WO2011067918A1 - 部品実装装置および部品実装装置における基板搬送方法 - Google Patents
部品実装装置および部品実装装置における基板搬送方法 Download PDFInfo
- Publication number
- WO2011067918A1 WO2011067918A1 PCT/JP2010/006956 JP2010006956W WO2011067918A1 WO 2011067918 A1 WO2011067918 A1 WO 2011067918A1 JP 2010006956 W JP2010006956 W JP 2010006956W WO 2011067918 A1 WO2011067918 A1 WO 2011067918A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- substrate
- board
- conveyor
- unit
- transfer
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0452—Mounting machines or lines comprising a plurality of tools for guiding different components to the same mounting place
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/0061—Tools for holding the circuit boards during processing; handling transport of printed circuit boards
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/02—Feeding of components
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49002—Electrical device making
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49002—Electrical device making
- Y10T29/49117—Conductor or circuit manufacturing
- Y10T29/49124—On flat or curved insulated base, e.g., printed circuit, etc.
- Y10T29/4913—Assembling to base an electrical component, e.g., capacitor, etc.
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/51—Plural diverse manufacturing apparatus including means for metal shaping or assembling
- Y10T29/5136—Separate tool stations for selective or successive operation on work
- Y10T29/5137—Separate tool stations for selective or successive operation on work including assembling or disassembling station
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/53039—Means to assemble or disassemble with control means energized in response to activator stimulated by condition sensor
- Y10T29/53048—Multiple station assembly or disassembly apparatus
- Y10T29/53052—Multiple station assembly or disassembly apparatus including position sensor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/5313—Means to assemble electrical device
- Y10T29/53174—Means to fasten electrical component to wiring board, base, or substrate
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/5313—Means to assemble electrical device
- Y10T29/53174—Means to fasten electrical component to wiring board, base, or substrate
- Y10T29/53178—Chip component
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/5313—Means to assemble electrical device
- Y10T29/53174—Means to fasten electrical component to wiring board, base, or substrate
- Y10T29/53183—Multilead component
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/5313—Means to assemble electrical device
- Y10T29/53187—Multiple station assembly apparatus
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/5313—Means to assemble electrical device
- Y10T29/53191—Means to apply vacuum directly to position or hold work part
Definitions
- the present invention relates to a component mounting apparatus for mounting a component on a substrate and a substrate transport method for transporting a substrate in the component mounting apparatus.
- a component mounting apparatus that manufactures a mounting board by mounting components on a board is provided with a board transfer mechanism for transferring the board from the upstream side to the downstream side, and is transferred to the board holding unit by the board transfer mechanism.
- a component mounting operation for transferring and mounting a component taken out from the component supply unit is executed on the held substrate.
- a component mounting apparatus having a configuration in which a substrate transfer mechanism has a plurality of substrate transfer lanes is known (see, for example, Patent Document 1).
- Patent Document 1 an example in which two rows of transfer devices (substrate transfer lanes) having a configuration in which a pair of conveyor belts are arranged in parallel is shown.
- the board transfer operation in one board transfer lane and the component mounting operation in the other board transfer lane can be performed in parallel. Accordingly, there is an advantage that the component mounting operation is not interrupted even when the board is conveyed, and the productivity can be improved.
- a board request signal output for each board transfer lane that is, a board loading order in the order in which a signal indicating that a new board can be received in the board transfer lane is output.
- the distance that the mounting head reciprocates between the component supply unit and the board holding unit provided in each board transfer lane is the board transfer lane and the component supply unit. It depends on the positional relationship between For this reason, the component mounting work efficiency depends on whether the target is a board located in the board transfer lane closer to the component supply unit or the board located in the board transfer lane farther from the component supply unit. As the board conveyance lane is closer to the component supply unit, better component mounting work efficiency is realized.
- the board transfer lane for carrying the board is simply determined based on the preceding and following board request signals, so that the board transfer lane closer to the component supply unit can accept a new board. If the board request signal has already been output for the board transport lane farther from the component supply unit before that timing, the board will be carried into the board transport lane farther from the component feed unit. Is done. That is, from the viewpoint of component mounting work efficiency, the originally desired board loading order is not always realized, and this is one factor that hinders the improvement of productivity.
- the present invention provides a component mounting apparatus and a substrate transport method in the component mounting apparatus that can improve productivity by rationally controlling the board loading order in a configuration including a plurality of board transport lanes. Objective.
- the component mounting apparatus includes a conveyor row in which a plurality of substrate transport conveyors provided with a substrate holding portion for transporting a substrate and positioning and holding the substrate are arranged in parallel, and is disposed on a side of the conveyor row.
- the substrate distribution unit that distributes the substrate delivered from the upstream device to the plurality of substrate transfer conveyors, and the substrate distribution unit and the substrate transfer conveyor
- a substrate transfer control unit for executing a substrate transfer operation for transferring the transferred substrate to a substrate holding unit of any of the substrate transfer conveyors, and taking out a component from the component supply unit by a mounting head to the substrate holding unit
- a signal output unit for determining whether or not the substrate is in a state in which a new substrate can be received, and outputting a substrate request signal for requesting loading of a new substrate to the substrate transfer conveyor based on the component mounting mechanism for mounting on the substrate that has been positioned and held, and the presence / absence detection result of the substrate on the substrate transport conveyor,
- a signal output unit for determining whether or not the substrate
- the substrate carrying method in the component mounting apparatus includes a conveyor row in which a plurality of substrate carrying conveyors provided with a board holding portion for carrying and positioning and holding the board are arranged in parallel, and a side of the conveyor row.
- a component supply unit configured to supply components mounted on the substrate, a substrate distribution unit that distributes a substrate delivered from an upstream device to the plurality of substrate transfer conveyors, and the substrate distribution unit and the substrate transfer conveyor.
- a substrate transfer control unit for executing a substrate transfer operation for carrying the transferred substrate into a substrate holding unit of any of the substrate transfer conveyors, and taking out a component from the component supply unit by a mounting head, and Based on a component mounting mechanism for mounting on a board positioned and held by the board holding unit, and a board presence / absence detection result on the board conveyor. And determining whether or not the substrate transfer conveyor is ready to accept a new substrate, and outputting a substrate request signal for requesting a new substrate to be transferred to the substrate transfer conveyor based on the determination result.
- a component mounting apparatus including a signal output unit, a board transfer method for carrying the board into the board holding unit, wherein the board request signal is output for a plurality of the board transfer conveyors. A new board is carried in from the board distribution section to the board conveyance conveyor closest to the component supply section among the board conveyance conveyors.
- a conveyor row including a plurality of substrate transfer conveyors arranged in parallel, a component supply unit that supplies components to be mounted on a substrate that is arranged on the side of the conveyor row, and a substrate that is delivered from an upstream device If the board request signal is output for the plurality of board transfer conveyors, the closest to the component supply section among these board transfer conveyors.
- the block diagram which shows the structure of the component mounting system of one embodiment of this invention The top view of the component mounting apparatus of one embodiment of this invention
- the block diagram which shows the structure of the control system of the component mounting apparatus of one embodiment of this invention The time chart which shows the board
- substrate carrying-in order in the component mounting apparatus of one embodiment of this invention (A), (b) Operation
- the component mounting system 1 includes a plurality of component mounting devices, a substrate supply device M1, a screen printing device M2, a component mounting device M3, an appearance inspection device M4, a reflow device M5, and a substrate recovery device M6 in the X direction ( The substrate is connected in series in the substrate transport direction).
- the component mounting apparatus M3 is accompanied by a board distributing unit M3B having a function of distributing the board sent from the screen printing apparatus M2 to each board conveying conveyor on the upstream side of the component mounting mechanism M3A having a plurality of board conveying conveyors. It is a form that was allowed to.
- Each device is connected to each other via the LAN 2, and the operation of each device is controlled by the host computer 3 connected to the LAN 2.
- the board supply device M1 takes out a board to be mounted on a component housed in a container such as a magazine and supplies it to the screen printing apparatus M2.
- the screen printing apparatus M2 prints paste such as cream solder, which is a bonding material, on the electrode for component connection formed on the substrate.
- the board after the paste printing by the screen printing apparatus M2 is finished is sorted by the board sorting unit M3B, and then carried to a specific board carrying conveyor among the plurality of board carrying conveyors of the component mounting mechanism unit M3A.
- a component mounting operation for mounting the electronic component taken out from the component supply unit at a predetermined position on the board carried in is performed.
- the appearance inspection apparatus M4 performs an inspection for the purpose of determining the quality of the mounted state, such as the presence or absence of the electronic component after mounting and the positional deviation, by imaging the substrate after the component mounting work with a camera.
- inspection is favorable is carried in to the reflow apparatus M5, and by heating a board
- the board on which the component mounting operation is completed after the soldering is completed is collected by the board collection device M6.
- the component mounting apparatus M3 is configured by combining the board distribution unit M3B having a function of distributing boards on the upstream side of the component mounting mechanism unit M3A as the main body unit.
- the configuration of the component mounting mechanism M3A will be described.
- a front conveyor composed of a first substrate transport conveyor 10A and a second substrate transport conveyor 10B (hereinafter abbreviated as “first conveyor 10A” and “second conveyor 10B”).
- a rear conveyor row 11B comprising a row 11A, a third substrate transfer conveyor 10C, and a fourth substrate transfer conveyor 10D (hereinafter abbreviated as “third conveyor 10C” and “fourth conveyor 10D”) is an apparatus center line. They are arranged in the X direction across CL. That is, the component mounting apparatus M3 includes a front conveyor row 11A and a rear conveyor row 11B that are formed by arranging a plurality of board conveyance conveyors that convey the board 13 in parallel.
- Each of the first conveyor 10A, the second conveyor 10B, the third conveyor 10C, and the fourth conveyor 10D is configured by combining a fixed rail 10a and a movable rail 10b, and is provided in each of the fixed rail 10a and the movable rail 10b.
- the belt driving mechanisms 18A and 18B By driving the conveyor belt by the belt driving mechanisms 18A and 18B, the substrate 13 supplied from the substrate distributing unit M3B is conveyed in the X direction.
- the first conveyor 10A, the second conveyor 10B, the third conveyor 10C, and the fourth conveyor 10D are respectively a first transfer lane L1, a second transfer lane L2, and a second transfer lane L2 that transfer the board 13 to be mounted in the component mounting mechanism M3A.
- 3 conveyance lane L3 and 4th conveyance lane L4 are comprised.
- Substrate holders 12 are provided at substantially intermediate positions in the X direction of the first transport lane L1, the second transport lane L2, the third transport lane L3, and the fourth transport lane L4.
- the substrate 13 conveyed by the substrate conveyance conveyor is positioned and held.
- Each substrate holding unit 12 is provided with substrate detection sensors S1, S2, S3, and S4. These substrate detection sensors are provided for the substrate 13 in each substrate holding unit 12 of the first conveyor 10A to the fourth conveyor 10D. Detect the presence or absence. Based on the substrate detection result, as will be described later, it is determined whether or not the substrate transport conveyor is ready to accept a new substrate 13.
- the movable rail 10b located inside is movable in the Y direction, and drives the rail width adjusting mechanisms 17A and 17B.
- the movable rail 10b moves in the Y direction, whereby the conveyance width W determined by the distance between the fixed rail 10a and the movable rail 10b can be adjusted according to the target substrate 13.
- a front part supply part 20A and a rear part supply part 20B are arranged on the sides of the front conveyor line 11A and the rear conveyor line 11B, and the front part supply part 20A and the rear part supply part 20B include A plurality of parts feeders 21 storing components to be mounted on the substrate 13 are arranged in parallel.
- the lower side of the drawing corresponds to the front side of the mounting apparatus, and the upper side corresponds to the rear side.
- a front mounting head 23A and a rear mounting head 23B driven by a front head moving mechanism 22A and a rear head moving mechanism 22B are disposed.
- the front mounting head 23A takes out components from the front component supply unit 20A and mounts them on the substrate 13 held by the substrate holding unit 12 of the first conveyor 10A or the second conveyor 10B (arrows c and d).
- the rear mounting head 23B takes out components from the rear component supply unit 20B and mounts them on the substrate 13 held by the substrate holding unit 12 of the fourth conveyor 10D or the third conveyor 10C (arrows e and f).
- the front head moving mechanism 22A and the front mounting head 23A, and the rear head moving mechanism 22B and the rear mounting head 23B take out components from the front component supply unit 20A and the rear component supply unit 20B, respectively, by using the mounting head.
- a component mounting mechanism for mounting on the substrate 13 positioned and held by the holding unit 12 is configured.
- the first conveyor 10A is closer to the front component supply unit 20A than the second conveyor 10B, and the fourth conveyor 10D is a rear component supply unit from the third conveyor 10C. Since it is close to 20B, the head movement path indicated by arrows c and e is shorter than the head movement path indicated by arrows d and f. Therefore, in the component mounting work for the front conveyor row 11A, the higher the component for the board 13 located on the first conveyor 10A than the one for the board 13 located on the second conveyor 10B. Mounting work efficiency can be realized.
- the target for the board 13 positioned on the fourth conveyor 10D is more than the target for the board 13 positioned on the third conveyor 10C.
- High component mounting work efficiency can be realized.
- the first conveyor 10A is set as the priority lane for carrying in the board in the front conveyor row 11A and the fourth conveyor 10D in the rear conveyor row 11B. Yes.
- first substrate sorting conveyors 6A and a second substrate sorting conveyor 6B are arranged side by side with the transport direction as the X direction.
- Each of the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B is configured by combining a fixed rail 6a and a movable rail 6b, and belt-drives the conveyor belts provided on the fixed rail 6a and the movable rail 6b.
- the mechanisms 8A and 8B By driving by the mechanisms 8A and 8B, the substrate supplied from the upstream side (left side of the drawing) is transported in the X direction (arrow a).
- the movable rail 6b located inside the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B is movable in the Y direction.
- the rail width adjusting mechanism 7 By driving the rail width adjusting mechanism 7, the movable rail 6b is moved in the Y direction. Accordingly, the conveyance width W determined by the distance between the fixed rail 6a and the movable rail 6b can be adjusted in accordance with the target substrate 13.
- the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B can be moved integrally in the Y direction (arrow b) on the base 5 by a drive mechanism (not shown).
- the board distribution conveyor 6A and the second board distribution conveyor 6B can be connected to one of the two conveyor rows 11A and 11B provided in the component mounting mechanism M3A.
- the substrate distribution unit M3B combines the movement of the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B in the Y direction with the substrate transfer operation by the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B.
- the board distribution unit distributes the board 13 delivered from the screen printing apparatus M2 which is the upstream apparatus to the plurality of board conveyance conveyors of the component mounting mechanism M3A.
- the control device 30 controls the following units constituting the component mounting device M3. Further, the control device 30 includes a signal output unit 31 and a board transfer control unit 32 as internal control functions, and these functions control the board transfer operation of the component mounting apparatus M3 when the component mounting system 1 is in operation. .
- the substrate transfer controller 32 controls the substrate sorting unit M3B and the first conveyor 10A, the second conveyor 10B, the third conveyor 10C, and the fourth conveyor 10D, so that the substrate 13 delivered from the upstream screen printing apparatus M2 is transferred. Is carried into the substrate holding part 12 of any of the substrate transfer conveyors.
- the signal output unit 31 is configured to detect the substrate 13 by the substrate detection sensors S1, S2, S3, and S4 provided on the first conveyor 10A, the second conveyor 10B, the third conveyor 10C, and the fourth conveyor 10D, respectively. Based on the presence / absence detection result, it is determined whether or not the substrate transport conveyor is ready to accept a new substrate 13, and the new substrate 13 is carried into the substrate transport conveyor based on the determination result.
- the board request signal for obtaining is output.
- the substrate detection sensors S1, S2, S3, and S4 are provided in the substrate holding unit 12 to detect the presence or absence of the substrate 13 in the substrate holding unit 12, but the first conveyor 10A to the fourth conveyor 10D A similar substrate detection sensor may be provided at the downstream end portion to detect that the substrate 13 has been completely discharged downstream from the substrate transport conveyor.
- the control device 30 controls the front head moving mechanism 22A, the front mounting head 23A, the front component supply unit 20A, the rear head moving mechanism 22B, the rear mounting head 23B, and the rear component supply unit 20B, whereby the first conveyor 10A. Then, a component mounting operation for the board 13 carried into the second conveyor 10B, the third conveyor 10C, and the fourth conveyor 10D is executed.
- the recognition device 33 performs recognition processing on an image obtained by imaging the components taken out by the substrate 13, the front mounting head 23 ⁇ / b> A, and the rear mounting head 23 ⁇ / b> B carried into the substrate holding unit 12.
- the display unit 34 is a display device such as a liquid crystal panel, and displays an image related to a predetermined item regarding the operating status of the host computer 3.
- the storage unit 35 stores data necessary for executing a board transport operation and component mounting operation by the host computer 3.
- the communication unit 36 exchanges signals with other devices and the host computer 3 via the LAN 2.
- FIG. 4 and 5 show the ON / OFF state of the board request signal R in the first transfer lane L1 to the fourth transfer lane L4, the board transfer operation (indicated by a double line arrow), and component mounting work (in a hatched rectangular frame).
- 6 (a), (b), FIG. 7 (a), and (b) are the respective transport lanes at specific timings shown in FIG. 4 and FIG. This shows the transport state of the substrate 13.
- FIGS. 4, 6A and 6B when the operation of the component mounting system 1 is newly started, the substrate 13 is newly transported from the state where the substrate 13 is not carried into the component mounting mechanism M3A at all.
- the case where an operation is started is shown. That is, in this case, at the timing ta shown in FIG. 4, as shown in FIG. 6A, the substrate detection sensors S1, S2, S3, and S4 do not detect the substrate 13, so the first transport lane
- the substrate request signal R is in the ON state for all of L1 to fourth transport lane L4.
- the substrates 13 are transferred from the upstream side to the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B, respectively, and these substrates 13 are in accordance with a preset loading priority order. It is carried into the component mounting mechanism M3A. That is, as shown in FIG. 6B, the substrate 13 held by the substrate distribution unit M3B is carried into the fourth transfer lane L4 from the second substrate distribution conveyor 6B (arrow g), and then the first substrate distribution conveyor. 6A is carried into the first transport lane L1 (arrow h).
- FIG. 6B shows a state at the timing tb shown in FIG. 4.
- the substrate 13 is loaded, and the fourth transport lane L4 and the first transport lane L1 are respectively timed t1, t1.
- the board request signal R is turned off. Further, since the substrate request signal R remains in the ON state for the third transport lane L3 and the second transport lane L2 into which the substrate 13 has not yet been loaded, it is then transferred from the upstream side to the substrate sorting unit M3B. The new substrate 13 is carried into the third transport lane L3 and the second transport lane L2.
- the board transfer control unit 32 outputs the board request signal R for a plurality of board transfer conveyors (first conveyor 10A to fourth conveyor 10D).
- the board conveyors closest to the front part supply unit 20A and the rear part supply unit 20B in this example, the first conveyor 10A and the fourth conveyor 10D
- the substrate sorting unit M3B and each substrate transport conveyor are controlled so that a new substrate 13 is carried in from the sorting unit M3B.
- it is possible to carry in the board 13 in preference to the board conveying conveyor which is advantageous in terms of component mounting work efficiency in the vicinity of the component supply unit, and rationally controls the board loading order to improve productivity. be able to.
- FIG. 7A and FIG. 7B the board transfer operation when the operation of the component mounting apparatus M3 has already started in the component mounting system 1 will be described.
- the rear mounting head 23B and the front mounting head 23A are used, respectively.
- the substrate detection sensors S1 and S4 detect the substrate 13 and the substrate detection sensors S3 and S2 do not detect the substrate 13, as shown in FIG. 7A. Therefore, the substrate request signal R is OFF for the first transport lane L1 and the fourth transport lane L4, and is ON for the second transport lane L2 and the third transport lane L3.
- the substrates 13 are transferred to the first substrate distribution conveyor 6A and the second substrate distribution conveyor 6B from the upstream side to the substrate distribution unit M3B, respectively.
- a destination for delivery to the component mounting mechanism M3A is selected.
- the board conveyor that is closer to the component supply unit and is advantageous in terms of component mounting work efficiency is preferentially selected.
- the component mounting operation for the already loaded substrate 13 is completed in the fourth transfer lane L4, and before the transfer operation of the substrate 13 from the second substrate distribution conveyor 6B to the component mounting mechanism unit M3A is started.
- An example is shown in which the substrate request signal R is turned on at timing t3.
- the substrate request signal R has already been output for the third transport lane L3, as shown in FIG. 7B (corresponding to the timing td shown in FIG. 5)
- a new The substrate 13 is carried into the fourth transfer lane L4 from the second substrate sorting conveyor 6B (arrow k)
- a component mounting operation (arrow m) is performed by the rear mounting head 23B on the substrate 13 as an object.
- the substrate transfer control unit 32 is a rear component supply unit among a plurality of substrate transfer conveyors (first conveyor 10A to fourth conveyor 10D). Transfer operation for carrying a new board 13 into the third conveyor 10C from the board sorting unit M3B when the board request signal R is output for the board conveyor (in this case, the third conveyor 10C) far from 20B If the board request signal R is output for the board transport conveyor (here, the fourth conveyor 10D) closer to the rear component supply unit 20B before the start of the process, the new board 13 is carried into the fourth conveyor 10D.
- the substrate sorting unit M3B and each substrate transport conveyor are controlled. Even in this case, it is possible to carry in the board 13 in preference to the board conveying conveyor which is advantageous in terms of component mounting efficiency in the vicinity of the component supply unit, and rationally controls the board loading order to improve productivity. Can be made.
- the component mounting apparatus and the substrate transport method in the component mounting apparatus according to the present invention can carry in a board in preference to the board transport conveyor which is advantageous in terms of component mounting efficiency, and can be produced by rationally controlling the board carry-in order. This is effective in the field of manufacturing a mounting board by mounting electronic components on a wiring board.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Operations Research (AREA)
- Supply And Installment Of Electrical Components (AREA)
Abstract
Description
10A 第1コンベア
10B 第2コンベア
10C 第3コンベア
10D 第4コンベア
11A 前側コンベア列
11B 後側コンベア列
12 基板保持部
13 基板
20A 前側部品供給部
20B 後側部品供給部
21 パーツフィーダ
22A 前側ヘッド移動機構
22B 後側ヘッド移動機構
23A 前側実装ヘッド
23B 後側実装ヘッド
M3A 部品実装機構部
M3B 基板振り分け部
L1 第1搬送レーン
L2 第2搬送レーン
L3 第3搬送レーン
L4 第4搬送レーン
S1,S2,S3,S4 基板検出センサ
Claims (2)
- 基板を搬送しこの基板を位置決めして保持する基板保持部が設けられた基板搬送コンベアを複数並列して成るコンベア列と、前記コンベア列の側方に配置され前記基板に実装される部品を供給する部品供給部と、
上流側装置から受け渡された基板を前記複数の基板搬送コンベアに振り分ける基板振り分け部と、前記基板振り分け部および基板搬送コンベアを制御することにより、前記受け渡された基板をいずれかの基板搬送コンベアの基板保持部に搬入する基板搬送動作を実行させる基板搬送制御部と、前記部品供給部から部品を実装ヘッドによって取り出して前記基板保持部に位置決め保持された基板に実装する部品実装機構と、
前記基板搬送コンベアにおける基板の有無検出結果に基づいて当該基板搬送コンベアが新たな基板を受け入れることが可能な状態であるか否かを判定し、この判定結果に基づいて当該基板搬送コンベアへの新たな基板の搬入を求める基板要求信号を出力する信号出力部とを備え、
前記基板搬送制御部は、複数の前記基板搬送コンベアについて前記基板要求信号が出力されている場合には、これらの基板搬送コンベアのうち前記部品供給部に最も近接した基板搬送コンベアに前記基板振り分け部から新たな基板を搬入させることを特徴とする部品実装装置。 - 基板を搬送しこの基板を位置決めして保持する基板保持部が設けられた基板搬送コンベアを複数並列して成るコンベア列と、前記コンベア列の側方に配置され前記基板に実装される部品を供給する部品供給部と、上流側装置から受け渡された基板を前記複数の基板搬送コンベアに振り分ける基板振り分け部と、前記基板振り分け部および基板搬送コンベアを制御することにより、前記受け渡された基板をいずれかの基板搬送コンベアの基板保持部に搬入する基板搬送動作を実行させる基板搬送制御部と、前記部品供給部から部品を実装ヘッドによって取り出して前記基板保持部に位置決め保持された基板に実装する部品実装機構と、前記基板搬送コンベアにおける基板の有無検出結果に基づいて当該基板搬送コンベアが新たな基板を受け入れることが可能な状態であるか否かを判定し、この判定結果に基づいて当該基板搬送コンベアへの新たな基板の搬入を求める基板要求信号を出力する信号出力部とを備えた部品実装装置において、前記基板を前記基板保持部へ搬入する基板搬送方法であって、
複数の前記基板搬送コンベアについて前記基板要求信号が出力されている場合には、これらの基板搬送コンベアのうち前記部品供給部に最も近接した基板搬送コンベアに前記基板振り分け部から新たな基板を搬入させることを特徴とする部品実装装置における基板搬送方法。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/511,774 US8782875B2 (en) | 2009-12-01 | 2010-11-29 | Component mounting apparatus and substrate conveyance method in component mounting apparatus |
CN201080053404.7A CN102640584B (zh) | 2009-12-01 | 2010-11-29 | 零件安装装置及零件安装装置的基板搬送方法 |
DE112010004632T DE112010004632T5 (de) | 2009-12-01 | 2010-11-29 | Bauelementmontagevorrichtung und Substrattransportverfahren in der Bauelementmontagevorrichtung |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009273067A JP5206654B2 (ja) | 2009-12-01 | 2009-12-01 | 部品実装装置および部品実装装置における基板搬送方法 |
JP2009-273067 | 2009-12-01 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011067918A1 true WO2011067918A1 (ja) | 2011-06-09 |
Family
ID=44114780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2010/006956 WO2011067918A1 (ja) | 2009-12-01 | 2010-11-29 | 部品実装装置および部品実装装置における基板搬送方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8782875B2 (ja) |
JP (1) | JP5206654B2 (ja) |
KR (1) | KR20120101424A (ja) |
CN (1) | CN102640584B (ja) |
DE (1) | DE112010004632T5 (ja) |
WO (1) | WO2011067918A1 (ja) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5120357B2 (ja) * | 2009-10-14 | 2013-01-16 | パナソニック株式会社 | 電子部品実装装置および電子部品実装方法 |
JP5212399B2 (ja) * | 2010-02-19 | 2013-06-19 | パナソニック株式会社 | 部品実装装置および部品実装装置における基板搬送方法 |
KR101672840B1 (ko) * | 2011-11-09 | 2016-11-08 | 한화테크윈 주식회사 | 플립칩 마운터 증식형 시스템 |
CN104137667B (zh) * | 2012-02-28 | 2016-12-21 | 富士机械制造株式会社 | 元件安装机 |
JP5906399B2 (ja) * | 2013-02-22 | 2016-04-20 | パナソニックIpマネジメント株式会社 | 電子部品実装システムおよび電子部品実装方法 |
US10462947B2 (en) * | 2013-10-31 | 2019-10-29 | Fuji Corporation | Component mounting machine |
JP6244551B2 (ja) * | 2014-02-26 | 2017-12-13 | パナソニックIpマネジメント株式会社 | 部品実装ライン及び部品実装方法 |
WO2019198195A1 (ja) * | 2018-04-12 | 2019-10-17 | ヤマハ発動機株式会社 | 部品供給装置および部品実装装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000118678A (ja) * | 1998-10-13 | 2000-04-25 | Yamaha Motor Co Ltd | 基板搬送用コンベア |
JP2003204193A (ja) * | 2002-01-08 | 2003-07-18 | Matsushita Electric Ind Co Ltd | 電子部品実装装置および電子部品実装方法 |
JP2003204192A (ja) * | 2002-01-08 | 2003-07-18 | Matsushita Electric Ind Co Ltd | 電子部品実装装置および電子部品実装方法 |
JP2008198914A (ja) * | 2007-02-15 | 2008-08-28 | Fuji Mach Mfg Co Ltd | 基板生産方法および装置 |
JP2009135554A (ja) * | 2009-03-25 | 2009-06-18 | Fuji Mach Mfg Co Ltd | 部品実装装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5282712A (en) * | 1985-05-13 | 1994-02-01 | Computer Aided Systems, Inc. | Organizer system and method for a rotatable storage structure |
JP3196626B2 (ja) * | 1995-12-26 | 2001-08-06 | ソニー株式会社 | 部品実装方法 |
JP4162930B2 (ja) | 2002-06-25 | 2008-10-08 | 富士機械製造株式会社 | 電子部品実装装置における基板搬送装置 |
JP4303463B2 (ja) * | 2002-11-29 | 2009-07-29 | パナソニック株式会社 | 基板搬送装置及び部品実装における基板搬送方法 |
JP5186277B2 (ja) | 2008-05-12 | 2013-04-17 | シャープ株式会社 | 選局候補チャンネル提供方法及び放送受信装置 |
-
2009
- 2009-12-01 JP JP2009273067A patent/JP5206654B2/ja active Active
-
2010
- 2010-11-29 CN CN201080053404.7A patent/CN102640584B/zh not_active Expired - Fee Related
- 2010-11-29 DE DE112010004632T patent/DE112010004632T5/de not_active Withdrawn
- 2010-11-29 US US13/511,774 patent/US8782875B2/en active Active
- 2010-11-29 KR KR1020127014020A patent/KR20120101424A/ko not_active Application Discontinuation
- 2010-11-29 WO PCT/JP2010/006956 patent/WO2011067918A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000118678A (ja) * | 1998-10-13 | 2000-04-25 | Yamaha Motor Co Ltd | 基板搬送用コンベア |
JP2003204193A (ja) * | 2002-01-08 | 2003-07-18 | Matsushita Electric Ind Co Ltd | 電子部品実装装置および電子部品実装方法 |
JP2003204192A (ja) * | 2002-01-08 | 2003-07-18 | Matsushita Electric Ind Co Ltd | 電子部品実装装置および電子部品実装方法 |
JP2008198914A (ja) * | 2007-02-15 | 2008-08-28 | Fuji Mach Mfg Co Ltd | 基板生産方法および装置 |
JP2009135554A (ja) * | 2009-03-25 | 2009-06-18 | Fuji Mach Mfg Co Ltd | 部品実装装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102640584A (zh) | 2012-08-15 |
US8782875B2 (en) | 2014-07-22 |
JP2011119314A (ja) | 2011-06-16 |
KR20120101424A (ko) | 2012-09-13 |
US20120272511A1 (en) | 2012-11-01 |
CN102640584B (zh) | 2015-05-13 |
JP5206654B2 (ja) | 2013-06-12 |
DE112010004632T5 (de) | 2012-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011067918A1 (ja) | 部品実装装置および部品実装装置における基板搬送方法 | |
JP4872961B2 (ja) | 電子部品搭載装置 | |
WO2010038440A1 (ja) | 電子部品実装システム | |
US20150271925A1 (en) | Electronic component mounting system and electronic component mounting method | |
WO2010038437A1 (ja) | 電子部品実装システムおよび電子部品実装方法 | |
JP5206655B2 (ja) | 部品実装装置および部品実装装置における基板搬送方法 | |
JP5845399B2 (ja) | 電子部品実装システムおよび電子部品実装方法 | |
JP5906399B2 (ja) | 電子部品実装システムおよび電子部品実装方法 | |
JP5212399B2 (ja) | 部品実装装置および部品実装装置における基板搬送方法 | |
JP2011171538A (ja) | 部品実装装置および部品実装装置における基板搬送方法 | |
JP2015188113A (ja) | 電子部品実装システムおよび電子部品実装方法 | |
JP5321474B2 (ja) | 部品実装装置および部品実装方法 | |
JP5370204B2 (ja) | 部品実装装置および部品実装方法 | |
JP5304919B2 (ja) | 電子部品実装ラインおよび電子部品実装方法 | |
JP4985634B2 (ja) | スクリーン印刷装置およびスクリーン印刷方法 | |
JP5234013B2 (ja) | 部品実装装置および部品実装方法 | |
JP4933507B2 (ja) | 電子部品の装着方法 | |
JP6606668B2 (ja) | 部品実装方法 | |
JP5187324B2 (ja) | 部品実装装置および部品実装方法 | |
JP4933508B2 (ja) | 電子部品の装着方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080053404.7 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10834372 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13511774 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 20127014020 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1120100046328 Country of ref document: DE Ref document number: 112010004632 Country of ref document: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 10834372 Country of ref document: EP Kind code of ref document: A1 |