Nothing Special   »   [go: up one dir, main page]

JPS61204701A - Redundancy system - Google Patents

Redundancy system

Info

Publication number
JPS61204701A
JPS61204701A JP4365785A JP4365785A JPS61204701A JP S61204701 A JPS61204701 A JP S61204701A JP 4365785 A JP4365785 A JP 4365785A JP 4365785 A JP4365785 A JP 4365785A JP S61204701 A JPS61204701 A JP S61204701A
Authority
JP
Japan
Prior art keywords
backup
control
abnormality
signal
backup device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4365785A
Other languages
Japanese (ja)
Inventor
Masanori Shinoda
正紀 篠田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Priority to JP4365785A priority Critical patent/JPS61204701A/en
Publication of JPS61204701A publication Critical patent/JPS61204701A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B9/00Safety arrangements
    • G05B9/02Safety arrangements electric
    • G05B9/03Safety arrangements electric with multiple-channel loop, i.e. redundant control systems

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

PURPOSE:To eliminate an influence of drawing to a plant by providing an operating means which is operated prior to drawing from a system and sends out a prescribed signal to a backup device. CONSTITUTION:On a control arithmetic unit 1, a self-diagnosing part 11 is provided, whether a control function of itself is normal or not is always monitored, and when an abnormality has been detected, a contact 12 is opened. As a result, a relay 14 becomes non-exciting, its contact 15 becomes a state as shown in the figure, and an abnormality signal SFi is transferred to a backup device 2 through a line 7i. When an abnormality is detected from a state of the line 7i, the backup device 2 discriminates by which control arithmetic unit it has been caused, and outputs a signal SBi for showing a fact that the unit is in the course of backup, to the corresponding AND gate 4i. In this case, the AND gate 4i is opened, switches 5i, 6i become a state reverse to those which are shown in the figure, and the backup by the backup device 2 is executed.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、個別にシステムへの抜き挿しく着脱)が可
能で、かつ所定の制御演算を行なうn台(n≧1)の制
御演算装置と、これら制御演算装置の1つに異常が生じ
たときまたはシステムから引き抜かれたときはその機能
を代替する1台のバンクアップ用制御演算装置とを備え
た冗長化システムに関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention provides n control calculation devices (n≧1) that can be individually inserted into and removed from a system and that perform predetermined control calculations. The present invention relates to a redundant system comprising: a bank-up control/arithmetic unit that replaces the function of one of the control/arithmetic units when an abnormality occurs or when one of the control/arithmetic units is removed from the system.

〔従来の技術〕[Conventional technology]

冗長化システムを構成する個々の制御演算装置が例えば
カード状のプリント基板から成り、システムへの着脱が
可能なプラグイン形式のものである場合は、これが不用
意に引き抜かれることも多い。このような場合、従来は
その状態変化を接点信号によってバックアップ用制御演
算装置(単に、バックアップ装置ともいう。)へ通知し
、バックアップ装置ではこれを受けて所定のバックアッ
プ動作を行なう方式を採るのが一般的である。
When the individual control processing units constituting a redundant system are made of card-shaped printed circuit boards, for example, and are of plug-in type that can be attached to and detached from the system, they are often pulled out inadvertently. In such cases, conventional methods have been adopted in which the state change is notified to a backup control arithmetic unit (also simply referred to as a backup device) using a contact signal, and the backup device receives this and performs a predetermined backup operation. Common.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかしながら、このような方式では制御演算装置が引き
抜かれてからバックアップ態勢に移行する迄の間に時間
遅れが生じ、この間は信号が与えられないかまたは不定
の状態となるため、プラント等の制御対象に対して悪影
響を及ぼすという問題点がある。
However, with this method, there is a time delay between when the control processing unit is pulled out and when it enters the backup mode, and during this time, no signal is given or the signal is in an undefined state. There is a problem in that it has a negative impact on

〔問題点を解決するための手段〕[Means for solving problems]

冗長化システムを構成する個々の制御演算装置内に、こ
れを引き抜くに先立ってバンクアップ装置へ所定の信号
を送出するための信号送出用操作手段を設ける。
A signal sending operating means for sending a predetermined signal to the bank up device prior to pulling out the redundant system is provided in each control arithmetic device constituting the redundant system.

〔作用〕[Effect]

制御演算装置の1つをシステムから引き抜くときには、
その直前に上記操作手段を操作して所定の信号をバンク
アップ装置へ送出し、バックアップのために必要な動作
を行なわせることにより、プラント等の制御対象に対す
る出力信号が失なわれないようにし、制御対象への悪影
響を回避する。
When removing one of the control computing units from the system,
Immediately before that, the operating means is operated to send a predetermined signal to the bank-up device, and the necessary operation for backup is performed, so that the output signal to the controlled object such as the plant is not lost; Avoid adverse effects on controlled objects.

〔実施例〕〔Example〕

第1図はこの発明の実施例を示す構成図、第1A図は第
1図における制御演算装置の具体例を示す概要図である
。なお、第1図において、1(II〜1□)は制御演算
装置、2はバックアップ用制御演算装置(バックアップ
装置)、3はプラント(制御対象)、4(4+〜4.、
)はアンドゲート、5、〜5,1,6.〜67はスイッ
チ、7□(iは1≦i≦nを満足する任意の整数;以下
同じ)は異常信号SF、を含む制御演算装置の状態を通
知するたあの通知ライン、8五はバックアップ中である
ことを示す信号SB、を伝送するバンクアップ中信号ラ
イン、91は入力信号ライン、10□は出力信号ライン
、Lは伝送ラインである。また、第1A図において、1
1は自己診断部、12.13はスイッチ、14はリレー
、15はリレー14の接点である。
FIG. 1 is a block diagram showing an embodiment of the present invention, and FIG. 1A is a schematic diagram showing a specific example of the control calculation device in FIG. In FIG. 1, 1 (II to 1□) is a control calculation device, 2 is a backup control calculation device (backup device), 3 is a plant (control object), 4 (4+ to 4.,
) is an and gate, 5, ~5, 1, 6. ~67 is a switch, 7□ (i is any integer that satisfies 1≦i≦n; the same applies hereinafter) is a notification line that notifies the status of the control processing unit including the abnormal signal SF, and 85 is a backup in progress. 91 is an input signal line, 10□ is an output signal line, and L is a transmission line. In addition, in FIG. 1A, 1
1 is a self-diagnosis section, 12 and 13 are switches, 14 is a relay, and 15 is a contact point of the relay 14.

以下、これらの図を参照してその動作を説明する。The operation will be explained below with reference to these figures.

制御演算装置1iはプラント3の状態を入力信号ライン
9iを介して取り込んで所定の制御演算を行ない、その
結果を出力信号ライン10.を介してプラント3へ送出
する。バックアップ装置2は伝送ラインLを介して制御
演算装置1の動作状態を監視するとともに、データの収
集を行ない、いつでもバックアップ態勢に移行し得るよ
う準備する。また、制御演算装置1には、第1A図に示
されるように自己診断部11が設けられ、これにより自
身の制御機能が正常か否かを常時監視し、異常を検知し
たときには接点12を図示の如く開放する。これによっ
てリレー14は非励磁となり、その接点15が図示の状
態となって異常信号SF。
The control calculation device 1i takes in the state of the plant 3 via the input signal line 9i, performs predetermined control calculations, and outputs the results on the output signal line 10. It is sent to plant 3 via. The backup device 2 monitors the operating state of the control processing device 1 via the transmission line L, collects data, and prepares to shift to a backup mode at any time. In addition, the control calculation device 1 is provided with a self-diagnosis section 11 as shown in FIG. Open as follows. As a result, the relay 14 becomes de-energized, and its contact 15 becomes the state shown in the figure, and an abnormality signal SF is generated.

がライン7、を介してバックアップ装置2に伝達される
。一方、正常な場合には接点12が閉成してリレー14
が励磁されるため、その接点15によって正常信号が伝
達される。つまり、ライン7゜には正常、異常に応じて
それぞれ0″、″v2 ′ボルトの信号が現われるため
、バックアップ装置2はこのラインの所定点Xを監視す
ることにより、正常、異常を判別する。バンクアップ装
置2はライン7iの状態から異常を検知すると、いずれ
の制御演算装置によるものかを判別し、第1図の対応す
るアンドゲート41に対してバックアップ中であること
を示す信号SB、を出力する。このとき、対応する制御
演算装置1、から異常信号SF。
is transmitted to the backup device 2 via line 7. On the other hand, when normal, contact 12 closes and relay 14
is excited, so a normal signal is transmitted through its contact 15. That is, since signals of 0'' and ''v2' volts appear on line 7° depending on normality and abnormality, respectively, the backup device 2 determines normality and abnormality by monitoring a predetermined point X on this line. When the bank up device 2 detects an abnormality from the state of the line 7i, it determines which control arithmetic device caused the abnormality, and sends a signal SB indicating that backup is in progress to the corresponding AND gate 41 in FIG. Output. At this time, an abnormality signal SF is sent from the corresponding control calculation device 1.

が出力されているためアンドゲート4□が開き、これに
よってスイッチ54,6iが図示とは逆の状態となり、
バックアップ装置2によるバックアップが行なわれる。
Since is being output, the AND gate 4□ opens, which causes the switches 54 and 6i to be in the opposite state to that shown in the figure.
Backup is performed by the backup device 2.

以上は、主として自己診断の結果異常となる場合、つま
りスイッチ12が開放となる場合について説明したが、
その他に制御演算装置1への電源が何らかの原因により
失なわれた場合、または制御演算装置がシステムから引
き抜かれた場合も、その動作は上記と同様である。
The above has mainly explained the case where the self-diagnosis results in an abnormality, that is, the case where the switch 12 is opened.
In addition, even if the power to the control calculation device 1 is lost for some reason, or if the control calculation device 1 is removed from the system, the operation is the same as described above.

すなわち、前者の場合は電源の喪失によってリレー14
が非励磁となることから、また後者の場合はスイッチ1
2が開放する以前にスイッチ13が開放されることから
それぞれ上記と同様に動作することがわかる。特に後者
の場合に対してはスイッチ13を新たに設置し、制御演
算装置1をシステムから引き抜く前にこのスイッチ13
を操作し、バックアップ装置2に前もってバックアップ
動作を開始させることにより、制御演算装置の引き抜き
によるプラントへの悪影響を無くすようにしている。
In other words, in the former case, relay 14
is de-energized, and in the latter case switch 1
Since switch 13 is opened before switch 2 is opened, it can be seen that each operates in the same manner as described above. Particularly in the latter case, a new switch 13 is installed, and the switch 13 is
By operating the backup device 2 to start the backup operation in advance, the negative impact on the plant due to the removal of the control arithmetic device is eliminated.

〔発明の効果〕〔Effect of the invention〕

この発明によれば、冗長化システムを構成する個々の制
御演算装置内に、これのシステムからの引き抜きに先立
って操作されて所定の信号をバックアップ装置へ送出す
る操作手段を設けることにより、制御演算装置を実際に
引き抜く以前にバックアップ装置によるバックアップ動
作を開始することが可能となり、これによって制御対象
となるプラントに対しこの引き抜きによる影響を無くす
ことができる利点がもたらされる。
According to this invention, by providing in each control arithmetic device constituting the redundant system an operating means that is operated and sends a predetermined signal to the backup device prior to pulling out the control arithmetic device from the system, the control arithmetic device It becomes possible to start the backup operation by the backup device before the device is actually pulled out, and this brings about the advantage that the influence of this withdrawal on the plant to be controlled can be eliminated.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例を示す構成図、第1A図は第
1図に示される制御演算装置の具体例を示す概要図であ
る。 符号説明 1 (1,〜13)・・・制御演算装置、2・・・バッ
クアップ用制御演算装置、3・・・プラント(制御対象
)、4 (4,〜4.)・・・アンドゲート、5I〜5
、。 61〜6..12.13−・・スイッチ、7.〜7n・
・・通知ライン、81〜8.l・・・バックアップ中信
号ライン、91〜9カ・・・入力信号ライン、1o・・
・出力信号ライン、11・・・自己診断部、14・・・
リレー、15・・・リレー14の接点、L・・・伝送ラ
イン。 代理人 弁理士 並 木 昭 夫 代理人 弁理士 松 崎   清 1111A図
FIG. 1 is a block diagram showing an embodiment of the present invention, and FIG. 1A is a schematic diagram showing a specific example of the control calculation device shown in FIG. Description of symbols 1 (1, to 13)...Control calculation device, 2...Backup control calculation device, 3...Plant (control target), 4 (4, to 4.)...And gate, 5I~5
,. 61-6. .. 12.13--Switch, 7. ~7n・
...Notification line, 81-8. l...backup signal line, 91~9ka...input signal line, 1o...
・Output signal line, 11... Self-diagnosis section, 14...
Relay, 15...Contact of relay 14, L...Transmission line. Agent Patent Attorney Akio Namiki Agent Patent Attorney Kiyoshi Matsuzaki 1111A

Claims (1)

【特許請求の範囲】[Claims] 個別にシステムへの着脱が可能でかつ所定の制御演算を
行なう複数の制御演算装置と、これら制御演算装置のい
ずれか1つに異常が生じたときまたはこれがシステムか
ら引き抜かれたときはそのバックアップを行なうバック
アップ装置とを備えてなる冗長化システムにおいて、前
記制御演算装置の各々にシステムからの引き抜きに先立
って操作されて所定の信号を前記バックアップ装置に送
出する操作手段を設け、制御演算装置をシステムから引
き抜く前に該操作手段を操作することにより前記バック
アップ動作の開始時点を速めることを特徴とする冗長化
システム。
A plurality of control calculation devices that can be individually attached to and removed from the system and perform predetermined control calculations, and a backup system that can be used in the event that any one of these control calculation devices malfunctions or is removed from the system. In the redundant system, each of the control calculation devices is provided with operating means that is operated to send a predetermined signal to the backup device prior to extraction from the system, and the control calculation device is connected to the system. A redundancy system characterized in that the start point of the backup operation is accelerated by operating the operating means before pulling out the backup operation.
JP4365785A 1985-03-07 1985-03-07 Redundancy system Pending JPS61204701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4365785A JPS61204701A (en) 1985-03-07 1985-03-07 Redundancy system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4365785A JPS61204701A (en) 1985-03-07 1985-03-07 Redundancy system

Publications (1)

Publication Number Publication Date
JPS61204701A true JPS61204701A (en) 1986-09-10

Family

ID=12669927

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4365785A Pending JPS61204701A (en) 1985-03-07 1985-03-07 Redundancy system

Country Status (1)

Country Link
JP (1) JPS61204701A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019079288A (en) * 2017-10-25 2019-05-23 能美防災株式会社 Reception panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019079288A (en) * 2017-10-25 2019-05-23 能美防災株式会社 Reception panel

Similar Documents

Publication Publication Date Title
JPS62271745A (en) Safety device for printer
GB2071893A (en) Command and monitoring apparatus
JPS61204701A (en) Redundancy system
JP2906789B2 (en) Runaway monitoring circuit of multiple microcomputers
JPS6019540B2 (en) Configuration switching control method
JPH09292928A (en) Clock signal source monitoring device
JPS6260019A (en) Information processor
JPH05158743A (en) Runaway monitoring circuit for plural microcomputers
JP3107104B2 (en) Standby redundancy method
JP2508606B2 (en) Redundant device
JPS63303499A (en) Information processor
JPS63291146A (en) Input/output processor
JPH06202889A (en) Fault detection device for multiple input/output circuit system
JPS6341903A (en) Backup system for controller
JPS59157703A (en) Switching system of multisystem controller
JPS63269234A (en) System switching device
JPH02135954A (en) Automatic command generating system
JPS63316145A (en) System for controlling re-start of data processor
JPS63191434A (en) Clock circuit
JPS58114145A (en) Monitoring system for fault of master microprocessor
JPH1020904A (en) Control state monitor device
JPH0817399B2 (en) Series controller
JPH02126350A (en) Monitoring system for terminal peripheral equipment
JP2001142732A (en) Control system switching device
JPH02141831A (en) Peripheral system fault processing system in virtual computer system