JP5215822B2 - エネルギーシステム制御装置および制御方法 - Google Patents
エネルギーシステム制御装置および制御方法 Download PDFInfo
- Publication number
- JP5215822B2 JP5215822B2 JP2008297962A JP2008297962A JP5215822B2 JP 5215822 B2 JP5215822 B2 JP 5215822B2 JP 2008297962 A JP2008297962 A JP 2008297962A JP 2008297962 A JP2008297962 A JP 2008297962A JP 5215822 B2 JP5215822 B2 JP 5215822B2
- Authority
- JP
- Japan
- Prior art keywords
- energy
- operation plan
- actual value
- value
- evaluation function
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 48
- 230000006870 function Effects 0.000 claims description 113
- 238000011156 evaluation Methods 0.000 claims description 111
- 238000004146 energy storage Methods 0.000 claims description 41
- 238000010801 machine learning Methods 0.000 claims description 21
- 238000005457 optimization Methods 0.000 claims description 19
- 238000012790 confirmation Methods 0.000 claims 1
- 238000004364 calculation method Methods 0.000 description 27
- 239000000446 fuel Substances 0.000 description 14
- 238000010248 power generation Methods 0.000 description 13
- 238000005338 heat storage Methods 0.000 description 9
- 238000004891 communication Methods 0.000 description 7
- 230000002068 genetic effect Effects 0.000 description 6
- 238000004422 calculation algorithm Methods 0.000 description 5
- 230000005611 electricity Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 238000013528 artificial neural network Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000000611 regression analysis Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 238000002939 conjugate gradient method Methods 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000002945 steepest descent method Methods 0.000 description 1
- 210000003813 thumb Anatomy 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
1a〜1n 需要家
11 太陽電池
12 燃料電池
13 蓄電池
14 蓄熱装置
15 電力負荷
16 熱負荷
17 熱配管
2 制御装置
21 通信部
22 実績データベース部
23 最適スケジューリング部
24 学習データベース部
25 評価関数学習部
26 最適運転算出部
27 パラメータ決定部
3 電力線
4 系統電力
Claims (10)
- エネルギー発生装置と、エネルギー貯蔵装置と、エネルギー負荷と、を有するエネルギーシステムと通信可能であり、気象予報情報を用いて前記エネルギー発生装置および前記エネルギー貯蔵装置の運転計画を決定するエネルギーシステム制御装置であって、
前記エネルギー発生装置によるエネルギー発生の実績値と、前記エネルギー負荷によるエネルギー需要の実績値を保存する実績データベース部と、
前記エネルギー発生装置および前記エネルギー貯蔵装置の最適運転計画を、予め定められた最適化手法を用いて、前記実績データベース部内のエネルギー発生の実績値およびエネルギー需要の実績値に基づいて作成する最適スケジューリング部と、
前記エネルギー発生装置および前記エネルギー貯蔵装置の状態を評価するための状態評価関数を、前記最適スケジューリング部にて作成された最適運転計画に基づいて確定する確定部と、
前記確定部にて確定された状態評価関数と、前記気象予報情報と、を用いて、前記運転計画を決定する運転計画決定部と、
を含み、
前記確定部は、
前記気象予報情報の実績値と、前記エネルギー発生の実績値と、前記エネルギー需要の実績値と、前記最適運転計画と、を格納する学習データベース部と、
前記学習データベース部内のデータが学習実施条件を満たした場合に、前記状態評価関数が有する所定のパラメータの値を、予め定められた機械学習法を用いて、前記学習データベース部内の気象予報情報の実績値、エネルギー発生の実績値およびエネルギー需要の実績値と、前記最適運転計画と、に基づいて決定する評価関数学習部と、を含む、エネルギーシステム制御装置。 - 前記学習データベース部は、所定の日時ごとに、前記最適運転計画と、前記気象予報情報の実績値と、前記エネルギー発生の実績値と、前記エネルギー需要の実績値と、前記エネルギー発生装置の出力状態と、前記エネルギー貯蔵装置の蓄積状態とを、互いに関連づけて格納する、請求項1に記載のエネルギーシステム制御装置。
- 前記所定のパラメータは、前記エネルギー貯蔵装置におけるエネルギー蓄積量の評価値についての第1パラメータ、および、前記エネルギー発生装置の出力状態の評価値についての第2パラメータを含み、
前記第1パラメータおよび前記第2パラメータは、前記気象予報情報に応じた値を持つ、請求項1または2に記載のエネルギーシステム制御装置。 - 前記最適スケジューリング部は、運転計画での目的達成の度合いを評価するための目的関数の値が、前記最適運転計画において最適となるように、前記最適運転計画を、前記最適化手法を用いて、前記エネルギー発生の実績値および前記エネルギー需要の実績値に基づいて作成し、
前記評価関数学習部は、前記機械学習法として、前記目的関数と前記状態評価関数から構成される運転評価関数を用いた機械学習法を用いて、前記所定のパラメータの値を、前記学習データベース部内の気象予報情報の実績値、エネルギー発生の実績値およびエネルギー需要の実績値と、前記最適運転計画と、に基づいて決定し、
前記運転計画決定部は、前記運転評価関数と、前記気象予報情報と、を用いて、前記運転計画を決定する、請求項1から3のいずれか1項に記載のエネルギーシステム制御装置。 - 前記評価関数学習部は、前記最適運転計画と異なる他の運転計画の候補を複数作成し、前記運転計画の候補のそれぞれの運転評価関数の値が前記最適運転計画の運転評価関数の値よりも良くなる数が最小となる前記所定のパラメータ値を決定する、請求項4に記載のエネルギーシステム制御装置。
- エネルギー発生装置と、エネルギー貯蔵装置と、エネルギー負荷と、を有するエネルギーシステムと通信可能であり、気象予報情報を用いて前記エネルギー発生装置および前記エネルギー貯蔵装置の運転計画を決定する、エネルギーシステム制御装置が行うエネルギーシステム制御方法であって、
前記エネルギー発生装置によるエネルギー発生の実績値と、前記エネルギー負荷によるエネルギー需要の実績値を実績データベース部に保存する保存ステップと、
前記エネルギー発生装置および前記エネルギー貯蔵装置の最適運転計画を、予め定められた最適化手法を用いて、前記実績データベース部内のエネルギー発生の実績値およびエネルギー需要の実績値に基づいて作成する最適スケジューリングステップと、
前記エネルギー発生装置および前記エネルギー貯蔵装置の状態を評価するための状態評価関数を、前記最適運転計画に基づいて確定する確定ステップと、
前記状態評価関数と、前記気象予報情報と、を用いて、前記運転計画を決定する運転計画決定ステップと、
を含み、
前記確定ステップは、
前記気象予報情報の実績値と、前記エネルギー発生の実績値と、前記エネルギー需要の実績値と、前記最適運転計画と、を学習データベース部に格納する格納ステップと、
前記学習データベース部内のデータが学習実施条件を満たした場合に、前記状態評価関数が有する所定のパラメータの値を、予め定められた機械学習法を用いて、前記学習データベース部内の気象予報情報の実績値、エネルギー発生の実績値およびエネルギー需要の実績値と、前記最適運転計画と、に基づいて決定する評価関数学習ステップと、を含む、エネルギーシステム制御方法。 - 前記格納ステップでは、所定の日時ごとに、前記最適運転計画と、前記気象予報情報の実績値と、前記エネルギー発生の実績値と、前記エネルギー需要の実績値と、前記エネルギー発生装置の出力状態と、前記エネルギー貯蔵装置の蓄積状態とを、互いに関連づけて前記学習データベース部に格納する、請求項6に記載のエネルギーシステム制御方法。
- 前記所定のパラメータは、前記エネルギー貯蔵装置におけるエネルギー蓄積量の評価値についての第1パラメータ、および、前記エネルギー発生装置の出力状態の評価値についての第2パラメータを含み、
前記第1パラメータおよび前記第2パラメータは、前記気象予報情報に応じた値を持つ、請求項6または7に記載のエネルギーシステム制御方法。 - 前記最適スケジューリングステップでは、運転計画での目的達成の度合いを評価するための目的関数の値が、前記最適運転計画において最適となるように、前記最適運転計画を、前記最適化手法を用いて、前記エネルギー発生の実績値および前記エネルギー需要の実績値に基づいて作成し、
前記評価関数学習ステップでは、前記機械学習法として、前記目的関数と前記状態評価関数から構成される運転評価関数を用いた機械学習法を用いて、前記所定のパラメータの値を、前記学習データベース部内の気象予報情報の実績値、エネルギー発生の実績値およびエネルギー需要の実績値と、前記最適運転計画と、に基づいて決定し、
前記運転計画決定ステップでは、前記運転評価関数と、前記気象予報情報と、を用いて、前記運転計画を決定する、請求項6から8のいずれか1項に記載のエネルギーシステム制御方法。 - 前記評価関数学習ステップでは、前記最適運転計画と異なる他の運転計画の候補を複数作成し、前記運転計画の候補のそれぞれの運転評価関数の値が前記最適運転計画の運転評価関数の値よりも良くなる数が最小となる前記所定のパラメータ値を決定する、請求項9に記載のエネルギーシステム制御方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008297962A JP5215822B2 (ja) | 2008-11-21 | 2008-11-21 | エネルギーシステム制御装置および制御方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008297962A JP5215822B2 (ja) | 2008-11-21 | 2008-11-21 | エネルギーシステム制御装置および制御方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010124644A JP2010124644A (ja) | 2010-06-03 |
JP5215822B2 true JP5215822B2 (ja) | 2013-06-19 |
Family
ID=42325473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008297962A Expired - Fee Related JP5215822B2 (ja) | 2008-11-21 | 2008-11-21 | エネルギーシステム制御装置および制御方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5215822B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101778599B1 (ko) * | 2016-11-09 | 2017-09-26 | 청운대학교 인천캠퍼스 산학협력단 | 건물 태양열시스템 최적화 설계방법 |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012026573A1 (ja) * | 2010-08-27 | 2012-03-01 | 三洋電機株式会社 | 電力管理装置 |
JP4643759B1 (ja) * | 2010-10-13 | 2011-03-02 | 株式会社フィールドロジック | 発電シミュレーション装置、発電シミュレーション方法、及びプログラム |
JP5660863B2 (ja) * | 2010-11-22 | 2015-01-28 | 京セラ株式会社 | 制御装置及び制御方法 |
JP5670774B2 (ja) * | 2011-01-17 | 2015-02-18 | 株式会社 Jcサービス | 複数拠点接続型省電力制御システム |
JP5537478B2 (ja) * | 2011-03-28 | 2014-07-02 | 株式会社東芝 | 複合蓄電池エネルギー管理システム及び方法 |
JP5578124B2 (ja) * | 2011-03-29 | 2014-08-27 | 株式会社デンソー | 電力供給システム |
JP5681070B2 (ja) * | 2011-08-31 | 2015-03-04 | ニチコン株式会社 | マルチパワーコンディショナシステム |
JP5468590B2 (ja) | 2011-09-27 | 2014-04-09 | 株式会社東芝 | データ収集装置およびその方法 |
JP5843572B2 (ja) | 2011-11-10 | 2016-01-13 | 株式会社東芝 | 運転計画システム及び運転計画作成方法 |
JP5780989B2 (ja) * | 2012-03-16 | 2015-09-16 | 三菱電機株式会社 | 設備コントローラ及び分散電源システム |
JP5813544B2 (ja) * | 2012-03-22 | 2015-11-17 | 株式会社東芝 | エネルギー管理装置とその管理方法及びエネルギー管理プログラム |
US9535474B2 (en) | 2012-03-22 | 2017-01-03 | Kabushiki Kaisha Toshiba | Renewable energy management using weighted load patterns |
JP6178045B2 (ja) * | 2012-04-16 | 2017-08-09 | 株式会社東芝 | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 |
JP5882156B2 (ja) * | 2012-07-23 | 2016-03-09 | 株式会社デンソー | 電力制御装置 |
WO2014034391A1 (ja) | 2012-09-03 | 2014-03-06 | 株式会社 東芝 | エネルギー管理システム、サーバ、エネルギー管理方法および記憶媒体 |
JP5921390B2 (ja) * | 2012-09-03 | 2016-05-24 | 株式会社東芝 | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 |
KR101478791B1 (ko) * | 2012-11-27 | 2015-01-02 | 에스케이씨앤씨 주식회사 | 전력 관리 방법 및 시스템 |
JP2017108560A (ja) * | 2015-12-10 | 2017-06-15 | 株式会社Nttドコモ | 電力融通システムの制御装置および制御プログラム |
US20190181680A1 (en) * | 2016-08-09 | 2019-06-13 | Yanmar Co., Ltd. | Control device optimizing evaluation of energy management in in-plant energy network |
KR101972828B1 (ko) * | 2017-11-14 | 2019-04-26 | 동신대학교 산학협력단 | V2g가 적용된 열 전기 복합 그리드 시스템 및 그 운영 방법 |
KR101972830B1 (ko) * | 2017-11-14 | 2019-04-26 | 동신대학교 산학협력단 | Pv/t가 적용된 열 전기 복합 그리드 시스템 및 그 운영 방법 |
KR101965328B1 (ko) * | 2017-11-14 | 2019-04-03 | 동신대학교 산학협력단 | Dc 나노그리드가 적용된 열 전기 복합 그리드 시스템 및 그 운영 방법 |
KR101965336B1 (ko) * | 2017-11-14 | 2019-04-03 | 동신대학교 산학협력단 | 상황인지기술이 적용된 열 전기 복합 그리드 시스템 및 그 운영 방법 |
JP7053299B2 (ja) * | 2018-02-15 | 2022-04-12 | 株式会社日立製作所 | 運転計画生成装置、及び運転計画生成方法 |
JP7049911B2 (ja) * | 2018-05-17 | 2022-04-07 | 大成建設株式会社 | 設備機器運転システムおよび設備機器運転方法 |
JP7178478B2 (ja) * | 2018-07-05 | 2022-11-25 | ヒタチ・エナジー・スウィツァーランド・アクチェンゲゼルシャフト | 分散予測によって電力網を最適化するための技術 |
JP7058254B2 (ja) * | 2019-10-11 | 2022-04-21 | 京セラ株式会社 | 情報処理装置、情報処理方法、及びプログラム |
JP7083008B2 (ja) * | 2020-08-31 | 2022-06-09 | 三菱重工サーマルシステムズ株式会社 | 計画システム、計画方法及びプログラム |
KR102618054B1 (ko) * | 2022-05-27 | 2023-12-27 | (주)누리플렉스 | 빌딩 내 분산전원 운전 방법 및 장치 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08202406A (ja) * | 1995-01-23 | 1996-08-09 | Hitachi Ltd | エネルギ供給プラントの運転計画立案方法 |
JP2002230099A (ja) * | 2001-01-31 | 2002-08-16 | Mitsubishi Electric Corp | 設備最適運転サービスシステム |
JP2005304118A (ja) * | 2004-04-07 | 2005-10-27 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギーシステムの制御装置および制御方法 |
JP4245583B2 (ja) * | 2005-04-15 | 2009-03-25 | 日本電信電話株式会社 | 分散型エネルギーシステムの制御装置、制御方法、プログラム、および記録媒体 |
JP2008141918A (ja) * | 2006-12-05 | 2008-06-19 | Nippon Telegr & Teleph Corp <Ntt> | 太陽光発電システム評価装置、方法、およびプログラム |
-
2008
- 2008-11-21 JP JP2008297962A patent/JP5215822B2/ja not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101778599B1 (ko) * | 2016-11-09 | 2017-09-26 | 청운대학교 인천캠퍼스 산학협력단 | 건물 태양열시스템 최적화 설계방법 |
Also Published As
Publication number | Publication date |
---|---|
JP2010124644A (ja) | 2010-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5215822B2 (ja) | エネルギーシステム制御装置および制御方法 | |
US10921760B2 (en) | Predictive control loops using time-based simulation and building-automation systems thereof | |
Reynolds et al. | Operational supply and demand optimisation of a multi-vector district energy system using artificial neural networks and a genetic algorithm | |
Reynolds et al. | A zone-level, building energy optimisation combining an artificial neural network, a genetic algorithm, and model predictive control | |
JP4245583B2 (ja) | 分散型エネルギーシステムの制御装置、制御方法、プログラム、および記録媒体 | |
Silvente et al. | A rolling horizon optimization framework for the simultaneous energy supply and demand planning in microgrids | |
JP2013529879A (ja) | 発電機の運転をスケジューリングするための方法 | |
JP7053299B2 (ja) | 運転計画生成装置、及び運転計画生成方法 | |
Pandey et al. | Applications of artificial intelligence in power system operation, control and planning: a review | |
CN111245024B (zh) | 基于模型预测控制的综合能源系统鲁棒优化运行方法 | |
De Ridder et al. | A trading strategy for industrial CHPs on multiple power markets | |
Zhang et al. | A review of recent advances on reinforcement learning for smart home energy management | |
Pan et al. | Impacts of optimization interval on home energy scheduling for thermostatically controlled appliances | |
JP2005304118A (ja) | 分散型エネルギーシステムの制御装置および制御方法 | |
Schellenberg et al. | Operational optimisation of a heat pump system with sensible thermal energy storage using genetic algorithm | |
Sarkar et al. | Concurrent carbon footprint reduction (c2fr) reinforcement learning approach for sustainable data center digital twin | |
Raju et al. | Reinforcement learning in adaptive control of power system generation | |
CN113723793A (zh) | 园区综合能源系统的实现方法、装置、设备和介质 | |
Navarro-Caceres et al. | An evaluation of a metaheuristic artificial immune system for household energy optimization | |
Pappala et al. | Unit commitment under wind power and demand uncertainties | |
Zhan et al. | Comparing model predictive control and reinforcement learning for the optimal operation of building-PV-battery systems | |
Zhu et al. | Memetic algorithm for solving monthly unit commitment problem considering uncertain wind power | |
Molderink et al. | On the effects of MPC on a domestic energy efficiency optimization methodology | |
Hu et al. | Energy Management for isolated renewable-powered microgrids using reinforcement learning and game theory | |
Xiong et al. | Optimizing electricity demand scheduling in microgrids using deep reinforcement learning for cost‐efficiency |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20101217 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20110614 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120312 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120417 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120605 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130226 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130301 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160308 Year of fee payment: 3 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |