EP3400161A1 - Track installation and method for operating a track installation - Google Patents
Track installation and method for operating a track installationInfo
- Publication number
- EP3400161A1 EP3400161A1 EP17705372.5A EP17705372A EP3400161A1 EP 3400161 A1 EP3400161 A1 EP 3400161A1 EP 17705372 A EP17705372 A EP 17705372A EP 3400161 A1 EP3400161 A1 EP 3400161A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- train
- train protection
- section
- protection device
- leading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000005540 biological transmission Effects 0.000 claims abstract description 6
- 238000004891 communication Methods 0.000 claims description 17
- 230000006854 communication Effects 0.000 claims description 17
- 108090000623 proteins and genes Proteins 0.000 claims description 2
- 238000011161 development Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L7/00—Remote control of local operating means for points, signals, or track-mounted scotch-blocks
- B61L7/06—Remote control of local operating means for points, signals, or track-mounted scotch-blocks using electrical transmission
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L11/00—Operation of points from the vehicle or by the passage of the vehicle
- B61L11/08—Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/04—Electrical locking and release of the route; Electrical repeat locks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
- B61L27/37—Migration, e.g. parallel installations running simultaneously
Definitions
- the invention relates to a railway engineering installation with Wenig ⁇ least one track section in which a schaltba ⁇ res adjusting element is arranged at least, and at least two au ⁇ tonomen trackside train protection systems, which in each case for a command from having an associated vehicle-side train control device equipped Vehicles are formed on the at least one section. Furthermore, the invention relates to a method for operating a railway installation, which has at least one Streckenab ⁇ section with at least one switchable actuator and the at least two autonomous trained for a train protection equipped with an associated vehicle-side train protection vehicles on the stretch track-side train protection facilities.
- Trains and vehicles are therefore to be operated on a stretch of road with various train control facilities. This can for example be realized in that all trains and vehicles are equipped with two train control devices. However, this solution is expensive and expensive.
- train control device tolerates a foreign train, but can not control. This tolerated train must be controlled by a driver and must a certain maximum speed ⁇ how, not exceed, for example, 30 km / h exceeded. Driverless, such tolerated trains can not drive.
- the object of the present invention vorzuschla ⁇ conditions a railway technical system and a method for operating a railway installation of the type mentioned, which enables the automatic operation of vehicles with different vehicle-side train protection device.
- the above-mentioned railway technical system achieves this object by virtue of one of the train protection devices being connected to the at least one control element and thereby being designed as a train protection device leading to the road section and at least one interface formed between the leading train protection device for the transmission of at least one information and the at least one further train protection device is provided.
- the solution according to the invention has the advantage that one of the train control devices has the sovereignty over the control elements and controls these on request for the other or the other Zu ⁇ gommes wornen. This gives a clear role distribution.
- the leading train control device reports the control of the control elements using the Interface to the subordinate train protection device, which can then drive the vehicle assigned to it on the common ⁇ route section.
- the interface according to the invention enables communication between the autonomous train control devices, by means of which a guest road can be requested by a subordinate train protection device at the leading train protection device and provided by the leading train protection device.
- At least one piece of information about the at least one adjusting element can be transmitted by the interface.
- This has the advantage that a successful control of the desired actuating elements, which are, for example, signals or points, can be signaled in a simple manner.
- the desired actuating elements which are, for example, signals or points
- the desired actuating elements can be signaled in a simple manner.
- the position of all control elements in Streckenabschitt can be reported.
- At least one piece of information about a provision of at least one predetermined route on the route section or its status can be transmitted by the interface.
- the standby position ⁇ a requested host route can be displayed by a single signal via the interface.
- the system can be at least two Anlagenêt- / Werleit-facilities that are designed to coordinate the train traffic and each one of the Zu ⁇ gommes drivenen are assigned, and at least one have formed between the Werêt- / Werleit-trained further interface for the transmission of information.
- This has the advantage that not all information about the interface between the Werstenseinrichtun- gene must be replaced, but a further interface ⁇ is available.
- the train / train management facilities can have a lower security requirement than the train control facilities, so that non-safety-relevant information can be easily transmitted via the further interface of the train control / train management facilities.
- the interface Zvi ⁇ rule is relieved the command infrastructure and the system less complicated.
- the train control / Buchleit facilities represent an operational control level of the system and can also be referred to as ATS (Automatic Train Supervision).
- the system can have at least one non-switchable track element arranged in the road section, which is connected to all train control devices.
- a route element is, for example, an emergency stop button or a track release indicator device. Since the elements or the route with all known in the track section are connected to ⁇ gommes Rheinen, also each of the command infrastructure recognizes the current position of the egg nem vehicle in the road section irrespective of its vehicle-side train control device.
- the leading train protection devices may have at least one adjusting device connected to the switchable actuating elements, which is designed to control the adjusting elements.
- This adjusting device which may for example also be referred to as a signal box, is designed as a separate unit within the train protection device, for example on a separate computer.
- the leading train control device may comprise at least comprise at least one trackside route apparatus for communica tion with the vehicles ⁇ and off separately from the adjustment device is formed. This separation between the setting device and the distance device increases safety within the leading train protection device.
- the interface between the train control devices can be at least one
- Method may be transmitted between the leading train protection device and the at least one further train protection device at least one information relating to one or more of the control element.
- this has the advantage that, for example, a status of the adjusting elements can be displayed in a simple manner.
- At least one piece of information about a provision of at least one predetermined route on the route section or its status can be transmitted between the leading train protection device and the at least one further train protection device.
- both train control devices can resolve a set route, a ride of the vehicles in the Section be monitored by both the leading train control device as well as one of the other train control facilities.
- This one of the other train protection devices is the one to which the vehicle-side safety device of the vehicle is assigned.
- ⁇ through no communication from the child back to the leading train control is necessary, which simplifies the interface and method.
- the figure shows a schematic representation of a railway system according to the invention.
- FIG. 1 An exemplary embodiment of a railway engineering installation 1, as shown in the figure, a Stre ⁇ ckennetz 2 with a plurality of track sections, of which only a path section 3 is shown. Furthermore, the railway technical system 1 comprises two trackside Zu ⁇ gommes wornen 4, which secure train service autonomously operated vehicles 5 in the route network 2. The vehicles 5 of the railway installation 1 each have exactly ei ⁇ ne vehicle-side train control device 6, which are designed for communication with one of the trackside train control devices 4.
- the train protection device 4 and also other multiple components of the system 1 are partially provided to distinguish in addition with letters, such as the train control devices 4a, 4b. If the number without letters is mentioned as the reference symbol , all components should be included. Thus, the train control devices 4 are the train control devices 4a or 4b to understand.
- the route network 2 of the railway system 1 also has in the figure, not shown sections on which, from one of the two train protection devices 4a, 4b are secured and thus can be driven only by vehicles 5, which are formed with the corresponding vehicle-side train protection device 6.
- the section 3 shown in the figure is, for example, a depot or a car wash, which is to be used by all vehicles 5 independently of the assignment of their vehicle-side train protection device 6.
- the track section 3 has a plurality of switchable Sachlemen ⁇ te 7, such as signals 8 and 9 points, non-switchable stretch ⁇ elements 10, such as emergency stop or Gleisokomelde sensoryen, and position marks IIa, IIb, such as
- the adjusting elements 7, the position marks 11 and the track elements 10 are shown in the figure for the sake of simplicity only at one position, although these are of course distributed as usual in the track section 3.
- the track-side train protection devices 4a, 4b each have a track-side communication device 12a, 12b, which is designed in each case for communication with corresponding vehicle-side communication devices 13a, 13b of the associated vehicles 5.
- the communication devices 12, 13 and the train protection devices 4, 6 are designed, for example, for a CBTC (Communication Based Train Control) communication.
- the track-side train protection devices 4a, 4b each have an adjusting device 14 and a distance device 15.
- the switchable control elements 7 are signal technology exclusively connected to the trackside train protection device 4b and in particular their control device 14b.
- the adjusting elements 7 can be controlled only by the distance-soapy train protection device 4b, whereby the track-side train protection device 4b is designed as a leading train protection device for the track section 3.
- the non-switchable track elements 10 are connected to both track-side train protection devices 4a, 4b and in particular their adjusting devices 14a, 14b.
- the interface 16 has a switching module 17, which is designed, for example, as an I / O relay module.
- the switch assembly 17 is connected to the leading track-side train protection device 4b and the output side to be designated as subordinate track-side train protection device 4a.
- the switch assembly 17 is single ⁇ Lich designed for communication in one direction, in the direction of the leading train protection device 4b to the subordinate train protection device 4a.
- the railway engineering installation 1 further comprises in the beispielhaf ⁇ th embodiment of the figure, two Anlagenêt- / train control devices 18a, 18b, each one of the trackside train protection systems 4a, 4b associated.
- the Switzerlandbericht- / Switzerlandleit devices 18a, 18b provide a management level of the railway system 1, and stel ⁇ len one as ATS (Automatic Train Supervision) known single direction.
- ATS Automatic Train Supervision
- Between the Switzerlandêt- / Switzerlandleit devices 18a, 18b is a further Interface 19 formed.
- the train control / rail device 18a is connected to the secondary train protection device 4a and the train / rail device 18b is connected to the leading train protection device 4b.
- the vehicle 5a is intended, for example, to drive on the section 3 on a predetermined route. For example to drive to a used by all vehicles 5a, 5b car wash. On the section 3 at a certain ⁇ number of known routes is also possible. In this case, a specific control of the switchable actuating elements 7 is necessary for each route.
- the switch assembly 17 has in the here ge ⁇ showed exemplary embodiment, for each route a safe I / O signal on, for example by means of a re ⁇ relay (not shown).
- the train control / Werleit device 18a which is associated with the vehicle 5a and the train protection device 4a, the desired route at the Switzerlandêt- / Buchleit device 18b requested.
- This request is transmitted via the further interface 19, which is designed, for example, as a network interface.
- the ge ⁇ wished route will be ⁇ draws to as guest driveway because the vehicle 5a it were a guest for the tier ⁇ -saving train control device 4b.
- the Switzerlandêt- / Buchleit device 18b receives the request for the guest road and gives it to the track-side Wersiche ⁇ tion device 4b and in particular to the adjusting device 14b on.
- the adjusting device 14b controls, as soon as possible, the necessary for the guest road control elements 7, ie signals 8 and switches 9, and thereby provides the guest ⁇ driveway.
- the leading Switzerlandsi ⁇ cherungs worn transmitted 4a 4b is a representative for providing the host route information via the interface 16 to the subordinate train control device.
- the transmission of this information by the switching of the corresponding safe I / O signal by means of a relay of the switching module 17, which has been agreed for the provision of the predetermined guest road and representative.
- the train control / lane facility 18a has informed the child platoon 4a that the guest road has been requested. Is thereby expected the subordinate train control device 4, the information via the interface 16.
- the guest road is allowed by the whilinrich ⁇ device 14a and passed within the train protection device 4a a corresponding message to the route device 15a.
- the route devices 15a, 15b may also be referred to as WCU (Wayside Control Unit).
- ⁇ chd is a release message, a so-called Movement Authority, transmitted from the trackside communication device 12a at the tension-side communication device 13a of the vehicle 5a.
- the autonomously operated vehicle 5a travels along the provided hospitality road. Since position marks IIa, IIb are arranged on the track section 3 for both vehicle types 5a, 5b, the vehicle 5a can determine its position accordingly.
- the track members 10, in particular the train detection systems give examples the trackside train protection systems 4a, 4b feedback concerning the travel of the vehicle 5 so that a driving road ⁇ resolution by both trackside train protection systems 4a, 4b is monitored.
- the inventive method is particularly advantageous because only for vehicles 5a of the subordinate train protection device 4a a guest road must be requested. That happens only occasionally. Otherwise takes over the leading train protection device 4b the train protection of the section 3 alone.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102016203694.7A DE102016203694A1 (en) | 2016-03-07 | 2016-03-07 | Railway installation and method for operating a railway installation |
PCT/EP2017/053268 WO2017153132A1 (en) | 2016-03-07 | 2017-02-14 | Track installation and method for operating a track installation |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3400161A1 true EP3400161A1 (en) | 2018-11-14 |
EP3400161B1 EP3400161B1 (en) | 2021-12-22 |
Family
ID=58046660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17705372.5A Active EP3400161B1 (en) | 2016-03-07 | 2017-02-14 | Track installation and method for operating a track installation |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3400161B1 (en) |
CN (1) | CN108778890B (en) |
DE (1) | DE102016203694A1 (en) |
ES (1) | ES2908575T3 (en) |
WO (1) | WO2017153132A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102019204135A1 (en) * | 2019-03-26 | 2020-10-01 | Siemens Mobility GmbH | Method for the mixed operation of a track-bound route section with a switch as well as a route section and a switch |
DE102019211966A1 (en) * | 2019-08-09 | 2021-02-11 | Siemens Mobility GmbH | Track-bound route section, equipped with an automatic train protection system and procedures for its operation |
CH718466A2 (en) * | 2021-03-22 | 2022-09-30 | Stadler Rail Ag | Procedure for the partial dissolution of routes, CBTC system and rail vehicle. |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2348034A (en) * | 1999-03-17 | 2000-09-20 | Westinghouse Brake & Signal | An interlocking for a railway system |
CN2653788Y (en) * | 2003-07-30 | 2004-11-03 | 深圳市思科泰技术有限公司 | Full compatible locomotive radio station |
DE102004042979A1 (en) * | 2004-08-31 | 2006-03-16 | Siemens Ag | System for the safe operation of track-bound trains on tracks |
CN101007537A (en) * | 2007-01-26 | 2007-08-01 | 北京交通大学 | Universal automatic protection (ATP) vehicle-mounted system for train and its mode control method |
CN100536456C (en) * | 2007-01-29 | 2009-09-02 | 北京交通大学 | Communication-based interconnected and intercommunicated I-CBIT train operation control system |
DE102007032805A1 (en) * | 2007-07-10 | 2009-01-15 | Siemens Ag | Method and system architecture for secure single-channel communication for controlling a safety-critical rail operation process |
DE102008045050A1 (en) * | 2008-08-27 | 2010-03-04 | Siemens Aktiengesellschaft | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control |
DE102011082598A1 (en) * | 2011-09-13 | 2013-03-14 | Siemens Aktiengesellschaft | control arrangement |
WO2014011887A1 (en) * | 2012-07-11 | 2014-01-16 | Carnegie Mellon University | A railroad interlocking system with distributed control |
US9718487B2 (en) * | 2014-02-18 | 2017-08-01 | Nabil N. Ghaly | Method and apparatus for a train control system |
-
2016
- 2016-03-07 DE DE102016203694.7A patent/DE102016203694A1/en not_active Ceased
-
2017
- 2017-02-14 WO PCT/EP2017/053268 patent/WO2017153132A1/en active Application Filing
- 2017-02-14 CN CN201780015092.2A patent/CN108778890B/en active Active
- 2017-02-14 ES ES17705372T patent/ES2908575T3/en active Active
- 2017-02-14 EP EP17705372.5A patent/EP3400161B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP3400161B1 (en) | 2021-12-22 |
CN108778890B (en) | 2021-11-12 |
CN108778890A (en) | 2018-11-09 |
ES2908575T3 (en) | 2022-05-03 |
DE102016203694A1 (en) | 2017-09-07 |
WO2017153132A1 (en) | 2017-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3400160B1 (en) | Railway-technical installations and method for operating a railway-technical installation | |
EP3405377A1 (en) | Ato device, rail vehicle and method for the automated driving of a rail vehicle | |
EP3247609A1 (en) | Method and device for automatically influencing track-bound vehicles | |
EP2874857B1 (en) | Operating a rail vehicle by means of an etcs device, railvehicle and apparatus | |
EP2170673A1 (en) | Method and arrangement for the operation of a railroad line | |
DE102004001818B3 (en) | Operating system for rail transport | |
EP2307256B1 (en) | Method and device for operating a railroad security system | |
WO2017153132A1 (en) | Track installation and method for operating a track installation | |
EP3124351A1 (en) | Method for retrofitting existing railway network parts with the train securing system etcs | |
EP3036146B1 (en) | Operation of a rail vehicle | |
EP2790994A2 (en) | System for controlling, securing and/or monitoring travel paths of track-bound vehicles and method for operating such a system | |
EP2663483B1 (en) | Arrangement for european train control system level 2 (etcs l2) train control | |
DE102019209395A1 (en) | Train and method of operating a train | |
EP2088051B1 (en) | Method and device for secure setting of a route for a rail vehicle | |
EP2819907B1 (en) | Method for the auxiliary operation of a track element and operation control system | |
WO1995007832A1 (en) | Traffic control system to control operations and traffic flow in rail transport | |
EP3092162B1 (en) | Method for controlling a rail vehicle connected to a cbtc system and cbtc system with at least one rail vehicle | |
DE102011054422A1 (en) | Protection system for intermittent protection of rail vehicle i.e. train, has signal detection unit transferring determined driving road information to data balise to transmit information as further information to rail vehicle | |
DE9411793U1 (en) | Train protection system with transition to ZUB operation in the event of vehicle-side ATP faults | |
WO2017045863A1 (en) | Communication device and method for automatically exchanging messages in a railway system | |
DE102016217905A1 (en) | Monitoring a rail vehicle | |
DE102016217900A1 (en) | Monitoring a rail vehicle | |
DE102019212790A1 (en) | Rail vehicle and procedure for its operation | |
DE19927023A1 (en) | Method of setting call times in railway radio-drive mode reliably prevents unwanted operational disturbances caused by different reaction times of the different types of track elements | |
DE3107102A1 (en) | System for controlling train, route and traction currents |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180808 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY GMBH |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20210722 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502017012293 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1456883 Country of ref document: AT Kind code of ref document: T Effective date: 20220115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220322 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20211222 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2908575 Country of ref document: ES Kind code of ref document: T3 Effective date: 20220503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220322 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220323 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220422 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502017012293 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220422 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220228 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220214 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
26N | No opposition filed |
Effective date: 20220923 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220228 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220214 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220228 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220228 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1456883 Country of ref document: AT Kind code of ref document: T Effective date: 20220214 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220214 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170214 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240304 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240418 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240521 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211222 |