Nothing Special   »   [go: up one dir, main page]

DE202004005154U1 - Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles - Google Patents

Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles Download PDF

Info

Publication number
DE202004005154U1
DE202004005154U1 DE202004005154U DE202004005154U DE202004005154U1 DE 202004005154 U1 DE202004005154 U1 DE 202004005154U1 DE 202004005154 U DE202004005154 U DE 202004005154U DE 202004005154 U DE202004005154 U DE 202004005154U DE 202004005154 U1 DE202004005154 U1 DE 202004005154U1
Authority
DE
Germany
Prior art keywords
joint
forked
slab
interlocking
profiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202004005154U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MULTIPLAST KUNSTSTOFFVERARBEIT
MULTIPLAST KUNSTSTOFFVERARBEITUNG GmbH
Original Assignee
MULTIPLAST KUNSTSTOFFVERARBEIT
MULTIPLAST KUNSTSTOFFVERARBEITUNG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MULTIPLAST KUNSTSTOFFVERARBEIT, MULTIPLAST KUNSTSTOFFVERARBEITUNG GmbH filed Critical MULTIPLAST KUNSTSTOFFVERARBEIT
Priority to DE202004005154U priority Critical patent/DE202004005154U1/en
Publication of DE202004005154U1 publication Critical patent/DE202004005154U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/681Sealings of joints, e.g. expansion joints for free moving parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A method for filling the gaps between paving slabs with a load carrying capacity has a two part joint fitted to a slab edge and linking with a similar joint on the adjacent slab. The joint is made a plastic reinforced with short fibres. One part of the joint comprises an angled edge strip (16) fitted over the top edge of the slab and with a socket slot (18) on the vertical edge to take profiled strip joint (22) attached to a forked component (24) whose forked profile has a sliding grip with a similar profile attached to the adjacent slab.

Description

Die vorliegende Erfindung bezieht sich auf eine Vorrichtung zum Ausgleichen von benachbarten Bodenplatten, insbesondere von Bodenplatten in beanspruchten Industrieböden oder dergleichen.The present invention relates a device for leveling adjacent floor slabs, especially of floor slabs in industrial floors or like.

Zum Teil werden aneinander stoßende Bodenbeläge verschiedener Dicke zum Sicherstellen von einer flüchtenden Oberfläche mit Trennprofilschienen ausgeglichen wie in CH 429 110 beschrieben. Es sind auch Profilschienen zum Schutz von Bodenbelagskanten beispielsweise aus der DE 102 17 252 bekannt, die ein unten offnes U aufweisen. Es stellt sich jedoch die Aufgabe, unterschiedliche Bewegungen oder Versetzungen nebeneinander liegender Bodenplatten auszugleichen. Hierfür sind die genanten Lösungen ungeeignet. Auch ein Dehnungsprofil gemäß DE 101 41 480 ist ungeeignet, Fugen zwischen Bodenplatten auszugleichen, die schweren Belastungen standhalten müssen, wenn beispielsweise Industrieböden von schweren F1urfördergeräten befahren werden.In some cases, abutting floor coverings of different thicknesses are compensated with separating profile rails in order to ensure a flush surface, as described in CH 429 110. There are also profile rails to protect flooring edges, for example from the DE 102 17 252 known that have a U open at the bottom. However, there is the task of compensating for different movements or displacements of adjacent floor slabs. The solutions mentioned are unsuitable for this. Also an elongation profile according to DE 101 41 480 is unsuitable for leveling joints between floor slabs that have to withstand heavy loads, for example when heavy floors are used on industrial floors.

Für diesen Zweck ist ein mehrteiliges Bodenausgleichsprofil aus Vollmetall bekannt, dessen zweiteiliges Brückenglied in den sich gegenüberliegenden Seitenwänden der benachbarten Platten gelenkig verankert ist und von denen ein Brückenglied zungenartig vom anderen Brückenglied gabelartig umgriffen wird. Dadurch können Längen- und Höhenänderungen so überbrückt werden, dass die Fugen überfahrbar sind.For this purpose is a multi-part floor leveling profile made of full metal known, the two-part bridge link in the opposite sidewalls of the neighboring plates is articulated and one of them bridge member tongue-like from the other pontic is gripped like a fork. This allows changes in length and height to be bridged that the joints can be run over are.

Nachteilig ist die Vielgliedrigkeit dieser Brückenbildung. Die Platten werden von einem zweigliedrigen Teil umfasst, das zwar gleichförmig für beide Seiten ausgebildet ist, aber die Zunge und die Gabel stellen zwei weitere unterschiedlich geformte Glieder dar, die gesondert gefertigt werden müssen.The disadvantage is that there are many members this bridging. The plates are surrounded by a two-part part, the uniform mutually is trained, but the tongue and fork make two more differently shaped links, which are manufactured separately have to.

Demgegenüber steht die vorliegende Erfindung unter der Aufgabe, das Problem einfach und kostengünstig zu lösen. Die erfindungsgemäße Lösung geht aus dem Hauptanspruch hervor und Ausgestaltungen sind den Unteransprüchen zu entnehmen.This is in contrast to the present invention with the task of making the problem simple and inexpensive to solve. The solution according to the invention works from the main claim and refinements are to the dependent claims remove.

Weitere Einzelheiten, Merkmale und Vorteile ergeben sich aus der folgenden Beschreibung eines in der Zeichnung dargestellten Ausführungsbeispiels.More details, features and Advantages result from the following description of one in the Drawing shown embodiment.

Es zeigen:Show it:

1 schematisch eine Stellung der Ausgleichvorrichtung in einer Ausgangs- und niveaugleichen Stellung und 1 schematically shows a position of the compensating device in an initial and level position and

2 eine Stellung zwischen zwei unterschiedlichen Niveaus, die ausgeglichen sind. 2 a position between two different levels that are balanced.

Die Vorrichtung 10 als Brücke zwischen zwei Platten 12 und 14 besteht nur aus zwei gleichförmigen Teilen aus faserverstärktem Kunststoff Ein Teil 16 liegt als Winkel auf je einer Fugenkante der Platten 12 und 14 auf und weist eine im Querschnitt kugelförmige Pfanne 18 auf, die ein Gelenk bildet. In dieser „Pfanne", die sich längs der Fugenkante erstreckt, greift ein im Querschnitt kugelförmiger Kopf 22 des zweiten Teils 20 aus faserverstärktem Kunststoff ein. Dieses gleichförmige Teil 20 wird paarweise in der Weise eingesetzt, dass ein jeweils außen liegender längerer Zinken 24 ineinander greifend eine jeweils innen liegende Zunge 26 des zweiten Teils 20 umgreift. In der niveaugleichen Stellung der 1 greifen die beiden „Gabeln" 20 fast vollständig ineinander, da in dieser Stellung die Fuge zwischen Platten 12 und 14 kurz ist. Entsteht beispielsweise durch Setzungen ein größerer Abstand und ein Höhenunterschied zwischen den Platten 12 und 14, verschieben sich die doppelten „Zungen" 26 zwischen den doppelten Zinken 24, um eine breitere Fuge sicher überfahrbar zu überbrücken. Ein Vorteil der besseren Stabilität ergibt sich durch den doppelten Ineinandergriff Dennoch ist die Vorrichtung nicht so aufwendig in der Herstellung und Lagerhaltung wie der Stand der Technik, da die Brücke (10) nur aus zwei gleichförmigen Teilen besteht.The device 10 as a bridge between two plates 12 and 14 consists of only two uniform parts made of fiber-reinforced plastic One part 16 lies as an angle on each joint edge of the panels 12 and 14 and has a pan which is spherical in cross section 18 that forms a joint. In this "pan", which extends along the edge of the joint, a head with a spherical cross-section engages 22 of the second part 20 made of fiber-reinforced plastic. This uniform part 20 is used in pairs in such a way that a longer tine on the outside 24 an interlocking tongue 26 of the second part 20 embraces. In the same position as the 1 grab the two "forks" 20 almost completely into each other, because in this position the joint between the panels 12 and 14 is short. For example, there is a greater distance and a height difference between the slabs due to settlement 12 and 14 , the double "tongues" shift 26 between the double tines 24 to bridge a wider joint that can be safely driven over. An advantage of better stability results from the double meshing. Nevertheless, the device is not as complex to manufacture and store as the prior art, since the bridge ( 10 ) consists of only two uniform parts.

Claims (4)

Vorrichtung zum Ausgleichen von benachbarten Bodenplatten insbesondere von Bodenplatten in beanspruchten Industrieböden oder dergleichen durch ein mehrteiliges Bodenausgleichsprofil, dessen zweiteiliges Brückenglied in den sich gegenüberliegenden Seitenwänden der benachbarten Platten gelenkig verankert ist und von denen ein Brückenglied zungenartig vom anderen Brückenglied gabelartig umgriffen wird, dadurch gekennzeichnet, dass die Vorrichtung (10) nur zweiteilig ist, aus einem an der jeweiligen Fugenkante anliegendem Winkelprofil (16) und einer gleichförmigen Gabel (20) besteht, die je aus faserverstärktem Kunststoff bestehen.Device for leveling adjacent floor slabs, in particular floor slabs in stressed industrial floors or the like, by a multi-part floor leveling profile, the two-part bridge link of which is articulated in the opposite side walls of the adjacent boards and of which one bridge link is fork-like gripped by the other bridge link, characterized in that the device ( 10 ) is only in two parts, from an angular profile lying against the respective joint edge ( 16 ) and a uniform fork ( 20 ) consists of fiber-reinforced plastic. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Gabel (20) aus einem äußeren Zinken (24) und einer inneren Zunge (26) besteht, die paarweise mit ihren offenen Enden ineinander gesteckt sind.Device according to claim 1, characterized in that the fork ( 20 ) from an outer tine ( 24 ) and an inner tongue ( 26 ) exists, which are inserted into each other in pairs with their open ends. Vorrichtung nach Ansprüchen 1 und 2 , dadurch gekennzeichnet, dass der Zinken (24) länger als die Zunge (26) ist.Device according to claims 1 and 2, characterized in that the tine ( 24 ) longer than the tongue ( 26 ) is. Vorrichtung nach Ansprüchen 1 bis 3, dadurch gekennzeichnet, dass der Kunststoff mit Kurzfasern bewehrt ist.Device according to claims 1 to 3, characterized in that the plastic is reinforced with short fibers.
DE202004005154U 2004-03-30 2004-03-30 Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles Expired - Lifetime DE202004005154U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202004005154U DE202004005154U1 (en) 2004-03-30 2004-03-30 Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202004005154U DE202004005154U1 (en) 2004-03-30 2004-03-30 Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles

Publications (1)

Publication Number Publication Date
DE202004005154U1 true DE202004005154U1 (en) 2004-08-26

Family

ID=32921299

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202004005154U Expired - Lifetime DE202004005154U1 (en) 2004-03-30 2004-03-30 Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles

Country Status (1)

Country Link
DE (1) DE202004005154U1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005058087A1 (en) * 2005-12-05 2007-06-14 Migua Fugensysteme Gmbh & Co. Kg Cover device for floor joints has two bridging units each with two layers of projection such that each projection on one layer is in laminar contact with projection on other layer
US7827750B2 (en) 2005-12-21 2010-11-09 Herm, Friedr. Kuenne Gmbh & Co. Profile-rail system
EP2497877A1 (en) * 2011-03-08 2012-09-12 Dinac Earthquake-resistant seal
EP2489805A3 (en) * 2011-02-17 2014-09-10 Murinox Bautechnik AG Anchor for connecting two components that move relative to one another and method and device for producing same
CN106836520A (en) * 2017-04-26 2017-06-13 荆门创佳机械科技有限公司 A kind of metope turning movement joint of the connectionless screw in surface
CN110055888A (en) * 2019-05-30 2019-07-26 中铁二院工程集团有限责任公司 A kind of the beam-ends telescopic device and construction method of embedded tracks
GB2592599A (en) * 2020-03-03 2021-09-08 Devlin Seamus Expansion joint cover

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005058087A1 (en) * 2005-12-05 2007-06-14 Migua Fugensysteme Gmbh & Co. Kg Cover device for floor joints has two bridging units each with two layers of projection such that each projection on one layer is in laminar contact with projection on other layer
DE102005058087B4 (en) * 2005-12-05 2007-09-20 Migua Fugensysteme Gmbh & Co. Kg Device for covering floor joints
US7827750B2 (en) 2005-12-21 2010-11-09 Herm, Friedr. Kuenne Gmbh & Co. Profile-rail system
EP2489805A3 (en) * 2011-02-17 2014-09-10 Murinox Bautechnik AG Anchor for connecting two components that move relative to one another and method and device for producing same
EP2497877A1 (en) * 2011-03-08 2012-09-12 Dinac Earthquake-resistant seal
CN106836520A (en) * 2017-04-26 2017-06-13 荆门创佳机械科技有限公司 A kind of metope turning movement joint of the connectionless screw in surface
CN110055888A (en) * 2019-05-30 2019-07-26 中铁二院工程集团有限责任公司 A kind of the beam-ends telescopic device and construction method of embedded tracks
CN110055888B (en) * 2019-05-30 2023-09-19 中铁二院工程集团有限责任公司 Beam end telescoping device of embedded track and construction method
GB2592599A (en) * 2020-03-03 2021-09-08 Devlin Seamus Expansion joint cover
GB2592599B (en) * 2020-03-03 2022-09-14 Devlin Seamus Expansion joint cover

Similar Documents

Publication Publication Date Title
WO2005083195A1 (en) Covering device for floorings
EP1223265A2 (en) Parquet panel
EP1010836A2 (en) Device for realising the transition between two juxtaposed floor covering sections of different thickness
DE202007006021U1 (en) Connectable mounting rail (base rail)
DE102009048098A1 (en) Scaffolding resting ground
DE3150459C2 (en) Conveyor trough, in particular for chain scraper conveyors
DE202004005154U1 (en) Method for filling gaps between paving slabs with two part joints fitted to adjacent edges and with interlocking forked profiles
DE102005058087B4 (en) Device for covering floor joints
DE202007004412U1 (en) spirit level
DE3205568C1 (en) Sheet piles and sheet piling made from them
WO2014037551A1 (en) Slot drain
DE202013001750U1 (en) rail
EP3399119A1 (en) Device for cladding an extension joint between floor sections clad with linings
DE202017107390U1 (en) cover
DE8906438U1 (en) Passive protective device for traffic routes, in particular guide barriers
EP2476918A1 (en) Dovetail connection
DE202020103926U1 (en) Substructure to accommodate visible profiles and attachment
AT525398A1 (en) Cover for a slot in an outdoor floor area
DE202019103312U1 (en) A voided steel beam as part of a composite structure together with concrete as a filler for the steel beam
DE202018105968U1 (en) Connectable components
AT508008B1 (en) DEVICE FOR COVERING A JOINT BETWEEN FLOORING SECTIONS
DE9110290U1 (en) Foil element for the construction of a hollow floor
DE102006003771A1 (en) Profile for forming supporting frame`s side pieces for switching/distribution box, has connecting sections that contact at different positions in three chambers such that angled profile section is connected to ends of other profile sections
DE2329596C3 (en) Expansion joint cover
DE102013114443A1 (en) Floor profile for attachment of vehicle equipment in vehicles

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20040930

R156 Lapse of ip right after 3 years

Effective date: 20071002