- EP3049591A1 EP3049591A1 EP14830792.9A EP14830792A EP3049591A1 EP 3049591 A1 EP3049591 A1 EP 3049591A1 EP 14830792 A EP14830792 A EP 14830792A EP 3049591 A1 EP3049591 A1 EP 3049591A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- profile
- carrier
- longitudinal axis
- scaffold
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 20
- 239000010959 steel Substances 0.000 claims abstract description 20
- 239000002184 metal Substances 0.000 claims abstract description 12
- 229910052751 metal Inorganic materials 0.000 claims abstract description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 11
- 230000000694 effects Effects 0.000 claims description 6
- 230000001154 acute effect Effects 0.000 claims description 3
- 239000011248 coating agent Substances 0.000 claims 1
- 238000000576 coating method Methods 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 11
- 210000002414 leg Anatomy 0.000 description 65
- 238000005452 bending Methods 0.000 description 9
- 238000003780 insertion Methods 0.000 description 9
- 230000037431 insertion Effects 0.000 description 9
- 239000000463 material Substances 0.000 description 7
- 210000000078 claw Anatomy 0.000 description 6
- 239000000725 suspension Substances 0.000 description 5
- 210000000689 upper leg Anatomy 0.000 description 5
- 238000003860 storage Methods 0.000 description 4
- 230000032258 transport Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 229910001208 Crucible steel Inorganic materials 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 229910001060 Gray iron Inorganic materials 0.000 description 1
- 229910001296 Malleable iron Inorganic materials 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 210000004072 lung Anatomy 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 108090000623 proteins and genes Proteins 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/306—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
- E04G7/307—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect with tying means for connecting the bars or members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/152—Platforms made of metal or with metal-supporting frame
Definitions
- the invention relates to a scaffold bars made of metal with an elongated rod-shaped, preferably We ⁇ sentlichen straight in the direction of a first Lhacksach ⁇ se in a first longitudinal direction, preferably rectilinear, extending carrier profile of steel, which, first in the
- a carrier profile width, a carrier profile height and a carrier profile wall thickness has, and the one when viewed in an installed position upper, Auflagerand or, considered in the installed position upper, Auflager selected for laying and / or hanging a scaffold decking or multiple scaffold planks, and wherein the carrier profile two in opposite directions in the first
- Such scaffold bars are from the practice and from the prospectus of the applicant "Catalog and price list” for "Layher Allround scaffolding system", Issue 01.03.2007, in the form shown there on page 8 and as “O-bar, ver ⁇ strengthens” and “U-bars, reinforced” have become known Gerüstrie ⁇ gel.
- the reinforcing profile of this bar has a V-shaped cross-section and the inner cross-section ⁇ is triangular.
- the reinforcing profile is by folding or bending a substantially flat plane
- Connection heads and have a downwardly projecting Un ⁇ tergurt profile in the form of a round tube.
- the lower belt-Pro ⁇ fil is also referred to as "chord-Q-Profile”.
- the round tube is welded to the ends of its upward rankwin ⁇ celt pipe parts to the upper flange profile.
- the lower flange O-profile is also connected to the upper flange profile by welding via a plurality of support plates spaced apart from one another in the longitudinal direction of the "double lock” and each providing a vertical spacing Stützplat ⁇ th likewise consist of a yield strength of about 320 N / mm 2 comprising steel material.
- such a “double-pel-bars” Although comprises opposite said “O-Riegln” and “U-bars” a greater bending strength or Tragfä ⁇ ability on, but a significantly larger overall height.
- This can lead to disabilities in the passage of people on the ground or on. walk the scaffolding floors of a lower floor.
- Apart from the ⁇ sen disadvantages such "double bars” are comparatively expensive.
- a first inventive scaffold ⁇ bolt with its U-reinforcement profile between the U-profile leg of the U-beam profile of a second inventive Gerüstriegels is inserted, wherein, in a perpendicular to the respective second longitudinal axis As seen in the cross-sectional view, the base profile of the U reinforcement profile of the first structural beam at an insertion distance to the ends of the U-profile legs of the U-beam profile of the second framework beam in one with the U-profile.
- Legs and the base profile of the U-beam profile of the second frame rack limited U-carrier profile interior can be arranged or arranged. According to one embodiment, it may be provided that the
- U-reinforcement profile height at least by a factor of 1.3 or 1.5 or 1.6 or 1.7 is greater than the U-gain profile width.
- the computational ratio of U-gain profile height to U-gain profile width is at least 1.3 or at least 1.5 or Minim ⁇ least 1.6 or at least 1.7.
- the factor or the ratio is greater than 1.7.
- the U-Verstär ⁇ effect profile width by at least or more than three ⁇ fold, or at least or more than four times or at least or more five-fold or we ⁇ iquess or more than six times the wall thickness of the carrier profile is smaller than the carrier profile width measured in a same direction as the U-reinforcement profile width.
- the U-gain profile width by at least 10 Pro ⁇ centrally or at least 20 percent or at least 25 percent or at least 30 percent smaller than that in the same direction as the U-Verstärkungsprofil- may be provided Width measured beam profile width.
- the U-profile legs have at their fixing end ⁇ leg-wall parts, the legs of the U-profile in a direction towards one another or off folded inwards or are bent off or and those at theirs
- Carrier profile associated ends have the attachment ends on ⁇ . This not only greater stiffening and thus a greater flexural strength and load capacity is achieved, but also a safe manual handling ability, because sharp edges can be avoided.
- the U-profile legs in the region of their fastening Having leg-wall portions have, which are bent away from the U-profile legs in a direction away from each other or to the outside or bent or bent and which have at their ends associated with the carrier profile, the mounting ends.
- leg wall parts viewed in a cross section running perpendicular to the second longitudinal axis, are bent away from the U profile legs by an angle or are bent off or bent over. This allows a simple and inexpensive production.
- this angle can take a value between 95 degrees and 145 degrees. In particular, this angle can be about 120 degrees.
- the angle is an acute angle, that is, less than 90 degrees and greater than zero degrees.
- this angle can be a value between 20 degrees and 70 degrees. In particular, this angle can be about 45 degrees.
- correspond ⁇ is the outer diameter of the carrier profile is a circular tube with one of the support profile and the carrier profile width-height.
- the carrier profile is a U-carrier profile which, viewed in a cross-section perpendicular to the first longitudinal axis, is in the
- Substantially over the entire carrier profile length has a U-shaped U-profile cross-section and in an opening away from the U-reinforcement profile opening direction, in the installed position upwards, is open, and with a extending in the first longitudinal direction base Is designed, which, considered in a perpendicular to the first longitudinal axis ⁇ cross-section, a base Pro ⁇ fil width, wherein bent from the base profile two ⁇ lateral U-profile leg or um- or are bent substantially perpendicularly from the base
- the support ends of the U-profile legs are formed by folds or bends, wherein the U- Profile legs about each preferably about 180 degrees inward in one of the U-profile legs and the Basispro ⁇ fil limited U-carrier profile interior or bent over or bent or bent leg wall parts of leg ends have, the itself, preferably parallel to each other, in
- the U-reinforcement profile width considered in a cross section running perpendicular to the second longitudinal axis, is slightly smaller than the transverse inner spacing between the U-profile legs or the
- the U-carrier profile and / or the U-gain profile symmetrical with respect to a contained the first longitudinal ⁇ axis and the second longitudinal axis of longitudinal symmetry is - formed trieebene and / or arranged or are.
- the invention also relates to an arrangement of a first inventive Gerüstriegels, in particular according to one of claims 1 to 12, and a second Gerüstriegels invention, in particular double U-Gerüstriegels, in particular ⁇ special according to one of claims 9 to 12, wherein the U-reinforcement profile of first scaffold bar between the underground
- Profile leg or the leg wall parts of the U-carrier profile of the second scaffolding crossbar is inserted with little lateral play, preferably so that or wherein, viewed in a direction perpendicular to the respective second longitudinal axis cross-section, the base profile of
- U-reinforcing profiles of the first scaffold bar in a Einstecka- distance to the ends of the U-profile legs of the U-beam profile of the second scaffold tower in a limited with the U-profile legs and the base profile of the U-beam profile of the second scaffolding frame U Carrier profile interior is arranged. This makes it possible to stack a ⁇ order of at least two inventive scaffolding bars reach wherein "nested together" transports the at least two frame bars and / or can be stored thereby reduces the loading volume of the.
- a be Hetcher as a double-U-frame latch first framework bars, in particular according to one of claims 9 to 12, with its U-reinforcement profile between the U profile legs or the leg-wall parts of the U-carrier profile of the second scaffolding crossbar, which can also be marked as a double U-scaffold, with little lateral clearance.
- the inserted into the U-carrier profile interior of the U-beam profile of the second scaffold bar U-reinforcement profile of the first scaffold bar with its base profile on the base profile of the U-beam profile of the second scaffold bar is applied.
- the base profile of the U-gain profile of the first stand bar to the base profile of the U-carrier profile of the second scaffolding crucible rest. Since ⁇ through security against lateral tilting during storage and / or transportation of scaffolding bolt can be further increased.
- the U-beam profile and / or the U-reinforcement profile may or may be by forming, in particular by Ab- or
- Reinforcement made of a steel sheet material or consist which has a yield strength which is least ⁇ least 450 N / mm 2 to 470 N / mm 2 or at least 460 N / mm 2 .
- S460 or the carrier profile and / or the U-carrier profile are made of steel material S460.
- the use of such a high-strength steel material allows a significantly improved flexural strength or load-bearing capacity of the scaffold bar produced therefrom.
- connection head can preferably be designed with an upper header and a lower head part, between which a forwardly open slot connection head for attaching the arrival at the with an opening, preferably several openings, provided Befest Trentsele ⁇ ment, such as mounting flange, preferably Ro ⁇ sette, in particular perforated disc can be formed.
- the connection head can have at least one wedge opening or at least two wedge openings for insertion or insertion of the wedge
- connection head When the connection head is formed with an upper head part and a nether head part and a or the formed therebetween slot, both the upper head portion and the lower crown part can be provided with wedge apertures for the passage of the connection ⁇ wedge.
- the connection head may be formed with the vertical in the A ⁇ bauwolf side surfaces.
- the slot may also be open to the side surfaces be designed.
- the side surfaces can draw forming one vorzugswei ⁇ se 40 to 50 degrees, particularly about 44 degrees or about 45 degrees or about 46 degrees, the wedge angle including ⁇ SEN, wherein the side faces to the front in the direction of a center, preferably on a stick and / or Scheibenzent ⁇ rum a perforated disc attached to a handle, and / or in the direction of a central axis of the scaffold element, ⁇ preferably scaffold tube, in particular in the direction of a stem axis of a scaffold stem, tapering may be formed.
- the connection key may be preferably captively attached to the connecting head, preferably by means of its removal from, in particular being pulled out, the connection head, preventing the fuse element, wherein ⁇ game as a rivet. It is understood, however, that the respective connection head can also be designed differently.
- connection head with a transversely, preferably ⁇ preferably approximately perpendicular to the first longitudinal axis of the ers ⁇ th U-profile and in the installed position downwards, in particular below the first U-profile surface of the first U-profile, extending Be provided lapel.
- this lug of the connection head in the vertical direction or in the direction of a fürbrechungs ⁇ axis of at least one opening of the fastening ⁇ elements on the fastening element of the scaffold element are releasably attached or be.
- connection head in such a way at the at least one opening having fastener be releasably be ⁇ be fastened or fixed, that its plug ⁇ nose is inserted through the opening of the fastener in the vertical direction or is.
- the fastening element may be preferably a least one opening, preferably a plurality in the circumferential direction, preferably at equal circumferential waving, arranged into ⁇ particular of 45 degrees, offset from each other perforations having rosette, particularly hole ⁇ disk, a structural element, preferably a Framework ⁇ tube, in particular a scaffold handle act.
- the invention also relates to an arrangement and / or a scaffolding frame and / or a scaffold, with at least two ver ⁇ tical scaffolding tubes or scaffolding posts, to each of which at least one versehe with at least one aperture ⁇ nes fastener, in particular mounting flange, preferably rosette, in particular perforated disc , Is attached to which a scaffold bar according to the invention, in particular ⁇ re according to one of claims 1 to 12, fixed in such a way that each connection head by means of the respective, inserted through the respective opening of the respective fastener connection wedge is releasably secured or wedged.
- the invention also relates to an arrangement and / or a scaffolding frame and / or a scaffold, with at least two, preferably at least four, vertical scaffolding tubes or scaffold posts on which, or at which, in each case, a carrier ⁇ profile, in particular U-carrier profile, one Scaffold component is attached to which a scaffold bar according to the invention, in particular according to one of claims 1 to 12, by means of at least one hanging claw or suspension claw, preferably detachable, placed on and / or hung before ⁇ .
- Figure 1 is a three-dimensional view of an assembled in egg ⁇ ner mounting position on the perforated discs of two scaffolding poles stand bar according to a first embodiment.
- Fig. 2 is a side view of the Gerstriegel, wherein the
- Fig. 3 is a plan view of the scaffolding crucible
- FIG. 4 is an enlarged side view of the Gerüstrie ⁇ gel in the region of the end shown on the left in Figure 2 with a partial section in the connection region of a connection head.
- 5 is an enlarged plan view of the Gerstriegel in the region of its end shown in Figure 2 right;
- FIG. 6 shows a side view of a scaffold bar according to a second embodiment
- Fig. 7 is a plan view of the Gerstriegel of FIG.
- FIG. 12.1 to 12.3 views of a first Shifsvari ⁇ ante a stacking arrangement of two nested framework bars according to the first embodiment, in which
- Fig. 12.2 is a plan view and Fig. 12.3 shows a cross section along the section lines 12.3, 12.3 in Fig. 12.1;
- Fig. 13.2 is a plan view
- 14.1 to 14.3 are views of a thirdticiansva ⁇ variant of a stack arrangement of two ineinan ⁇ nested Gerüstriegeln according to a sixth embodiment, which are similar ge ⁇ staltet, as in the second embodiment ⁇ example, where
- Fig. 14.2 is a plan view
- Fig. 14.3 is a cross section along the section lines
- scaffold bars 20.1 to 20.6 shown in all figures are common: It is in each case to scaffold bar
- the scaffold bars 20.1 to 20.6 made of, preferably galvanized, metal.
- the scaffold bars 20.1 to 20.6 each comprise a carrier ⁇ profile 21.1, 21.2 made of steel or steel sheet and a welded thereto U-reinforcement profile 22.1, 22.2 steel ⁇ sheet.
- the elongated, rod-shaped, straight carrier profile 21.1, 21.2 extends in the direction of a first longitudinal ⁇ axis 23 in a first longitudinal direction. 24.
- the carrier profile 21.1, 21.2 has in the first longitudinal direction 24 considered, a carrier profile length 25 and a carrier profile
- the carrier profile 21.1, 21.2 has, viewed in a direction perpendicular to the longitudinal direction 24 transverse ⁇ section , a carrier profile width 27.1, 27.2, a perpendicular measured carrier profile height 40.1, 40.2 and a carrier profile wall thickness 28.1, 28.2.
- the support ⁇ profile 21.1, 21.2 has at least one, viewed in an installation ⁇ position 29 upper, support edge 30.1 or has, in an installed position considered upper, support edges ⁇ 30.2.1, 30.2.2, for laying and / or hanging a Gerüstbelags 31 or more scaffolding pads 31 on.
- the carrier profile 21.1, 21.2 has two in opposite directions ⁇ put in the first longitudinal direction 24 voneinan ⁇ the path extending support profile ends 32.1, 32.2 on each of which a fastening means 33; 33.1, 33.2 made of metal for attaching the scaffold bars 20.1 to 20.6 are attached to other scaffolding components directly or indirectly by welding.
- the elongate, rod-shaped, straight, U-reinforcing profile 22.1, 22.2 is, on a in the installed position 29, a bottom 34 forming side of the carrier profile 21.1,
- the U-reinforcement profile 22. 1, 22. 2 extends in the installed position 29. tet below the carrier profile 21.1, 21.2. It is essentially below the support section 21.1, arranged ⁇ 21.2.
- the U-gain profile 22.1, 22.2 extends towards a second longitudinal axis 43 in a second longitudinal direction 44 parallel to the support section 21.1, 22.2 and parallel to the first longitudinal axis 23 under Studentsbrü ⁇ ckung the carrier profile longitudinal center 26 along the Rauchpro ⁇ fils 21.1 , 21.2 continuously over a reinforcing profile length 45, which corresponds to at least half of the carrier profile length 25 of the carrier profile 21.1, 21.2.
- the Rauchpro ⁇ fil length 25 may for example be 2924 mm.
- the reinforcing profile length 45 may be for example 2424 mm. It is understood, however, that other lengths and / or combinations of lengths are possible.
- the first longitudinal axis may be 2924 mm.
- the profile ends 37.1, 37.2 of the U-reinforcement profile 22.1, 22.2 to the carrier profile ends 32.1, 32.2 of the carrier profile 21.1, 21.2 each have a longitudinal spacing 38.1, 38.2. This may preferably be about 100 mm or about 250 mm.
- the U-gain profile 22.1, 22.2 has, viewed in a perpendicular ⁇ extending right to the second longitudinal axis 43 cross-section, substantially over its entire Verstär ⁇ effect profile length 45 has a substantially U-shaped U-profile cross-section 39.1, 39.2 at.
- the U-reinforcement profile 22.1, 22.2 is in the second longitudinal direction 44 extending, flat, plate-shaped base profile 46 designed.
- the base profile 46 has, in a perpendicular to the second longitudinal axis 43 extending cross-section ⁇ tet, a base profile width 47 on. Of the base profile 46, two lateral U-profile legs 48.1.1, 48.1.2;
- the U-profile legs 48.1.1, 48.1.2; 48.2.1, 48.2.2 have the carrier profile 21.1, 21.2 associated Fixed To ⁇ confining ends 49.1.1, 49.1.2; 49.2.1, 49.2.2, which are welded to the underside 34 of the carrier profile 21.1, 21.2 or via which the U-reinforcement profile 22.1, 22.2 is welded to the carrier profile 21.1 21.2.
- the U-reinforcement profile 22.1, 22.2 has a U-reinforcement profile width corresponding to the transverse spacing or the base profile width 47 and a spacing of the attachment profile.
- the respective U-gain profile 22.1, 22.2 Wanddi ⁇ a bridge 52 of about 2.5 mm.
- the U-reinforcement profile height 50.1, 50.2 is greater than the carrier profile height 40.1, 40.2 measured in the same direction as the U-reinforcement profile height 50.1, 50.2.
- the U-reinforcement profile height 50.1, 50.2 is greater than the carrier profile height 40.1, 40.2 measured in the same direction as the U-reinforcement profile height 50.1, 50.2.
- the U-reinforcement profile height 50.1, 50.2 is greater than the carrier profile height 40.1, 40.2 measured in the same direction as the U-reinforcement profile height 50.1, 50.2.
- the reinforcement profile height may be 59 mm and / or the gain profile width 34 mm.
- the U-profile legs 48.1.1, 48.1.2; 48.2.1, 48.2.2 of each ⁇ supplementary U-gain profile 22.1, 22.2 have in the region of its fastening ends 49.1.1, 49.1.2; 49.2.1, 49.2.2 Thigh Wall Parts 53.1.1, 53.1.2; 53.2.1, 53.2.2, which of the U-profile legs 48.1.1, 48.1.2; 48.2.1, 48.2.2 in one direction to each other or bent inward or bent or bent over.
- These leg wall parts 53.1.1, 53.1.2; 53.2.1, 53.2.2 have at their the carrier profile 21.1, 21.2 associated ends the attachment ends 49.1.1, 49.1.2; 49.2.1, 49.2.2, over which the U
- Reinforcement 22.1, 22.2 is welded to the support section 21.1, 21.2.
- the Carrier profile 21.1, 21.2 and the U-reinforcing profile 22.1, 22.2 each symmetrical to the first longitudinal axis 23 of the carrier profile 21.1, 21.2 and the second longitudinal axis 43 of the U-reinforcing profile 22.1, 22.2 longitudinal symmetry plane 36 formed. Furthermore, in all the exemplary embodiments shown, the carrier profile 21.1, 21.2 and the U-reinforcement profile 22.1, 22.2 are arranged symmetrically to the longitudinal symmetry plane 36 contained in the first longitudinal axis 23 of the carrier profile 21.1, 21.2 and the second longitudinal axis 43.
- the framework ⁇ latch 01/20 to 06/20 can also be referred to with stand lining support or may be employed for supporting scaffolding platforms 31 as shown, for example, with reference to FIG 1 using the example of the first embodiment of a scaffolding OF INVENTION ⁇ to the invention the latch 20.1.
- fastening means 33.1, 33.2 are provided in particular:
- connection head 33.1 made of metal for releasably securing the Gerustriegels 20.1 in the installed position 29 on a provided with at least one opening 56 fastener , preferably ⁇ a perforated disc 55, a scaffolding component, preferred example of a scaffold stick 41, be welded by means of a plug through the at least one opening 56 wedge 57.
- An arrangement of a scaffolding bar 20.1 according to the first exemplary embodiment that is releasably wedged onto two scaffolding posts 41, 41 in this manner is shown in particular in FIG.
- a erfindungsge ⁇ MAESSEN scaffold latch 20.2, 20.6 as the fastening means depending ⁇ wells a hook-shaped Einitatikralle or Ein rehabilitationklaue 33.2 from metal, in particular Steel, preferably made of galvanized steel, for releasable placement and / or hanging of the respective Gerstriegel 20.2, 20.6 in its installation ⁇ position 29 on and / or be welded to scaffolding components.
- the suspension claws or suspension claws 33.2 each have attachment holes delimiting suspension hammers which, viewed in the respective installed position 29, are open at the bottom.
- the leg-wall parts 53.1,1, 53.1.2 of the respective U-gain profile 22.1 in a perpendicular to the longitudinal axis of two ⁇ th Viewed 43 extending cross-section of the U-profile legs 48.1.1, 48.1.2 each bent at an obtuse angle 54.1.1, 54.1.2 or off or bent.
- this angle is 54.1.1, 54.1.2 each about 120 degrees.
- leg wall parts are 53.2.1,
- Angles 54.2.1, 54.2.2 each about 45 degrees.
- the carrier profile is a
- U-beam profile 21.1 The U-beam profile 21.1, viewed in a direction perpendicular to its longitudinal axis 23, ie to the first longitudinal axis 23, extending cross-section, substantially over the entire carrier profile length 25 has a substantially U-shaped U-profile cross-section 59.
- U-beam profile 21.1 is in a direction away from the U-gain profile 22.1, 22.2 opening direction, in the installed position 29 as viewed upwards, open.
- the U-carrier profile 21.1 is designed with a base profile 60 extending in the first longitudinal direction 24.
- Base profile 60 is designed substantially flat and plate-shaped.
- the base profile 60 has, in a running perpendicular to the first longitudinal axis 23 cross-section ⁇ tet, a base profile width 61 on.
- the base profile width 61 can be 49 mm.
- the U-profile legs 62.1, 62.2 are two lateral U-profile legs 62.1, 62.2 to ⁇ edged or reversed or bent.
- the U-profile legs 62.1, 62.2 extend substantially perpendicularly from the Base profile 60 away in a same direction and in one of the base profile width 61 corresponding transverse distance substantially parallel to each other, in the installed position 29 as viewed upwards.
- the U-beam profile 21.1 has a, preferably 53 mm amount, U-beam profile height 40.2.
- the U-beam profile 21.1 has a, preferably 2.5 mm amount, wall thickness 28.1.
- the wall thickness 28.1 of the U-beam profile 21.1 and the wall thickness 52 of the U-reinforcement profile 22.1, 22.2 are the same size.
- both the U-beam profile 21.1 and the U-reinforcement profile 22.1, 22.2 by forming, in particular on a roller ⁇ road, are produced.
- the U-profile legs 62.1, 62.2 of the U-beam profile 21.1 form in the region of their base profile 60 facing away, viewed in the installed position 29 upper, support ends 64.1, 64.2 Auflagerän- 30.1, 30.2.1, 30.2 .2 for laying and / or hanging of scaffold components, in particular of scaffold planks 31.
- the U-profile legs 62.1, 62.2 have in the region of their on ⁇ position ends 64.1, 64.2 a transverse inner spacing 66 to each other.
- the U-profile legs 62. 1, 62. 2 each have an inward turn of approximately 180 degrees into a U-carrier profile inner space 67 delimited by the U-profile legs 62. 1, 62. 2 and the base profile 60. bent or bevelled
- the transverse inner distance 66 may preferably be 36 mm.
- the transverse inner distance 66 between the U-profile legs 62.1, 62.2 or between the said leg wall parts 68.1, 68.2 of the U-carrier profile 21.1 is, in a direction perpendicular to the first and second longitudinal axis 23, 43 extending cross-section Consider ⁇ tet, slightly larger than the U-reinforcement profile width 47 of the U-gain profile 221st 22.2.
- the U-reinforcement profile width 47 may preferably be 34 mm.
- the U-gain profile width 47 as viewed in a direction perpendicular to the first and second Lijnsach ⁇ se 23, 43 cross section slightly smaller than the transverse internal clearance 66 between the U-profile legs 62.1, 62.2 or their leg wall parts 68.1, 68.2 of the U-carrier profile 21.1.
- this framework bolt 20.1, 20.2, 20.5, 20.6 can be inserted with its U reinforcement profile 21.1, 21.2 into the U-beam profile 21.1 of a second scaffold beam 20.1, 20.2, which is identical or identically designed, at least with regard to its carrier profile.
- Figure shown in a cross section approximately ⁇ fifth embodiment example of an inventive bar frame 11 and 20.5 in the example shown in the figures 14.1 to 14.3 sixth embodiment of a scaffold according to the invention 20.6 bar, are each a double
- U-frame bar This is in each case formed from a U-carrier profile 21.1 and a U-reinforcement profile 22.1, 22.2 welded thereto.
- the scaffold bar 20.1 according to the preferred first exemplary embodiment shown in FIGS. 1 to 8 and 12.1 to 12.3 has an overall height 71, preferably 112 mm.
- the support profile may be a
- Circular tube 21.2 act with one of the carrier profile width 27.2 and the carrier profile height 40.2 corresponding outer diameter 42.
- the outer diameter 42 may preferably be 48.3 mm.
- the wall thickness 28.2 of the round tube 21.2 may preferably be 2.7 mm. However, it can also be a another wall thickness, for example of 3.2 mm, exhibiting round tube be used.
- this scaffold 20.2 has at least one, preferably two, also as sword markable or designated Aushebeêt- fixing body 73.1, 73.2.
- FIGS. 12.1 to 14.3 show three alternative embodiments of stack arrangements 70.1, 70.2, 70.3, each of which is also referred to as an arrangement, in which two identical scaffold bars 20.1, 20.1; 20.2, 20.2; 20.6, 20.6 are arranged nested.
- Each of these At ⁇ orders 70.1, 70.2, 70.3 includes a first Invention ⁇ proper scaffolding bars 20.1, 20.2, 20.6 and a second frame bar 20.1, 20.2, 20.6 according to the invention, each with a U-bracket profile 21.1 and with a U-gain profile 22.1.
- the U-reinforcement profile 22.1 of the first scaffold crucible shown in the figures at the top is 20.1, 20.2, 20.6 between the U-profile legs 62.1, 62.2 of the U-beam profile 22.1 of the second bottom ge Service ⁇ th scaffold bars 20.1, 20.2, 20.6 inserted with little lateral play.
- 20.1, 20.2, 20.6 be in a with the U-profile legs 62.1, 62.2 and the base profile 60 of the U-beam profile 21.1 of the lower or second Gerustriegels 20.1, 20.2, 20.6 be ⁇ bound U-carrier profile interior 67 is arranged ,
- the first exporting ⁇ approximately variant of a stack array 70.1 shown in Figures 12.1 to 12.3 includes two identical frame bars 20.1, 20.1, which are arranged one inside another marach ⁇ telt. In each of these frame bars there is a frame locking 20.1 shown according to the particular in Figures 2 to 6 and 8 ⁇ first execution example.
- the two connecting heads 33.1, 33.1 of the first scaffolding bar 20.1 shown above are located on the two connecting heads 33.1, 33.1 of the second scaffolding bar shown below
- the insertion distance 74.1 is in front of ⁇ preferably about 40 mm to 41 mm. Between the base profile 46 of the U-reinforcement profile 22.1 of the inserted first girder 20.1 and the base profile 60 of the U-carrier profile 21.1 of the second girder 20.1 is a gap
- This gap 75.1 is for example about 10 mm.
- This first stack arrangement 70.1 has a stack height 76.1, preferably approximately 184 mm.
- the second exporting ⁇ approximately variant of a stack array 70.2 shown in Figures 1.13 to 3.13 also includes two identical frame bars 20.2, 20.2, which are arranged one inside ge ⁇ boxes. In each of these frame bars there is a scaffold in accordance with the special locking 20.2 into ⁇ in Figures 6 to 8 shown ⁇ second exporting approximately example. As can be seen from FIG.
- the first scaffold bar 20.2 shown above abuts the base profile 60 of its U-carrier profile 21.1 on or on the free ends of the lifting-out fixing bodies 73.1, 73.2, which are also referred to as a sword ,
- the insertion distance 74.2 is preferably about 21 mm.
- This gap 75.2 is for example about 29.5 mm.
- This second stack assembly 70.2 comprises a, preferably, about 212 mm ⁇ draw end stack-height of 76.2 in.
- the third exporting ⁇ approximately variant of a stack array 70.3 shown in Figures 14.1 to 14.3 also includes two identical frame bars 20.6, 20.6, which are arranged one inside another overall boxes.
- Each of these scaffold bars 20.6 according to the sixth embodiment is designed the same as that of the scaffold bars 20.2 according to the second embodiment variant shown in FIGS. 6 to 8, with the exception that in the case of the sixth embodiment variant shown here, those which can also be marked as a sword ⁇ recorded Aushebesch fixing are omitted.
- the insertion distance is 74.3 of the base profile 46 of the U-reinforcement profile 22.1 of the inserted upper or first girder lock 20.6 to the support ends 64.1, 64.2 of the U-profile legs 62.1, 62.2 of the U-beam profile 21.1 of lower or two ⁇ Gerdarstriegel s 20.6 maximizes.
- the insertion distance 74.3 is about 50 to 51 mm.
- This third Sta ⁇ pel arrangement 70.3 has a, preferably about 174 mm be ⁇ bearing, stack height 76.3.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL14830792T PL3049591T3 (pl) | 2014-01-17 | 2014-12-09 | Rygiel rusztowaniowy |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102014100498.1A DE102014100498A1 (de) | 2014-01-17 | 2014-01-17 | Gerüstriegel |
PCT/DE2014/100433 WO2015106734A1 (fr) | 2014-01-17 | 2014-12-09 | Longeron d'échafaudage |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3049591A1 true EP3049591A1 (fr) | 2016-08-03 |
EP3049591B1 EP3049591B1 (fr) | 2017-06-14 |
Family
ID=52423532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14830792.9A Active EP3049591B1 (fr) | 2014-01-17 | 2014-12-09 | Longeron d'échafaudage |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP3049591B1 (fr) |
AU (1) | AU2014377971B2 (fr) |
DE (1) | DE102014100498A1 (fr) |
ES (1) | ES2640393T3 (fr) |
PL (1) | PL3049591T3 (fr) |
WO (1) | WO2015106734A1 (fr) |
ZA (1) | ZA201603135B (fr) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102015109623A1 (de) | 2015-06-16 | 2016-12-22 | Wilhelm Layher Verwaltungs-Gmbh | Gerüstriegel und Stapelanordnung von wenigstens zwei Gerüstriegeln |
DE102016200868A1 (de) * | 2016-01-22 | 2017-07-27 | Peri Gmbh | Traggerüst |
DE102017107850A1 (de) | 2017-04-11 | 2018-10-11 | Alfix Gmbh | Gerüstriegel mit integriertem Unterzug |
EP3591140B1 (fr) | 2018-07-04 | 2021-06-16 | Tobler AG | Longeron lourd, échafaudage, procédé de fabrication d'un longeron lourd, procédé de fabrication d'un échafaudage |
CN111593870B (zh) * | 2020-06-08 | 2022-01-11 | 洛阳鼎桓电力科技有限公司 | 一种电路紧急抢修用协助支架 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4671382A (en) * | 1986-07-21 | 1987-06-09 | Harsco Corporation | Scaffolding system for sloped surfaces |
DE102012108020A1 (de) | 2012-08-30 | 2014-06-12 | Wilhelm Layher Verwaltungs-Gmbh | Doppel-U-Gerüstriegel |
DE102013102492A1 (de) | 2013-03-12 | 2014-09-18 | Wilhelm Layher Verwaltungs-Gmbh | Gerüstbelagträger |
-
2014
- 2014-01-17 DE DE102014100498.1A patent/DE102014100498A1/de active Pending
- 2014-12-09 EP EP14830792.9A patent/EP3049591B1/fr active Active
- 2014-12-09 ES ES14830792.9T patent/ES2640393T3/es active Active
- 2014-12-09 AU AU2014377971A patent/AU2014377971B2/en active Active
- 2014-12-09 PL PL14830792T patent/PL3049591T3/pl unknown
- 2014-12-09 WO PCT/DE2014/100433 patent/WO2015106734A1/fr active Application Filing
-
2016
- 2016-05-10 ZA ZA2016/03135A patent/ZA201603135B/en unknown
Also Published As
Publication number | Publication date |
---|---|
ES2640393T3 (es) | 2017-11-02 |
DE102014100498A1 (de) | 2015-07-23 |
ZA201603135B (en) | 2019-07-31 |
WO2015106734A1 (fr) | 2015-07-23 |
AU2014377971B2 (en) | 2016-11-24 |
AU2014377971A1 (en) | 2016-07-07 |
PL3049591T3 (pl) | 2017-10-31 |
EP3049591B1 (fr) | 2017-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2253764B1 (fr) | Treillis en forme de cadre | |
EP3049591A1 (fr) | Longeron d'échafaudage | |
DE202006015586U1 (de) | Vertikalrahmenelement aus Metall | |
DE102008006911A1 (de) | Zum Aufbau einer Rahmenstütze, eines Traggerüsts und/oder eines Traggerüstturms bestimmter Vertikalrahmen | |
DE102014107323A1 (de) | Kranträger für einen Kran, insbesondere für einen Brücken- oder Portalkran, und einen Kran hiermit | |
DE102013102492A1 (de) | Gerüstbelagträger | |
EP1911907B1 (fr) | Elément de cadre vertical en métal | |
EP3274520B1 (fr) | Boulin d'échafaudage et dispositif d'empilement d'au moins deux boulins d'échafaudage | |
DE202015003670U1 (de) | Mast | |
DE102010017803A1 (de) | Gerüststütze für eine Gabione | |
EP2590867B1 (fr) | Dispositif de transport | |
EP1888415B1 (fr) | Dispositif de transport conçu pour des elements de clôture et des pieds-supports | |
EP2977526B1 (fr) | Équerre de fixation pour coffrages de rives de dalle | |
DE102017216892A1 (de) | Gerüstelement zur Anbindung an eine scheibenförmige Anschlussplatte sowie Gerüst-Teil mit einem solchen Gerüstelement | |
DE102012108020A1 (de) | Doppel-U-Gerüstriegel | |
DE202011004948U1 (de) | Gitterträger für einen Gitterträgerausbaurahmen | |
DE202013102808U1 (de) | Gerüstpalette | |
DE102017216255A1 (de) | Gerüstriegel, Gerüst und Verfahren zum Aufbau eines Gerüsts | |
WO2012013187A2 (fr) | Palette de transport | |
DE822899C (de) | Stahlskelettbauweise | |
EP3329063B1 (fr) | Éléments préfabriqués en cadre d'acier à parement pour la construction d'un bâtiment | |
EP3070225B1 (fr) | Élément d'armature de poinçonnement et construction dotée d'une plaque comprenant un élément d'armature de poinçonnement | |
CH459518A (de) | Satz von Bauelementen | |
AT10698U1 (de) | Verbindungselement und hohlwandelement mit solchen verbindungselementen | |
DE102021211507A1 (de) | Stiel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20160425 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20170208 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 901107 Country of ref document: AT Kind code of ref document: T Effective date: 20170615 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: GEITZ TRUCKENMUELLER LUCHT CHRIST PATENTANWAEL, CH |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502014004275 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170915 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170914 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2640393 Country of ref document: ES Kind code of ref document: T3 Effective date: 20171102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170914 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171014 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502014004275 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
26N | No opposition filed |
Effective date: 20180315 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171209 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20171231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20141209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170614 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 901107 Country of ref document: AT Kind code of ref document: T Effective date: 20191209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191209 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230502 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231220 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20231219 Year of fee payment: 10 Ref country code: NL Payment date: 20231219 Year of fee payment: 10 Ref country code: FR Payment date: 20231220 Year of fee payment: 10 Ref country code: DE Payment date: 20231214 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20231127 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240118 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20240110 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20231229 Year of fee payment: 10 |