EP2546428A1 - Wall stud - Google Patents
Wall stud Download PDFInfo
- Publication number
- EP2546428A1 EP2546428A1 EP12187680A EP12187680A EP2546428A1 EP 2546428 A1 EP2546428 A1 EP 2546428A1 EP 12187680 A EP12187680 A EP 12187680A EP 12187680 A EP12187680 A EP 12187680A EP 2546428 A1 EP2546428 A1 EP 2546428A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- timber
- struts
- section
- sections
- strut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002184 metal Substances 0.000 claims description 14
- 229910052751 metal Inorganic materials 0.000 claims description 14
- 238000005304 joining Methods 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000009413 insulation Methods 0.000 description 11
- 238000010276 construction Methods 0.000 description 9
- 239000000463 material Substances 0.000 description 4
- 210000000282 nail Anatomy 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 241001270131 Agaricus moelleri Species 0.000 description 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 229910052770 Uranium Inorganic materials 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009950 felting Methods 0.000 description 1
- 210000004904 fingernail bed Anatomy 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/12—Load-carrying floor structures formed substantially of prefabricated units with wooden beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/70—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/7407—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/20—Roofs consisting of self-supporting slabs, e.g. able to be loaded
- E04B7/22—Roofs consisting of self-supporting slabs, e.g. able to be loaded the slabs having insulating properties, e.g. laminated with layers of insulating material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/12—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
- E04C3/18—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with metal or other reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/291—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures with apertured web
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/292—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being wood and metal
Definitions
- the present invention relates to a wall stud and a wall using such a stud. Also described is a roof rafter and a roofing system using such a roof rafter.
- roofs are made by positioning a series of roof rafters at spaced intervals across the roof line of a building, connecting them to a wallplate and tying the heads of the wallplate together with a ceiling joist which in turn supports the ceiling lining.
- An alternative and more popular approach is the use of trussed rafters which are prefabricated offsite and which sit on and are fixed to the wallplate and braced with diagonal and longitudinal braces to keep the trussed rafters vertical and to distribute the forces back to flanking walls.
- An outer pitched surface is then sometimes boarded and is covered with weatherproof roofing material such as roofing felt and tiles.
- Braces are known in the building industry for strengthening timber frames and one example is given in US 3,591,997 in which a sheet metal channel member is arranged to form a diagonal brace connecting several upright members of a frame.
- Metal web members for pre-manufactured wooden trusses are also known of V, U, W or S shapes. They are shown for example in US 5,996,303 and are used for horizontal roof trusses and floor joists.
- a stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts.
- each wall stud comprises a plurality of crossed struts at spaced intervals along its length.
- a wall stud constructed in this manner can be used instead of a traditional timber wall stud or can be preassembled into a wall section or complete wall by joining together several such studs.
- the struts may be formed with protrusions in a region of each of the first and third sections which can be pushed into a timber surface to positively engage and grip the side of the timber chords.
- protrusions preferably take the form of integral punched metal fasteners, i.e. nailbeds.
- the struts could be provided with holes to accommodate nails, screws or rivets for fastening to the timber surfaces.
- the struts are made of steel, and they may be stamped out of metal sheets. They may be formed by stamping V shaped forms and then breaking the V shape in half at the root of the V to make two symmetrical half struts.
- the steel plate used can be of relatively thin gauge because the arrangement of the crossed struts form very strong structures.
- the steel plate may be stamped to form struts of uniform width along their length and then peripheral portions along the edges of the second section may be folded over, e.g. at right angles to the plate, so as to add lateral strength to the strut.
- Such struts make assembly of wall studs and roof rafters relatively easy and quick and provide increased strength to the studs and rafters. They are versatile since they can be made in a variety of sizes and shapes and can be manufactured to close tolerances. Thus any thickness of rafter and roof panel can be constructed to suit particular applications.
- Wall studs constructed in this way have a cavity running along their length to accommodate insulation and building services such as electric wires or pipes without affecting the integrity of the structure.
- Using the invention allows the wall thickness to be increased without using thicker timbers with consequent savings in cost and weight.
- a wall made in accordance with the invention has a cavity running along the whole height and length, rather than just between stud timbers and hence insulation is easier to install. Also building services such as wires and pipes are easier to fit.
- struts on opposite sides of the rafter in a crossed arrangement increases the rigidity of the rafter since stiff points on the timber chords are provided at each position where a strut is fastened to the timber chords. It also gives equal bending resistance to both chords and reduces the risk of thermal bridging.
- a roof rafter comprising two parallel elongate timber chords joined together by two metal struts on opposite elongate faces of the timber chords so that the two struts form a cross separating the timber chords, wherein the struts each comprise a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, and wherein the first and the third section of each strut is fixed to and parallel with the respective timber chord so that the second section of each strut forms a bridge connecting the two timber chords.
- a bearing is provided on one chord for supporting the weight of the rafter.
- the bearing may be provided by a timber member plated onto one of the chords.
- a second bearing may be provided by a timber cross piece joining the two chords of the rafter.
- One of the chords is preferably longer than the other so as to provide an overhang to a roof constructed with a rafter according to the invention.
- a roof panel may be formed as a rafter cassette by joining together a plurality of the inventive roof rafters. This makes on-site construction of a roof quicker.
- the rafters may be boarded on the underside with any suitable material such as OSB (Oriented Strand Board). Insulation is preferably fitted between the rafters and between chords and flanges.
- Roofs constructed with such rafters have a cavity running along their length which can accommodate insulation and could also accommodate building services such as electric wires or pipes without the need to drill through trusses or braces which could affect the integrity of the finished roof structure.
- the roof panel depths can be increased without using thicker timbers, with consequent savings in cost and weight.
- Figures 1 and 2 illustrate a roof rafter 41 according to one aspect of the invention.
- Figure 1 shows a perspective view of the whole length of the rafter 41 and
- Figure 2 shows an enlarged schematic view of part of the rafter 41.
- the rafter 41 comprises two spaced apart parallel timber chords 9 and 10 connected by metal struts 1a and 1b on opposite sides of the chords 9 and 10.
- Figure 2 is a side view of part of the rafter showing more detail of the crossed pairs of struts 1a and 1b connecting the chords 9 and 10.
- one strut 1a is on the near sides of the chords 9 and 10 and one strut 1b is on the far sides of the chords 9 and 10, as viewed in the figure.
- each pair of struts forms a cross shape, with the diagonals of the crosses keeping the two chords 9 and 10 apart.
- the crossed pairs of struts 1a and 1b may be fastened to the chords 9 and 10 at any position but, in one example, they are spaced a distance of about 0.6 metres and each extends a total of 0.3 metres along the length of the rafter.
- each strut has three sections 2, 3 and 4. End sections 2 and 4 are parallel to each other and make an obtuse angle with the middle section 3.
- Figure 3 on each of the end sections there is a nail plate or a set of protrusions 5, 6 standing out from the surface of the strut 101 for engagement with the timber chord.
- the protrusions are each tapered to a relatively sharp point to make it easier to insert them into undrilled timber, for example by means of pressing the end sections against the timber. Such pressing will be done using an industrial press to apply an appropriate pressure to fully embed the protrusions in the timber.
- the struts 1a, 1b are preferably formed of metal which may be pressed or cast, and are advantageously formed of steel. They may be pressed out of a metal blank as a V shape and then split or cut at the base of the V to form two separate struts. The struts may be pressed with uniform width along their length and then the edges folded over along peripheral parts of the sides of the middle section to increase the lateral strength and rigidity of the strut.
- Figure 4 shows an alternative embodiment of a strut 1a, 1b in which the end sections 2 and 4 are provided with holes 7 and 8 by which the strut may be fixed to the timber chords 9 and 10 using nails, screws or rivets.
- FIGS 5 to 13 illustrate steps in the construction of a roof using rafters according to the invention.
- FIG. 5 illustrates the top floor 21 of a building onto which a roof is to be added.
- This top floor 21 may be formed using prefabricated floor cassettes constructed of double timber floor joists connected by a frame and boarded over. A hole 19 is provided for a staircase (not shown).
- This top floor 21 is constructed to be level and square so as to provide a good base to work from for construction of the roof.
- Floor cassettes make it easier to achieve this since they can be constructed to high tolerances in the factory and can be laser levelled on site. However cassettes are not essential and any traditional top floor surface can be used.
- Two lower flat-top spandrels 23 and 24 are then erected on opposite long sides of the laser levelled top floor 21 as shown in Figure 6 .
- Each of these spandrels 23 and 24 are approximately trapezoidal in shape with a frame comprising an upper horizontal chord 61 generally parallel to a lower horizontal chord 62 and joined by two sloping chords 71 and 72 and two vertical stub chords 70.
- a plurality of internal vertical webs 63 are located in the frame to increase strength and rigidity, but no horizontal chords are used since these are more difficult to press. The chords and webs are all joined together with punched metal plate fasteners.
- one or more ceiling cassette frames 29 are craned into position as shown in Figure 7 , which illustrates two such ceiling cassette frames 29. These rest on the top chords 61 of the lower spandrels 23 and 24 and are located by means of a locator channel 65 in the top surface of one or each upper chord 61. This channel is formed by a three ply construction of the top chord 61, for example using 97mm inner and outer chords and a 72mm internal chord.
- ceiling cassettes 29 are then insulated and decked as shown in Figure 8 , so that the roof space above is a cold roof space to avoid unnecessary heating of the loft space in the finished building.
- the ceiling cassettes may be pre-insulated and decked in the factory before being installed on site.
- the ceiling 29 has upstanding edge beams 46a, 46b to support the roof rafters as explained later.
- the edge beams 46a and 46b are fitted with ceiling noggins 58 (see Figure 8 ) which are angle cut so as to meet the roof rafters at an appropriate angle.
- Two relatively low timber frame walls 22 are then built on the other two opposite short sides of the floor 21 as shown in Figure 9 so as to abut the spandrels 23, 24 at the stub beams 70.
- Triangular shaped upper, apex, spandrels 30 are then lifted into position on top of the ceiling cassette 29 and aligned with the lower spandrels 23, 24 as shown in Figure 10 .
- These apex spandrels 30 may also incorporate a locator groove in the underside surface of their horizontal beam to make fitting on site easier and more accurate.
- an elongate rafter cassette 40 is positioned to bridge the gap between the low wall 22 and the edge beam 46b on the ceiling cassette 29.
- the rafter cassette 40 comprises three of the double chorded rafters 41 of Figure 1 , but it may comprise more rafters as required. These are joined together at the upper end by a timber connecting piece 42 and boarded on the underside for example with OSB 43.
- the bearing members 45 which are plated onto the lower timber chords 10, rest on the top of the edge beam 46b of the ceiling cassette 29.
- the rafter cassette 40 is also supported at its lower end by the bearing surface 47 resting on the low wall 22.
- the rafter cassette 40 overhangs the low wall 22 as shown at 49 because of the extended upper chord 9, and abuts the side of the sloping beam 71 of the spandrel 23.
- the rafter cassette 40 may be pre-insulated between the rafters and insulation may also be pressed between the timber chords during manufacture.
- the cassette 40 may also be felted and counter-battened during manufacture in the factory to make roof construction faster on site. Alternatively the roof may be insulated and subsequently felted and counterbattened on site.
- a second rafter cassette 50 is positioned adjacent the cassette 40.
- Each rafter cassette 40, 50 comprises three rafters 41 but cassettes of any suitable number of rafters 41 may be produced.
- Cassette 50 is constructed with an opening 51 for a dormer window.
- Dormer windows are then installed in the relevant openings such as 51 and the whole roof is then completed with felting and weatherproof roofing material such as tiles.
- Figure 14 illustrates a skeleton wall structure 15 comprising five wall studs 12 each comprising two generally parallel posts 9 and 10, fastened together with three pairs of struts 1a and 1b.
- Three of the struts 1a are on the near sides of the posts 9 and 10 and three of the struts 1b are on the far sides of the posts 9 and 10 as viewed in the figure.
- Each pair of struts forms a cross shape, with the diagonals of the crosses are separated by the depth of the posts.
- Such a wall stud 12 may be constructed to be any size but typically would be around 2.35 metres long with a depth of 0.200 metres.
- the crossed pairs of struts 1a and 1b may be fastened to the posts at any position but in one example they are separated by a distance of about 0.6 metres and each extend a total of 0.3 metres in the direction of the stud.
- the studs 12 are attached together at their ends with planks 13 and 14 to form the skeleton wall structure 15, which is boarded on one side as shown as 16.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Electromagnetism (AREA)
- Physics & Mathematics (AREA)
- Wood Science & Technology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Composite Materials (AREA)
- Chemical & Material Sciences (AREA)
- Rod-Shaped Construction Members (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
- The present invention relates to a wall stud and a wall using such a stud. Also described is a roof rafter and a roofing system using such a roof rafter.
- Traditionally roofs are made by positioning a series of roof rafters at spaced intervals across the roof line of a building, connecting them to a wallplate and tying the heads of the wallplate together with a ceiling joist which in turn supports the ceiling lining. An alternative and more popular approach is the use of trussed rafters which are prefabricated offsite and which sit on and are fixed to the wallplate and braced with diagonal and longitudinal braces to keep the trussed rafters vertical and to distribute the forces back to flanking walls. An outer pitched surface is then sometimes boarded and is covered with weatherproof roofing material such as roofing felt and tiles.
- Traditional trussed rafters can be heavy and take up a large amount of space because the webs forming the trusses in the loft area render it unusable for living accommodation. Insulation is usually added piece by piece after the roof is constructed, preferably between the bases of the trusses and under the roofing material and this is time consuming on site.
- There is an increasing need for lower cost housing in which a larger proportion of a building is useable as living space. There is also an increasing need for better insulated buildings and constructions in which a minimum of non-living space is heated, so as to make heating more economical and to reduce the carbon footprint of new buildings both from an ecological point of view and to meet modern legal standards.
- There is also an increasing need for more insulation to be incorporated into walls to reduce CO2 emissions and meet ever more stringent building regulations. Thicker insulation requires the walls to be deeper. However deeper walls of conventional construction require thicker stud timbers which increases the cost considerably. In addition thicker timbers are heavier and thus more difficult and expensive to transport and handle and walls made of thicker timbers require stronger support.
- Braces are known in the building industry for strengthening timber frames and one example is given in
US 3,591,997 in which a sheet metal channel member is arranged to form a diagonal brace connecting several upright members of a frame. - Metal web members for pre-manufactured wooden trusses are also known of V, U, W or S shapes. They are shown for example in
US 5,996,303 and are used for horizontal roof trusses and floor joists. - According to one aspect of the invention there is provided a stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts.
- In a preferred embodiment each wall stud comprises a plurality of crossed struts at spaced intervals along its length.
- A wall stud constructed in this manner can be used instead of a traditional timber wall stud or can be preassembled into a wall section or complete wall by joining together several such studs.
- The struts may be formed with protrusions in a region of each of the first and third sections which can be pushed into a timber surface to positively engage and grip the side of the timber chords. Such protrusions preferably take the form of integral punched metal fasteners, i.e. nailbeds. Alternatively the struts could be provided with holes to accommodate nails, screws or rivets for fastening to the timber surfaces.
- Preferably the struts are made of steel, and they may be stamped out of metal sheets. They may be formed by stamping V shaped forms and then breaking the V shape in half at the root of the V to make two symmetrical half struts. The steel plate used can be of relatively thin gauge because the arrangement of the crossed struts form very strong structures. The steel plate may be stamped to form struts of uniform width along their length and then peripheral portions along the edges of the second section may be folded over, e.g. at right angles to the plate, so as to add lateral strength to the strut.
- Such struts make assembly of wall studs and roof rafters relatively easy and quick and provide increased strength to the studs and rafters. They are versatile since they can be made in a variety of sizes and shapes and can be manufactured to close tolerances. Thus any thickness of rafter and roof panel can be constructed to suit particular applications.
- Wall studs constructed in this way have a cavity running along their length to accommodate insulation and building services such as electric wires or pipes without affecting the integrity of the structure.
- The thicker the wall the more insulation can be installed, increasing the thermal resistance of the wall and decreasing the U value to meet modern building standards. Using the invention allows the wall thickness to be increased without using thicker timbers with consequent savings in cost and weight.
- In addition a wall made in accordance with the invention has a cavity running along the whole height and length, rather than just between stud timbers and hence insulation is easier to install. Also building services such as wires and pipes are easier to fit.
- If studs are required for eccentrically loaded locations it is relatively easy to increase the member size of one of the stud sections whilst maintaining the same strut size.
- Use of such struts increases the bending stiffness in the plane of a stud or rafter without increasing the volume of the timber used. Economy of timber usage is a significant advantage of the invention.
- Using struts on opposite sides of the rafter in a crossed arrangement increases the rigidity of the rafter since stiff points on the timber chords are provided at each position where a strut is fastened to the timber chords. It also gives equal bending resistance to both chords and reduces the risk of thermal bridging.
- Also there is described a roof rafter comprising two parallel elongate timber chords joined together by two metal struts on opposite elongate faces of the timber chords so that the two struts form a cross separating the timber chords, wherein the struts each comprise a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, and wherein the first and the third section of each strut is fixed to and parallel with the respective timber chord so that the second section of each strut forms a bridge connecting the two timber chords.
- Preferably a bearing is provided on one chord for supporting the weight of the rafter. The bearing may be provided by a timber member plated onto one of the chords. A second bearing may be provided by a timber cross piece joining the two chords of the rafter.
- One of the chords is preferably longer than the other so as to provide an overhang to a roof constructed with a rafter according to the invention.
- A roof panel may be formed as a rafter cassette by joining together a plurality of the inventive roof rafters. This makes on-site construction of a roof quicker. The rafters may be boarded on the underside with any suitable material such as OSB (Oriented Strand Board). Insulation is preferably fitted between the rafters and between chords and flanges.
- Roofs constructed with such rafters have a cavity running along their length which can accommodate insulation and could also accommodate building services such as electric wires or pipes without the need to drill through trusses or braces which could affect the integrity of the finished roof structure.
- The deeper the rafter the more insulation can be installed in a roof, increasing the thermal resistance of the roof panel and decreasing the U value to meet modern building standards. The roof panel depths can be increased without using thicker timbers, with consequent savings in cost and weight.
- For a better understanding of the present invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawings, in which:
-
Figure 1 is a perspective view of a rafter according to one aspect of the present invention; -
Figure 2 is a side view of part of the rafter ofFigure 1 showing more detail; -
Figure 3 is a schematic view of a strut used in the construction of the rafter ofFigures 1 and 2 ; -
Figure 4 is a schematic view of an alternative embodiment of the strut ofFigure 3 ; -
Figures 5 to 13 illustrate construction of a roof using rafters according to the first aspect of the invention; -
Figure 14 is a perspective view of a wall section constructed of studs according to the second aspect of the invention. -
Figures 1 and 2 illustrate aroof rafter 41 according to one aspect of the invention.Figure 1 shows a perspective view of the whole length of therafter 41 andFigure 2 shows an enlarged schematic view of part of therafter 41. Therafter 41 comprises two spaced apartparallel timber chords metal struts chords - Towards the upper end of the rafter
41a bearing member 45 is plated onto the lower chord 10 (which is on the left hand side as shown inFigure 1 ) by a series of punched metal plate fasteners. A second bearing is provided at the lower end of the rafter by atimber cross piece 47 joining the twochords overhang 49 is provided by making theupper chord 9 longer than thelower chord 10. -
Figure 2 is a side view of part of the rafter showing more detail of the crossed pairs ofstruts chords strut 1a is on the near sides of thechords strut 1b is on the far sides of thechords chords struts chords - The design of the
struts Figures 3 and 4 . Each strut has threesections End sections 2 and 4 are parallel to each other and make an obtuse angle with themiddle section 3. InFigure 3 on each of the end sections there is a nail plate or a set of protrusions 5, 6 standing out from the surface of the strut 101 for engagement with the timber chord. Preferably the protrusions are each tapered to a relatively sharp point to make it easier to insert them into undrilled timber, for example by means of pressing the end sections against the timber. Such pressing will be done using an industrial press to apply an appropriate pressure to fully embed the protrusions in the timber. Thestruts -
Figure 4 shows an alternative embodiment of astrut end sections 2 and 4 are provided with holes 7 and 8 by which the strut may be fixed to thetimber chords -
Figures 5 to 13 illustrate steps in the construction of a roof using rafters according to the invention. -
Figure 5 illustrates thetop floor 21 of a building onto which a roof is to be added. Thistop floor 21 may be formed using prefabricated floor cassettes constructed of double timber floor joists connected by a frame and boarded over. Ahole 19 is provided for a staircase (not shown). Thistop floor 21 is constructed to be level and square so as to provide a good base to work from for construction of the roof. Floor cassettes make it easier to achieve this since they can be constructed to high tolerances in the factory and can be laser levelled on site. However cassettes are not essential and any traditional top floor surface can be used. - Two lower flat-
top spandrels top floor 21 as shown inFigure 6 . Each of thesespandrels horizontal chord 61 generally parallel to a lowerhorizontal chord 62 and joined by two slopingchords vertical stub chords 70. A plurality of internalvertical webs 63 are located in the frame to increase strength and rigidity, but no horizontal chords are used since these are more difficult to press. The chords and webs are all joined together with punched metal plate fasteners. - Subsequently one or more ceiling cassette frames 29 are craned into position as shown in
Figure 7 , which illustrates two such ceiling cassette frames 29. These rest on thetop chords 61 of thelower spandrels locator channel 65 in the top surface of one or eachupper chord 61. This channel is formed by a three ply construction of thetop chord 61, for example using 97mm inner and outer chords and a 72mm internal chord. - These
ceiling cassettes 29 are then insulated and decked as shown inFigure 8 , so that the roof space above is a cold roof space to avoid unnecessary heating of the loft space in the finished building. The ceiling cassettes may be pre-insulated and decked in the factory before being installed on site. - As shown in the figures the
ceiling 29 hasupstanding edge beams Figure 8 ) which are angle cut so as to meet the roof rafters at an appropriate angle. - Two relatively low
timber frame walls 22 are then built on the other two opposite short sides of thefloor 21 as shown inFigure 9 so as to abut thespandrels - Triangular shaped upper, apex,
spandrels 30 are then lifted into position on top of theceiling cassette 29 and aligned with thelower spandrels Figure 10 . Theseapex spandrels 30 may also incorporate a locator groove in the underside surface of their horizontal beam to make fitting on site easier and more accurate. - As shown in
Figure 11 anelongate rafter cassette 40 is positioned to bridge the gap between thelow wall 22 and theedge beam 46b on theceiling cassette 29. In this example therafter cassette 40 comprises three of the doublechorded rafters 41 ofFigure 1 , but it may comprise more rafters as required. These are joined together at the upper end by atimber connecting piece 42 and boarded on the underside for example withOSB 43. - The bearing
members 45, which are plated onto thelower timber chords 10, rest on the top of theedge beam 46b of theceiling cassette 29. Therafter cassette 40 is also supported at its lower end by the bearingsurface 47 resting on thelow wall 22. Therafter cassette 40 overhangs thelow wall 22 as shown at 49 because of the extendedupper chord 9, and abuts the side of thesloping beam 71 of thespandrel 23. Therafter cassette 40 may be pre-insulated between the rafters and insulation may also be pressed between the timber chords during manufacture. Thecassette 40 may also be felted and counter-battened during manufacture in the factory to make roof construction faster on site. Alternatively the roof may be insulated and subsequently felted and counterbattened on site. - In
Figure 12 asecond rafter cassette 50 is positioned adjacent thecassette 40. Eachrafter cassette rafters 41 but cassettes of any suitable number ofrafters 41 may be produced.Cassette 50 is constructed with an opening 51 for a dormer window. - In
Figures 11 and12 theapex spandrels 30 are omitted so as to show more detail of the other features. - After all of the
rafter cassettes spandrels Figure 13 . - Dormer windows are then installed in the relevant openings such as 51 and the whole roof is then completed with felting and weatherproof roofing material such as tiles.
-
Figure 14 illustrates askeleton wall structure 15 comprising five wall studs 12 each comprising two generallyparallel posts struts struts 1a are on the near sides of theposts struts 1b are on the far sides of theposts struts - The studs 12 are attached together at their ends with
planks skeleton wall structure 15, which is boarded on one side as shown as 16. - The following clauses comprise the original subject matter of the claims of the parent application
EP 10164657.8 EP 2 261 434 - 1. A roof rafter (41) comprising two parallel elongate timber chords (9, 10) joined together by two metal struts (1a, 1b) on opposite elongate faces of the timber chords so that the two struts (1a, 1b) form a cross separating the timber chords (9, 10), wherein the struts (1a, 1b) each comprise a first short section (2), a second longer section (3) connected at an obtuse angle to the first section (2) and a third short section (4) connected to the second section (3) at an obtuse angle and being generally parallel to the first section (2), and wherein the first (2) and the third section (4) of each strut (1a, 1b) is fixed to and parallel with the respective timber chord (9, 10) so that the second section (3) of each strut (1a, 1b) forms a bridge connecting the two timber chords (9, 10).
- 2. A roof rafter (41) according to clause 1 wherein a first bearing is provided on one chord for supporting the weight of the rafter (41).
- 3. A roof rafter (41) according
clause 2 wherein the first bearing is provided by a timber member plated onto one chord (10). - 4. A roof rafter (41) according to
clauses - 5. A roof rafter (41) according to clause 4 wherein the second bearing is provided by a timber cross piece joining the two chords (9, 10) of the rafter (41).
- 6. A roof rafter (41) according to any one of the preceding clauses wherein one of the chords (9) is longer than the other chord (10) so as to provide an overhang (49) for a roof constructed with the rafter (41).
- 7. A roof panel (40) comprising a plurality of roof rafters (41) according to any one of the preceding clauses.
- 8. A roof panel (40) according to clause 7 comprising boarding on one side.
- 9. A roof panel (40) according to clause 7 or 8 comprising insulation fitted between the rafters (41) and between the chords (9, 10).
- 10. A method of constructing a roof on top of a building comprising: fixing two lower spandrels, one on each of two opposite sides of the top of a building, the lower spandrels each having two parallel sides and two sloping sides; fixing at least one panel to the upper of the parallel sides of the spandrels to form a platform; fitting upper spandrels above the respective lower spandrels on the platform; and fitting roof rafters according to any one of clauses 1 to 6, or roof panels according to clauses 7 to 9, between the sloping sides of the spandrels to bridge the gap between the top floor of the building and the platform to form a roof.
Claims (6)
- A stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts, comprising a plurality of crossed struts (1a, 1b) at spaced intervals along its length.
- A stud according to claim 1, wherein the struts (1a, 1b) are formed with protrusions in the form of integral punched metal fasteners in a region of each of the first and third sections which protrusions are adapted to be pushed into a timber surface to positively engage and grip the timber.
- A stud according to claim 1, wherein the struts (1a, 1b) are provided with holes to accommodate nails or screws or rivets for fastening to the timber surfaces.
- A stud according to claim 1, wherein the struts are formed by stamping V shaped forms from steel sheets and then breaking the V shape in half at the root of the V to make two symmetrical half struts.
- A stud according to claim 1, wherein the struts are formed by stamping to form struts of uniform width along their length and then peripheral portions along the edges of the second section are folded over, generally at right angles to the plate.
- A wall section formed by joining together a plurality of studs according to claim 1.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0909349A GB2470721A (en) | 2009-06-01 | 2009-06-01 | A stud for use in timber frame walls |
GB0919897A GB2470796A (en) | 2009-06-01 | 2009-11-13 | Roof rafter comprising two timber chords joined by metal struts |
EP10164657A EP2261434B1 (en) | 2009-06-01 | 2010-06-01 | Roof rafter |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10164657.8 Division | 2010-06-01 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2546428A1 true EP2546428A1 (en) | 2013-01-16 |
EP2546428B1 EP2546428B1 (en) | 2013-12-25 |
Family
ID=40902363
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12187680.9A Active EP2546428B1 (en) | 2009-06-01 | 2010-06-01 | Wall stud |
EP10164657A Active EP2261434B1 (en) | 2009-06-01 | 2010-06-01 | Roof rafter |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10164657A Active EP2261434B1 (en) | 2009-06-01 | 2010-06-01 | Roof rafter |
Country Status (3)
Country | Link |
---|---|
EP (2) | EP2546428B1 (en) |
DK (2) | DK2261434T3 (en) |
GB (2) | GB2470721A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2470721A (en) | 2009-06-01 | 2010-12-08 | Mitek Holdings Inc | A stud for use in timber frame walls |
FR2973051A1 (en) * | 2011-03-23 | 2012-09-28 | Herve Hourman | Double hollow bar for use in wall for construction of wooden building, has set of bars located opposite to one another and spaced from each other, and flat attaching units i.e. metal sections, for attaching set of bars |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1405889A (en) * | 1921-02-17 | 1922-02-07 | Barling Walter Henry | Spar |
US3591997A (en) | 1969-06-19 | 1971-07-13 | James D Tennison Jr | Antiracking support brace for a building wall |
US4435929A (en) * | 1982-08-23 | 1984-03-13 | Bussell Hugh M | Modified A-frame structure |
US5996303A (en) | 1999-02-18 | 1999-12-07 | Mitek Holdings, Inc. | Truss with alternating metal web |
EP1016465A1 (en) | 1997-09-27 | 2000-07-05 | TDK Corporation | Spin coating method and coating apparatus |
EP1609920A1 (en) * | 2004-06-21 | 2005-12-28 | MiTek Holdings, Inc | Structural wall framework |
EP2261434A1 (en) | 2009-06-01 | 2010-12-15 | MiTek Holdings, Inc. | Roof rafter and wall stud |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3103262A (en) * | 1958-11-14 | 1963-09-10 | Mc Graw Edison Co | Box beam |
US3025577A (en) * | 1959-03-09 | 1962-03-20 | Automated Building Components | Structural element |
CA1069272A (en) * | 1977-11-16 | 1980-01-08 | Fred Haas | Wood and metal building component adapted for prefabricated manufacture |
GB2041060B (en) * | 1978-12-21 | 1982-12-01 | Redland Technology Ltd | Rafters roof structures |
US4475328A (en) * | 1979-08-06 | 1984-10-09 | Moehlenpah Industries, Inc. | Web member |
GB2121848B (en) * | 1982-06-09 | 1986-01-22 | Hydro Air International | Wall studs and connectors therefor |
US8695310B2 (en) * | 2005-03-18 | 2014-04-15 | 3088-7418 Quebec Inc. | Modular building structure |
-
2009
- 2009-06-01 GB GB0909349A patent/GB2470721A/en not_active Withdrawn
- 2009-11-13 GB GB0919897A patent/GB2470796A/en not_active Withdrawn
-
2010
- 2010-06-01 EP EP12187680.9A patent/EP2546428B1/en active Active
- 2010-06-01 EP EP10164657A patent/EP2261434B1/en active Active
- 2010-06-01 DK DK10164657.8T patent/DK2261434T3/en active
- 2010-06-01 DK DK12187680.9T patent/DK2546428T3/en active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1405889A (en) * | 1921-02-17 | 1922-02-07 | Barling Walter Henry | Spar |
US3591997A (en) | 1969-06-19 | 1971-07-13 | James D Tennison Jr | Antiracking support brace for a building wall |
US4435929A (en) * | 1982-08-23 | 1984-03-13 | Bussell Hugh M | Modified A-frame structure |
EP1016465A1 (en) | 1997-09-27 | 2000-07-05 | TDK Corporation | Spin coating method and coating apparatus |
US5996303A (en) | 1999-02-18 | 1999-12-07 | Mitek Holdings, Inc. | Truss with alternating metal web |
EP1609920A1 (en) * | 2004-06-21 | 2005-12-28 | MiTek Holdings, Inc | Structural wall framework |
EP2261434A1 (en) | 2009-06-01 | 2010-12-15 | MiTek Holdings, Inc. | Roof rafter and wall stud |
Also Published As
Publication number | Publication date |
---|---|
GB0909349D0 (en) | 2009-07-15 |
DK2261434T3 (en) | 2012-11-05 |
GB2470721A (en) | 2010-12-08 |
GB0919897D0 (en) | 2009-12-30 |
DK2546428T3 (en) | 2014-03-10 |
EP2261434A1 (en) | 2010-12-15 |
EP2546428B1 (en) | 2013-12-25 |
GB2470796A (en) | 2010-12-08 |
EP2261434B1 (en) | 2012-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1231647C (en) | Cellular-core structural panel and building structure incorporating same | |
US7562500B2 (en) | Composite steel joist/composite beam floor system and steel stud wall systems | |
US4490956A (en) | Truss spacer | |
US20040200172A1 (en) | Building construction systems and methods | |
US20080000177A1 (en) | Composite floor and composite steel stud wall construction systems | |
US9670676B2 (en) | Truss | |
EP2325410B1 (en) | Roofing system | |
US5205098A (en) | Long-span decking panel | |
EP3350382A1 (en) | Shear transfer system | |
US4464873A (en) | Wall panel system | |
JP6687681B2 (en) | Wooden unit type building structure and its construction method | |
CN111094673B (en) | Building and building construction method thereof | |
EP2261434B1 (en) | Roof rafter | |
GB2480994A (en) | Timber I-beams and panels in attic roof structures | |
WO2008007325A2 (en) | Building method | |
JP6640162B2 (en) | Roof construction method, rafter panel, roof structure and house | |
CA2592820A1 (en) | Composite floor and composite steel stud wall construction systems | |
US4073103A (en) | Building structure and method of construction | |
US20020116892A1 (en) | Elongated structural member | |
CA1069272A (en) | Wood and metal building component adapted for prefabricated manufacture | |
JP3876507B2 (en) | Hut structure and its construction method | |
EP2770131A1 (en) | An Improved Roofing Arrangement | |
JP6632946B2 (en) | Diagonal support structure | |
Poutanen et al. | Glued timber trusses | |
RU78826U1 (en) | FRAME-MODULAR PANEL |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 2261434 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
17P | Request for examination filed |
Effective date: 20130620 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20130808 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 2261434 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 646751 Country of ref document: AT Kind code of ref document: T Effective date: 20140115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010012775 Country of ref document: DE Effective date: 20140213 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20140306 Ref country code: NO Ref legal event code: T2 Effective date: 20131225 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 646751 Country of ref document: AT Kind code of ref document: T Effective date: 20131225 |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: FG4A Ref document number: E009183 Country of ref document: EE Effective date: 20140325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140425 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
REG | Reference to a national code |
Ref country code: SK Ref legal event code: T3 Ref document number: E 16233 Country of ref document: SK |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140428 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010012775 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
26N | No opposition filed |
Effective date: 20140926 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010012775 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010012775 Country of ref document: DE Effective date: 20140926 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140601 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150227 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010012775 Country of ref document: DE Effective date: 20150101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140630 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140630 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140326 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20100601 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131225 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20240627 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240627 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LT Payment date: 20240520 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20240625 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240626 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CZ Payment date: 20240522 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SK Payment date: 20240520 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20240627 Year of fee payment: 15 Ref country code: EE Payment date: 20240604 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240627 Year of fee payment: 15 Ref country code: LV Payment date: 20240523 Year of fee payment: 15 |