CN210421112U - Foundation ditch SMW worker method stake supporting construction - Google Patents

Foundation ditch SMW worker method stake supporting construction Download PDF

Info

Publication number
CN210421112U
CN210421112U CN201921227222.1U CN201921227222U CN210421112U CN 210421112 U CN210421112 U CN 210421112U CN 201921227222 U CN201921227222 U CN 201921227222U CN 210421112 U CN210421112 U CN 210421112U
Authority
CN
China
Prior art keywords
anchor cable
shaped steel
pit
pile
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921227222.1U
Other languages
Chinese (zh)
Inventor
胡富贵
徐志强
张洪亮
黄君
蔡鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hnceg Communications Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921227222.1U priority Critical patent/CN210421112U/en
Application granted granted Critical
Publication of CN210421112U publication Critical patent/CN210421112U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a foundation ditch SMW worker method stake supporting construction, including cement mixing pile and foundation ditch earth's surface, cement mixing pile is located one side of foundation ditch earth's surface, and cement mixing pile's inside is provided with H shaped steel, and the top of H shaped steel is provided with the enclosure roof beam, and the H shaped steel is provided with the prestressed anchorage cable with the junction fixedly connected with of enclosure roof beam, and the inside of foundation ditch earth's surface is provided with the filling hole, and the inside of filling hole is provided with first cast-in-place concrete, and the inside of first cast-in-place concrete is provided with the fixed hole, and the inside of fixed hole is provided with second cast-in-place. According to the foundation pit SMW construction method pile supporting structure, the pre-stressed anchor cable is well fixed through the design of the first pouring concrete and the second pouring concrete, so that the supporting effect of the pre-stressed anchor cable is improved, wherein the first pouring concrete reinforces the periphery of the fixed end of the pre-stressed anchor cable, and the supporting effect of the pre-stressed anchor cable is greatly prevented from being influenced by geological subsidence.

Description

Foundation ditch SMW worker method stake supporting construction
Technical Field
The utility model relates to a excavation supporting technical field specifically is a foundation ditch SMW worker method stake supporting construction.
Background
In the construction of coastal backfill area buildings, an enclosure retaining mode of foundation pit supporting engineering is adopted, in the foundation pit engineering construction of coastal backfill areas in the past in China, a punched cast-in-place pile is often adopted or an SMW construction method pile is adopted to be combined with an inner support of a foundation pit to support the foundation pit, when the punched cast-in-place pile is adopted to support the foundation pit, an enclosure structure is firm and difficult to chisel, and has large adverse effects on parts which need to be excavated in the future, and the mode needs to additionally add a high-pressure jet grouting pile or a cement mixing pile to be used as water stop, needs to consume a large amount of steel bars and concrete, has high manufacturing cost, and when the SMW construction method pile and the prestressed anchor cable are adopted to support the foundation pit, when the prestressed anchor cable and an anchoring section of the ground of the foundation pit sink, the supporting effect of the prestressed anchor cable and.
Therefore, a foundation pit SMW construction method pile support structure is now proposed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a foundation ditch SMW worker method stake supporting construction has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a foundation ditch SMW worker method stake supporting construction, includes cement mixing pile and foundation ditch earth's surface, cement mixing pile is located one side of foundation ditch earth's surface, cement mixing pile's inside is provided with H shaped steel, H shaped steel's top is provided with enclosure roof beam, the junction fixedly connected with prestressed anchorage cable of H shaped steel and enclosure roof beam, the inside of foundation ditch earth's surface is provided with the filling hole, the inside of filling hole is provided with first cast-in-place concrete, the inside of first cast-in-place concrete is provided with the fixed pit, the inside of fixed pit is provided with the second cast-in-place concrete.
Optionally, the enclosure ring beam is closed and built on the cement soil mixing pile and the H-shaped steel along the horizontal direction.
Optionally, the prestressed anchor cable is a recoverable anchor cable.
Optionally, the outer surface of the H-shaped steel is provided with a friction reducer.
Optionally, one end of the prestressed anchor cable, which is far away from the containment ring beam, is located inside the second poured concrete.
(III) advantageous effects
The utility model provides a foundation ditch SMW worker method stake supporting construction possesses following beneficial effect:
1. according to the foundation pit SMW construction method pile supporting structure, the pre-stressed anchor cable is well fixed through the design of the first pouring concrete and the second pouring concrete, so that the supporting effect of the pre-stressed anchor cable is improved, wherein the first pouring concrete reinforces the periphery of the fixed end of the pre-stressed anchor cable, and the supporting effect of the pre-stressed anchor cable is greatly prevented from being influenced by geological subsidence.
2. According to the foundation pit SMW construction method pile supporting structure, the supporting mode that the SMW construction method piles are combined with the prestressed anchor cables is adopted, the situation that the piles are difficult to chive in the later period when punched cast-in-place piles are used for supporting is avoided, and for projects developed in stages, underground structures in different development periods are favorably communicated, wherein H-shaped steel can be recycled after the construction of a basement structure is completed, the prestressed anchor cables can also be recycled, so that the utilization rate of resources is improved, and the cost is reduced.
Drawings
Fig. 1 is a schematic view of the main sectional structure of the present invention.
In the figure: 1. mixing the cement soil with the pile; 2. the ground surface of the foundation pit; 3. h-shaped steel; 4. a containment ring beam; 5. a pre-stressed anchor cable; 6. filling a pit; 7. first pouring concrete; 8. a fixing pit; 9. and second pouring concrete.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, the present invention provides a technical solution: a foundation pit SMW construction method pile supporting structure comprises a cement mixing pile 1 and a foundation pit ground surface 2, wherein the cement mixing pile 1 is located on one side of the foundation pit ground surface 2, H-shaped steel 3 is arranged inside the cement mixing pile 1, an antifriction agent is arranged on the outer surface of the H-shaped steel 3, an enclosure ring beam 4 is arranged at the top of the H-shaped steel 3, the enclosure ring beam 4 is constructed on the cement mixing pile 1 and the H-shaped steel 3 in a sealed mode in the horizontal direction, a prestressed anchor cable 5 is fixedly connected to the joint of the H-shaped steel 3 and the enclosure ring beam 4, the prestressed anchor cable 5 is a recyclable anchor cable, a pouring pit 6 is arranged inside the foundation pit ground surface 2, first pouring concrete 7 is arranged inside the pouring pit 6, a fixing pit 8 is arranged inside the first pouring concrete 7, second pouring concrete 9 is arranged inside the fixing pit 8, and one end, far away from the enclosure ring beam 4, of the anchor cable 5 is located inside the second pouring concrete.
Further, the insertion mode of the H-shaped steel 3 is a close insertion type, that is, one H-shaped steel 3 is inserted into each cement mixing pile wall 1.
Further, the thickness of the antifriction agent coated on the outer surface of the H-shaped steel 3 is 2 mm.
Further, the density of the second casting concrete 9 is greater than the density of the first casting concrete 7.
The cement mixing pile 1 and the H-shaped steel 3 (namely the pile in the SMW method) adopt the construction method in the prior art, wherein the simple construction steps of the ground surface fixed end of the prestressed anchor cable 5 are as follows:
(1) excavating a pouring pit 6 on the ground surface 2 of the foundation pit;
(2) pouring first pouring concrete 7 into the pouring pit 6;
(3) excavating a fixing pit 8 from the upper surface of the first poured concrete 7;
(4) one end of a prestressed anchor cable 5 is placed in a fixing pit 8 and is fixed by an anchor rod and the like;
(5) and pouring second pouring concrete 9 into the fixing pit 8.
In summary, the foundation pit SMW construction method pile supporting structure has the advantages that the first pouring concrete 7 and the second pouring concrete 9 are designed to achieve a good fixing effect on the prestressed anchor cable 5, so that the supporting effect of the prestressed anchor cable 5 is improved, the first pouring concrete 7 strengthens the periphery of the fixed end of the prestressed anchor cable 5, the supporting effect of the prestressed anchor cable 5 is greatly avoided being influenced due to geological subsidence, the supporting mode that the SMW construction method pile is combined with the prestressed anchor cable 5 is adopted, the situation that the pile is difficult to chisel in the later period when the punched pouring pile is used for supporting is avoided, the underground structures in different development periods are favorably communicated for the engineering developed in different periods, the H-shaped steel 3 can be recycled after the construction of the basement structure is completed, the prestressed anchor cable 5 can also be recycled, and the utilization rate of resources is improved, the cost is reduced.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a foundation ditch SMW worker method stake supporting construction, includes soil cement mixing pile (1) and foundation ditch earth's surface (2), its characterized in that: the cement mixing pile is characterized in that the cement mixing pile (1) is located on one side of a foundation pit earth surface (2), H-shaped steel (3) is arranged inside the cement mixing pile (1), an enclosure ring beam (4) is arranged at the top of the H-shaped steel (3), a prestressed anchor cable (5) is fixedly connected to the joint of the H-shaped steel (3) and the enclosure ring beam (4), a filling pit (6) is arranged inside the foundation pit earth surface (2), first filling concrete (7) is arranged inside the filling pit (6), a fixing pit (8) is arranged inside the first filling concrete (7), and second filling concrete (9) is arranged inside the fixing pit (8).
2. The foundation pit SMW construction method pile supporting structure according to claim 1, characterized in that: the enclosure ring beam (4) is closed and built on the cement soil mixing pile (1) and the H-shaped steel (3) along the horizontal direction.
3. The foundation pit SMW construction method pile supporting structure according to claim 1, characterized in that: the prestressed anchor cable (5) is a recoverable anchor cable.
4. The foundation pit SMW construction method pile supporting structure according to claim 1, characterized in that: and the outer surface of the H-shaped steel (3) is provided with an antifriction agent.
5. The foundation pit SMW construction method pile supporting structure according to claim 1, characterized in that: one end of the prestressed anchor cable (5) far away from the enclosure ring beam (4) is positioned in the second poured concrete (9).
CN201921227222.1U 2019-07-31 2019-07-31 Foundation ditch SMW worker method stake supporting construction Active CN210421112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921227222.1U CN210421112U (en) 2019-07-31 2019-07-31 Foundation ditch SMW worker method stake supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921227222.1U CN210421112U (en) 2019-07-31 2019-07-31 Foundation ditch SMW worker method stake supporting construction

Publications (1)

Publication Number Publication Date
CN210421112U true CN210421112U (en) 2020-04-28

Family

ID=70383861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921227222.1U Active CN210421112U (en) 2019-07-31 2019-07-31 Foundation ditch SMW worker method stake supporting construction

Country Status (1)

Country Link
CN (1) CN210421112U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174995A (en) * 2021-04-12 2021-07-27 浙江交工地下工程有限公司 Construction method of TRD composite type enclosure comprehensive pipe gallery close to river channel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174995A (en) * 2021-04-12 2021-07-27 浙江交工地下工程有限公司 Construction method of TRD composite type enclosure comprehensive pipe gallery close to river channel
CN113174995B (en) * 2021-04-12 2022-06-21 浙江交工地下工程有限公司 Construction method of TRD composite type enclosure comprehensive pipe gallery close to river channel

Similar Documents

Publication Publication Date Title
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN108412225A (en) The underground of existed building adds a layer construction method
CN109577277B (en) A wall-mounted drainage bolt retaining wall structure and construction method thereof
CN108035360B (en) A method of for pattern foundation pit supporting structure
CN210421112U (en) Foundation ditch SMW worker method stake supporting construction
CN108005086B (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN109826224A (en) A caisson retaining wall excavation foundation for transmission line towers in desert areas and its construction method
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN110528528A (en) A kind of vertical support system of prestressed concrete pipe pile and its construction method
CN214942693U (en) Underpinning support system for storey-adding reconstruction of existing building basement
CN210459300U (en) Enclosure structure for covering and digging station
CN113653064A (en) Front-support rear-pull type foundation pit enclosure system and construction method thereof
CN115506382A (en) Construction method for pile plate wall of island building platform
CN110318419B (en) Construction method of one-lining door opening support of underpass type pipe gallery
CN111894010A (en) A foundation pit enclosure structure and construction method based on prefabricated slabs and diagonal braces
CN209723014U (en) A kind of sinking well protection wall digging foundation for desert region iron tower of power transmission line
CN102518130B (en) Manufacturing method of and construction process of reinforcement cage cement plaster pile casing
CN218779499U (en) Multistage supporting construction of steel sheet pile
CN113323026A (en) Soft soil layer existing building side-excavation deep foundation pit front reinforcing structure and reinforcing method thereof
CN216275717U (en) Deep foundation pit soil retaining excavation supporting structure for deep and thick soft soil area
CN217325390U (en) Retaining structure of foundation pit
CN218757521U (en) PC construction method pile and inclined strut combined supporting structure
CN217298949U (en) Waterproof and anti-skid slope deep foundation pit next to high-rise dwelling house with high slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200824

Address after: 410000, 12 floor, 1201-1232 floor, building complex, building 788, Furong South Road, No. 1, Furong Road, Hunan, Changsha

Patentee after: HNCEG COMMUNICATIONS CONSTRUCTION Co.,Ltd.

Address before: Office room 1201-1232, comprehensive building, new construction city, 788, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province

Co-patentee before: Xu Zhiqiang

Patentee before: Hu Fugui

Co-patentee before: Zhang Hongliang

Co-patentee before: Huang Jun

Co-patentee before: Cai Xin

TR01 Transfer of patent right