step S11. On the other hand, when it determines with the hot water supply flow volume exceeding a threshold value (step S11; Yes), the control part 11 controls the mixing valve 140 and adjusts hot water supply temperature (step S12). Specifically, the control unit 11 controls the mixing ratio of the mixing valve 140 so that the hot water temperature measured by the temperature sensor 191 is equal to the hot water temperature set in the terminal 40.
  • the control unit 11 controls the mixing ratio of the mixing valve 140 so that the hot water temperature measured by the temperature sensor 191 is equal to the hot water temperature set in the terminal 40.
  • control unit 11 determines whether or not the hot water supply flow rate is smaller than the threshold value (step S13). This threshold value is equal to the threshold value used in step S11.
  • step S13; Yes When it determines with the hot water supply flow volume being smaller than a threshold value (step S13; Yes), the control part 11 will be in a standby state, and will repeat the process after step S11. On the other hand, when it determines with the hot water supply flow volume not being smaller than a threshold value (step S13; No), the control part 11 repeats the process after step S12.
  • the hot water supply switching valve 180 connects the second heating unit 220 and the hot water supply port 102 by connecting the mixing valve 140 and the hot water supply port 102. Cut off. For this reason, city water does not flow into the 2nd heating unit 220, and heating of city water by the 2nd heating unit 220 is not performed.
  • This operation process is a process for preheating city water by the heat exchanger 160.
  • the process shown in FIG. 4 starts when the operation mode is set to the preheating hot water supply mode.
  • control unit 11 switches the flow path communicating with the suction switching valve 131 to the heat exchanger 160 side (step S21).
  • the control part 11 switches the flow path connected by the discharge switching valve 132 to the hot water storage tank 120 side (step S22).
  • the hot water storage tank 120 is connected to the hot water storage tank 120 via the heat exchanger 160, the suction switching valve 131, the circulation pump 130, and the discharge switching valve 132 from the upper part of the hot water storage tank 120.
  • a circulation path returning to the lower part is formed.
  • the control unit 11 determines whether or not the preheating flow rate measured by the flow rate sensor 163 exceeds a threshold value (step S23).
  • This preheating flow rate is the amount of water flowing into the second heating unit 220 through the secondary side of the heat exchanger 160, and increases when the hot water tap is opened.
  • the threshold value for determining the preheating flow rate corresponds to a certain amount of water that can be stably detected by the flow sensor 163.
  • step S23 If it is determined that the preheating flow rate does not exceed the threshold (step S23; No), the control unit 11 repeats the determination in step S23. On the other hand, when it determines with a preheating flow volume exceeding a threshold value (step S23; Yes), the control part 11 adjusts a preheating temperature while controlling the circulation pump 130 and producing a water flow in a circulation path (step S24). When a water flow is generated in the circulation path, the hot water flowing out from the upper part of the hot water storage tank 120 is cooled by passing through the primary side of the heat exchanger 160 and returns to the lower part of the hot water storage tank 120.
  • control unit 11 is configured so that the difference between the temperature of the city water measured by the temperature sensor 111 and the temperature of the primary outlet measured by the temperature sensor 161 is equal to a preset target value.
  • the number of revolutions of the circulation pump 130 is controlled to adjust the preheating temperature.
  • FIG. 5 shows the temperature change of the water flowing through the heat exchanger 160.
  • the line L1 shows the temperature change of the water which flows through the flow path on the primary side, and when the water flows from the primary side inlet to the primary side outlet, the water temperature changes along the solid line arrow.
  • Tw1i corresponds to the temperature of water flowing into the primary side inlet
  • Tw1o corresponds to the temperature of water flowing out from the primary side outlet.
  • a line L2 indicates a change in the temperature of the water flowing through the secondary-side flow path. When the water flows from the secondary-side inlet to the secondary-side outlet, the water temperature changes along the dashed arrow.
  • Tw2i corresponds to the temperature of the water flowing into the secondary side inlet
  • Tw2o corresponds to the temperature of the water flowing out from the secondary side outlet.
  • control unit 11 controls the rotation speed of the circulation pump 130 so that ⁇ TwL which is the difference between Tw1o and Tw2i shown in FIG. 5 is equal to the target value.
  • the control unit 11 reduces the rotational speed of the circulation pump 130 in this case to bring ⁇ TwL closer to the target value.
  • Tw1o becomes low and the city water cannot be sufficiently preheated. In this case, the control unit 11 increases the rotational speed of the circulation pump 130 to bring ⁇ TwL closer to the target value.
  • the primary flow rate can be set to an appropriate flow rate considering the preheating amount and the efficiency of heat exchange according to the secondary flow rate.
  • ⁇ TwL the water temperature in the lower part of the hot water storage tank 120 can be lowered, and the incoming water temperature of the first heating unit 210 when the boiling operation is subsequently executed can be lowered.
  • the energy consumption efficiency of the heating operation can be improved.
  • the refrigerant flowing through the refrigerant circuit of the first heating unit 210 is CO2
  • energy consumption efficiency can be greatly improved by lowering the incoming water temperature.
  • the heat exchanger 160 provides the city water with an appropriate amount of heat corresponding to the flow rate on the secondary side, the heat storage in the hot water storage tank 120 can be used effectively.
  • the rotation speed of the circulation pump 130 is controlled by instructing the circulation pump 130 at the rotation speed corresponding to the flow rate on the secondary side, as shown in FIG. 6, instead of adjusting the preheating temperature shown in FIG. May be executed. Since the rotational speed of the circulation pump 130 and the primary-side flow rate are substantially proportional, the primary-side flow rate can be made appropriate according to the secondary-side flow rate even by such an instruction.
  • step S24 the controller 11 determines whether or not the preheat flow rate is smaller than the threshold (step S25). This threshold value is equal to the threshold value used in step S23.
  • step S25; No When it is determined that the preheating flow rate is not smaller than the threshold value (step S25; No), the control unit 11 repeats the processing after step S24. On the other hand, when it determines with a preheating flow volume being smaller than a threshold value (step S25; Yes), the control part 11 enters into a standby state, and repeats the process after step S23.
  • Heating operation processing Next, the heating operation process executed by the control unit 22 of the second heating unit 220 in the preheating hot water supply mode will be described with reference to FIG.
  • control unit 22 determines whether or not the flow rate of the second heating unit 220 exceeds a threshold value (step S31). Specifically, the control unit 22 determines whether or not the measured value by the flow sensor 224 exceeds a certain flow rate that the flow sensor 224 can stably detect.
  • step S31 When it is determined that the flow rate does not exceed the threshold (step S31; No), the control unit 22 repeats the determination of step S31. On the other hand, when it determines with a flow volume exceeding a threshold value (step S31; Yes), the control part 22 ignites a burner (step S32). Thereby, heat exchange by the heat exchanger 221 is started, and the city water flowing into the heat exchanger 221 is heated.
  • control unit 22 controls the burner, the adjustment valve 225, and the bypass valve 226 to adjust the hot water supply temperature (step S33). Specifically, the control unit 22 obtains the temperature of hot water flowing out from the heat exchanger 221 from the temperature sensor 228, and controls the burner combustion amount so that this temperature approaches the target value. In addition, the control unit 22 controls the opening amount of the adjustment valve 225 to adjust the amount of water flowing into the second heating unit 220, and controls the opening amount of the bypass valve 226, thereby reducing the amount of water flowing through the bypass passage. Adjust to make the hot water temperature equal to the set value.
  • the hot water whose temperature of the hot water supply is adjusted by the second heating unit 220 returns to the hot water storage unit 100 through the hot water supply pipe, is decompressed by the pressure reducing valve 170, and is then supplied from the hot water supply port 102 via the hot water supply switching valve 180.
  • the control unit 22 determines whether or not the flow rate of the second heating unit 220 is smaller than the threshold value (step S34).
  • This threshold value is equal to the threshold value used in step S31.
  • the control part 22 repeats the process after step S32.
  • the control part 22 extinguishes a burner (step S35), enters into a standby state, and repeats the process after step S31.
  • the hot water supply switching valve 180 causes the pressure reducing valve 170 and the hot water supply port 102 to communicate with each other and blocks the flow path connecting the mixing valve 140 and the hot water supply port 102. . For this reason, the hot water in the hot water storage tank 120 is not supplied to the hot water supply port 102.
  • the rotation speed of the circulation pump 130 may be adjusted by adjusting the temperature of the preheated city water measured by the temperature sensor 162 to the target value. Good.
  • the rotation speed of the circulation pump 130 is increased, the heat exchange amount of the heat exchanger 160 is increased and the preheating temperature is increased.
  • the preheating temperature increases, the amount of heating to be heated by the second heating unit 220 with respect to the same hot water supply temperature decreases, so that it is possible to save fuel consumption.
  • the preheating temperature becomes excessively high, the incoming water temperature of the second heating unit 220 becomes high, and the hot water temperature cannot be adjusted by the second heating unit 220, or combustion may be stopped.
  • control unit 11 may adjust the rotation speed of the circulation pump 130 so that the target value of the preheating temperature becomes equal to the upper limit value of the incoming water temperature of the second heating unit 220.
  • This upper limit is, for example, 30 ° C.
  • the flow rate on the primary side of the heat exchanger 160 is controlled so that the preheating temperature becomes equal to the target value, compared with the case where ⁇ TwL shown in FIG.
  • the temperature of the water returning to the hot water storage tank 120 is increased, and the incoming water temperature of the first heating unit 210 is increased during the subsequent boiling operation.
  • a refrigerant that condenses on the high pressure side such as HFC, HC, HFO, etc.
  • the energy consumption efficiency against the rise of the incoming water temperature The degree of decrease is small.
  • the method of controlling the flow rate on the primary side so that the preheating temperature becomes equal to the target value is particularly effective when employing a refrigerant that condenses on the high pressure side.
  • the hot water filling operation is an operation for supplying a certain amount of hot water to the bathtub 50.
  • the terminal 40 transmits a hot water filling command to the control unit 22, and the hot water filling operation is started.
  • control unit 22 determines whether or not there is a hot water filling command from the terminal 40 (step S41). When it determines with there being no hot water filling command (step S41; No), the control part 22 enters into a standby state, and repeats determination of step S41.
  • step S41 when it is determined that there is a hot water filling command (step S41; Yes), the control unit 22 opens the hot water filling valve 227 (step S42) and ignites the burner (step S43). Thereby, the preheated city water flows into the second heating unit 220, branches after passing through the regulating valve 225, one is heated by the heat exchanger 221, and the other joins after passing through the bypass path. .
  • the combined hot water passes through the hot water valve 227 and is supplied to the bathtub 50 from both the forward piping and the return piping.
  • control unit 22 controls the burner, the adjustment valve 225, and the bypass valve 226 to adjust the hot water supply temperature (step S44). Specifically, the control unit 22 controls the burner combustion amount so that the hot water supply temperature measured by the temperature sensor 228 is equal to a preset hot water temperature target value. In addition, the controller 22 controls the opening of the adjustment valve 225 to adjust the amount of water flowing into the second heating unit 220. Moreover, the control part 22 shall control the opening degree of the bypass valve 226, adjust the amount of water which flows into a bypass channel, and shall make hot water supply temperature equal to a target value.
  • control unit 22 determines whether or not the hot water supply amount exceeds the hot water filling target value (step S45). This amount of hot water supply can be obtained by integrating the measured values by the flow sensor 224. In addition, the control part 22 may determine whether the amount of hot water supply exceeds the hot water filling target value using the output of the water level sensor which detects the water level of the bathtub 50.
  • step S45; No When it determines with the amount of hot water supply not exceeding the hot water filling target value (step S45; No), the control part 22 repeats the process after step S42. On the other hand, when it determines with the amount of hot water supply exceeding a hot water filling target value (step S45; Yes), the control part 22 extinguishes a burner (step S46) and closes the hot water filling valve 227 (step S47). Thereafter, the controller 22 ends the hot water filling operation process.
  • the control unit 11 of the hot water storage unit 100 executes the operation process in the preheating hot water supply mode shown in FIG. Thereby, the capacity of the hot water storage tank 120 does not require the amount of hot water for hot water filling. Therefore, the hot water storage type hot water heater 1000 can be configured using the hot water storage tank 120 having a small capacity.
  • the tank hot water supply mode operation is executed simultaneously with the hot water filling operation when the heat storage amount of the hot water storage tank 120 is larger than a preset threshold value.
  • the operation in the preheating hot water supply mode is executed simultaneously with the hot water filling operation.
  • the control unit 22 closes the hot water valve 227 and operates the pump 223. Thereby, a water flow is generated in the circulation path from the bathtub 50 through the return pipe, the pump 223, the heat exchanger 222, and the forward pipe to the bathtub 50. And the control part 22 ignites a burner and makes the heat exchanger 222 heat hot water again. In the reheating / warming operation, the operation process in the preheating hot water supply mode is not executed.
  • FIG. 9 shows an actuator control method of the hot water storage unit 100 when simultaneous operation is executed.
  • the flow rate on the secondary side of the heat exchanger 160 is about 15 to 20 L / min at the maximum, and the flow rate on the primary side increases with the flow rate on the secondary side.
  • the amount of water flowing into the first heating unit 210 during the hot water storage operation is, for example, about 1.15 L when the city water temperature in winter is 9 ° C., the hot water storage temperature is 65 ° C., and the heating capacity is 4.5 kW. / Min.
  • the control unit 11 controls the rotational speed of the circulation pump 130 so that the temperature difference ⁇ TwL becomes equal to the target value. Further, the control unit 11 controls the suction switching valve 131 so that the flow path connected to the heat exchanger 160 is fully opened. Moreover, the control part 11 controls the opening degree of the discharge switching valve 132 so that the tapping temperature becomes equal to the target value by adjusting the boiling flow rate of the first heating unit 210.
  • FIG. 10 shows the relationship between the opening degree of the discharge switching valve 132 and the flow rate.
  • a line L11 indicates a flow rate from the discharge switching valve 132 to the hot water storage tank 120 side
  • a line L12 indicates a flow rate from the discharge switching valve 132 to the first heating unit 210 side.
  • the circulation pump 130 adjusts the required flow rate on the primary side of the heat exchanger 160, and the discharge switching valve 132 is heated by the first heating unit 210.
  • the ratio between the flow rate required for the increase and the remaining flow rate returning to the hot water storage tank 120 is adjusted.
  • the hot water storage tank 120 stays in the hot water storage tank 120 for a long time, there is a possibility that germs may propagate in the stored water, which is not preferable. If the city water is sterilized with chlorine, the propagation of miscellaneous bacteria is suppressed, but once heated, for example, when the water temperature reaches about 20 to 45 ° C., Legionella bacteria may propagate. In the state where the hot water storage tank 120 is hermetically sealed and clean city water is always supplied, it can be said that there is almost no possibility of germs breeding.
  • the hot water in the hot water storage tank 120 is heated again to a high temperature at which the germs can be sterilized. There is a need to.
  • This temperature is, for example, 60 ° C. or higher.
  • the hot water storage type water heater 1000 performs the high-temperature boiling operation shown in FIG.
  • the high-temperature boiling operation is started when the hot-water storage type water heater 1000 becomes operational.
  • This high-temperature boiling operation is desirably performed in a time period before a large amount of hot water supply load is generated.
  • This time zone is, for example, a time zone from 15:00 to 18:00.
  • the controller 11 determines whether or not the amount of hot water supplied from the hot water storage tank 120 to the hot water outlet 102 within a preset time exceeds the capacity of the hot water storage tank 120 (step S51). That is, the control unit 11 determines whether hot water in the hot water storage tank 120 is retained. This stagnation means that the water is stored in the hot water storage tank 120 for a relatively long time set in advance without being reheated.
  • the preset time is, for example, 72 hours.
  • the amount of hot water discharged from the hot water storage tank 120 to the hot water supply port 102 is measured by the temperature sensor 111 and the temperature of the hot water discharged from the hot water storage tank 120 measured by the temperature sensor 141 after integrating the hot water supply flow rate measured by the flow rate sensor 192. It can be obtained by estimating the mixing ratio by the mixing valve 140 from the relationship between the temperature of the city water and the hot water temperature measured by the temperature sensor 191.
  • a flow rate sensor may be provided in the water pipe which connects the upper part of the hot water storage tank 120 and the inlet of the mixing valve 140, and the amount of hot water discharged may be calculated
  • step S51 determines that the water in the hot water storage tank 120 is not staying, and ends the high temperature boiling operation without boiling the hot water. .
  • step S51 determines that water has stayed in the hot water storage tank 120 for a long time, and controls the hot water supply switching valve 180.
  • the hot water supply port 102 and the second heating unit 220 are communicated with each other.
  • the control unit 11 sets the operation mode to the preheating hot water supply mode (step S52).
  • control unit 11 determines whether or not the current time is before a specific time at midnight (step S53).
  • the specific time is set in advance as, for example, 23:00 when the electricity rate is low.
  • step S53 If it is determined that the current time is before the specific time (step S53; Yes), the control unit 11 determines whether or not the heat storage amount of the hot water storage tank 120 is smaller than the threshold (step S54). This threshold value is equal to the threshold value for starting the hot water storage operation.
  • step S54 If it is determined that the heat storage amount is not lower than the threshold (step S54; No), the control unit 11 repeats the processing from step S53. On the other hand, when it determines with the heat storage amount being lower than a threshold value (step S54; Yes), the control part 11 determines whether the hot water storage temperature of the hot water storage tank 120 is lower than specific temperature (step S55).
  • the hot water storage temperature of the hot water storage tank 120 is an average temperature of the water in the hot water storage tank 120 and can be obtained from the measured values of the temperature sensors 121 to 124.
  • FIG. 12 shows the relationship between the incoming water temperature of the first heating unit 210 and COP (Coefficient Of Performance) as energy consumption efficiency.
  • the boiling temperature is a constant temperature set in advance, for example, 65 ° C.
  • hot water storage type water heater 1000 mainly consumes electric power to boil hot water, and generates shortage of hot water in combustion-type second heating unit 220.
  • Electric power is generated, for example, by burning fossil fuel in a thermal power plant.
  • primary energy efficiency can be used to evaluate the first heating unit 210 with the same evaluation index as the second heating unit 220 that directly inputs fuel.
  • the primary energy efficiency of the electric power that will eventually be consumed at home is about 36.9% of the fossil fuel input at the power plant.
  • the heat pump type first heating unit 210 can absorb heat from the atmosphere and obtain hot water supply heat that is equal to or higher than the input electric energy. For this reason, the primary energy efficiency of the first heating unit 210 can be obtained by multiplying the primary energy efficiency of the electrical energy by the COP.
  • the hot water combustion efficiency of the combustion type second heating unit 220 is about 95% even if it is highly efficient. Since the second heating unit 220 directly inputs the fossil fuel, the combustion efficiency can be regarded as the primary energy efficiency of the hot water supply.
  • step S55 When it determines with hot water storage temperature not being lower than specific temperature (step S55; No), the control part 11 repeats the process after step S53. Thereby, the operation process in the preheating hot water supply mode is executed. As a result, the water temperature in the hot water storage tank 120 decreases. As a result, the energy efficiency at the time of subsequent boiling-up operation (step S56) and boiling-up operation (step S57) can be improved.
  • step S55 when it determines with hot water storage temperature being lower than specific temperature (step S55; Yes), the control part 11 performs the high temperature boiling increase operation of the hot water storage tank 120 (step S56).
  • This high-temperature boiling operation is an operation in which the boiling temperature is set to 65 ° C., which is higher than the boiling temperature of the hot water storage operation, for example, and the amount of heat necessary for the day is predicted to be heated. Then, the control part 11 repeats the process after step S53.
  • step S53 If it is determined in step S53 that the current time is not earlier than the specific time of midnight (step S53; No), the control unit 11 performs a high-temperature boiling operation (step S57). In this high-temperature boiling operation, regardless of the hot water supply load expected on the next day, the whole hot water storage tank 120 is heated up to a sterilizable temperature. The high temperature boiling operation is executed instead of the hot water storage operation executed at midnight.
  • the incoming water temperature of the first heating unit 210 gradually increases.
  • the first heating unit 210 that is a heat pump type, when the incoming water temperature rises, the pressure on the high-pressure side increases, and the allowable pressure may be exceeded.
  • the operation of the compressor 211 is stopped, only the circulation pump 130 is operated, and the temperature at the bottom of the hot water storage tank 120 is 60 ° C.
  • the hot water in the lower part of the hot water storage tank 120 may be circulated to the upper part until it becomes.
  • the compressor 211 since the compressor 211 is stopped, heating by the first heating unit 210 is not executed, but the hot water in the upper part of the hot water storage tank 120 and the cold water in the lower part are mixed, and the temperature of the entire hot water storage tank 120 is increased. It can be 60 degreeC or more.
  • the control unit 11 ends the high-temperature boiling operation process.
  • the amount of heat stored in the hot water storage tank 120 increases when the hot water storage operation is executed in the midnight hours when the electricity rate is low.
  • the heat storage amount at the end time of the midnight time zone may be the maximum value that can store heat in the hot water storage tank 120, or may be in accordance with the expected hot water supply load. In the example shown in FIG. 13, the end time of the midnight time zone is 7:00.
  • a general hot water supply load is generated in the bathroom and kitchen faucet. Since this general hot water supply load is smaller than the hot water supply load generated by bathing, the operation process in the tank hot water supply mode is executed. During the time when the general hot water supply load is not generated, the heat storage amount gradually decreases due to the heat radiation from the hot water storage tank 120.
  • Hot water filling operation is executed around 19:00. At this time, since the operation process in the preheating hot water supply mode is executed, a decrease in the amount of heat stored in the hot water storage tank 120 and heating by the second heating unit 220 occur simultaneously.
  • the hot water filling operation is executed, the amount of heat stored in the hot water storage tank 120 is significantly reduced and becomes lower than the threshold value TH1 for controlling the hot water supply switching valve 180. That is, the operation mode shifts from the tank hot water supply mode to the preheating hot water supply mode. Thereafter, a general hot water supply load represented by a shower is generated, but the operation processing in the preheating hot water supply mode continues until the amount of heat stored in the hot water storage tank 120 falls below the threshold value TH2 for executing the hot water storage operation.
  • the first heating unit 210 starts the hot water storage operation.
  • the operation process in the preheating hot water supply mode is executed.
  • the target value of the heat storage amount of the hot water storage tank 120 is set to a hot water supply load that is expected to occur after the current time on that day. This target value is usually smaller than the target value for hot water storage operation during midnight hours.
  • the operation of the tank hot water supply mode is executed when the heat storage amount of the hot water storage tank 120 is larger than the threshold value TH1, and the operation of the preheating hot water supply mode is executed when the heat storage amount is smaller than the threshold value TH1. Is done. Although it is desirable to control the amount of heat storage so that it becomes the minimum at 24:00, which is the end time of the day, if the occurrence of a general hot water supply load is predicted after 24:00, at the time of 24:00 You may leave some heat storage.
  • the hot water storage type water heater 1000 As described above, in the hot water storage type water heater 1000 according to the present embodiment, even if water stays in the hot water storage tank 120 for a long time and it is necessary to perform a high temperature boiling operation, the operation in the preheating hot water supply mode is performed. By executing the above, the heat storage in the hot water storage tank 120 can be used.
  • the hot water storage type water heater 1000 executes the operation process in the preheating hot water supply mode, and executes the high temperature boiling operation after the water temperature of the hot water storage tank 120 is lowered. For this reason, when performing high-temperature boiling operation, the incoming water temperature of the heat pump type 1st heating unit 210 can be made low. Therefore, overall primary energy efficiency can be increased.
  • the hot water storage type water heater 1000 performs a high-temperature boiling operation that increases the amount of heat stored in the hot water storage tank 120 under conditions that require sterilization. For this reason, there is little increase amount of middle temperature water, and the energy consumption efficiency of the high temperature boiling operation performed at midnight of the day can be made high. In the high temperature boiling operation at midnight, out of the total amount stored in the hot water storage tank 120, the remaining hot water that has not been heated in the high temperature boiling operation may be boiled.
  • the energy consumption efficiency at the time of the hot water storage operation of the first heating unit 210 can be increased.
  • CO2 is used as the refrigerant
  • the high pressure side is a supercritical cycle, and the lower the incoming temperature of the first heating unit 210, the higher the energy consumption efficiency, which is effective.
  • the hot water storage unit 100 has a flow rate sensor 163 that measures the flow rate of city water
  • the second heating unit 220 has a flow rate sensor 224 that measures the flow rate of city water that flows in. For this reason, when the city water flowing into the second heating unit 220 is preheated by the hot water storage unit 100, there is no need to communicate between the control unit 11 of the hot water storage unit 100 and the control unit 22 of the second heating unit 220. Thus, the actuators of the hot water storage unit 100 and the second heating unit 220 can be controlled.
  • Hot water storage type hot water supply apparatus 1000 is different from that according to Embodiment 1 in that its constituent elements are controlled by one controller that executes a program.
  • FIG. 14 shows the configuration of hot water storage type water heater 1000 according to the present embodiment.
  • the hot water storage type water heater 1000 includes a controller 60 that controls the hot water storage unit 100, the first heating unit 210, and the second heating unit 220.
  • the controller 60 is configured as a computer having a processor 61, a main storage unit 62, an auxiliary storage unit 63, an input unit 64, an output unit 65, and a communication unit 66.
  • the main storage unit 62, auxiliary storage unit 63, input unit 64, output unit 65, and communication unit 66 are all connected to the processor 61 via an internal bus 67.
  • the processor 61 includes an MPU (Micro Processing Unit).
  • the processor 61 exhibits a function equivalent to that of the control units 11, 21, and 22 according to the first embodiment by executing the program 68 stored in the auxiliary storage unit 63.
  • the main storage unit 62 includes a RAM (Random Access Memory).
  • the main storage unit 62 loads the program 68 from the auxiliary storage unit 63.
  • the main storage unit 62 is used as a work area for the processor 61.
  • the auxiliary storage unit 63 includes a nonvolatile memory such as an HDD (Hard Disk Drive) or a flash memory. In addition to the program 68, the auxiliary storage unit 63 stores various data used for the processing of the processor 61.
  • HDD Hard Disk Drive
  • flash memory a nonvolatile memory
  • the auxiliary storage unit 63 stores various data used for the processing of the processor 61.
  • the input unit 64 includes, for example, an input key and a capacitive pointing device.
  • the input unit 64 acquires information input by the user and notifies the processor 61 of the information.
  • the output unit 65 includes a display device represented by an LCD (Liquid Crystal Display), for example.
  • the output unit 65 is, for example, formed integrally with a pointing device that configures the input unit 64 to configure a touch screen. Since the terminal 40 corresponds to the user interface of the hot water storage type hot water supply device 1000, the controller 60 may be configured without the input unit 64 and the output unit 65.
  • the communication unit 66 includes a communication interface circuit for communicating with an external device.
  • the communication unit 66 notifies the processor 61 of information included in a signal received from the outside, and transmits a signal for transmitting the information output from the processor 61 to an external device.
  • Information acquired from the outside by the communication unit 66 includes the measurement results of the sensors of the hot water storage unit 100, the first heating unit 210, and the second heating unit 220.
  • the information transmitted to the outside by the communication unit 66 includes instructions for the pumps and valves of the hot water storage unit 100, the first heating unit 210, and the second heating unit 220.
  • the hot water storage unit 100 is configured without the control unit 11 (see FIG. 1)
  • the first heating unit 210 is configured without the control unit 21 (see FIG. 1)
  • the second The heating unit 220 is configured by omitting the control unit 22 (see FIG. 1).
  • the hot water storage type water heater 1000 has the controller 60 that controls its constituent elements. This facilitates maintenance and management of the program executed by the controller 60.
  • the flow rate sensor 163 that measures the flow rate on the secondary side of the heat exchanger 160 may be provided not near the secondary side inlet but near the secondary side outlet.
  • the user may be able to input a command for starting a high-temperature boiling operation from the terminal 40.
  • a command for starting a high-temperature boiling operation For example, in a home equipped with a solar power generation device, it may be sunny during the day and surplus power may be generated.
  • the terminal 40 informs the user that it is necessary to perform a high-temperature boiling operation, and surplus power High temperature boiling operation may be encouraged. Thereby, even when input electric power becomes large by execution of high temperature boiling operation, the raise of a running cost can be suppressed.
  • a controller of a HEMS (Home Energy Management System) including the hot water storage type hot water heater 1000 may instruct the hot water type hot water heater 1000 to perform a high-temperature boiling operation for sterilization in anticipation of generation of surplus power.
  • HEMS Home Energy Management System
  • a program stored in the EEPROM of the control units 11, 21, 22 and a program 68 stored in the auxiliary storage unit 63 are stored in a flexible disk, a CD-ROM (Compact Disk Read-Only Memory), a DVD (A device that performs the above-described processing is configured by storing and distributing it in a computer-readable recording medium represented by Digital Versatile Disk (MO) and MO (Magneto-Optical Disk), and installing these programs in the computer. Can do.
  • MO Digital Versatile Disk
  • MO Magnetic-Optical Disk
  • the program may be stored in a disk device included in a server device on a communication network represented by the Internet, and may be downloaded onto a computer, for example, superimposed on a carrier wave.
  • the above-described processing can also be achieved by starting and executing a program while transferring it via a network represented by the Internet.
  • processing can also be achieved by executing all or part of the program on the server device and executing the program while the computer transmits / receives information related to the processing via the communication network.
  • the means for realizing the functions of the hot water storage type water heater 1000 is not limited to software, and part or all of the means may be realized by dedicated hardware. For example, if a circuit represented by an FPGA (Field Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit) is used, power saving of the hot water storage water heater 1000 can be achieved.
  • FPGA Field Programmable Gate Array
  • ASIC Application Specific Integrated Circuit
  • the present invention is suitable for a technique for supplying hot water generated by heating city water.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

貯湯式給湯機(1000)は、水を加熱して第1の湯を生成する第1加熱ユニット(210)と、第1の湯を貯える貯湯タンク(120)と、貯湯タンク(120)から取水した第1の湯と市水との熱交換により当該市水を予熱する熱交換器(160)と、熱交換器(160)により予熱された市水を加熱して第2の湯を生成する第2加熱ユニット(220)と、を備え、予め設定された時間内に貯湯タンク(120)から給湯口(102)に供給した第1の湯の量が貯湯タンク(120)の容量より小さい場合に、第2の湯を給湯口(102)に供給する。

Description

貯湯式給湯機、給湯方法及びプログラム
 本発明は、貯湯式給湯機、給湯方法及びプログラムに関する。
 水を加熱することで生成した湯を貯湯タンクに貯えておいて、この貯湯タンクから湯を供給する貯湯式給湯機が知られている(例えば、特許文献1を参照)。特許文献1には、貯湯タンクの水をヒートポンプにより沸き上げて供給するシステムについて記載されている。このシステムは、貯湯タンクの蓄熱量が不足した場合に、時間をかけて貯湯タンクの水を再度沸き上げることなく、貯湯タンクから取り出した水をバーナで加熱して温水を供給する。
特開2014-214958号公報
 特許文献1に記載されたシステムでは、貯湯タンク内の雑菌の繁殖を抑えるために、貯湯タンク内の湯温を60℃とする沸き上げ運転が実施される。ここで、比較的高い30~40℃程度の温水が貯湯タンクに貯えられていても、一定時間以内に沸き上げ運転が行われないまま貯湯タンクの水が滞留している場合には、速やかに沸き上げ運転を開始して貯湯タンク内の湯温を60℃以上にする必要がある。しかしながら、このような比較的高い温度の温水を沸き上げる運転は、低温の水を沸き上げる運転よりもエネルギー消費効率が低い。このため、貯湯式給湯機のエネルギー消費効率を向上させる余地があった。
 本発明は、上記の事情に鑑みてなされたもので、貯湯式給湯機のエネルギー消費効率を向上させることを目的とする。
 上記目的を達成するため、本発明の貯湯式給湯機は、水を加熱して第1の湯を生成する第1加熱手段と、第1の湯を貯える貯湯タンクと、貯湯タンクから取水した第1の湯と市水との熱交換により当該市水を予熱する熱交換器と、熱交換器により予熱された市水を加熱して第2の湯を生成する第2加熱手段と、を備え、予め設定された時間内に貯湯タンクから給湯口に供給した第1の湯の量が貯湯タンクの容量より小さい場合に、第2の湯を給湯口に供給する。
 本発明によれば、予め設定された時間内に貯湯タンクから給湯口に供給した第1の湯の量が貯湯タンクの容量より小さい場合に、貯湯タンクから取水した第1の湯との熱交換により予熱された市水が加熱されて給湯口に供給される。このため、貯湯タンク内の比較的高い温水の熱量を利用して湯を供給しつつ、貯湯タンク内の水温を低下させることができる。これにより、貯湯式給湯機のエネルギー消費効率を向上させることができる。
実施の形態1に係る貯湯式給湯機の構成を示す図 給湯切替弁の制御処理を示すフロー図 タンク給湯モードの運転処理を示すフロー図 予熱給湯モードの運転処理を示すフロー図 熱交換器を通る水の温度変化を示す図 熱交換器の1次側流量と2次側流量との関係を示す図 加熱処理を示すフロー図 湯張り運転処理を示すフロー図 アクチュエータの制御について説明するための図 吐出切替弁の制御について説明するための図 高温沸き上げ運転処理を示すフロー図 第1加熱ユニットの入水温度とCOPとの関係を示す図 給湯負荷、貯湯タンクの蓄熱量、及び加熱能力の推移を示す図 実施の形態2に係る貯湯式給湯機の構成を示す図
 以下、本発明の実施の形態を、図面を参照しつつ詳細に説明する。
 実施の形態1.
 図1には、実施の形態1に係る貯湯式給湯機1000の構成が示されている。貯湯式給湯機1000は、給水口101から得た水を加熱して、給湯口102から湯を供給する給湯機である。給水口101は、給水系統に接続される給水端であって、給水系統から給水として市水の供給を受ける。市水は、例えば水道水又は上水である。給湯口102は、例えば蛇口及びシャワー等の給湯栓に代表される温水利用箇所に接続される給湯端である。なお、図1中の太い実線は、配水管を示し、破線は、信号線を示す。
 貯湯式給湯機1000は、図1に示されるように、貯湯タンク120に湯を貯える貯湯ユニット100と、貯湯タンク120の貯留水を加熱する第1加熱ユニット210と、貯湯タンク120を経由することなく給水を加熱して供給するための第2加熱ユニット220と、ユーザが給湯温度を設定するための端末40と、を有している。
 (貯湯ユニット100の構成)
 貯湯ユニット100は、給水管110を介して供給された水及びこの水から生成された湯を貯える貯湯タンク120と、貯湯タンク120の貯留水を循環させる循環ポンプ130と、貯湯タンク120の湯と市水とを混合する混合弁140と、貯湯タンク120の蓄熱を利用して市水を予熱する熱交換器160と、給湯管190に連通する流路を切り替える給湯切替弁180と、貯湯ユニット100の構成要素を制御する制御部11と、を有している。
 給水管110は、給水口101及び貯湯タンク120の下部に接続される。給水管110には、市水の温度を計測する温度センサ111と、貯湯タンク120の圧力を設定するための減圧弁112と、が取り付けられている。温度センサ111は、計測結果を示す信号を制御部11に送信する。また、給水管110は、給水口101と減圧弁112との間で分岐して、熱交換器160の二次側入口に接続されている。また、給水管110は、減圧弁112と貯湯タンク120との間で分岐して、混合弁140の吸入口に接続されている。給水管110は、給水口101から貯湯タンク120、熱交換器160及び混合弁140に市水を導入する。
 貯湯タンク120は、容量が150~600Lの範囲内にあって例えば300L又は500Lのタンクである。貯湯タンク120には、通常、満水まで水が貯留されている。貯湯タンク120の下部には市水が供給されて低温層が形成され、貯湯タンク120の上部には第1加熱ユニット210によって生成された湯が供給されて高温層が形成される。これらの層の温度勾配により貯湯タンク120の内部には温度成層が形成される。貯湯タンク120の表面には、湯水の温度を計測する複数の温度センサ121,122,123,124が高さ方向に取り付けられている。これらの温度センサ121~124は、計測結果を示す信号を制御部11に送信する。
 循環ポンプ130の吸入口は、吸入切替弁131を介して貯湯タンク120の下部と熱交換器160の1次側出口とに接続されている。吸入切替弁131は、制御部11からの制御命令に従って、貯湯タンク120及び熱交換器160のいずれか一方と、循環ポンプ130と、を連通させるように流路を切り替える。また、循環ポンプ130の吐出口は、吐出切替弁132を介して貯湯タンク120の下部と第1加熱ユニット210とに接続される。吐出切替弁132は、制御部11からの制御命令に従って、貯湯タンク120及び第1加熱ユニット210のいずれか一方と、循環ポンプ130と、を連通させるように流路を切り替える。
 循環ポンプ130は、制御部11からの制御命令に従った回転数で稼働して水を送出することにより、後述の循環路に流れる水流を生成する。
 混合弁140の吸入口は、給水管110及び貯湯タンク120の上部に接続され、混合弁140の吐出口は、給湯切替弁180の吸入口に接続されている。混合弁140は、貯湯タンク120の上部から流出した高温の湯と市水とを混合することにより生成した温水を、給湯切替弁180に吐出する。混合弁140による混合の比率は、可変であって、制御部11からの制御命令に従う。また、混合弁140と貯湯タンク120とを接続する配水管には、貯湯タンク120から取り出した湯の温度を計測する温度センサ141が取り付けられている。温度センサ141は、計測結果を示す信号を制御部11に送信する。
 熱交換器160は、1次側に流れる貯湯タンク120の湯と、2次側に流れる市水との間で熱交換を行うことにより、市水を予熱する。熱交換器160の1次側入口は、貯湯タンク120の上部に接続され、1次側出口は、吸入切替弁131の吸入口に接続されている。この1次側出口と吸入切替弁131とを接続する配水管には、1次側出口から流出した水の温度を計測する温度センサ161が取り付けられている。また、熱交換器160の2次側入口は、給水管110に接続され、この2次側入口近傍の給水管110には、2次側入口に流入する水量を計測する流量センサ163が取り付けられている。また、熱交換器160の2次側出口は、第2加熱ユニット220に接続され、この2次側出口近傍の配水管には、2次側出口から流出する水の温度を計測する温度センサ162が取り付けられている。温度センサ161,162及び流量センサ163は、計測結果を示す信号を制御部11に送信する。
 給湯切替弁180の吸入口は、混合弁140の吐出口、及び第2加熱ユニット220に接続され、給湯切替弁180の吐出口は、給湯管190に接続されている。給湯切替弁180は、制御部11からの制御命令に従って、給湯管190に導入する湯の供給源を、貯湯タンク120及び第2加熱ユニット220のいずれか一方に切り替える。なお、第2加熱ユニット220からの湯を給湯切替弁180に導く配水管には、給湯圧力を設定するための減圧弁170が取り付けられている。
 給湯管190は、給湯切替弁180の吐出口と給湯口102とに接続され、給湯切替弁180から吐出された湯を給湯口102に導く。給湯管190には、給湯の温度を計測する温度センサ191と、給湯の水量を計測する流量センサ192と、が取り付けられている。温度センサ191及び流量センサ192は、計測結果を示す信号を制御部11に送信する。
 制御部11は、プログラムを実行するマイクロプロセッサ、RAM(Random Access Memory)及びプログラムを記憶するEEPROM(Electrically Erasable Programmable Read-Only Memory)を含んで構成される。制御部11は、温度センサ111,121~124,141,161,162,191及び流量センサ163,192の計測結果を取得する。また、制御部11は、端末40から給湯温度を含む情報を取得する。そして、制御部11は、循環ポンプ130の回転数と、吸入切替弁131、吐出切替弁132、及び給湯切替弁180によって連通される流路と、混合弁140による混合比率と、を制御する。制御部11による制御処理の詳細は、後述する。
 (第1加熱ユニット210の構成)
 第1加熱ユニット210は、ヒートポンプにより貯湯タンク120の貯留水を加熱して湯を生成する主熱源である。第1加熱ユニット210は、貯湯タンク120の下部から水を導入する入水配管と、生成した湯を貯湯タンク120の上部に供給する出湯配管と、を介して貯湯ユニット100に接続されている。第1加熱ユニット210は、圧縮機211、熱交換器212、膨張弁213及び蒸発器214がこの順に冷媒配管で接続されてなる冷媒循環路と、第1加熱ユニット210の構成要素を制御する制御部21と、を有している。冷媒循環路に循環させる冷媒として、例えば、CO2、HFC、HC、HFOを用いることができるが、これには限定されず、冷媒の種類は任意である。
 圧縮機211は、冷媒を圧縮して高温高圧の気体として熱交換器212に吐出する。本実施の形態に係る圧縮機211は、インバータを有し、制御部21からの制御命令に従って回転数を設定する。
 熱交換器212は、1次側の高温の冷媒と2次側の水との間で熱交換を行うことにより、2次側の水を加熱して湯を生成する。熱交換器212の2次側入口は、入水配管を介して吐出切替弁132の吐出口に接続されている。また、熱交換器212の2次側出口は、出湯配管を介して貯湯タンク120の上部に接続されている。熱交換器212に流入した冷媒は、冷却されることで低温高圧の液体となり、膨張弁213に吐出される。
 膨張弁213は、冷媒を減圧して低温低圧の液体として蒸発器214に吐出する。本実施の形態に係る膨張弁213は、開度を調節可能であり、制御部21の指示に従って、圧縮機211の吸入温度又は吐出温度が一定の温度となるように開度を調節する。
 蒸発器214は、送風機(不図示)によって導かれた外気と冷媒との間で熱交換を行う熱交換器である。蒸発器214に流入した冷媒は、外気との熱交換により高温低圧の気体となって圧縮機211の吸入口に吐出される。
 制御部21は、プログラムを実行するマイクロプロセッサ、RAM及びプログラムを記憶するEEPROMを含んで構成される。制御部21は、端末40から情報を取得する。この情報には、第1加熱ユニット210による加熱運転の開始及び終了の指令が含まれる。そして、制御部21は、圧縮機211の回転数及び膨張弁213の開度を制御することにより、第1加熱ユニット210の加熱能力を調節する。この加熱能力は、制御部21によって一定に保たれてもよいし、制御部21が端末40及び制御部11と連携することで変更されてもよい。
 (第2加熱ユニット220の構成)
 第2加熱ユニット220は、ガス及び灯油に代表される燃料をバーナで燃焼させることで市水を加熱して湯を生成する補助熱源である。第2加熱ユニット220は、熱交換器160によって予熱された市水を導入する入水配管と、生成した湯を給湯切替弁180に供給する出湯配管と、を介して貯湯ユニット100に接続されている。また、第2加熱ユニット220は、浴槽50に湯を供給する往き配管と、浴槽50から水を導く戻り配管と、を介して浴槽50に接続されている。
 第2加熱ユニット220は、市水を加熱する熱交換器221と、浴槽に湯を供給するための熱交換器222及びポンプ223と、第2加熱ユニット220の構成要素を制御する制御部22と、を有している。
 熱交換器221は、バーナによる燃焼で発生した排気と市水との間で熱交換を行うことで、市水を加熱して湯を生成する。熱交換器221及び貯湯ユニット100に接続される入水配管には、貯湯ユニット100から流入した市水の水量を計測する流量センサ224が取り付けられている。流量センサ224は、計測結果を示す信号を制御部22に送信する。また、入水配管には、流量センサ224と熱交換器221との間に、水量を調節する開度可変の調節弁225が取り付けられている。調節弁225は、制御部22からの制御命令に従って水流量を調節する。
 また、入水配管は、調節弁225と熱交換器221との間で分岐して、熱交換器221を迂回するバイパス路に接続されている。このバイパス路には、熱交換器221と並列に接続される開度可変のバイパス弁226が設けられている。バイパス弁226は、制御部22からの制御命令に従って開度を設定する。
 また、熱交換器221及び貯湯ユニット100に接続される出湯配管は、バイパス弁226が設けられたバイパス路と合流する。この出湯配管は、熱交換器221から吐出された湯とバイパス路を通った市水とが混合した湯水を、貯湯ユニット100に送出する。出湯配管には、混合した湯水の温度を計測する温度センサ228が取り付けられている。温度センサ228は、計測結果を示す信号を制御部22に送信する。また、出湯配管は、バイパス路との合流部より下流側で分岐して、開度可変の湯張り弁227を介して浴槽50の戻り配管の途中に接続されている。湯張り弁227は、制御部22からの制御命令に従って開度を設定する。
 熱交換器222は、バーナによる燃焼で発生した排気と水との間で熱交換を行うことで、水を加熱して湯を生成する。熱交換器222及び浴槽50に接続される戻り配管は、その途中で分岐して出湯配管と接続され、出湯配管との接続部と熱交換器222との間には、ポンプ223が取り付けられている。ポンプ223は、制御部22からの制御命令に従った回転数で稼働し、湯張り弁227から吐出された水又は浴槽50から取り出した水を熱交換器222に送出する。熱交換器222によって生成された湯は、戻り配管を介して浴槽50に供給される。
 制御部22は、プログラムを実行するマイクロプロセッサ、RAM及びプログラムを記憶するEEPROMを含んで構成される。制御部22は、流量センサ224から計測結果を取得し、端末40から情報を取得する。この情報には、端末40に入力された給湯温度と、湯張り運転の開始指令と、追い焚き運転の開始指令と、が含まれる。そして、制御部22は、バーナに燃焼の開始及び終了を指示し、調節弁225、バイパス弁226及び湯張り弁227の開度と、ポンプ223の回転数と、を制御する。制御部22による制御処理の詳細は、後述する。
 続いて、貯湯式給湯機1000によって実行される各種運転について説明する。これらの運転は、制御部11,21,22及び端末40が信号線を介した通信により協働することで実現される。
 (貯湯運転)
 貯湯運転は、第1加熱ユニット210が貯湯タンク120の貯留水を沸き上げて湯を生成する沸き上げ運転である。貯湯運転は、貯湯タンク120の蓄熱量に応じて開始する。
 貯湯タンク120の蓄熱量は、制御部11が、温度センサ121~124の計測結果に基づいて、貯湯タンク120内の湯が有する蓄熱量のうち、給湯負荷に有効な蓄熱量を算出することで得ることができる。例えば、比較的少量の一般給湯負荷が生じると、貯湯タンク120内の湯が有する熱エネルギーは、この湯と市水とが混合することで利用される。このため、熱エネルギーの基準値を市水の温度として、温度センサ121~124の計測結果と基準値との差分を貯湯タンク120の容積について積分することで、蓄熱量が算出される。なお、基準値は、予め定められた値でもよい。また、例えばユーザにより設定された給湯温度が40℃であるときに、貯湯タンク120に貯えられている38℃の湯は利用できないため、貯湯タンク120に貯えられている湯水のうち特定の温度以上の湯についてのみ積分することで蓄熱量を算出してもよい。特定の温度は、例えば45℃として予め定められた値であってもよいし、給湯温度に応じて定められる値であってもよい。なお、給湯負荷は、給湯の需要を意味し、一般給湯負荷は、湯張り運転及び追い焚き運転による給湯負荷以外の給湯負荷としてもよい。
 制御部11は、温度センサ121~124の計測結果から算出される貯湯タンク120の蓄熱量を監視して、蓄熱量が予め設定された特定の閾値を下回ると、貯湯運転を開始する。具体的には、制御部11は、端末40及び制御部21と連携して、第1加熱ユニット210に湯を生成させる。貯湯運転を開始するための閾値は、例えば、貯湯タンク120の最大蓄熱量の10%に相当する。
 貯湯運転では、端末40が、ユーザにより設定された給湯温度に応じて、生成すべき湯の目標温度を定める。ここで、第1加熱ユニット210で湯が沸き上げられてから実際に給湯口102から給湯されるまでの間に貯湯タンク120表面からは放熱があり、また、混合弁140において市水の混合比率をゼロには設定できないことがある。このため、本実施の形態に係る端末40は、設定された給湯温度に一定の値を加算することにより目標温度を求める。例えば、給湯温度が40℃に設定された場合には、正の値をAとして(40+A)℃が目標温度として算出される。そして、端末40は、目標温度を制御部11に送信する。
 貯湯運転が開始すると、制御部11は、貯湯タンク120の下部と循環ポンプ130の吸入口とが連通するように吸入切替弁131を制御し、循環ポンプ130の吐出口と第1加熱ユニット210とが連通するように吐出切替弁132を制御する。これにより、図1中の実線矢印で示されるように、貯湯タンク120の下部から、吸入切替弁131、循環ポンプ130、吐出切替弁132、及び熱交換器212を経由して貯湯タンク120の上部に戻る循環路が形成される。
 そして、制御部11は、循環ポンプ130を稼働させることにより、貯湯タンク120の下部に存在する低温の水を熱交換器212に送出する。これにより、第1加熱ユニット210によって生成された湯が、貯湯タンク120の上部に供給されることとなる。制御部11は、循環ポンプ130を稼働させる際に、目標温度の湯が生成されるように、循環ポンプ130の回転数を調節する。
 そして、制御部11は、貯湯タンク120の蓄熱量が目標貯湯量に達すると、貯湯運転を停止する。目標貯湯量は、例えば、現在から将来の特定の時刻までに発生することが予測される給湯負荷と、現在の貯湯タンク120の蓄熱量との差から算出される。将来の給湯負荷は、過去の数日間における実際の給湯負荷から学習して推定することが好ましい。実際に生じた給湯負荷は、流量センサ192によって計測された給湯量の積算値、及び、温度センサ191によって計測された給湯温度と温度センサ111によって計測された市水の温度との差の積算値から算出される。
 なお、制御部11は、貯湯タンク120の蓄熱量に関わらず、特定の時間帯に貯湯運転を実行してもよい。特定の時間帯は、例えば、深夜の電気料金が低廉になる時間帯、又は、貯湯式給湯機1000とともに設置された発電装置によって生成された発電電力の余剰が発生する時間帯である。
 (給湯切替弁180の制御処理)
 続いて、制御部11による給湯切替弁180の制御処理について、図2を用いて説明する。図2に示される制御処理は、一定の周期で繰り返し実行される。一定の周期は、例えば1分間である。
 まず、制御部11は、貯湯タンク120の蓄熱量が予め設定された閾値を超えるか否かを判定する(ステップS1)。
 この閾値は、例えば、一般給湯負荷のうち、過去の数日間に生じた給湯負荷のうち1回の給湯負荷として最大の負荷に相当する。また、制御部11は、温度センサ121~124のいずれかによる計測結果が、一定の正値をBとして、(給湯温度+B)℃より高いときに、蓄熱量が閾値を超えると判定してもよい。また、一般給湯負荷のうち、1回のシャワー負荷に代表されるように比較的大きいものを閾値として採用してもよい。1回のシャワー負荷は、例えば40℃換算で50Lである。さらに、制御部11は、端末40にユーザが設定した閾値を用いてもよい。給湯切替弁180を制御するための閾値は、通常、貯湯運転を開始するための閾値より大きく、例えば貯湯タンク120の最大蓄熱量の30%に相当することとなる。
 蓄熱量が閾値を超えると判定した場合(ステップS1;Yes)、制御部11は、給湯口102と混合弁140の吐出口とが連通するように給湯切替弁180を制御して、運転モードをタンク給湯モードに設定する(ステップS2)。タンク給湯モードは、貯湯タンク120の湯を給湯口102から供給する運転モードである。タンク給湯モードの詳細は、後述する。
 一方、蓄熱量が閾値を超えないと判定した場合(ステップS1;No)、制御部11は、給湯口102と減圧弁170の吐出口とが連通するように給湯切替弁180を制御して、運転モードを予熱給湯モードに設定する(ステップS3)。予熱給湯モードは、熱交換器160によって予熱された市水から第2加熱ユニット220によって生成された湯を給湯口102から供給する運転モードである。予熱給湯モードの詳細は、後述する。
 その後、制御部11は、給湯切替弁180の制御処理を終了する。
 (タンク給湯モードの運転処理)
 続いて、制御部11によって実行されるタンク給湯モードの運転処理について、図3を用いて説明する。図3に示される処理は、運転モードがタンク給湯モードに設定されることで開始する。
 まず、制御部11は、給湯流量が閾値を超えるか否かを判定する(ステップS11)。具体的には、給湯口102に接続された給湯栓が開かれると、流量センサ192によって計測される給湯量がゼロより大きくなる。制御部11は、この流量センサ192による計測値が、安定的に検知できる一定の閾値以上か否かを判定する。
 給湯流量が閾値を超えないと判定した場合(ステップS11;No)、制御部11は、ステップS11の判定を繰り返す。一方、給湯流量が閾値を超えると判定した場合(ステップS11;Yes)、制御部11は、混合弁140を制御して給湯温度を調節する(ステップS12)。具体的には、制御部11は、温度センサ191によって計測される給湯温度が、端末40に設定された給湯温度に等しくなるように、混合弁140の混合比率を制御する。ここで、混合弁140に貯湯タンク120の上部から高温の湯が流れると、低温の市水が減圧弁112を通って貯湯タンク120の下部に流入する。
 次に、制御部11は、給湯流量が閾値より小さいか否かを判定する(ステップS13)。この閾値は、ステップS11で用いられた閾値に等しい。
 給湯流量が閾値より小さいと判定した場合(ステップS13;Yes)制御部11は、待機状態となり、ステップS11以降の処理を繰り返す。一方、給湯流量が閾値より小さくないと判定した場合(ステップS13;No)、制御部11は、ステップS12以降の処理を繰り返す。
 なお、タンク給湯モードの運転処理が実行されているときには、給湯切替弁180は、混合弁140と給湯口102とを連通させて、第2加熱ユニット220と給湯口102とを接続する流路を遮断する。このため、第2加熱ユニット220に市水が流入することはなく、第2加熱ユニット220による市水の加熱も実行されない。
 (予熱給湯モードの運転処理)
 続いて、制御部11によって実行される予熱給湯モードの運転処理について、図4を用いて説明する。この運転処理は、熱交換器160によって市水を予熱する処理である。図4に示される処理は、運転モードが予熱給湯モードに設定されることで開始する。
 まず、制御部11は、吸入切替弁131により連通する流路を熱交換器160側に切り替える(ステップS21)。次に、制御部11は、吐出切替弁132により連通する流路を貯湯タンク120側に切り替える(ステップS22)。これにより、図1中の破線矢印で示されるように、貯湯タンク120の上部から、熱交換器160、吸入切替弁131、循環ポンプ130、及び吐出切替弁132、を経由して貯湯タンク120の下部に戻る循環路が形成される。
 次に、制御部11は、流量センサ163によって計測された予熱流量が閾値を超えるか否かを判定する(ステップS23)。この予熱流量は、熱交換器160の2次側を通って第2加熱ユニット220に流入する水量であって、給湯栓が開かれると増加する。予熱流量について判定するための閾値は、流量センサ163が安定的に検知することができる一定の水量に相当する。
 予熱流量が閾値を超えないと判定した場合(ステップS23;No)、制御部11は、ステップS23の判定を繰り返す。一方、予熱流量が閾値を超えると判定した場合(ステップS23;Yes)、制御部11は、循環ポンプ130を制御して循環路に水流を生成するとともに、予熱温度を調節する(ステップS24)。循環路に水流が生成されると、貯湯タンク120の上部から流出した温水は、熱交換器160の1次側を通ることで冷却され、貯湯タンク120の下部に戻ることとなる。また、制御部11は、温度センサ111によって計測された市水の温度と、温度センサ161によって計測された1次側出口の温度との差が、予め設定された目標値に等しくなるように、循環ポンプ130の回転数を制御して、予熱温度を調節する。
 この予熱温度の調節について、図5を用いて説明する。図5には、熱交換器160を流れる水の温度変化が示されている。図5中、線L1は、1次側の流路を流れる水の温度変化を示し、水が1次側入口から1次側出口に流れると、水温が実線矢印に沿って変化する。Tw1iは、1次側入口に流入する水の温度に対応し、Tw1oは、1次側出口から流出する水の温度に対応する。また、線L2は、2次側の流路を流れる水の温度変化を示し、水が2次側入口から2次側出口に流れると、水温が破線矢印に沿って変化する。Tw2iは、2次側入口に流入する水の温度に対応し、Tw2oは、2次側出口から流出する水の温度に対応する。
 ここで、制御部11は、図5に示されるTw1oとTw2iとの差であるΔTwLが目標値に等しくなるように、循環ポンプ130の回転数を制御する。
 例えば、2次側の流量が小さく、1次側の流量が過大である場合には、Tw1oが高くなり、貯湯タンク120下部に流入する水の温度が高くなる。貯湯タンク120の下部に流入する水の温度は、ある程度低いことが望ましいため、制御部11は、この場合に循環ポンプ130の回転数を小さくして、ΔTwLを目標値に近付ける。一方、2次側の流量が大きく、1次側の流量が過小である場合には、Tw1oが低くなり、市水を十分に予熱することができない。この場合に、制御部11は、循環ポンプ130の回転数を大きくして、ΔTwLを目標値に近付ける。
 すなわち、ΔTwLに応じて循環ポンプ130の回転数を制御すると、2次側の流量に応じて、1次側の流量を、予熱量及び熱交換の効率を考慮した適当な流量にすることができる。ΔTwLを適当に調節すると、貯湯タンク120の下部の水温を低くして、その後に沸き上げ運転が実行される際の第1加熱ユニット210の入水温度を低くすることができる。ひいては、沸き上げ運転のエネルギー消費効率を向上させることができる。特に、第1加熱ユニット210の冷媒回路に流れる冷媒がCO2である場合には、入水温度を低くすることによってエネルギー消費効率を大幅に改善することができる。さらに、熱交換器160が2次側の流量に応じた適当な熱量を市水に与えるため、貯湯タンク120の蓄熱を有効に利用することができる。
 なお、循環ポンプ130の回転数の制御は、図5に示された予熱温度の調節に代えて、図6に示されるように、2次側の流量に応じた回転数を循環ポンプ130に指示することで実行されてもよい。循環ポンプ130の回転数と1次側の流量はほぼ比例するため、このような指示によっても、1次側の流量を2次側の流量に応じた適当なものとすることができる。
 図4に戻り、ステップS24に続いて、制御部11は、予熱流量が閾値より小さいか否かを判定する(ステップS25)。この閾値は、ステップS23で用いられた閾値に等しい。
 予熱流量が閾値より小さくないと判定した場合(ステップS25;No)、制御部11は、ステップS24以降の処理を繰り返す。一方、予熱流量が閾値より小さいと判定した場合(ステップS25;Yes)、制御部11は、待機状態に入り、ステップS23以降の処理を繰り返す。
 (加熱運転処理)
 続いて、予熱給湯モードにおいて第2加熱ユニット220の制御部22によって実行される加熱運転処理について、図7を用いて説明する。
 まず、制御部22は、第2加熱ユニット220の流量が閾値を超えるか否かを判定する(ステップS31)。具体的には、制御部22は、流量センサ224による計測値が、この流量センサ224が安定的に検知することができる一定の流量を超えるか否かを判定する。
 流量が閾値を超えないと判定した場合(ステップS31;No)、制御部22は、ステップS31の判定を繰り返す。一方、流量が閾値を超えると判定した場合(ステップS31;Yes)、制御部22は、バーナを点火する(ステップS32)。これにより、熱交換器221による熱交換が開始され、熱交換器221に流入した市水が加熱される。
 次に、制御部22は、バーナ、調節弁225及びバイパス弁226を制御して、給湯温度を調節する(ステップS33)。具体的には、制御部22は、熱交換器221から流出する湯の温度を温度センサ228から得て、この温度が目標値に近付くようにバーナの燃焼量を制御する。また、制御部22は、調節弁225の開度を制御することで、第2加熱ユニット220に流入する水量を調節し、バイパス弁226の開度を制御することで、バイパス路に流れる水量を調節して、給湯温度を設定値に等しいものとする。
 第2加熱ユニット220で給湯温度が調節された湯は、出湯配管を通って貯湯ユニット100に戻り、減圧弁170によって減圧された後に給湯切替弁180を介して給湯口102から供給される。
 次に、制御部22は、第2加熱ユニット220の流量が閾値より小さいか否かを判定する(ステップS34)。この閾値は、ステップS31で用いられた閾値に等しい。流量が閾値より小さくないと判定した場合(ステップS34;No)、制御部22は、ステップS32以降の処理を繰り返す。一方、流量が閾値より小さいと判定した場合(ステップS34;Yes)、制御部22は、バーナを消火して(ステップS35)、待機状態に入り、ステップS31以降の処理を繰り返す。
 なお、予熱給湯モードの運転処理が実行されているときには、給湯切替弁180は、減圧弁170と給湯口102とを連通させて、混合弁140と給湯口102とを接続する流路を遮断する。このため、貯湯タンク120の湯が給湯口102に供給されることはない。
 また、制御部11による予熱給湯モードの運転処理において、循環ポンプ130の回転数の調節は、温度センサ162によって計測された予熱後の市水の温度を目標値に調節することで実現されてもよい。循環ポンプ130の回転数が高くなると、熱交換器160の熱交換量が増加して予熱温度が高くなる。予熱温度が高くなるほど、同一の給湯温度に対して第2加熱ユニット220によって加熱すべき加熱量が減少するため、燃料の消費量を節約することができる。一方で、予熱温度が過大に高くなると、第2加熱ユニット220の入水温度が高くなり、第2加熱ユニット220で給湯温度を調節することができなくなったり、燃焼が停止したりするおそれがある。そのため、例えば、予熱温度の目標値が、第2加熱ユニット220の入水温度の上限値に等しくなるように、制御部11は循環ポンプ130の回転数を調節してもよい。この上限値は、例えば30℃である。
 また、予熱温度が目標値に等しくなるように熱交換器160の1次側の流量を制御すると、図5に示されたΔTwLを目標値に等しくする場合と比較して、1次側出口から貯湯タンク120に戻る水の温度が高くなり、その後の沸き上げ運転のときに第1加熱ユニット210の入水温度が高くなる。ここで、CO2のように高圧側で凝縮せず超臨界状態となる冷媒に比べて、HFC、HC、HFO等の高圧側で凝縮する冷媒を採用すると、入水温度の上昇に対してエネルギー消費効率が低下する度合いが小さい。このため、予熱温度が目標値に等しくなるように1次側の流量を制御する手法は、特に、高圧側で凝縮する冷媒を採用する場合に有効である。
 (湯張り運転処理)
 続いて、制御部22によって実行される湯張り運転処理について、図8を用いて説明する。湯張り運転は、浴槽50に一定量の湯を供給する運転である。端末40に湯張り運転を開始する指示が入力されると、端末40が、湯張り指令を制御部22に送信し、湯張り運転が開始する。
 まず、制御部22は、端末40から湯張り指令があったか否かを判定する(ステップS41)。湯張り指令がないと判定した場合(ステップS41;No)、制御部22は、待機状態に入り、ステップS41の判定を繰り返す。
 一方、湯張り指令があったと判定した場合(ステップS41;Yes)、制御部22は、湯張り弁227を開き(ステップS42)、バーナを点火する(ステップS43)。これにより、予熱された市水が第2加熱ユニット220に流入して、調節弁225を通ってから分岐して、一方は熱交換器221で加熱され、他方はバイパス路を通った後に合流する。そして、合流した温水は、湯張り弁227を通り、往き配管及び戻り配管の双方から浴槽50に供給されることとなる。
 次に、制御部22は、バーナ、調節弁225及びバイパス弁226を制御して、給湯温度を調節する(ステップS44)。具体的には、制御部22は、温度センサ228によって計測される給湯温度が、予め設定された湯張り温度の目標値に等しくなるように、バーナの燃焼量を制御する。また、制御部22は、調節弁225の開度を制御して、第2加熱ユニット220に流入する水量を調節する。また、制御部22は、バイパス弁226の開度を制御して、バイパス路に流れる水量を調節して、給湯温度を目標値に等しいものとする。
 次に、制御部22は、給湯量が湯張り目標値を超えるか否かを判定する(ステップS45)。この給湯量は、流量センサ224による計測値を積算することで得ることができる。なお、制御部22は、浴槽50の水位を検知する水位センサの出力を用いて、給湯量が湯張り目標値を超えるかを判定してもよい。
 給湯量が湯張り目標値を超えないと判定した場合(ステップS45;No)、制御部22は、ステップS42以降の処理を繰り返す。一方、給湯量が湯張り目標値を超えると判定した場合(ステップS45;Yes)、制御部22は、バーナを消火し(ステップS46)、湯張り弁227を閉じる(ステップS47)。その後、制御部22は、湯張り運転処理を終了する。
 なお、湯張り運転を実行する際には、貯湯タンク120の蓄熱量に関わらず、貯湯ユニット100の制御部11によって、図4に示される予熱給湯モードの運転処理が実行される。これにより、貯湯タンク120の容量は、湯張りのための湯量を必要としない。したがって、容量の小さい貯湯タンク120を用いて貯湯式給湯機1000を構成することができる。
 また、湯張り運転の最中に一般給湯負荷が生じた場合には、貯湯タンク120の蓄熱量が予め設定された閾値より大きいときにタンク給湯モードの運転が湯張り運転と同時に実行され、蓄熱量がこの閾値より小さいときに予熱給湯モードの運転が湯張り運転と同時に実行される。
 (追い焚き・保温運転)
 続いて、制御部22によって実行される追い焚き・保温運転について説明する。端末40に、浴槽50の湯を一定の温度に保つ保温指令が入力されたとき、又は、浴槽50に貯まっている湯を再加熱する追い焚き指令が入力されたときに、制御部22は、追い焚き・保温運転を実行する。
 追い焚き・保温運転では、制御部22は、湯張り弁227を閉じて、ポンプ223を稼働させる。これにより、浴槽50から、戻り配管、ポンプ223、熱交換器222及び往き配管を通って浴槽50に戻る循環路に水流が生じる。そして、制御部22は、バーナを点火して、熱交換器222に湯を再度加熱させる。追い焚き・保温運転では、予熱給湯モードの運転処理が実行されない。
 (貯湯運転と予熱給湯モードの運転との同時運転)
 続いて、貯湯運転と予熱給湯モードの運転との同時運転が実行される場合について説明する。この同時運転は、貯湯運転の最中に予熱給湯モードの運転が開始したり、予熱給湯モードの運転の最中に貯湯運転が開始したりすることで開始する。
 図9には、同時運転が実行される場合における貯湯ユニット100のアクチュエータ制御手法が示されている。一般的に、熱交換器160の2次側の流量は、最大で約15~20L/min程度となり、2次側の流量に応じて1次側の流量も大きくなる。一方、貯湯運転の際に第1加熱ユニット210に流入する水量は、例えば冬期の市水温度が9℃で貯湯温度が65℃で、加熱能力が4.5kWであるときに、約1.15L/minとなる。
 このため、循環ポンプ130を稼働させて、第1加熱ユニット210の入水量と、熱交換器160の1次側の流入量と、を独立に制御する必要がある。また、予熱に利用する1次側の水の一部を第1加熱ユニット210に送り出して、残りを貯湯タンク120に戻す必要がある。
 そこで、図9に示されるように、制御部11は、温度差ΔTwLが目標値に等しくなるように循環ポンプ130の回転数を制御する。また、制御部11は、熱交換器160に接続される流路が全開となるように、吸入切替弁131を制御する。また、制御部11は、第1加熱ユニット210の沸き上げ流量を調節することで出湯温度が目標値に等しくなるように、吐出切替弁132の開度を制御する。
 図10には、吐出切替弁132の開度と流量との関係が示されている。図10中、線L11は、吐出切替弁132から貯湯タンク120側への流量を示し、線L12は、吐出切替弁132から第1加熱ユニット210側への流量を示している。図10に示されるように、吐出切替弁132の開度ステップがゼロから最大の100まで変化すると、貯湯タンク120側の流量と第1加熱ユニット210側の流量の合計が100%となる条件下で、流量比が変化する。
 このため、図9に示されたようにアクチュエータを制御すると、循環ポンプ130は、熱交換器160の1次側に必要な流量を調整し、吐出切替弁132は、第1加熱ユニット210による沸き上げに必要な流量と、貯湯タンク120に戻る残りの流量との比を調整することとなる。
 (高温沸き上げ運転処理)
 続いて、貯湯タンク120の高温沸き上げ運転処理について、図11を用いて説明する。
 貯湯タンク120の貯留水が長時間にわたって貯湯タンク120内に滞留すると、貯留水に雑菌が繁殖する可能性があり、好ましくない。市水が塩素消毒されていれば雑菌の繁殖は抑制されるが、一度加熱された後に、例えば20~45℃程度の水温になると、レジオネラ菌が繁殖する可能性がある。貯湯タンク120が密閉式であって、清潔な市水が常に供給される状態では、雑菌が繁殖する可能性はほぼないといえる。しかしながら、何らかの外的要因による不測の状況まで考慮すると、長期間にわたり雑菌の繁殖が可能な温度のまま滞留したときに、雑菌を殺菌することができる高い温度まで貯湯タンク120内の湯を再度加熱する必要がある。この温度は、例えば60℃以上である。
 そこで、本実施の形態に係る貯湯式給湯機1000は、図11に示される高温沸き上げ運転を実行する。高温沸き上げ運転は、貯湯式給湯機1000が稼働可能になると開始される。この高温沸き上げ運転は、給湯負荷が多く発生する前の時間帯に実行することが望ましい。この時間帯は、例えば15~18時の時間帯である。
 まず、制御部11は、予め設定された時間内に貯湯タンク120から給湯口102に供給された湯量が貯湯タンク120の容量を超えるか否かを判定する(ステップS51)。すなわち、制御部11は、貯湯タンク120内の湯が滞留しているか否かを判定する。この滞留は、貯湯タンク120内で水が再加熱されることなく予め設定された比較的長い時間にわたり貯留されていることを意味する。予め設定された時間は、例えば72時間である。
 なお、貯湯タンク120から給湯口102への出湯量は、流量センサ192によって計測された給湯流量を積算した上で、温度センサ141によって計測された貯湯タンク120からの出湯温度、温度センサ111によって計測された市水の温度、及び温度センサ191によって計測された給湯温度の関係から、混合弁140による混合比率を推定することで、求めることができる。なお、貯湯タンク120の上部と混合弁140の吸入口とを接続する配水管に流量センサを設けて、この流量センサの計測値を積算することで出湯量を求めてもよい。
 ステップS51の判定が否定された場合(ステップS51;No)、制御部11は、貯湯タンク120内の水が滞留していないと判断して、湯を沸き上げることなく高温沸き上げ運転を終了する。
 一方、ステップS51の判定が肯定された場合(ステップS51;Yes)、制御部11は、貯湯タンク120内に水が長時間にわたり滞留していると判断して、給湯切替弁180を制御することにより、給湯口102と第2加熱ユニット220とを連通させる。そして、制御部11は、運転モードを予熱給湯モードに設定する(ステップS52)。
 次に、制御部11は、現在時刻が深夜の特定時刻より前であるか否かを判定する(ステップS53)。特定時刻は、例えば、電気料金が低廉になる23時として予め設定される。
 現在時刻が特定時刻より前であると判定した場合(ステップS53;Yes)、制御部11は、貯湯タンク120の蓄熱量が閾値より小さいか否かを判定する(ステップS54)。この閾値は、貯湯運転を開始するための閾値に等しい。
 蓄熱量が閾値より低くはないと判定した場合(ステップS54;No)、制御部11は、ステップS53以降の処理を繰り返す。一方、蓄熱量が閾値より低いと判定した場合(ステップS54;Yes)、制御部11は、貯湯タンク120の貯湯温度が特定の温度より低いか否かを判定する(ステップS55)。ここで、貯湯タンク120の貯湯温度は、貯湯タンク120内の水の平均温度であって、温度センサ121~124の計測値から求めることができる。
 ステップS55の判定に用いる特定の温度について、図12を用いて説明する。図12には、第1加熱ユニット210の入水温度とエネルギー消費効率としてのCOP(Coefficient Of Performance)との関係が示されている。ただし、沸き上げ温度は、予め設定された一定の温度であって、例えば65℃であるものとする。第1加熱ユニット210の入水温度が高いほど、凝縮器出口の冷媒温度が高くなり、COPは低下する。このため、貯湯タンク120に比較的高い温度の湯が残っている状態で高温沸き上げ運転を実行すると、COPが低くなる。
 ところで、本実施の形態に係る貯湯式給湯機1000は、主として電力を消費して湯を沸き上げて、不足する湯を燃焼式の第2加熱ユニット220で生成している。電力は、例えば火力発電所で化石燃料を燃焼させて生成される。ここで、燃料を直接投入する第2加熱ユニット220と同一の評価指標で第1加熱ユニット210を評価するために、1次エネルギー効率を用いることができる。
 発電所で投入される化石燃料に対して、最終的に家庭で消費する電力の1次エネルギー効率は、約36.9%とされている。ヒートポンプ式の第1加熱ユニット210は、大気から熱を吸収して、投入される電気エネルギー以上の給湯熱を得ることができる。このため、第1加熱ユニット210の1次エネルギー効率は、電気エネルギーの1次エネルギー効率に、COPを乗じることで得ることができる。
 これに対して、燃焼式の第2加熱ユニット220の給湯燃焼効率は、高効率なものでも95%程度である。第2加熱ユニット220は、化石燃料を直接投入するため、その燃焼効率を給湯の1次エネルギー効率とみなすことができる。
 したがって、第1加熱ユニット210の1次エネルギー効率が第2加熱ユニット220の1次エネルギー効率より高くなるためには、COPが2.57(=95/36.9)より大きければよい。
 具体的には、図12に示されるように、第1加熱ユニット210の入水温度とCOPとの関係から、第1加熱ユニット210の1次エネルギー効率が第2加熱ユニット220に等しくなる入水温度Twiを求めることができる。そして、図11中のステップS55の判定で用いる特定の温度を、この入水温度Twiとすればよい。
 貯湯温度が特定の温度より低くはないと判定した場合(ステップS55;No)、制御部11は、ステップS53以降の処理を繰り返す。これにより、予熱給湯モードの運転処理が実行される。その結果、貯湯タンク120内の水温が低下する。ひいては、その後の沸き増し運転(ステップS56)及び沸き上げ運転(ステップS57)が実行される際のエネルギー効率を向上させることができる。
 一方、貯湯温度が特定の温度より低いと判定した場合(ステップS55;Yes)、制御部11は、貯湯タンク120の高温沸き増し運転を実行する(ステップS56)。この高温沸き増し運転は、沸き上げ温度を例えば貯湯運転の沸き上げ温度より高い65℃として、当日に必要な熱量を予測して沸き上げる運転である。その後、制御部11は、ステップS53以降の処理を繰り返す。
 ステップS53にて、現在時刻が深夜の特定時刻より前ではないと判定した場合(ステップS53;No)、制御部11は、高温沸き上げ運転を実行する(ステップS57)。この高温沸き上げ運転では、翌日に予想される給湯負荷にかかわらず、貯湯タンク120の全量が殺菌可能な温度となるように沸き上げる。高温沸き上げ運転は、深夜に実行される貯湯運転に代えて実行される。
 ここで、沸き上げ温度を65℃に設定して貯湯運転を実行し、貯湯タンク120内の蓄熱量が増加すると、第1加熱ユニット210の入水温度が徐々に上昇する。ヒートポンプ式である第1加熱ユニット210では、入水温度が上昇すると、高圧側の圧力が高くなり、許容圧力を超えてしまうことが考えられる。
 このため、例えば第1加熱ユニット210の入水温度が例えば50℃の上限値を超えると、圧縮機211の稼働を停止して、循環ポンプ130のみを稼働させ、貯湯タンク120底部の温度が60℃になるまで、貯湯タンク120下部の湯を上部に循環させてもよい。この場合、圧縮機211は停止しているため第1加熱ユニット210による加熱は実行されないが、貯湯タンク120上部の高温の湯と下部の低温の水とが混合し、貯湯タンク120全体の温度を60℃以上とすることができる。
 貯湯タンク120全体が殺菌可能な温度以上になると、制御部11は、高温沸き上げ運転処理を終了する。
 (運転動作例)
 続いて、1日間に給湯負荷、貯湯タンク120の蓄熱量、第1加熱ユニット210及び第2加熱ユニット220の加熱能力が推移する例について、図13を用いて説明する。
 貯湯タンク120の蓄熱量は、電気料金が低廉になる深夜時間帯に貯湯運転が実行されることで増加する。深夜時間帯の終了時刻における蓄熱量は、貯湯タンク120に蓄熱可能な最大値としてもよいし、予想される給湯負荷に応じたものとしてもよい。図13に示される例では、深夜時間帯の終了時刻は、7:00である。
 7:00から18:00頃までに、洗面所や台所の蛇口における一般給湯負荷が発生する。この一般給湯負荷は、入浴により発生する給湯負荷に比べて小さいため、タンク給湯モードの運転処理を実行する。一般給湯負荷が発生していない時間には、貯湯タンク120からの放熱により、蓄熱量が徐々に減少する。
 19:00頃に湯張り運転が実行される。この際に予熱給湯モードの運転処理が実行されるため、貯湯タンク120の蓄熱量の減少と、第2加熱ユニット220による加熱と、が同時に発生する。湯張り運転が実行されると、貯湯タンク120の蓄熱量が大幅に減少して、給湯切替弁180を制御するための閾値TH1より低くなる。すなわち、運転モードが、タンク給湯モードから予熱給湯モードに移行する。その後、シャワーに代表される一般給湯負荷が発生するが、貯湯タンク120の蓄熱量が、貯湯運転を実行するための閾値TH2を下回るまでは、予熱給湯モードの運転処理が続行する。
 一般給湯負荷が連続して発生し、貯湯タンク120の蓄熱量が閾値TH2を下回ると、第1加熱ユニット210は、貯湯運転を開始する。そして、蓄熱量が閾値TH2より大きくなるまでに一般給湯負荷が発生した場合には、予熱給湯モードの運転処理が実行される。貯湯タンク120の蓄熱量の目標値は、当日において現在時刻以降に発生することが予想される給湯負荷に設定する。この目標値は、通常、深夜時間帯の貯湯運転の目標値より小さくなる。
 貯湯運転の終了後に一般給湯負荷が発生した場合において、貯湯タンク120の蓄熱量が閾値TH1より大きいときにはタンク給湯モードの運転が実行され、蓄熱量が閾値TH1より小さいときには予熱給湯モードの運転が実行される。1日の終了時刻である24:00に最低となるように蓄熱量を制御することが望ましいが、24:00以降に一般給湯負荷の発生が予測される場合には、24:00の時点で蓄熱量をある程度残してもよい。
 以上、説明したように、本実施の形態に係る貯湯式給湯機1000では、貯湯タンク120に水が長時間にわたり滞留し、高温沸き上げ運転を実行する必要が生じても、予熱給湯モードの運転を実行することにより貯湯タンク120の蓄熱を利用することができる。
 また、貯湯式給湯機1000は、予熱給湯モードの運転処理を実行して、貯湯タンク120の水温が低下してから高温沸き上げ運転を実行する。このため、高温沸き上げ運転を実行する際にヒートポンプ式の第1加熱ユニット210の入水温度を低くすることができる。したがって、総合的な1次エネルギー効率を高くすることができる。
 また、貯湯式給湯機1000は、殺菌が必要な条件下において、貯湯タンク120の蓄熱量を増加させる高温沸き増し運転を実行する。このため、中温水の増加量が少なく、当日の深夜に実行する高温沸き上げ運転のエネルギー消費効率を高くすることができる。なお、深夜の高温沸き上げ運転では、貯湯タンク120が貯える全量のうち、高温沸き増し運転で沸き上げられなかった残りの湯を沸き上げればよい。
 また、貯湯タンク120の蓄熱量が一般給湯負荷を賄うのに十分な場合に、貯湯タンク120から給湯口102に直接給湯し、貯湯タンク120の下部には、低温の市水が流入する。このため、第1加熱ユニット210の貯湯運転時のエネルギー消費効率を高くすることができる。特に、冷媒にCO2を用いる場合には、高圧側が超臨界サイクルとなり、第1加熱ユニット210の入水温度が低いほどエネルギー消費効率が高くなるため、有効である。
 また、貯湯ユニット100は市水の流量を計測する流量センサ163を有し、第2加熱ユニット220は、流入する市水の流量を計測する流量センサ224を有している。このため、第2加熱ユニット220に流入する市水を貯湯ユニット100で予熱する際に、貯湯ユニット100の制御部11と第2加熱ユニット220の制御部22とで通信する必要がなく、それぞれ独立して貯湯ユニット100及び第2加熱ユニット220のアクチュエータを制御することができる。
 実施の形態2.
 続いて、実施の形態2について、上述の実施の形態1との相違点を中心に説明する。なお、上記実施の形態1と同一又は同等の構成については、同等の符号を用いるとともに、その説明を省略又は簡略する。本実施の形態に係る貯湯式給湯機1000は、プログラムを実行する一のコントローラによってその構成要素が制御される点で、実施の形態1に係るものと異なっている。
 図14には、本実施の形態に係る貯湯式給湯機1000の構成が示されている。図14に示されるように、貯湯式給湯機1000は、貯湯ユニット100、第1加熱ユニット210、第2加熱ユニット220を制御するコントローラ60を有している。
 コントローラ60は、プロセッサ61、主記憶部62、補助記憶部63、入力部64、出力部65、及び通信部66を有するコンピュータとして構成される。主記憶部62、補助記憶部63、入力部64、出力部65、及び通信部66はいずれも、内部バス67を介してプロセッサ61に接続されている。
 プロセッサ61は、MPU(Micro Processing Unit)を含んで構成される。プロセッサ61は、補助記憶部63に記憶されるプログラム68を実行することにより、実施の形態1に係る制御部11,21,22と同等の機能を発揮する。
 主記憶部62は、RAM(Random Access Memory)を含んで構成される。主記憶部62は、補助記憶部63からプログラム68をロードする。そして、主記憶部62は、プロセッサ61の作業領域として用いられる。
 補助記憶部63は、HDD(Hard Disk Drive)又はフラッシュメモリ等の不揮発性メモリを含んで構成される。補助記憶部63は、プログラム68の他に、プロセッサ61の処理に用いられる種々のデータを記憶している。
 入力部64は、例えば入力キー及び静電容量方式のポインティングデバイスを含んで構成される。入力部64は、ユーザによって入力された情報を取得して、プロセッサ61に通知する。出力部65は、例えばLCD(Liquid Crystal Display)に代表される表示デバイスを含んで構成される。出力部65は、例えば、入力部64を構成するポインティングデバイスと一体的に形成されることで、タッチスクリーンを構成する。なお、端末40が貯湯式給湯機1000のユーザインタフェースに相当するため、入力部64及び出力部65を省いてコントローラ60を構成してもよい。
 通信部66は、外部の機器と通信するための通信インタフェース回路を含んで構成される。通信部66は、外部から受信した信号に含まれる情報をプロセッサ61に通知して、プロセッサ61から出力された情報を伝送するための信号を外部の機器に送信する。通信部66が外部から取得する情報には、貯湯ユニット100、第1加熱ユニット210及び第2加熱ユニット220が有する各センサの計測結果が含まれる。また、通信部66が外部に送信する情報には、貯湯ユニット100、第1加熱ユニット210及び第2加熱ユニット220が有するポンプ及び弁に対する指示が含まれる。
 なお、本実施の形態において、貯湯ユニット100は、制御部11(図1参照)を省いて構成され、第1加熱ユニット210は、制御部21(図1参照)を省いて構成され、第2加熱ユニット220は、制御部22(図1参照)を省いて構成される。
 以上、説明したように、本実施の形態に係る貯湯式給湯機1000は、その構成要素を制御するコントローラ60を有していた。これにより、コントローラ60が実行するプログラムの保守及び管理が容易になる。
 以上、本発明の実施の形態について説明したが、本発明は上記実施の形態によって限定されるものではない。
 例えば、熱交換器160の2次側の流量を計測する流量センサ163は、2次側入口近傍ではなく、2次側出口近傍に設けてもよい。
 また、ユーザが端末40から高温沸き上げ運転を開始する指令を入力できるようにしてもよい。例えば、太陽光発電装置を備える家庭において、日中に晴天となり余剰電力が発生する場合がある。この場合に、例えば現在時刻以降の24時間以内に貯湯タンク120の殺菌が必要になると予想されれば、端末40からユーザに対して高温沸き上げ運転の実行を要する旨を報知して、余剰電力による高温沸き上げ運転を促してもよい。これにより、高温沸き上げ運転の実行により投入電力が大きくなる場合にもランニングコストの上昇を抑えることができる。
 また、貯湯式給湯機1000を含むHEMS(Home Energy Management System)のコントローラが余剰電力の発生を予想して、貯湯式給湯機1000に殺菌のための高温沸き上げ運転を指示してもよい。
 また、制御部11,21,22のEEPROMに記憶されているプログラム、及び、補助記憶部63に記憶されているプログラム68を、フレキシブルディスク、CD-ROM(Compact Disk Read-Only Memory)、DVD(Digital Versatile Disk)、MO(Magneto-Optical disk)に代表されるコンピュータ読み取り可能な記録媒体に格納して配布し、それらプログラムをコンピュータにインストールすることにより、上述の処理を実行する装置を構成することができる。
 また、プログラムをインターネットに代表される通信ネットワーク上のサーバ装置が有するディスク装置に格納しておき、例えば、搬送波に重畳させて、コンピュータにダウンロードするようにしてもよい。
 また、インターネットに代表されるネットワークを介してプログラムを転送しながら起動実行することによっても、上述の処理を達成することができる。
 さらに、プログラムの全部又は一部をサーバ装置上で実行させ、その処理に関する情報をコンピュータが通信ネットワークを介して送受信しながらプログラムを実行することによっても、上述の処理を達成することができる。
 なお、上述の機能を、OS(Operating System)が分担して実現する場合又はOSとアプリケーションとの協働により実現する場合には、OS以外の部分のみを媒体に格納して配布してもよく、また、コンピュータにダウンロードしてもよい。
 また、貯湯式給湯機1000の機能を実現する手段は、ソフトウェアに限られず、その一部又は全部を専用のハードウェアによって実現してもよい。例えば、FPGA(Field Programmable Gate Array)又はASIC(Application Specific Integrated Circuit)に代表される回路を用いて構成すれば、貯湯式給湯機1000の省電力化を図ることができる。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施の形態及び変形が可能とされるものである。また、上述した実施の形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施の形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 本発明は、市水を加熱して生成した湯を供給する技術に適している。
 1000 貯湯式給湯機、 11 制御部、 100 貯湯ユニット、 101 給水口、 102 給湯口、 110 給水管、 111,121~124,141,161,162,191 温度センサ、 112,170 減圧弁、 120 貯湯タンク、 130 循環ポンプ、 131 吸入切替弁、 132 吐出切替弁、 140 混合弁、 160 熱交換器、 163,192 流量センサ、 180 給湯切替弁、 190 給湯管、 210 第1加熱ユニット、 21 制御部、 211 圧縮機、 212 熱交換器、 213 膨張弁、 214 蒸発器、 220 第2加熱ユニット、 22 制御部、 221,222 熱交換器、 223 ポンプ、 224 流量センサ、 225 調節弁、 226 バイパス弁、 227 湯張り弁、 228 温度センサ、 40 端末、 50 浴槽、 60 コントローラ、 61 プロセッサ、 62 主記憶部、 63 補助記憶部、 64 入力部、 65 出力部、 66 通信部、 67 内部バス、 68 プログラム、 L1,L2,L11,L12 線。

Claims (5)

  1.  水を加熱して第1の湯を生成する第1加熱手段と、
     前記第1の湯を貯える貯湯タンクと、
     前記貯湯タンクから取水した前記第1の湯と市水との熱交換により当該市水を予熱する熱交換器と、
     前記熱交換器により予熱された前記市水を加熱して第2の湯を生成する第2加熱手段と、を備え、
     予め設定された時間内に前記貯湯タンクから給湯口に供給した前記第1の湯の量が前記貯湯タンクの容量より小さい場合に、前記第2の湯を前記給湯口に供給する、貯湯式給湯機。
  2.  前記貯湯タンクは、水と前記第1の湯とを貯え、
     前記第1加熱手段は、
     前記貯湯タンクから取水した水を加熱して第1温度の前記第1の湯を生成し、
     前記予め設定された時間内に前記貯湯タンクから前記給湯口に供給された前記第1の湯の量が前記容量より小さい場合において、前記貯湯タンクに貯えられている水と前記第1の湯との平均温度が閾値より低くなると、前記貯湯タンクから取水した水を加熱して前記第1温度より高い第2温度の前記第1の湯を生成する、
     請求項1に記載の貯湯式給湯機。
  3.  前記閾値は、前記第1加熱手段の一次エネルギー効率が、前記第2加熱手段の一次エネルギー効率に等しくなる温度である、
     請求項2に記載の貯湯式給湯機。
  4.  水を加熱することで生成した第1の湯を貯湯タンクに貯える貯湯ステップと、
     予め設定された時間内に前記貯湯タンクから給湯口に供給した前記第1の湯の量が前記貯湯タンクの容量より小さい場合に、前記貯湯タンクから取水した前記第1の湯と市水との熱交換により当該市水を予熱し、予熱した市水を加熱することで生成した第2の湯を前記給湯口に供給する給湯ステップと、
     を含む給湯方法。
  5.  貯湯タンクを有する貯湯式給湯機を制御するコンピュータに、
     水を加熱することで生成した第1の湯を前記貯湯タンクに貯えることを前記貯湯式給湯機に指示し、
     予め設定された時間内に前記貯湯タンクから前記貯湯式給湯機の給湯口に供給された前記第1の湯の量が前記貯湯タンクの容量より小さい場合に、前記貯湯式給湯機に、前記貯湯タンクから取水した前記第1の湯と市水との熱交換により当該市水を予熱し、予熱した市水を加熱することで生成した第2の湯を前記給湯口に供給することを指示する、
     ことを実行させるためのプログラム。
PCT/JP2016/079309 2016-10-03 2016-10-03 貯湯式給湯機、給湯方法及びプログラム WO2018066037A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018543493A JP6682002B2 (ja) 2016-10-03 2016-10-03 貯湯式給湯機、給湯方法及びプログラム
PCT/JP2016/079309 WO2018066037A1 (ja) 2016-10-03 2016-10-03 貯湯式給湯機、給湯方法及びプログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/079309 WO2018066037A1 (ja) 2016-10-03 2016-10-03 貯湯式給湯機、給湯方法及びプログラム

Publications (1)

Publication Number Publication Date
WO2018066037A1 true WO2018066037A1 (ja) 2018-04-12

Family

ID=61830902

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/079309 WO2018066037A1 (ja) 2016-10-03 2016-10-03 貯湯式給湯機、給湯方法及びプログラム

Country Status (2)

Country Link
JP (1) JP6682002B2 (ja)
WO (1) WO2018066037A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020225533A1 (en) * 2019-05-03 2020-11-12 Open Energi Limited A control method and system for operating an electrical component
JP2022016678A (ja) * 2019-08-06 2022-01-21 日立グローバルライフソリューションズ株式会社 給湯機
US12142919B2 (en) 2019-05-03 2024-11-12 Open Energi Limited Control method and system for operating an electrical component

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006170526A (ja) * 2004-12-15 2006-06-29 Denso Corp 貯湯式給湯装置
JP2010091196A (ja) * 2008-10-08 2010-04-22 Denso Corp 給湯装置
JP2011214793A (ja) * 2010-04-01 2011-10-27 Takagi Ind Co Ltd 給湯装置
JP2012013301A (ja) * 2010-06-30 2012-01-19 Panasonic Electric Works Co Ltd 給湯システム
JP2012127628A (ja) * 2010-12-17 2012-07-05 Panasonic Corp 給湯システム
JP2013164173A (ja) * 2012-02-09 2013-08-22 Tokyo Gas Co Ltd 給水予熱システム
JP2013228150A (ja) * 2012-04-26 2013-11-07 Toho Gas Co Ltd 給湯暖房システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003148809A (ja) * 2001-11-13 2003-05-21 Toshiba Electric Appliance Co Ltd 貯湯式給湯装置
JP2015140968A (ja) * 2014-01-29 2015-08-03 三菱電機株式会社 貯湯式給湯機

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006170526A (ja) * 2004-12-15 2006-06-29 Denso Corp 貯湯式給湯装置
JP2010091196A (ja) * 2008-10-08 2010-04-22 Denso Corp 給湯装置
JP2011214793A (ja) * 2010-04-01 2011-10-27 Takagi Ind Co Ltd 給湯装置
JP2012013301A (ja) * 2010-06-30 2012-01-19 Panasonic Electric Works Co Ltd 給湯システム
JP2012127628A (ja) * 2010-12-17 2012-07-05 Panasonic Corp 給湯システム
JP2013164173A (ja) * 2012-02-09 2013-08-22 Tokyo Gas Co Ltd 給水予熱システム
JP2013228150A (ja) * 2012-04-26 2013-11-07 Toho Gas Co Ltd 給湯暖房システム

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020225533A1 (en) * 2019-05-03 2020-11-12 Open Energi Limited A control method and system for operating an electrical component
US12142919B2 (en) 2019-05-03 2024-11-12 Open Energi Limited Control method and system for operating an electrical component
JP2022016678A (ja) * 2019-08-06 2022-01-21 日立グローバルライフソリューションズ株式会社 給湯機
JP7203934B2 (ja) 2019-08-06 2023-01-13 日立グローバルライフソリューションズ株式会社 給湯機

Also Published As

Publication number Publication date
JP6682002B2 (ja) 2020-04-15
JPWO2018066037A1 (ja) 2019-03-28

Similar Documents

Publication Publication Date Title
JP6044326B2 (ja) 貯湯式給湯機及びソーラーシステム
JP2007271163A (ja) 戻り温水の回収方法および給湯システム
WO2018066036A1 (ja) 貯湯式給湯機
JP5126345B2 (ja) 貯湯式給湯システム
JP2008051435A (ja) 貯湯式給湯システム
JP6107958B2 (ja) 蓄熱システム
JP2014016075A (ja) ハイブリッドシステム
WO2018066037A1 (ja) 貯湯式給湯機、給湯方法及びプログラム
JP6628643B2 (ja) 給湯システム
JP2019039577A (ja) 貯湯式給湯機、ホームシステム、及び、制御方法
JP6895766B2 (ja) 貯湯式給湯機
JP2011185552A (ja) 風呂湯張り装置
JP6164241B2 (ja) 給湯装置
JP6143092B2 (ja) 貯湯給湯装置
JP2012180962A (ja) 補助熱源付貯湯タンク給湯システム
JP2004150650A (ja) ヒートポンプ式給湯装置
JP2008304153A (ja) ヒートポンプ給湯機
JP2004205140A (ja) 風呂用追焚装置
JP2009257717A (ja) ヒートポンプ給湯機
JP5021385B2 (ja) ヒートポンプ給湯機およびその運転方法
JP6694757B2 (ja) 給湯システム
JP2016156559A (ja) コジェネ装置
JP2021018021A (ja) 貯湯式給湯装置
JP4988521B2 (ja) ヒートポンプ給湯装置
JP2013036709A (ja) 給湯装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16918238

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018543493

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16918238

Country of ref document: EP

Kind code of ref document: A1