CN203452266U - H型钢柱的固定和调平结构 - Google Patents
H型钢柱的固定和调平结构 Download PDFInfo
- Publication number
- CN203452266U CN203452266U CN201320492097.3U CN201320492097U CN203452266U CN 203452266 U CN203452266 U CN 203452266U CN 201320492097 U CN201320492097 U CN 201320492097U CN 203452266 U CN203452266 U CN 203452266U
- Authority
- CN
- China
- Prior art keywords
- steel column
- nuts
- leveling
- fixing
- mounting base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型涉及一种H型钢柱的固定和调平结构,其特征在于包括H型钢柱、安装底板、三根以上的地脚螺栓、三个以上的安装螺母及三个以上的调平螺母;所述H型钢柱竖直的安装在安装底板的上方;所述地脚螺栓垂直的穿过安装底板;所述安装螺母分别安装在各自的地脚螺栓上,安装螺母位于安装底板的上方;所述调平螺母分别安装在各自的地脚螺栓上,调平螺母位于安装底板的下方。其优点为:可以调节安装底板的水平度,从而可以调节H型钢柱的标高和垂直度,使H型钢柱能准确快速定好位,缩短工期,减少人工和机械费,降低了安装成本。
Description
技术领域
本实用新型涉及一种H型钢柱的固定和调平结构。
背景技术
现有的H型钢柱的固定包括H型钢柱(3)、安装底板(5)、三根以上的地脚螺栓(6)及三个以上的安装螺母(4);所述H型钢柱(3)竖直的安装在安装底板(5)的上方,所述地脚螺栓(6)垂直的穿过安装底板(5),所述安装螺母(4)分别安装在各自的地脚螺栓(6)上,安装螺母(4)位于安装底板(5)的上方,如图1所示。施工时,先将地脚螺栓(6)的下部预埋在混凝土柱脚(1)中,然后将安装底板(5)放置在混凝土柱脚(1)上,地脚螺栓(6)的上部穿过安装底板(5)并通过安装螺母(4)固定。由于混凝土柱脚(1)的水平度很难控制,因此H型钢柱的标高和垂直度也难以控制,增加施工难度,浪费不少的人工和机械费,并且延误工程的进度和工期。
发明内容
本实用新型的目的是克服现有技术的不足而提供一种可以调节安装底板的水平度,从而可以调节H型钢柱的标高和垂直度,使H型钢柱能准确快速定好位,缩短工期,减少人工和机械费,降低安装成本的H型钢柱的固定和调平结构。
为了达到上述目的,本实用新型是这样实现的,其是一种H型钢柱的固定和调平结构,其特征在于包括:
H型钢柱及安装底板,所述H型钢柱竖直的安装在安装底板的上方;
三根以上的地脚螺栓,所述地脚螺栓垂直的穿过安装底板;
三个以上的安装螺母,所述安装螺母分别安装在各自的地脚螺栓上,安装螺母位于安装底板的上方;及
三个以上的调平螺母,所述调平螺母分别安装在各自的地脚螺栓上,调平螺母位于安装底板的下方。
在所述每根地脚螺栓上套设有垫片,所述垫片位于安装螺母与安装底板之间。
本实用新型与现有技术相比的优点为:可以调节安装底板的水平度,从而可以调节H型钢柱的标高和垂直度,使H型钢柱能准确快速定好位,缩短工期,减少人工和机械费,降低了安装成本。
附图说明
图1是现有技术的结构示意图;
图2是本实用新型的结构示意图。
具体实施方式
下面结合附图对本实用新型的具体实施方式作进一步说明。在此需要说明的是,对于这些实施方式的说明用于帮助理解本实用新型,但并不构成对本实用新型的限定。此外,下面所描述的本实用新型各个实施方式中所涉及到的技术特征只要彼此之间未构成冲突就可以互相结合。
在本实用新型描述中,术语 “上”及“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型而不是要求本实用新型必须以特定的方位构造和操作,因此不能理解为对本实用新型的限制。
如图2所示,其是一种H型钢柱的固定和调平结构,包括:
H型钢柱3及安装底板5,所述H型钢柱3竖直的安装在安装底板5的上方;
三根以上的地脚螺栓6,所述地脚螺栓6垂直的穿过安装底板5;
三个以上的安装螺母4,所述安装螺母4分别安装在各自的地脚螺栓6上,安装螺母4位于安装底板5的上方;及
三个以上的调平螺母7,所述调平螺母7分别安装在各自的地脚螺栓6上,调平螺母7位于安装底板5的下方。
在本实施例中,设有四根地脚螺栓6、八个安装螺母4及四个调平螺母7,也可根据实际情况选择地脚螺栓6、安装螺母4及调平螺母7的数量。
施工时,先将地脚螺栓6的下部预埋在混凝土柱脚1中,然后在每根地脚螺栓6装上调平螺母7,再将安装底板5放置在混凝土柱脚1上,地脚螺栓6的上端部穿过安装底板5,此时如果混凝土柱脚1不平整,调节调平螺母7使安装底板5保持水平,调节完成后,在安装底板5与混凝土柱脚1表面之间再填上一层混凝土层8,该混凝土层用无收缩混凝土料,最后通过安装螺母4固定。
在本实施例中,在所述每根地脚螺栓6上套设有垫片2,所述垫片2位于安装螺母4与安装底板5之间,垫片2的数量与地脚螺栓6的数量相同。
以上结合附图对本实用新型的实施方式作出详细说明,但本实用新型不局限于所描述的实施方式。对于本领域的普通技术人员而言,在不脱离本实用新型的原理和宗旨的情况下对这些实施方式进行多种变化、修改、替换及变形仍落入在本实用新型的保护范围内。
Claims (2)
1.一种H型钢柱的固定和调平结构,其特征在于包括:
H型钢柱(3)及安装底板(5),所述H型钢柱(3)竖直的安装在安装底板(5)的上方;
三根以上的地脚螺栓(6),所述地脚螺栓(6)垂直的穿过安装底板(5);
三个以上的安装螺母(4),所述安装螺母(4)分别安装在各自的地脚螺栓(6)上,安装螺母(4)位于安装底板(5)的上方;及
三个以上的调平螺母(7),所述调平螺母(7)分别安装在各自的地脚螺栓(6)上,调平螺母(7)位于安装底板(5)的下方。
2.根据权利要求1所述的H型钢柱的固定和调平结构,其特征在于在所述每根地脚螺栓(6)上套设有垫片(2),所述垫片(2)位于安装螺母(4)与安装底板(5)之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320492097.3U CN203452266U (zh) | 2013-08-13 | 2013-08-13 | H型钢柱的固定和调平结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320492097.3U CN203452266U (zh) | 2013-08-13 | 2013-08-13 | H型钢柱的固定和调平结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203452266U true CN203452266U (zh) | 2014-02-26 |
Family
ID=50132153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320492097.3U Expired - Lifetime CN203452266U (zh) | 2013-08-13 | 2013-08-13 | H型钢柱的固定和调平结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203452266U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150259917A1 (en) * | 2014-03-17 | 2015-09-17 | Hitachi Metals Techno, Ltd. | Column structure |
US9255408B2 (en) | 2014-03-17 | 2016-02-09 | Hitachi Metals Techno, Ltd. | Column structure and base member |
CN105484356A (zh) * | 2016-01-08 | 2016-04-13 | 东青铝业有限公司 | 全铝建筑物 |
US9399868B2 (en) | 2014-03-17 | 2016-07-26 | Senqcia Corporation | Column structure and base member |
CN108999414A (zh) * | 2018-09-28 | 2018-12-14 | 北京首钢建设集团有限公司 | 一种使用螺母找正安装钢柱标高的方法 |
CN113062607A (zh) * | 2021-03-24 | 2021-07-02 | 中国五冶集团有限公司 | 一种型钢柱的定位安装方法 |
CN114016751A (zh) * | 2021-11-25 | 2022-02-08 | 陕西建工第三建设集团有限公司 | 垂直交叉式h型钢柱连接于钢混圆柱上的垂直度调整方法 |
-
2013
- 2013-08-13 CN CN201320492097.3U patent/CN203452266U/zh not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150259917A1 (en) * | 2014-03-17 | 2015-09-17 | Hitachi Metals Techno, Ltd. | Column structure |
US9145682B1 (en) * | 2014-03-17 | 2015-09-29 | Hitachi Metals Techno, Ltd. | Column structure |
US9255408B2 (en) | 2014-03-17 | 2016-02-09 | Hitachi Metals Techno, Ltd. | Column structure and base member |
US9399868B2 (en) | 2014-03-17 | 2016-07-26 | Senqcia Corporation | Column structure and base member |
CN105484356A (zh) * | 2016-01-08 | 2016-04-13 | 东青铝业有限公司 | 全铝建筑物 |
CN108999414A (zh) * | 2018-09-28 | 2018-12-14 | 北京首钢建设集团有限公司 | 一种使用螺母找正安装钢柱标高的方法 |
CN113062607A (zh) * | 2021-03-24 | 2021-07-02 | 中国五冶集团有限公司 | 一种型钢柱的定位安装方法 |
CN114016751A (zh) * | 2021-11-25 | 2022-02-08 | 陕西建工第三建设集团有限公司 | 垂直交叉式h型钢柱连接于钢混圆柱上的垂直度调整方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203452266U (zh) | H型钢柱的固定和调平结构 | |
CN104294753B (zh) | 一种桥梁预制空心墩柱连接结构及施工工法 | |
CN104234385B (zh) | 一种地坪大型钢板预埋件后安装施工方法 | |
CN203320700U (zh) | 一种钢结构柱脚连接结构 | |
CN101871265A (zh) | 平垫板可调的座浆安装方法 | |
CN103334496A (zh) | 隔震支座下预埋钢板调平螺栓及使用方法 | |
CN203960895U (zh) | 锚板锚栓组合件及塔架基础总成 | |
CN103469732B (zh) | 一种桥梁支座地脚螺栓预留孔的施工方法 | |
KR20150057581A (ko) | 프리캐스트 슬래브용 단차조절장치 및 이를 이용한 프리캐스트 슬래브 시공방법 | |
CN104032969A (zh) | 一种隔震支座预埋板精确定位及过程调控装置 | |
CN201826511U (zh) | 混凝土地面浇筑施工的标高控制系统 | |
CN104120802B (zh) | 一种隔震支座安装定位简易方法 | |
CN101225917B (zh) | 新型地脚螺栓垂直定位连接构造 | |
CN102650135B (zh) | 烧结环冷机立柱柱底预埋件找平方法 | |
CN103061249A (zh) | 一种桥梁钢管立柱快速定位施工装置及施工方法 | |
CN103306371B (zh) | 装配式住宅pc预制构件制作安装结构 | |
CN104278624B (zh) | 一种变高程桥梁支座 | |
CN103174299A (zh) | 叠层橡胶支座及平板滑移支座的安装施工方法 | |
CN105442855A (zh) | 一种大尺寸预埋板高精度埋设方法 | |
CN202970006U (zh) | 一种l形预制清水看台板安装施工结构 | |
CN105484282A (zh) | 一种管道钢支架的杯口基础内的调平装置及其使用方法 | |
CN209339179U (zh) | 用于大型设备安装的可调平预埋结构 | |
CN204552115U (zh) | 用于结构楼地面高精度找平的冲筋件 | |
CN203145034U (zh) | 一种装配式预应力混凝土圆筒型柱体基础 | |
CN203700899U (zh) | 钢质工具式临时施工道路 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 528000 1402, 1403 and 1404, floor 14, No. 1, Zhicheng Road, fengsha village committee, Daliang sub district office, Shunde District, Foshan City, Guangdong Province (residence declaration) Patentee after: Zhongchen Kejian (Guangdong) Group Co.,Ltd. Address before: 528300 5th floor, Shunyang commercial building, 21 Fengshan West Road, Daliang District, Foshan City, Guangdong Province Patentee before: GUANGDONG CHINASTAR STEEL STRUCTURE CO.,LTD. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140226 |